J-11 Price Sheet including Fully Burdened Hourly Rate.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Argon Piping Supply, Installation and Testing
- Solicitation number
- 73573
About this file
This is a price sheet template for labor rates under RFP 73573-JK for Argon Piping supply, construction, and testing services. The document establishes a framework for offerors to propose fully burdened hourly rates for four labor categories: Laborer, Electrician, Iron Worker, and Operator. Offerors must also provide separate burdened overtime rates for each category. All burdened rates must include overhead, profit, fringe benefits, and general and administrative (G&A) costs. The template includes a section for offerors to propose other direct costs (ODCs) with associated units of measure and rates that could be utilized for any subcontract change order work.
The pricing schedule relates to the Department of Energy's Fermi National Accelerator Laboratory solicitation for Argon Piping Supply, Installation and Testing (Solicitation 73573). The project involves supplying and installing approximately 8,000 miles of stainless-steel pipeline—ranging from 8" to 6" diameter Schedule 10—to transport liquid argon from the Ross Shaft Argon Receiving station to the Central Utility Cavern at the 4850 Level as part of the DUNE experiment. This template is designed to capture all labor costs in a standardized format to enable comparative evaluation of proposals across the labor categories and overtime rates essential to the project's execution.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Rates
| RFP 73573-JK Argon Piping (Supply, Construction, and Testing | ||
| Labor Category | Hourly Burdened Rates | Hourly Burdened Overtime Rates |
| Laborer | ||
| Electrician | ||
| Iron Worker | ||
| Operator |
| **Burdened rates shall include all additional costs including overhead, profit, fringe, and G&A | |
| Other Direct Costs. | |
| Description | Cost |
| (List here) | (List here) |
**Offeror shall propose any other direct cost and the Unit of Measure including rates that could be utilized for any Subcontract change order work.
Fully Burdened Rate Schedule
&N&&[Date]&T
Sheet2
Sheet1
File details come from the government source that posted it. Updated .