Amendment 4_Questions and Answers 3_Coil Coating.pdf
PDF 405 KB Posted
- Attached to
- ILM HVAC Replacement
- Solicitation number
- 697DCK-22-R-00467
About this file
This document provides questions and answers pertaining to solicitation number 697DCK-22-R-00467 for the HVAC replacement at Wilmington International Airport in Wilmington, NC. One question asked whether coil coating would still be required for air handling units with outside air cfm less than 25%, to which the response was that coil coating is required for all air handling units per the specifications. The solicitation involves upgrading the HVAC system for the air traffic control tower and base building, with proposals due on the date provided in the solicitation. The Federal Aviation Administration is the contracting agency.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Set#3
ILM HVAC Upgrade
697DCK-22-R-00467
14 September 2022
QUESTION #1: 1) Air Handling Unit schedule note 4 on M501 calls for “E-coat coil coating”. The outside air cfm is less than 25%. Is this coil coating still required?
Yes, the coating is required.