J-1502000 Facility Investment.pdf
PDF 1 MB Posted
- Attached to
- Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece Federal contract opportunity
- Solicitation number
- N6247024R0001
About this file
This document appears to be a set of attachments related to a federal contract opportunity for Base Operations Support (BOS) Services at U.S. Naval Support Activity (NSA) Souda Bay, Crete, Greece. The attachments contain detailed information about the facilities, equipment, and systems that need to be maintained under the contract, including definitions, references, facility descriptions, preventive maintenance requirements, and historical service order data. Key details include the types of maintenance required (preventive, corrective, and emergency) for systems such as generators, steam generators, fire protection, refrigeration, elevators, kitchen equipment, and various utilities. The contract is being solicited by the Department of the Navy Naval Facilities Engineering Command (NAVFAC) under Solicitation #N6247024R0001. The document does not provide information on response dates, award terms, or pricing.
View the file
Other files for this federal contract opportunity
Show all 50
Base Operations Support (BOS) Services U. S. Naval Support Activity (NSA) Souda Bay, Crete Greece has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J - 1502000
FACILITY INVESTMENT
Attachment Number Attachment Title
J-1502000-01 Definitions and Acronyms J-1502000-02 References and Technical Documents J-1502000-03 Facility Descriptions J-1502000-04 Sample Of Historical Service Orders and Estimated Anticipated Annual Service Orders J-1502000-05 Preventive Maintenance (PM) Program Services Matrix J-1502000-06 Auxiliary Generators
J-1502000-06.a Auxiliary Generators Preventive Maintenance Requirements J-1502000-07 Steam Generator System
J-1502000-07.a Water Chemistry Requirements J-1502000-08 Fire Protection Systems J-1502000-09 Refrigeration Systems
J-1502000-09.a Temperature Standards for Refrigeration Systems J-1502000-10 Vertical Transportation Equipment (VTE) and Systems J-1502000-11 Kitchen Equipment J-1502000-12 Uninterrupted Power Supply (UPS) J-1502000-13 Supplemental Weather Radar System (Doppler Radar) J-1502000-14 Electronic Harbor Security Systems and Equipment
J-1502000-14.a Electronic Harbor Security Systems and Equipment Preventive Maintenance Requirements
J-1502000-15 Sliding and Roll-up Doors J-1502000-16 Small Arms Firing Ranges (SAFR) J-1502000-17 Weatherpak Station
J-1502000-17.a Weatherpak Quick Deploy Guide J-1502000-18 Swimming Pool
J-1502000-18.a Swimming Pool Hours of Operations J-1502000-18.b Swimming Pool Start-up J-1502000-18.c Swimming Pool Shutdown and Off-Season Maintenance J-1502000-18.d Navy Youth Swim Test Standards J-1502000-19 Washers and Dryers J-1502000-20 Ice Machines
J-1502000-20.a Ice Machine Minimum Preventive Maintenance (PM) Requirements and Frequencies J-1502000-21 Solar Water Panel Systems
J-1502000-21.a Solar Water Heating Panel Systems Preventive Maintenance (PM) Plan J-1502000-21.b Domestic Type Solar Water Heating Panel Systems Preventive Maintenance (PM) Plan J-1502000-22 Solar PV (Photovoltaic) Systems
J-1502000-22.a Solar PV (Photovoltaic) Systems Preventive Maintenance (PM) Plan J-1502000-23 Irrigation Systems J-1502000-24 Exhaust Hoods and Ducts J-1502000-25 Grease Pipes J-1502000-26 Grease Traps J-1502000-27 Oil Water Separators J-1502000-28 Core Rotation J-1502000-29 Fuel Tank
J-1502000-29.a Aboveground Storage Tank (AST) Assets J-1502000-29.b Underground Storage Tank (UST) Assets J-1502000-29.c Portable Container Fuel Tank Assets J-1502000-29.d UST Fuel Tank Electronic Equipment J-1502000-29.e Dike Drainage Fuel Tank Assets J-1502000-29.f Piping Tightness Fuel Tank Assets
SECTION J - 1502000
FACILITY INVESTMENT
Attachment Number Attachment Title
J-1502000-29.g Appendix A2 - UST Monthly Inspection Checklist J-1502000-29.h Appendix B2 - AST Monthly Inspection Checklist J-1502000-29.j Appendix C2 - Portable Container Monthly Inspection Checklist J-1502000-29.k Appendix D2 - AST Annual Inspection Checklist J-1502000-29.l Dike Drainage Record Checklist #5 J-1502000-30 Dielectric Testing for Transformers – Electric Manholes J-1502000-31 Inspection of Electric Manholes
J-1502000-31.a Electric Manholes Inspection Job Plan J-1502000-32 Calibration of Equipment J-1502000-33 Arresting Gear
J-1502000-33.a STW-07 Outdoor Painting, Depainting, and Corrosion Control J-1502000-33.b NAVAIR 51-5-31 J-1502000-33.c Attesting Gear Removable Components J-1502000-33.d Arresting Gear Preserved On-Site Components J-1502000-33.e Arresting Gear Runaway Edge Sheave J-1502000-33.f NAVAIR 17-1-125 Corrosion Control
ATTACHMENT J-1502000-01
DEFINITIONS AND ACRONYMS
Definition Description
Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.
Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.
Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.
Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
Equipment, Personal Property
Personal property equipment includes all equipment other than collateral equipment.
Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
Facilities Maintenance Management
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Integrated Maintenance Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service Orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
Maintenance, Preventive
Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.
Management Information Systems- Maintenance
A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.
Off-specification Product
A product that fails to meet one or more of the physical, chemical, or performance requirements of the specification.
Quality Product that is tested and verified to conform with all physical, chemical, and performance requirements identified in applicable specifications.
Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair.
The intent of repair is to have the equipment at normal working condition.
Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.
Replacement is performed when the equipment has reached the end of its useful life;
when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
Weight Handling Equipment (WHE)
Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE.
ACRONYM TITLE
ACO Administrative Contracting Officer BPVC Boiler and Pressure Vessel Code BW Biweekly CDR Contract Discrepancy Report CIA Controlled Industrial Area CMMS Computerized Maintenance Management System COR Condition of Readiness DBH Diameter at Breast Height DoD Department of Defense DoN Department of Navy DRMO Defense Reutilization Management Office EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act FAR Federal Acquisition Regulation
FFP Firm Fixed Price FIFRA Federal Insecticide, Fungicide, and Rodenticide Act FSC Facility Support Contract GFE Government-furnished Equipment GFF Government-furnished Facilities GFM Government-furnished Materials GPWS Guide Performance Work Statements HCA Head Contracting Agency HVAC Heating, Ventilation, and Air Conditioning HAZMAT Hazardous Material ICAP Infrastructure Condition Assessment Program ICP Integrated Contingency Plan IDIQ Indefinite Delivery Indefinite Quantity IFLOLS Improved Fresnel Lens Optical Landing System IPM Integrated Pest Management IPMIS Integrated Pest Management Information System IPMP Integrated Pest Management Plan KO Contracting Officer LAN Local Area Network M Monthly MSDS Material Safety Data Sheets NFPA National Fire Protection Association NAVFAC Naval Facilities Engineering Command NMCI Navy Marine Corps Intranet NOSC Navy-On-Scene Coordinator PAP Performance Assessment Plan PAR Performance Assessment Representative PAW Performance Assessment Worksheet PEO Program Executive Officer PM Project Manager PRCSP Permit Required Confined Space Program PWS Performance Work Statement Q Quarterly QC Quality Control RPIE Real Property Inventory Equipment SC Security Clearances SCADA Supervisory Control and Data Acquisition SM Semimonthly SOP Standard Operating Procedures SPAR Senior Performance Assessment Representative SRM Sustainment, Restoration and Modernization TE Technical Evaluation UFC Unified Facilities Criteria UPV Unfired Pressure Vessel VIQ Variation in Quantity VTE Vertical Transportation Equipment
WBS Work Breakdown Structure
ATTACHMENT J-1502000-02
REFERENCES AND TECHNICAL DOCUMENTS
The Contractor shall adhere to the applicable portions of the following publications and directives in performing the services required under this contract. This list shall not be considered all-inclusive and does not release the Contractor from all obligations that must be fulfilled in the observance and execution of this contract.
When U.S., European and/or Greek directives, instructions and industry standards are applicable to the work to be performed under this contract, the most stringent directives, instructions and industry standards shall govern.
Reference Title
29 CFR Part 1910.1200 Hazard Communication
ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers
ASME A17.1 Handbook on Safety Code for Elevators and Escalators
ASME BPVC VI 1998 American Society of Mechanical Engineers, Boiler & Pressure Vessel Code
FGS - Greece Environmental Governing Standards - Greece
MIL-HDBK-1152 Inspection & Certification of Boilers & Unfired Pressure Vessels
NAVMAT P5100 Safety Precautions for Shore Activities
NAVMED P-5010-4 Manual of Naval Preventive Medicine
NAVMED P-5010-4 Swimming Pools and Bathing Places
NAVFAC P-717 Preventive/Recurring Maintenance Handbook NAVFAC MO-114 Building Maintenance
NAVFAC MO-115 Systems Maintenance Refrigeration
NAVFAC MO-118 Inspection of Vertical Transportation Equipment
NAVFAC MO-119 Building Maintenance; Galley Equipment NAVFAC MO-200 Facilities Engineering Electrical Exterior Facilities
NAVFAC MO-206 Operation and Maintenance of Air Compressor Plants
NAVFAC MO-209 Maintenance of Steam, Hot Water and Compressed Air Distribution Systems
NAVFAC MO-210 Maintenance & Operation of Water Supply System, Treatment & Distribution Systems
NAVFAC MO-220 Maintenance and Operation of Gas Systems
NAVFAC MO-225 Industrial Water Treatment
NAVFAC MO-324 Inspection and Certification of Boilers and Unfired Pressure Vessels NAVFAC MO-912 Standard for Ventilation Control and Fire Protection of Commercial Cooking
Operations
NAVY SHORE BOILER
GUIDE
Navy Shore Boiler System Operation, Inspection and Maintenance Guide
NEC National Electrical Code
NESC National Electrical Safety Code
NFPA National Fire Protection Agency Standards
NFPA Standard 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems
NFPA Standard 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations
NFPA Standard 99 Standards for Health Care Facilities
ATTACHMENT J-1502000-02
REFERENCES AND TECHNICAL DOCUMENTS
The Contractor shall adhere to the applicable portions of the following publications and directives in performing the services required under this contract. This list shall not be considered all-inclusive and does not release the Contractor from all obligations that must be fulfilled in the observance and execution of this contract.
When U.S., European and/or Greek directives, instructions and industry standards are applicable to the work to be performed under this contract, the most stringent directives, instructions and industry standards shall govern.
Reference Title
NRMP NSA Souda Bay Natural Resource Management Plan
OEBGD Overseas Environmental Bseline Guidance Document DoD Manual 4715.05
OSHA Occupational Safety and Health – Laws and Regulations
Technical Manual (OTM)
OSHA Instruction TED 01-00-015, Section III: Chapter 7, Legionnaires’ Disease
OPNAVINST 5090.1 Environmental Readiness Program Manual
OPNAVINST 5100.23 Navy Occupational Safety and Health Manual
OPNAVINST 11230.2C Inspection, Certification and Audit of Navy Specialized Infrastructure
SPRP NSA Souda Bay Spill Prevention and Response Plan
UFC 3-230-02 Operation and Maintenance: Water Supply Systems.
UFC 3-230-13 Industrial Water Treatment Operation
UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems
UFC 3-410-06 Operation and Maintenance: Central Heating Plants
UFC 3-430-07 Operations and Maintenance: Inspection and Certification of Boilers and Unfired Pressure Vessels
UFC 3-550-01 Exterior Electrical Power Distribution
UFC 3-560-01 Electrical Safety O&M
UFC 3-570-06 Cathodic Protection
UFC 3-600-02 Operations and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems
UFC 3-601-02 Fire Protection Systems Inspection, Testing and Maintenance
UNI EN 81-1 Safety rules for the construction and installation of lifts – Part 1: Electric lifts
UNI EN 81-2 Safety rules for the construction and installation of lifts – Part 2: Hydraulic lifts
J-1502000-03
FACILITY DESCRIPTIONS
Facility Number
Description/Type Size
(Square Feet) Year Built
1 Admin Building 6308 07/01/61
2 Dining Facility – Galley / AFRTV 17226 07/01/61
3 General Administrative Building 877 07/15/70
3 Emergency Operations Center / Ship Operations Building
1987 07/28/15
4 Telecommunications Building 7357 07/01/69
5 Aviation Operations Building (Air Ops) 14862 07/01/59
6 Warehouse / Aviation Operations Building
5523 07/01/59
8 UH - BEQ Samaria Towers / Enlisted Unaccompanied Personnel Housing
26045.64 06/28/93
11 UH - BEQ Omalos Towers / Enlisted Unaccompanied Personnel Housing
26042.96 06/28/93
14 Utility Building / Water Treatment 448 01/01/15
15 Vehicle Maintenance Shop / BOS Support
13149 07/01/96
17 Exchange Retail Store (NEX) 20183 07/01/09
18 Exchange Retail Store 8580 07/01/95
19 Medical Clinic – Souda Bay 4413 07/01/95
21 Communication Antenna 07/01/00
22 Air Passenger Terminal / Aviation Operations Building
4156 02/16/94
23 PW SEABEE Flagpole 07/01/03
23 Postal Facility 2841 01/01/11
25 Water Well, Water Source – Non potable 07/01/00
28 Utility Building / Power Plant 1650 07/31/00
30 Nine (9) Pads for Generators 102 07/01/99
31 Security Support Building / Charlie Post 158 07/01/99
32 PSD 1529.66 07/01/99
34 Covered Storage 2539 07/01/03
36 Building 1 Flagpole 07/01/61
37 Dental Clinic – Souda Bay 1287 09/01/15
42 NL 1, 2 and 3 Taxiway 25679 (SY) 07/01/59
48 NHG-NAVY INN Transient Lodging / Minoan Building
18739 07/01/00
49 NHG-NAVY INN Transient Lodging 31829.11 07/01/00
50 Air Intel Support Building / CROF 25975 03/24/00
53 Religious Ministry Facility 4148 07/01/78
54 Public Word / FEAD 7004 07/01/01
56 NHG-NAVY INN Transient Lodging / PYRGOS Hall
33412 07/01/99
58 Security Building 15577.66 07/01/96
Description/Type Size
(Square Feet) Year Built
59 HAZMAT PEB (Supply) 35 11/12/15
60 Hazardous Waste Storage / Disposal Facility
6996 07/01/79
61 MWR Sales And Rental Building 4288 02/03/10
62 Open Mess and Club Facility 6713 07/01/96
63 Water Well, Water Source 07/01/02
64 Covered Storage Building, Installation 1800 07/01/99
66 Indoor Physical Fitness Facility 17539 07/01/87
67 Outdoor Playing Court 7200 06/15/92
70 Aircraft Arresting System 500 01/01/94
70 Rotary-Wing Landing Area, Surfaced 1591 07/01/87
71 Athletic Field 69273 07/01/96
74 Security Support Building 77.15 06/01/15
75 Security Support Building 33 07/01/03
76 Utility Building 220.9 07/17/93
78 Operations Support Lab 1132 07/01/04
82 Sewage Treatment 4214 07/01/05
83 Liquid Fuel Loading/Unloading Facility 2243.95 07/01/10
84 Transient Lodging 11880.45 06/28/93
85 General Administrative Building 1004 07/01/07
86 Communications Facility/Tower 07/01/96
87 General Administrative Building 6194 01/10/03
88 Communications Building 209 12/01/09
89 Security Support Building 99 07/01/87
90 Working Animal Support Building 1125 08/15/05
91 Operations Supply Building 21857 07/01/92
92 Installation Support Equipment Maintenance Shed
2302 01/15/11
93 Airfield Fire and Rescue Station 21380 07/31/91
95 Facility Engineer Maintenance Shop 17277.1 07/01/94
96 Open Mess and Club Facility 15905 07/01/94
97 Outdoor Swimming Pool 11422.26 08/01/91
98 Liquid Oxygen Storage 1745 08/18/15
100 Public Restroom/Shower 311.08 07/29/16
107 Pol Pump Station 2932.63 07/06/13
108 Pol Pump Station 351 07/06/13
109 Pol Pump Station 351 07/06/13
110 Running Track 21696 07/06/13
111 Pol Pump Station 1731 07/06/13
Description/Type Size
(Square Feet) Year Built
112 Pol Pipeline 07/06/13
113 Pol Pipeline 07/06/13
114 Communication Lines 07/06/13
115 Other Operating Fuel Storage 407 07/06/13
116 Bulk Liquid Fuel Storage 4640 07/06/13
117 Bulk Liquid Fuel Storage 4640 07/06/13
119 Electrical Power Distribution Line, Underground
07/06/13
120 Electrical Power Substation 240 05/28/69
121 Other Operating Fuel Storage 07/06/13
122 Road, Surfaced 4340 07/06/13
124 Sidewalk And Walkway 369.5 07/06/13
125 Miscellaneous Paved Area 64.2 05/01/13
126 Miscellaneous Paved Area 89 07/06/13
127 Miscellaneous Paved Area 236 05/01/13
129 Utility Building 190 05/01/13
130 Utility Building 84.3 05/01/13
131 Utility Building 450 07/06/13
200 Athletic Field 68349 10/30/95
201 Pavilion 1657 10/30/95
202 Pavilion 1638 06/15/01
203 Public Restroom/Shower 658 06/15/01
204 Outdoor Playing Court 18252 07/01/96
205 Outdoor Playing Court 2800 07/01/96
207 Athletic Field 7200 06/15/01
210 Utility Building 3544 02/04/98
212 Vehicle Maintenance Facility 1940 07/01/01
214 Recreation Center 7486 05/15/02
215 Marine Maintenance Shop 2339 07/01/02
216 Recreation Center 532 07/01/03
218 Marine Maintenance Shop 319.69 07/01/03
220 Ship Operations Building 1946 11/05/15
238 Ammunition Storage, Depot and Arsenal 979.73 01/01/71
239 Ammunition Storage, Depot and Arsenal 979.7 01/01/71
301 Operations Supply Building 3369 07/01/71
302 Utility Building 4534 07/01/71
303 Covered Storage Building, Installation 6813 07/01/71
304 Exchange Warehouse 4539 07/01/71
Description/Type Size
(Square Feet) Year Built
308 Open Storage, Installation 2016.6 07/01/71
1097 Recreation Support Building 788 02/04/91
10 TUNNEL Ammunition Storage, Depot and Arsenal 14847 01/01/61
11 TUNNEL Ammunition Storage, Depot and Arsenal 14418 01/01/61
110PAD Outdoor Playing Court 05/23/18
11PK Vehicle Parking, Surfaced 2013 07/01/99
12 TUNNEL Ammunition Storage, Depot and Arsenal 15108 01/01/61
126CN Overhead Cover 1209.11 01/01/79
13 TUNNEL Ammunition Storage, Depot and Arsenal 14416.97 01/01/61
133CN
14A Utility Building 200 01/01/15
14FPPS Water Pump Facility, Fire Protection 1 06/27/03
14G Stand-By/Emergency Power 01/23/15
14WTP Water Treatment Facility 07/01/94
15A Vehicle Maintenance Facility 1460 07/01/96
15PK Vehicle Parking, Surfaced 2008 07/01/79
16DP Aircraft Navigation Facility 07/01/00
17A Personnel/Equipment Shelter 132 02/01/08
17LR Loading Platform/Ramp 2377.48 07/01/09
17PK Vehicle Parking, Surfaced 2138 07/01/92
18PK Vehicle Parking, Surfaced 1154 07/01/99
19PK Vehicle Parking, Surfaced 639 07/01/92
1INERT Ammunition Storage, Depot and Arsenal 4603 07/01/70
1PK Vehicle Parking, Surfaced 1278 07/01/99
202A Pavilion 1221 10/01/18
208A Sewage Treatment 07/01/98
208B Sewage Treatment 2310 10/01/18
208C Utility Building 143 07/01/02
209E Septic Tank and Drain Field 9331 02/04/98
209W Septic Tank and Drain Field 9342 07/01/02
20DP Utility Building 473 07/01/00
20DPFENCE Boundary Fence and Wall 07/01/00
20DPG Stand-By/Emergency Power 10/19/17
210A Utility Building 203.24 10/01/18
213FPAD
214A Pavilion 955.5 01/01/10
214B Overhead Cover 1025 10/01/18
214G Stand-By/Emergency Power 07/01/20
215BR Water Launch Ramp 2314.2 05/31/17
Description/Type Size
(Square Feet) Year Built
220G Stand-By/Emergency Power 06/01/17
221COM-A Communication Lines 02/24/20
221COM-B Communication Lines 02/24/20
22PK Vehicle Parking, Surfaced 1755 07/01/99
26LAB Ammunition Storage, Depot and Arsenal 12798.3 01/01/61
28PLANT Stand-By/Emergency Power 07/01/97
28POWER Electrical Power Switching Station 05/28/69
2INERT Ammunition Storage, Depot and Arsenal 4603 07/01/70
2T Other Operating Fuel Storage 09/01/08
32A Outdoor Recreation Area 211 02/01/08
32PK Vehicle Parking, Surfaced 139 07/01/92
32TNK Water Storage, Non-Potable 805 10/01/18
34LD Loading Platform/Ramp 572 10/01/18
3G Stand-By/Emergency Power 07/01/15
3 INERT Ammunition Storage, Depot and Arsenal 4603 07/01/70
4 TUNNEL Ammunition Storage, Depot and Arsenal 8811 01/01/61
49A Personnel/Equipment Shelter 248 02/01/08
49DP Boundary Fence and Wall 30 01/01/11
49DP1 Boundary Fence and Wall 30 01/01/11
49PK Vehicle Parking, Surfaced 92 07/01/92
4A Pavilion 420 07/01/69
4PK Vehicle Parking, Surfaced 1219 07/01/99
5 TUNNEL Ammunition Storage, Depot and Arsenal 9055 01/01/61
50PK Vehicle Parking, Surfaced 1050 07/01/92
53PK Vehicle Parking, Surfaced 317 07/01/92
54A Pavilion 146 02/01/08
54PK Vehicle Parking, Surfaced 2090 07/01/92
56A Pavilion 252 02/01/08
56B Administrative Structure, Other Than Buildings
16 12/30/96
56PK Vehicle Parking, Surfaced 1167 07/01/92
58PK Vehicle Parking, Surfaced 1091 07/01/99
59C Overhead Cover 2170 04/24/18
5A Pavilion 100 02/01/08
5B Boundary Fence and Wall 1 02/01/08
5PK Vehicle Parking, Surfaced 661 07/01/92
6 TUNNEL Ammunition Storage, Depot and Arsenal 9914 01/01/61
60A Miscellaneous Paved Area 1456.5 07/01/79
60B Boundary Fence and Wall 07/01/79
Description/Type Size
(Square Feet) Year Built
60PK Vehicle Parking, Surfaced 135 01/01/04
61PK Vehicle Parking, Surfaced 298 07/01/92
62B Outdoor Recreation Area 391 12/30/96
62C Boundary Fence and Wall 24.5 01/01/11
62D Overhead Cover 1596 02/15/13
66PK Vehicle Parking, Surfaced 1024 07/01/92
67A Miscellaneous Paved Area 448 01/30/00
67 PK Vehicle Parking, Surfaced 969 07/01/92
6A Observation & Training Tower/Bunker 64 02/25/88
6B Pedestrian Bridge 9 02/25/88
6PK Vehicle Parking, Surfaced 1034 07/01/92
7 TUNNEL Ammunition Storage, Depot and Arsenal 13936 01/01/61
73PK Vehicle Parking, Surfaced 1208 07/01/00
75A Mechanical Security Barricade 07/01/09
75B Security Support Building 40 10/01/18
76A Water Pump Facility, Non-Potable 239.2 06/27/03
76 TNK Water Storage, Non-Potable 1287 10/01/18
77A Vehicle Fueling Facility 674 07/01/04
77B Vehicle Fueling Facility 674 07/01/12
78 LAB Operations Support Lab 538.2 11/20/19
78 LABCOM Communication Lines 328 11/20/19
78 PAD Miscellaneous Paved Area 55.97 11/20/19
79A Vehicle Operating Fuel Storage 440 07/01/04
79C Vehicle Operating Fuel Storage 440 07/01/02
7A Electrical Power Switching Station 10/01/20
8 TUNNEL Ammunition Storage, Depot and Arsenal 12448 01/01/61
81A Aircraft Operating Fuel Storage 545 07/01/96
81B Aircraft Operating Fuel Storage 545 08/05/96
81C Aircraft Operating Fuel Storage 712.5 07/01/96
81D Aircraft Operating Fuel Storage 712.5 07/01/96
81E Aircraft Operating Fuel Storage 44.4 07/01/96
82C Observation & Training Tower/Bunker 205 03/15/08
82LAB Utility Building 241 09/26/18
82TNK Septic Tank and Drain Field 1064 06/27/03
83CN Overhead Cover 3849.82 07/26/16
84PK Vehicle Parking, Surfaced 451 07/01/92
85A Miscellaneous Paved Area 56 12/30/96
87PK Vehicle Parking, Surfaced 169 07/01/92
88FENCE Boundary Fence and Wall 09/25/09
Description/Type Size
(Square Feet) Year Built
8A Pavilion 900 12/30/96
9 TUNNEL Ammunition Storage, Depot and Arsenal 12027.6 01/01/61
90A Working Animal Support Building 3826 08/15/05
91PK Vehicle Parking, Surfaced 1252 10/01/18
93A Airfield Fire and Rescue Station 2220 03/13/15
93G Stand-By/Emergency Power 09/01/14
93PK Vehicle Parking, Surfaced 3572 07/01/92
95PK Vehicle Parking, Surfaced 804 07/01/92
96B Pavilion 826 02/01/08
99A Electrical Power Source, Photovoltaic 14450 04/20/12
99B Electrical Power Source, Photovoltaic 14875 04/08/11
APRL Airfield Pavement Lighting 08/01/16
C-083 Airfield Fire and Rescue Station
C65 Utility Building
C65G1 Stand-By/Emergency Power 01/01/11
C65G2 Stand-By/Emergency Power 01/01/11
C73 Communications Building 160 01/30/03
CALA Aircraft Apron, Surfaced 10833 10/02/15
CPAD Aircraft Apron, Surfaced 2888.89 09/11/20
F Security Support Building 98 07/01/79
FENCERF Boundary Fence and Wall 07/01/87
FUELLGT Exterior Lighting, Pole 05/28/69
GLPAD Miscellaneous Paved Area 17.64 10/01/18
GU1 Sewer And Industrial Waste Line 02/04/98
GU17 Sewer And Industrial Waste Line 07/01/96
GU17-A Sewer and Industrial Waste Line 07/01/79
GU17-B Sewer and Industrial Waste Line 07/01/96
GU17-LF Septic Tank and Drain Field 09/08/05
GU17LIFT Sewage Lift Stations 05/09/00
GU19LIN Electrical Power Distribution Line, Underground
07/01/61
GU19LIN2 Electrical Power Distribution Line, Underground
07/06/13
GU1-B Sewer And Industrial Waste Line 02/04/98
GU2 Road, Surfaced 31571 07/01/61
GU20 Water Distribution Line, Potable 07/01/61
GU22 Water Distribution Line, Non-Potable 07/01/99
GU3 Sidewalk And Walkway 16633 07/01/61
GU5 Storm Drainage 07/01/87
GU5APRON
Description/Type Size
(Square Feet) Year Built
GU5POND
LS1 Sewage Lift Stations 153 02/04/98
LS2 Sewage Lift Stations 02/04/98
LS3 Sewage Lift Stations 05/09/00
LS4 Sewage Lift Stations 02/04/98
LS5 Sewage Lift Stations 10/01/20
LS6 Sewage Lift Stations 10/01/20
MVPOWER Electrical Power Switching Station 38.54 01/16/17
OR11L Runway Overrun Area, Surfaced 12035 07/06/83
OR11R Runway Overrun Area, Surfaced 15308 07/06/83
OR29L Runway Overrun Area, Surfaced 19388 09/30/54
OUTFALL Sewer and Industrial Waste Line 07/06/15
PAMHA 1-2 Aircraft Apron, Surfaced 14284 07/01/59
PANPA123 Aircraft Apron, Surfaced 40939 09/17/96
PANPA4 Aircraft Apron, Surfaced 78803 08/01/16
PANTPK Miscellaneous Airfield Pavement, Surfaced
PANTPK2
PAPS2 Aircraft Apron, Surfaced 3100 07/01/59
PAPS3 Aircraft Apron, Surfaced 2840 07/01/59
PAPS7 Aircraft Apron, Surfaced 3135 07/01/59
POLLINE Pol Pipeline 08/01/16
POLPARK Vehicle Parking, Surfaced 683 07/01/10
POLPIT Aircraft Direct Fueling Facility 08/01/16
POLROADS Road, Surfaced 4258 07/01/10
PR1 Boundary Fence and Wall 07/01/87
PR15 Boundary Fence and Wall 07/01/99
PWSAGU18 Water Distribution Line, Potable 07/01/96
PWSAGU18-B Water Distribution Line, Potable 07/01/96
RSLPAD2 Miscellaneous Paved Area 31 08/18/15
RSLPAD3 Miscellaneous Paved Area 2.79 08/18/15
RSLPAD4 Miscellaneous Paved Area 62.8 07/17/17
RW11 Fixed-Wing Runway, Surfaced 179895 07/01/59
RWL Airfield Pavement Lighting 01/01/88
SL1 Exterior Lighting, Pole 05/28/69
SS20KVUG Electrical Power Substation 05/28/69
STPG Stand-By/Emergency Power 18 01/23/03
T-01 Operations Supply Building
T-035 Small Arms Storage, Installation
Description/Type Size
(Square Feet) Year Built
T-07 Police Station
T-07 Small Arms Storage, Installation 200 07/01/04
T-09 Airfield Fire and Rescue Station
T-13 General Administrative Building
T-24 General Administrative Building
T-26 Communications Building 317.12 07/01/03
T-29 Police Station
T-30 Police Station
T-39 Medical Warehouse 484
T-55A Small Arms Storage, Installation
T-60 Ammunition Storage, Installation
T-61A Veterinary Facility 197
T-61B Medical Warehouse 197
T-62 General Administrative Building
TWL Airfield Pavement Lighting 01/01/75
TWNL Taxiway, Surfaced 26486 07/01/59
TWNT Taxiway, Surfaced 126907 01/01/75
WHARF Pier
WHARF-K9 Pier 12948 07/01/70
WHARFS Wharf 26763 01/01/88
YK-10 Ammunition Storage, Depot and Arsenal 11162.5 01/03/61
ATTACHMENT J-1502000-04
HISTORICAL (separate attachment) and ESTIMATED ANTICIPATED SERVICE ORDERS
Historical service order data is provided via separate attachment.
Refer to Excel file “J-1501000-04 Sample of Historical Service Orders”.
ESTIMATED ANTICIPATED ANNUAL MAXIMO SERVICE ORDERS for E/U/R (See Spec Items 3.1.1, 3.1.2, 3.1.3)
CUSTOMER QUANTITY CATEGORY % Limit of Liability
PW/CNRE 180 - Emergency: 1%
- Urgent: 4%
- Routine: 95%
$3,000
PW/CNRE Locksmith 140 - Urgent: 100% $3,000
ESTIMATED ANTICIPATED ANNUAL
URGENT PERSONAL PROPERTY SERVICE ORDERS BY CUSTOMER
(See Spec Item 3.1.4) CUSTOMER QTY Limit of Liability
USAF 2 $3,000
AIR OPS 15 $3,000
EMO 3 $3,000
SPAWAR/NIWC (EHSS) 40 $3,000
GALLEY 70 $3,000
UNACCOMPANIED
HOUSING (UH)
20 $3,000
MWR 40 $3,000
NEX 20 $3,000
NHG-NAVY INN 10 $3,000
NCTMS 3 $3,000
ATTACHMENT J-1502000-05
PREVENTIVE MAINTENANCE (PM) PROGRAM SERVICES MATRIX
Preventive Maintenance (PM) Program Services Matrix is provided via separate attachment. Refer to Excel file “J-1501000-05 Preventive Maintenance (PM) Program Services Matrix”.
ATTACHMENT J-1502000-06
AUXILIARY GENERATOR SYSTEMS
Auxiliary Generator Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Auxiliary Generator Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Auxiliary Generator Systems, such as:
batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, transfer switches, switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, etc.
The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
Location Year Equipment Description
CUSTOMER: PW/CNRE (ST FUNDS)
NSA / Bldg. 4 1992 Spectrum Detroit Diesel 350DS
ATTACHMENT J-1502000-06.a
AUXILIARY GENERATOR SYSTEMS PREVENTIVE MAINTENANCE REQUIREMENTS
The following checks shall be performed WEEKLY:
I. SWITCHGEAR
a. Inspect switchgear enclosure for proper switch positions as detailed in the SOP (Standard Operating Procedure) Operating Sequence, Automatic Standby Operation
b. Inspect UPS units for proper operation
c. Check UPS system event logs for possible problems and record in Maintenance and operation Logbook.
Notify Facilities Manager of discrepancies
d. Check HVAC control panel for alarms or abnormal conditions. Take appropriate action, log problems and corrective actions in the maintenance log
e. Check UPS Battery Monitors for events. Notify Facility Manager of specific events and note in the
Maintenance Log
II. ENGINE ROOM
a. Check and ensure fluid levels.
b. Check engine preheat system for proper operation.
c. Check Battery Charger for proper Voltage and Amps charging.
d. Check Fuel tank level.
e. Fill in check sheet and inform Facilities manager of any discrepancy.
The following checks shall be performed BI-WEEKLY:
NOTE: Do not perform this Bi-weekly operational test if generators have operated in normal mode within the past two weeks
a. Perform manual operation SOP and operate each generator for 30 minutes
The following checks shall be performed MONTHLY:
NOTE EXEMPTION: DISA 350-195-2 9.1.2 The auxiliary electric power system has been used for actual operational requirements (lasting at least 1 hour for diesel systems) within 2 weeks of the scheduled monthly test.
In this case, the monthly exercise is not required. Reporting and record keeping requirements still pertain
a. Check battery monitor systems and record readings in checklist
b. Perform battery cell readings and record readings in checklist
c. Report any discrepancies to NCTL Det. Facility Manger
d. Auxiliary power exercises are to be conducted monthly. These exercises should be conducted using the facilities entire operational load that would be assumed during actual emergency operations. Operate diesel auxiliary power systems for a minimum of 1 hour
e. Perform the “Storm Anticipation Mode” SOP to satisfy this requirement
f. After 30 minutes, transfer between generators. Depress lead push button on alternate generator, causing generator to start and parallel with the existing lead generator. Depress alternate pushbutton on the generator that has been running to unload this generator and shutdown the unit
g. Complete the “Storm Anticipation Mode” procedure and ensure system is setup for Automatic operation
h. Note all tests in Master Station Log (Tech Control) and Equipment Maintenance Logs
i. Inform Facilities Manager of any discrepancies
ATTACHMENT J-1502000-06.a AUXILIARY GENERATOR SYSTEMS PREVENTIVE MAINTENANCE REQUIREMENTS - Cont.
The following checks shall be performed QUARTERLY:
NOTE EXEMPTION: DISA 350-195-2 9.1.3 Operational conditions during the 30 days prior to a scheduled quarterly activate the automatic start and load assumption cycle, for auxiliary units so equipped. In this case, the quarterly exercise requirement is considered to be satisfied. For diesel powered systems, the load must have been assumed for at least 1 hour. Reporting and record keeping requirements still pertain
a. Open Substation 8 feeder breaker supplying power to NCTAMS LANT DET while monitoring operation of system. System should start after 4 minutes and assume control of power to load. If not, reset feeder breaker and determine reason for failure. Check all switch positions and reset pushbutton
b. After 30 minutes, transfer between generators, depress lead push button on alternate generator, causing generator to start and parallel with the existing lead generator. Depress alternate pushbutton on the generator that has been running to unload this generator and shutdown the unit
c. After 1-hour, total time, close Substation 8 feeder breaker supplying power to NCTAMS LANT DET while monitoring operation of system. System should take approximately 10 minutes to switchback to commercial power
d. Ensure Master Station Log (In Tech Control) and Equipment Maintenance logs are completed and note which unit is left as lead generator
e. Observe operation of UPS Battery system during discharge/ transfer time frame when Utility power is removed, and Generators are starting. Note UPS with station load meters panel. Note (% battery) and Battery Voltage during discharge period prior to Generators assuming the load. Note readings in Equipment Maintenance logs
f. Perform Oil Analysis in accordance with Detroit Diesel approved procedures in “Lubricating oil, Fuel & Filters Manual (DDC-SVC-BRO-001) and manufacturer representative suggestions
g. Perform Coolant Strip test in accordance with Detroit Diesel manufacturer representative suggestions
The following checks shall be performed ANNUALLY:
a. A fuel analysis for moisture content and contamination shall be conducted for storage tanks. The
Contractor shall utilize NCTL Det Fuel Analysis process for testing. Inspection results shall be recorded in the Master Station Log and Maintenance Logs
b. Change Fuel and Oil Filters Only. Only change Oil after being notified by NCTL Det Facility manager due to results of Oil Analysis
c. Ship all Analysis program samples to NCTAMSLANT Norfolk. NCTAMSLANT Norfolk will forward Analysis to appropriate address. NCTL Det Facility manager will have access to test results and inform the contractor of results and schedule changes of specific fluids accordingly
NCTAMS LANT Det Souda Bay:
a. Will provide access to appropriate personnel in order to perform the maintenance on the Generators
ATTACHMENT J-1502000-07
STEAM GENERATOR SYSTEM
The Steam Generator System commences at and includes the utility isolation point of connection and terminate at the steam/hot water point of delivery. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Steam Generator System and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Steam Generator System, such as: burners, heat exchangers, flash tanks, meters, pressure vessel, pumps, piping, valves, steam regulating valves, steam traps, distribution lines, insulation, chemical feed system, condensation return lines, condensate meters, monitoring and controls systems, etc.
Two (2) boilers are located in Bldg. 2, Galley.
Manufacturer: Fulton Model: ICS20 (20 HP) Capacity:
o Output: 670,000 BTU/h o Steam Output: 6 90 lb/h (313 kg/h)
Note: this is the 'Nominal' capacity of each Steam Generator
CUSTOMER: PW/CNRE
ATTACHMENT J-1502000-07
STEAM GENERATOR SYSTEM - Cont.
J-1502000-07.a
STEAM GENERATOR WATER CHEMISTRY REQUIREMENTS
Water Chemistry Requirements for Fulton Steam Products (to 300 PSIG MAVP)
Parameter
Carbon Steel
Feedwater Vertical
Boiler/Steam Pac Water pH 7.5-9.5 8.5-10.5 Feedwater
Temperature 140F* -----
Hardness as CaCO3
<2ppm <10 ppm
Chlorides ----- ----- Total Alkalinity ----- <300 ppm Total Dissolved
Solids ----- <2000 ppm
Suspended Solids No visual turbidity**
No visual turbidity**
Total Organic Carbon
No sheen No foam++
No sheen No foam++
Iron Colorless liquid++
Colorless liquid++
Dissolved Oxygen <1ppm* ND Visual Oil ND ND
Conductivity (uS/cm)
----- <2985
*This is a minimum temperature. Feedwater temperatures below 200F will require an oxygen scavenger.
**Suspended solids: Take a water sample. After the sample sits for 10 minutes, no solids should be visible.
+Total Organic Carbon: Take a water sample. Shake vigorously for 30 seconds. No sheen or foam should be visible.
++Iron: Take a water sample. Hold the sample against a white background. The water should have no visible yellow, red or orange tinge.
ND: None Detected.
ATTACHMENT J-1502000-08
FIRE PROTECTION SYSTEMS
Fire protection systems commence at, and include, the utility isolation point of connection and includes the fire alarm and fire suppression/extinguishing systems.
The Contractor shall develop and implement an Integrated Maintenance Plan (IMP) for the fire protection systems and all mechanically and electrically interlocked ancillary parts, equipment and components; such as: fire alarm control panels, remote annunciator panels, audio alarms, audio visual alarms, duct smoke detectors, heat detectors, manual pull/push stations, tamper switches, fire department connections, visual alarms, water flow switches, rises, standpipe systems, wet chemical extinguishing systems, fire pumps, water storage tanks, fire-smoke dampers, telephone dialers, panel notifiers, manual push stations, AFFF Foam, air compressors, alarm devices, alarm valves, annunciators, antennas, backflow prevention devices (does not include drinking water backflows), Dry Chemicals, batteries, connections, control panels, detectors, diesel engines, electric motors, fuses, gauges, initiating devices, meters, notification appliances, nozzles, piping, pumps, receivers, sensors, sprinkler heads, tanks, transmitters, voice communication devices, valves (including post indicator valves), monitoring and controls systems, etc.
The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
FIRE SUPRESSION
Bldg No.
Customer Facility
FIRE ALARM SYSTEM SPRINKLER SYSTEM
SPECIAL
SYSTEMS
Fire Protection System Notes
Control Panel Initiating Devices Water flow
Switches Pressure switches
Tamper Switches
System Type Manuf Model No.
Pull Station
Smoke Detector
Heat Detector
Duct Detector
Other
1 PW/CNRE Administration Building
Notifier SFP 1024E 5 11 2 Conventional
2 PW/CNRE Galley Notifier NFS-320E 21 8 2 3 1 1 4 Kitchen Hood
/ANSUL
Addressable
1 NFC-50/100E, 47
Speaker/Strobes, 5 strobes, 15 speakers, 10 OUT Speaker Strobes
3 PW/CNRE EOC Notifier NFS-320E 2 1 1 4 Addressable
1 NFC-50/100E, 11
Speaker/Strobes, 2
OUT Speaker Strobes 4 PW/CNRE NCTMS Notifier SFP 1024E 12 44 1 FM200 Conventional
5 PW/CNRE SUPPLY/Air Terminal
Notifier SFP 1024E 13 6 1 1 4 Conventional
6 PW/CNRE Warehouse Notifier SFP 1024E 3 1 1 4 Conventional
8 PW/CNRE BEQ Notifier NFS-640 12 80 1 1 Addressable
11 PW/CNRE BEQ Notifier NFS-640 12 78 1 1 Addressable
SPECIAL
SYSTEMS
Fire Protection System Notes
Control Panel Initiating Devices Water flow
Switches Pressure switches
Tamper Switches
System Type Manuf Model No.
Pull Station
Smoke Detector
Heat Detector
Duct Detector
Other
14 PW/CNRE Water Storage Tank
Notifier SFP 1024E 1 2 Tank Sensor
Conventional
14 PW/CNRE Pump House Notifier NFS-320 3 2 6 12 Modules
Addressable
15 PW/CNRE PW Vehicle Shop/
Hold Shed
Notifier SFP 1024E 10 12 30 Conventional
17 PW/CNRE NEX Notifier SFP-10UD 9 2 3 1 2 Conventional
18 PW/CNRE NEXMART Notifier SFP-10UD 9 2 1 1 2 Conventional
19 NMRTC Medical Clinic Notifier SFP-10UD 4 6 1 2 Conventional
22 PW/CNRE Air Passenger Terminal
Notifier SFP 1024E 6 12 14 Conventional
28 PW/CNRE Standby Generator Bldg.
Notifier SFP 1024E 1 00 Conventional
37 NMRTC Dental Notifier NFS-320E 3 12 Addressable
1 NFC-50/100E, 11
Speaker/Strobes, 2
OUT Speaker Strobes
48 NHG-
NAVY
INN
NHG-NAVY
INN
Notifier NFS-320 6 77 1 1 4 Addressable
49 NHG-
NAVY
INN
NHG-NAVY
INN
Notifier NFS-320 25 67 1 1 4 Addressable
50 PW/CNRE Air Intel Support Bldg. / CROF
Notifier NFS2-640 7 10 4 1 1 Addressable
53 PW/CNRE Chapel Notifier NFS-320E 4 1 1 Addressable
1 NFC-50/100E, 18
Speaker/Strobes, 4 strobes, 3 speakers, 4 OUT speakers & 5 Text
Displays
SPECIAL
SYSTEMS
Fire Protection System Notes
Control Panel Initiating Devices Water flow
Switches Pressure switches
Tamper Switches
System Type Manuf Model No.
Pull Station
Smoke Detector
Heat Detector
Duct Detector
Other
54 PW/CNRE Public Works Notifier NFS-320E 7 5 1 2 4 Addressable
1 NFC-50/100E, 16
Speaker/Strobes, 6 strobes, 9 10 speakers, 4 OUT speakers & 4
Text Displays
56 NHG-
NAVY
INN
NHG-NAVY
INN
Notifier NFS-640 15 120 2 1 1 4 Addressable
58 PW/CNRE Security Notifier NFS-320E 10 2 3 1 Addressable
1 NFC-50/100E, 45
Speaker/Strobes, 36 speakers, 4strobes, 9 OUT Speakers & 11
Text Displays 60 PW/CNRE HAZMAT Notifier NFS-320 5 2 1 5 Addressable
1 NFC-50/100E
61 PW/CNRE Auto Hobby
Shop Notifier SFP-10UD 9 1 2 Conventional
62 PW/CNRE Shipmates Notifier SFP 1024E 6 1 1 2 Kitchen Hood
/AMEREX
Conventional
66 PW/CNRE Fitness Center/ Gymnasium
Notifier SFP-10UD 7 16 2 1 3 Conventional
78 PW/CNRE Gas Station Facility
Notifier SFP 1024E 5 2 Conventional
78B PW/CNRE Fuel Lab Notifier NFS-320E 3 1 1 3 Addressable
1 NFC-50/100E, 2
Speaker/Strobes, 1 Bell, 2 OUT Speaker Strobe
84 PW/CNRE BEQ Notifier NFS-640E 5 51 1 1 1 NFC-50/100E, 42 Speaker/Strobes, 1
OUT Speaker Strobe and 5 Text Displays
SPECIAL
SYSTEMS
Fire Protection System Notes
Control Panel Initiating Devices Water flow
Switches Pressure switches
Tamper Switches
System Type Manuf Model No.
Pull Station
Smoke Detector
Heat Detector
Duct Detector
Other
85 PW/CNRE MVRO Notifier NFS-320 2 3 1 2 Addressable
1 NFC-50/100E
90 PW/CNRE Dog Kennel Notifier NFS-320 2 1 Addressable
1 NFC-50/100E
93 PW/CNRE Fire Dept Notifier NFS-640E 13 59 15 2 2 6 Kitchen Hood
/AMEREX
Addressable
1 NFC-50/100E, 65
Speaker/Strobes, 11
Text Displays.
95 PW/CNRE PW Shops Notifier NFS-320 10 1 1 2 Addressable
1 NFC-50/100E
96 PW/CNRE MWR Notifier NFS-320 12 1 4 1 2 Kitchen
Hood
/ANSUL
Addressable
1 NFC-50/100E, 39
Speaker/Strobes, 8
OUT Speaker, 4 Text Displays, 1 Intelliquad
Sensor 111 PW/CNRE Fuel Farm Notifier NFS-640E 4 1 6 Addressable
1 NFC-50/100E, 2
Speaker/Strobes, 3
OUT Speaker Strobe T-13 PW/CNRE AIR OPS Notifier NFS-320E 6 6 1 3 Addressable
1 NFC-50/100E, 6
Speaker/Strobes, 2
OUT Speaker Strobes T-24 PW/CNRE AIR OPS Notifier NFS-320 8 9 Addressable
1 NFC-50/100E, 9
Speaker/Strobes, 2
OUT Speaker Strobes
214 PW/CNRE MWR
Olympia Electron ic
BS-116 4 17 1 Kitchen Hood
AMEREX /
ANSUL
220 PW/CNRE JTOC
(double decker)
Notifier NFS-320E 3 5 2 4 Addressable
1 NFC-50/100E, 9
SPECIAL
SYSTEMS
Fire Protection System Notes
Control Panel Initiating Devices Water flow
Switches Pressure switches
Tamper Switches
System Type Manuf Model No.
Pull Station
Smoke Detector
Heat Detector
Duct Detector
Other
Speaker/Strobes, 3 OUT Speaker Strobes, 2 Text Displays
ATTACHMENT J-1502000-09
REFRIGERATION SYSTEMS
Refrigeration Systems commence at and includes the utility isolation point of connection and terminate at the point of delivery. The Contractor shall develop and implement a Preventive Maintenance (PM) Program Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of Refrigeration Systems such as: compressors (including air compressors), evaporators, condensers, controls, heat pumps, expansion devices, metering device and thermal expansion valves, fans, coils, relays, thermostats, capillary tubes, etc.
The below list is provided to give a general sense of the magnitude of work but may not include all assets required to be maintained.
Bldg.
Location
MAXIMO
Asset No.
Equipment Description
Refrigerant Mfr. Model No. Serial No. Year
CUSTOMER: PW/CNRE
18 Inside
Warehouse 7-018-WRF-002 Walk-In
Refrigerator Display (Beer
Cooler)
Misa Sud Ref. S.P.A.
18 Inside Refrigerator Box
7-018-WRF-002 Evaporator FRIGA
BOHN
LUC1030E GK0404 1993
18 Roof 7-018-A/C-013 Compressor R449A-7Kg EMERSON ZXLE-050E-TFD-454 20DZ36540 M 2020 62 North Side of
B62
7-062A-RFB-
Walk-In
Refrigerator Box
MTH 1996
62 Inside Refrigerator Box
7-062A-RFB-
Evaporator ECO ICE42B1OED AI200401685 2009
62 North Side of B62
7-062A-WRF-
Compressor R449A- 19Kg
BITZER 4HE-18Y-40P 1600812654 2022
62 Inside Bldg.
2 Entrances
7-062-RFB-001 Walk-In Refrigerator Box
Psictothermi ki
CR P000004-01 2014
62 Inside Refrigerator Box
7-062-RFB-001 Evaporator FRIGA
BOHN
MUC780R HUO910 2014
62 West Side of B62
7-062-WRF-001 Compressor R404A-
10KG
BOCK HGX34P/380-4 2014
2 West Side of B2
- Outside 7-002-RFB-001 Walk-in
Bread/Veg Freezer #1
American Motors, Pillalis
2 Inside Freezer Box
7-002-RFB-001 Evaporator GEA SPBE35-F23 N/A 1997
Location
MAXIMO
Asset No.
Equipment Description
Refrigerant Mfr. Model No. Serial No. Year
CUSTOMER: PW/CNRE
2 West Side of B2
– Outside Above Box
7-002-DRX-001 Compressor R404A-5kg Copeland LSGP-40X-EWL 14B069559M 2014
2 West Side of B2
- Outside
7-002-RFB-002 Walk-in Meat Freezer #2
American Motors, Pillalis
2 Inside Freezer
7-002-RFB-002 Evaporator GEA SPBE35-F23 N/A 1997
– Outside Above
7-002-DRX-002 Compressor R404A-5kg Copeland LSGP-40X-EWL 14B098432M 2014
7-002-RFB-003 Walk-in Dairy
Refrigerator #3 American
Motors, Pillalis
2 Inside Refrigerator Box
7-002-RFB-003 Evaporator Friga Bohn LUC440F HM0080 1997
– Outside Above
7-002-DRX-003 Compressor R404A-3kg Copeland KSJP-15X-EWL 14G006138M 2014
7-002-RFB-004 Walk-in Fruit/Veg
Refrigerator #4 American
Motors, Pillalis
2 Inside Refrigerator Box
7-002-RFB-004 Evaporator Friga Bohn LUC440F HM0074 1997
2 West Side of B2
– Outside Above
Box
7-002-DRX-004 Compressor R404A-3kg Copeland KSJP-15X-EWL 14G006137M 2014
2 West Side of B2
- Outside
7-002-RFB-005 Walk-in Fruit/Veg Refrigerator #5
American Motors, Pillalis
2 Inside Refrigerator Box
7-002-RFB-005 Evaporator TEPSA ORP020D T0418 2021
Location
MAXIMO
Asset No.
Equipment Description
Refrigerant Mfr. Model No. Serial No. Year
CUSTOMER: PW/CNRE
2 West Side of B2
– Outside Above
7-002-DRX-005 Compressor R404A-3kg Copeland KSJP-15X-EWL 14G006139M 2014
REFRIGERATION SYSTEMS - Cont.
Location Equipment Description
Refrigerant Manufacturer Model No. Serial No. Year
CUSTOMER: NEX
18 Inside Market Walk-in Freezer Misa Sud Ref.
S.P.A.
18 Roof Compressor R404A-3KG COPELAND LSGP40X-EVL 181014104M 1995 18 Inside Freezer
Box Evaporator FRIGA BOHN LUC 440E CL0112 1995
18 Outside market Walk-in Freezer Box
AMP PILALIS 2009
18 South of Box Compressor R404A – 15kg BITZER 4NC-12 24-40P 1676608655 18 Inside Freezer
Box Evaporator AMP PILALIS
304 MOMAG Walk-in chill box FOSTER 304 Top of Box…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .