This is a Request for Proposal (RFP) letter for the Long-Baseline Neutrino Facility Deep Underground Neutrino Experiment (LBNF/DUNE-US) Argon Piping Supply, Installation and Testing Project. Fermi Forward Discovery Group LLC (FFDG) seeks proposals for construction work involving the supply, installation, and testing of stainless-steel argon piping extending from the Ross Shaft Argon Receiving station to the Central Utility Cavern (CUC) located at the 4850 Level in Lead, South Dakota. The piping system consists of 8-inch diameter Schedule 10 piping between the Argon Receiving Facility and Ross shaft, 6-inch diameter Schedule 10 piping from Ross shaft collar to the 4850 Level, and 8-inch diameter Schedule 10 piping from Ross shaft to the CUC. This work is part of the DUNE experiment's infrastructure to transport approximately 40,000 metric tons of argon in gaseous form underground through the pipeline system.

Proposals must be submitted electronically to Procurement Specialist Jerry King (jking@fnal.gov) no later than 5:00 PM Mountain Time on July 27, 2026, with an expected award date of October 10, 2026, and project completion by September 22, 2027. Attendance at a mandatory Virtual Pre-Proposal Meeting on June 23, 2026, at 9:00-10:30 AM MST is required; non-attendees will not be eligible for award. The subcontract will be awarded on a Firm-Fixed-Price (FFP) basis using a lowest-price technically acceptable (LPTA) evaluation approach. Proposals must meet mandatory technical requirements and will be evaluated against technical criteria detailed in the RFP. Offerors must submit required FFDG forms including PUR-466 Proposal Certifications, SARC Subcontractor Annual Representations and Certifications, OSHA 300A logs and Experience Modification Rating documents, Organizational Conflicts of Interest forms (FL-11 & FL-57B), a Small Business Subcontracting Plan (unless small business exempt per FL-55), a Price Proposal Sheet, Quality Assurance Program, and Corporate Environment Health and Safety Plan. Proposals remain valid for 180 days from the due date. This subcontract is issued under FFDG's Prime Contract with the U.S. Department of Energy for the management and operation of Fermi National Accelerator Laboratory (FNAL/Fermilab).

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP LETTER

June 1, 2026

Subject: Request for Proposal (RFP) No. LBNF-73573-JK Proposal Due Date: July 27, 2026

Fermi Forward Discovery Group LLC (FFDG) requests a proposal for the Long-Baseline Neutrino Facility Deep Underground Neutrino Experiment (LBNF/DUNE-US) Argon Piping – Supply, Installation and Testing Project in accordance with this RFP and the enclosed Proposal Preparation Instructions and other enclosures.

SCHEDULE

It is expected that the Argon Piping Supply, Installation and Testing Project will be awarded by October 10, 2026, and with an expected completion date of September 22, 2027.

SUMMARY OF SUBCONTRACT WORK

Construction work for Argon Piping from the Ross Shaft Argon Receiving station to the Central Utility Cavern (CUC) located in Lead South Dakota consisting of supply, installation and testing of the argon piping. Comment by Amanda Wehrli x8699 32119N: Either “at the” or “for-” should be removed? Wording doesn’t make sense. Comment by Jerry King: Agree should be “for”

SUBMITTAL OF PROPOSALS

Complete written proposals must be submitted electronically to the undersigned Procurement Specialist listed below no later than 5:00 PM Mountain Time on July 27, 2026. FFDG reserves the right to extend the due date for proposals and to accept late proposals if it is in the best interest of FFDG and the U.S. Department of Energy (DOE).

Jerry King Email: jking@fnal.gov The proposals shall be valid for a period of 180 days from the proposal’s due date. FFDG reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FFDG. FFDG will not reimburse any firm for any preparation costs incurred or any other costs related to the participation in or preparation of this RFP.

EVALUATION AND SELECTION

FFDG will evaluate each proposal to ensure that it meets the Mandatory Requirements as identified in the RFP. The Offeror will be required to provide evidence (along with its proposal) indicating the Mandatory Requirements identified have been met. If the proposal does not meet the Mandatory Requirements, FFDG Procurement may, at their discretion, contact the Offeror to clarify any omissions or exceptions. If an Offeror cannot meet or does not address compliance in writing with the mandatory technical requirements, the proposal may be considered non-responsive and not be evaluated further consideration for award of a Subcontract. Proposals that meet all the Mandatory Requirements in the solicitation will be further evaluated based on the Technical Evaluation criteria stated in the RFP.

FFDG will make the selection for award using a lowest-price technically acceptable (LPTA) approach. The resulting subcontract will be awarded on a Firm-Fixed-Price (FFP) basis.

Offerors are cautioned that any proposal may be rejected as nonresponsive if it is materially unbalanced as to the costs. FFDG may determine that a proposal is materially unbalanced when it is based on costs that are significantly less than cost for some work and costs that are significantly overstated for other work.

More information about the selection criteria and process is provided in the Proposal Preparation Instructions document.

FUNDING AVAILABILITY

FFDG’s obligation under this Subcontract is contingent upon the availability of appropriated funds from which payment for Subcontract purposes can be made. No legal liability on the part of FFDG for any payment may arise until funds are made available to FFDG for this Subcontract and until the Subcontractor receives notice of such availability, to be confirmed in writing by the Procurement Specialist. See FFDG General Terms & Conditions for Construction at SURF (Attachment J-3).

PRE-PROPOSAL MEETING

Offerors must attend a Virtual Pre-Proposal Meeting that will be scheduled on Tuesday, June 23, 2026, 9:00-10:30pm MST via Zoom. FFDG will present additional information about the project, which should be of interest to all Offerors. FFDG will provide further information on the Pre-Proposal Meeting via a meeting invite. Offerors that do not attend the Pre-Proposal Meeting will not be eligible for award and any submissions provided will not be evaluated.

Offerors shall inform the FFDG Procurement Specialist (jking@fnal.gov) no later than Monday, June 15, 2026, by 5:00 PM Mountain Time. The Offerors should provide their attendees name, title, email address and telephone number for each person who will be attending the Pre-Proposal Meeting, including any lower-tier Subcontractors, and the company they will be representing.

FFDG FORMS FOR SUBMISSION

The Offeror shall complete the following forms referenced within the Request for Proposal Submittals Checklist and submit them with the proposal:

· PUR-466 Proposal Certifications

· SARC Subcontractor Annual Representations and Certifications

· Subcontractor Injury and Illness Data Questionnaire, including OSHA 300A logs and Experience Modification Rating (EMR) documents

· Organizational Conflicts of Interest Form (FL-11 & FL-57B)

· Small Business Subcontracting Plan, in accordance with FAR Clause 52.215-9, Small Business Subcontracting Plan (June 2023). Small businesses are exempt from this requirement. See attached FL-55 form.

· Price Proposal Sheet

OTHER SUBMISSION REQUIREMENTS:

In addition to the items above, the following items must also be submitted with the proposal:

· Quality Assurance Program

· Corporate Environment Health and Safety Plan This solicitation is governed by procurement policies and procedures established under FFDG’s Prime Contract with the U.S. Government, represented by the Department of Energy (“DOE”), for the management and operation of Fermi National Accelerator Laboratory (FNAL/Fermilab). Proposals submitted will be treated as offers, and any resulting award(s) will be a Subcontract under the Prime Contract between the selected Offeror and FFDG; such a relationship shall not create a contractual relationship between the Subcontractor and the DOE.

If there are any questions, please contact me by email at jking@fnal.gov.

FFDG RFP No. LBNF-73573-JK Argon Piping Fermi Forward Discovery Group Lead, South Dakota image1.png