This document is a Testing Index and Test Numbering System for DDG 51 and Follow Ships, detailing comprehensive testing protocols for naval vessel systems across multiple ship-building stages. The document provides a systematic approach to testing various shipboard systems, organized into seven distinct testing stages: Material Receipt Inspection, Installation and Inspection Tests, Equipment Tests, Intrasystem Tests, Intersystem Tests, Special Tests, and Builder's and Acceptance Trials Tests. The testing index covers multiple Ship Work Breakdown Structure (SWBS) areas including general guidance, hull structure, propulsion plant, electrical plant, command and surveillance, auxiliary systems, outfit and furnishings, and weapons systems. Each test is assigned a unique alphanumeric code that indicates the test stage, system category, SWBS number, test location, and specific event number, enabling precise tracking and documentation of ship system evaluations throughout the vessel's construction and commissioning process.

View the file

Other files

File Type Posted
N00024-25-R-2301_A0004.pdf PDF
N00024-25-R-2301_Bidders Questions_A0004.xlsx XLSX spreadsheet
N00024-25-R-2301_Bidders Questions_A0003.xlsx XLSX spreadsheet
N00024-25-R-2301_A0003.pdf PDF
N00024-25-R-2301_A0002.pdf PDF
N00024-25-R-2301_Bidders Questions_A0002.xlsx XLSX spreadsheet
N00024-25-R-2301_Bidders Questions_A0001.xlsx XLSX spreadsheet
S-2 work packages_A0001.xlsx XLSX spreadsheet
N00024-25-R-2301_A0001.pdf PDF
S-1 - Bidders Questions Form.xlsx XLSX spreadsheet
S-2 work packages.xlsx XLSX spreadsheet
S-3 - Cost Exhibits.xlsx XLSX spreadsheet
S-4 - Compliance Checklist.docx DOCX document
S-5 - Contractor Award Announcement Information.docx DOCX document
Exhibit A_PSA RFP Preliminary CDRLS.pdf PDF
N00024-25-R-2301.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVSEA DWG 802-6215563

REVISION DE

TESTING INDEX AND TEST NUMBERING SYSTEM

FOR DDG 51 AND FOLLOW SHIPS

DISTRIBUTION STATEMENT D: Distribution limited to DOD and DOD contractors only:

Critical technology (4 May 1988). Other requests shall be referred to PMS 400D.

DESTRUCTION NOTICE - For classified documents, follow the procedures in DOD 5220.22M, Industrial Security Manual, Section II-10 or DOD 5200.1-R, Information Security Program Regulation, Chapter IX (Chapter 17 of OPNAVINST 5510.1). For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

DEPARTMENT OF THE NAVY

AEGIS PROGRAM MANAGER

WASHINGTON, D.C. 20362

NAVSEA DWG 802-6215563DE

RECORD OF REVISIONS

A1

DDG 51 AND FOLLOW TESTING INDEX

LIST OF EFFECTIVE PAGES

*INDICATES PAGES INCLUDED IN CURRENT UPDATE PACKAGE

PAGE REV/DATE

*A1 REV DE 04/30/21

B1-B17 REV DA 5/31/19

B18 REV DC 03/31/20

*B19 REV DE 04/30/21

i REV DA 5/31/19 ii REV DB 11/30/19 iii-6 REV DA 5/31/19

*7-8 REV DE 04/30/21

9 REV DD 08/31/20

10 REV DC 03/31/20

11 REV DD 08/31/20

12 REV DC 03/31/20

13-17 REV DA 5/31/19

18 REV DC 03/31/20

19-20 REV DA 5/31/19

21 REV DC 03/31/20

22 REV DD 08/31/20

23-24 REV DC 03/31/20

25-26 REV DA 5/31/19

27 REV DD 08/31/20

28 REV DB 11/30/19

29 REV DA 5/31/19

*30 REV DE 04/30/21

31 REV DD 08/31/20

32 REV DA 5/31/19

33 REV DD 08/31/20

34 REV DC 03/31/20

35 REV DA 5/31/19

36-37 REV DC 03/31/20

38 REV DD 08/31/20

39-44 REV DA 5/31/19

NAVSEA DWG 802-6215563DA

B1

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

- Initial Issue ABS 05/04/88

A Incorporated DB-0112C1 for DDG 51 and CACN 0131 for DDG 53. Entire document repaginated. PF 02/22/89

B Document made effective for DDG 54 and Follow Baseline.

Incorporated DB-0099C3 and DB-0101R1 for DDG 51-53.

Incorporated 51-0439R1 and 51-0553R1 for DDG 51. JT 04/07/89

C Page 15 revised by ECP 51-0638C1 for DDG 52 & 53. Pages 16-18, 32-36, 40 and 41 revised by CACN 0130 for DDG 51 & 53. Pages 19-23 included due to repagination. Page 43 revised by ECP 51-0712R1C1 for DDG 52 & 53.

Note: ECP DP-0206 which extends the applicability of this document to DDG 52 was incorporated in the initial issue, Revision -. JT 06/26/89

D Pages 23 and 25 revised by ECP 51-0646C2 for DDG 52 &

53. DDG 54 and Follow ships revised by Baseline RFP. JT 10/02/89

E Pages 3, 9, 11, 23, 46, 47, 50, 53 & 60 revised by CACN 0136 for DDG 51, 53, 54, 56 & 58.

Note: This revision provides implementing authority for CACN 0140 and CACN 0130 changes previously made in Revisions B and C respectively. Also, Table of Contents, Record of Revisions and Preface pages included due to repagination. JT 11/27/89

F Pages 5, 17, 21, 45, 46, 48, 49, 54 & 60 revised by CACN 0148 for DDG 51, 53, 54, 56 & 58.

Pages 48 & 50 revised by CACN 0147 for DDG 51 only.

Pages 33-35 revised by ECP 51-0670R1C1 for DDG 52 & 53.

JT 02/20/90

G Pages 3, 7, 9, 23, 25, 26, 33, 37 & 48 revised by CACN 0158 for DDG 51, 53, 54, 56 & 58.

Pages 41 & 52 revised by ECP 51-0802C1 for DDG 51 only and DDG 51 Class.

Page 20 revised by ECP 51-0803C2 for DDG 51 Class. JT 04/20/90

H This revision is a complete reprint to extend the ship applicability matrix for FY 90 ships and to implement ECPs 51-0824C1, DB-0151C1 for DDG 53 and DP-0233C3.

Note: This revision provides implementing authority for CACN 0130 previously made in Revision B for DDG 54, 56 & 58, and also revokes implementation of CACN 0130 made in Revision B for DDG 55 & 57. JT 06/30/90

B2

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

J This revision implements ECPs 51-0782R1 for DDG 51, 53, 54, 56 & 58, 51-0796C3 for DDG 51-58, DP-0292R1 for DDG 52, DP-0345 for DDG 52, 55 & 57, CACNs 0158 for DDG 52, 55 & 57, 0162 for DDG 51-58, and 5018 for DDG 52.

Note: This revision provides implementing authority for 51-0824C1 previously made in Revision H for DDG 51-58, and also provides implementing authority for CACN 0158 previously made in Revision G for DDG 51, 53, 54, 56 & 58.

Also revokes the extension of CACNs 0158 and 0162 for FY 90 hulls made in Revision H and reinstates IRB 119 (erroneously identified as CACN 0130 in Revision H) for

DDG 55 & 57.

JT 07/31/90

K This revision implements ECPs 51-0782R1 for DDG 55 & 57, 51-0790 for DDG 52-58, and 51-0864C3 for DDG 52, 55, 57, 59, 61 & 63.

Note: This revision provides implementing authority for DP-0292R1 previously made in Revision J for DDG 52 and for DP-0233C3 previously made in Revision H for DDG 52, 55 & 57. JT 09/30/90

L This revision implements ECP 51-0844R1 for DDG 52-63. JT 11/30/90

M This revision implements DB-0287C1 for DDG 51.

Note: This revision provides implementing authority for extension of CACNs 0136 and 0148 to DDG 60 & 62 previously made in Revision H. JT 03/31/91

N This revision implements ECP 51-0782R1 for DDG 52, CACNs 0174 for DDG 51, 53, 54, 56, 58, 60 & 62, and 0176 for DDG 51-63. JT 05/31/91

P This revision implements ECP 51-0864C3 for DDG 54, 56, 58, 60 & 62. JT 07/31/91

R This revision implements ECPs 51-0864C3 for DDG 53, and DB-0425R1 for DDG 51, 53, 54, 56, 58, 60 & 62. JT 09/30/91

T This revision is a complete reprint and implements ECPs 51-0945R1 for DDG 52-63, 51-0978C1 and 51-0979C1 for DDG 52, 55 , 57, 59, 61 & 63, DP-0526 for DDG 59, 61 & 63, and CACN 0181 for DDG 53, 54, 56, 58, 60 & 62.

JT 11/30/91

B3

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

U This revision implements ECPs 51-0978C1 and 51-0979C1 for DDG 53, 54, 56, 58, 60 & 62, CACN 0181 for DDG 52, 55, 57, 59, 61 & 63, CACN 0185 for DDG 54, 56, 58, 60 & 62, and DB-0629R1 for DDG 54, 56, 58, 60 & 62. JT 01/31/92

V This revision is a complete reprint to extend the ship applicability matrix for FY 91 ships and to implement for FY 91 ships ECPs 51-0844R1, 51-0864C3, 51-0978C1, 51- 0979C1, DP-0345, and CACNs 0136 and 0148. This revision also implements DB-0151C1 and DP-0719R1 for DDG 52, DB-0425R1 for DDG 64 & 66, DB-0454R1 for DDG 59, 61 & 63, and DB-0534 for DDG 52 - 67. JT 03/31/92

W This revision is a complete reprint to extend the ship applicability matrix for FY 92 ships and to implement for FY 92 ships ECP 51-1133C1 and CACNs 0174, 0181 and 0185. This revision also implements CACN 0176 for DDG 65 & 67, CACN 0185 for DDG 64 & 66, CACN 0188 for DDG 51, 53, 54, 56, 58, 60, 62, 64 & 66, CACN 0190 for DDG 53, 54, 56, 58, 60, 62, 64 & 66, DB-0624 for DDG 64 & 66, and DB-0629R1 for DDG 55, 57, 59, 61, and 63 - 67.

JT 05/31/92

Y This revision implements ECPs DB-0454R1 for DDG 60, 62, 64 & 66, DB-0454C1 for DDG 65 & 67, DB-0670 for DDG 52 - 67, DP-0818 for DDG 52, CACNs 0174 and 0190 for DDG 52, 55, 57, 59, 61, 63, 65 & 67, and CACN 0185 for DDG 55, 57, 59, 61, 63, 65 & 67. JT 08/31/92

AA This revision is a complete reprint to extend the ship applicability matrix for FY 93 ships and to discontinue applicability for DDG 51 and 52. For FY 93 ships this revision implements ECPs 51-1030R1, 51-1040, 51-0918R2, DB-828R2C1, DB-0905, and CACN 0211. This revision also implements ECP 51-0918R2 for DDG 54 - 76, and CACNs 0203 and 0206 for DDG 53 - 67, 69, 71 & 73 - 76.

Note: ECP 51-1133R3C2 was implemented for FY 93 hulls vice 51-1133R3 in order to keep test 4A472C001 contractor conducted as required by 51-979C1. JT 12/31/92

AB This revision implements ECP 51-1015 for DDG 59 – 67, and CACN 215 for DDG 73 - 76 as part of the FY 93 baseline. JT 03/31/93

B4

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

AC This revision implements ECPs 51-1058R1 for DDG 62 - 76, DB-0828R2C1 for DDG 59 - 76, DP-0909R1 for DDG 55, 57, 59, 61, 63, 65 & 67, DB-0964 for DDG 68, 70 & 72, and CACNs 0211 and 0215 for DDG 54 - 72.

Note: CACN 0211 renumbers and re-titles test 3A411C004 to test 3A411C010. ECP 51-1058R1 deletes test 3A411C004.

In order to implement the intent of 51-1058R1, test 3A411C010 has been deleted for DDG 62 -

76. JT 06/30/93

AD This revision implements ECP 51-1065R1 for DDG 60-76 and CACN 223 for DDG 53, 54, 56, 58, 60, 62, 64, 66, 68, 70, 72, 73, 75 & 76.

Note: This revision deletes test 5A411C225 for DDG 68 and Follow per 51-1058R1, adds test 5A463C002 for DDG 62 per 51-1058R1, and changes title of test 4A493C002 per DB-

0828R2C1. JT 09/30/93

AE This revision implements ECPs 51-1082C3 for DDG 53, 54, 56, 58, 60 & 62-76, 51-1087C1 for DDG 64-76, 51-1196R1C1 for DDG 66-76, DB-1181C1 for DDG 56 & 58- 76, DP-1291 for DDG 57, 59, 61, 63, 65, 67, 69, 71 & 74, and CACNs 0227 for DDG 53-76, and 5030 for DDG 55.

Note: This revision reinstates test 7C073C100 for DDG 53, 54 & 56 per CACN 0223, and deletes test 3C593C101 due to the cancellation of ECP 51-0916.

EV 04/30/94

AF This revision is a complete reprint to extend the ship applicability matrix for FY 94 ships and to discontinue applicability for DDG 53 through 56. For DDG 79 this revision implements ECPs 51-1200, 51-1201R2, 51-1202R2, 51-1204R1, 51-1205R1, 51-1206R2, 51-1215R4, 51-1216R2, 51-1226R1, 51-1230R3, and 51-1237R2. For DDG 77-79 this revision implements ECPs 51-1098R1, 51-1196R1C1, 51-1246R2C1, and CACNs 0230 and 0238. For DDG 78 this revision implements CACN

5034. EV 07/31/94

AG This revision implements ECPs 51-1246R2C1 for DDG 72-76 and DP-1384R1, and CACNs 0230 and 0238 for DDG 57-76, and 5034 for DDG 57, 59, 61, 63, 65, 67, 69, 71 and

74. JT 10/31/94

B5

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

AH This revision is a complete reprint to extend the ship applicability matrix for FY 95 ships and to discontinue applicability for DDG 57 through 60. JT 01/31/95

AJ This revision implements ECP DP-1489C2 for DDG 61, 63, 65 and 67. JT 04/30/95

AK This revision implements ECP 51-1098R6C2 for DDG 73-82, 51-1040 via CICS MMS-005 for DDG 73 and 74, DB 0854R1 via CICS MMS-006 for DDG 61-82, and DP-1681 via CICS MMS-007 for DDG 65-82 (Ingalls only).

The implementing authority for MMS-005, MMS-006 and MMS-007 is ECP 51-1316. JT 09/30/95

AL This revision implements DB-1794 for DDG 68-82. JT 12/31/95

AM This revision implements ECPs 51-1295C2 for DDG 79-82, DB-1792C2 for DDG 68-82, and DB-1793 for DDG 66 and 68-

82. JT 03/31/96

AN This revision is a complete reprint to extend the ship applicability matrix for FY 96 ships and to discontinue applicability for DDG 61-67. For DDG 68-84 this revision implements 51-1342C1. For DDG 79-84 this revision implements ECPs 51-1276R3C1, 51-1278R1, 51-1311R2C2 and 51-1340. For DDG 83-84 this revision implements 51-1338. For DDG 68, 70, 72, 73, 75, 76, 77, 79, 81 and 83, this revision implements DB-1943R1. For DDG 69, 71, 74, 78, 80, 82 and 84 this revision implements CACN 5036. JT 07/31/96

AP This revision is a complete reprint to extend the ship applicability matrix for FY 97 ships and to discontinue applicability for DDG 68-71. For DDG 73-78 this revision implements ECP 51-1345R2. For DDG 77-88 this revision implements ECP 51-1348R4C1. For DDG 72-78 this revision implements WF-2017.

MO 12/31/96

AR This revision implements ECPs 51-1378R2 and DB- 1908R1C1 for DDG 79-88 and CACN 0299 via CICS MMS- 008 for DDG 72-88.

The implementing authority for MMS-008 is ECP 51-1405.

MO 5/30/97

AT This revision implements CACN 0302 for DDG 72-88. MO 8/31/97

AU For DDG 79-82 this revision implements DB-2207C1. For DDG 72-78 this revision implements WF-2239. For DDG 72-88 this revision implements CACN 311.

MO 12/31/97

B6

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

AV This revision is a complete reprint to extend the ship applicability matrix for FY 98 ships and discontinue applicability for DDG 72-74. For DDG 75 and follow this revision implements DB-2061C1 via CICS MMS-009. For DDG 77-88 this revision implements ECP 51-1348R4C1 via CICS LMC-178. For DDG 85 and follow this revision implements MMCN 790R2C1 and CICS LMC-177. The implementing authority for all CICS in this implementation is ECP 51-1450. For DDG 79 and follow this revision implements DB-2130. For DDG 89 and follow this revision implements CACNs 0299, 0302, 0311, and ECPs 51- 1311R2C2, 51-1348R4C1, 51-1378R2, 51-1403C1, and DB-

1908R1C1. MB 02/28/98

AW This revision implements ECPs 51-1337R1, 51-1390C2, 51- 1398C1, and CICS LMC-195 for DDG 83 and follow. The implementing authority for LMC-195 is ECP 51-1450. MB 06/30/98

AY This revision incorporates CACN 5055 authorized by the Mar/Apr/May/Jun 1998 implementation directive for DDG 80 and follow (ISI hulls only). For DDG 74 and follow (ISI hulls only) this revision incorporates CACN 5056 authorized by the Jan/Feb 1998 implementation directive.

For DDG 84 and follow this revision implements ECP 1414R1C1 and CICS LMC-203.

MB 09/30/98

BA This revision implements CACN 0324 for DDG 79-82 and CICS LMC-205 for DDG 79 and follow. MB 12/31/98

BB This revision is a complete reprint to extend the ship applicability matrix for the balance of the FY-98 contract hulls (DDG 93-102). For DDG 86 and follow (BIW hulls only), this revision incorporates ECP 51-1403C5 authorized by the Oct/Nov/Dec 1998 implementation directive and CICS LMC-212. For DDG 79-82 this revision implements ECP 51-1457. For DDG 81-88 this revision implements ECP

51-1458R1C1. MB 03/31/99

BC This revision is a complete reprint to remove DDG 75-78 from the applicability matrix. For DDG 85-90, this revision implements ECP 51-1465R1, and LMC-218 under ECP 51- 1461. For DDG 89-90 this revision implements MMCN 852R1. For DDG 89 and follow, this revision implements MMCN 819R2. For DDG 89 and follow, this revision implements MMCN 0806R5. For DDG 91 and follow, this revision implements MMCN 792R4, MMCN 804R4, MMCN 811R4 and MMCN 812R4. For DDG 85-88, this revision implements ECP 51-1464R1 (advance implementation). MB 06/30/99

B7

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

BD This revision implements CACN 0350 and CICS LMC-219 under ECP 51-1480 for DDG 79 and follow. Note: This revision moves three test procedures from page 21 to page

22. MB 10/31/99

BE This revision implements ECP DP-2294R1 and CICS LMC-222 for DDG 80 and 82. For DDG 84 and follow (ISI hulls only), this revision implements ECP DP-2314. For DDG 79 and follow (BIW hulls only), this revision implements DB-2383C1. MB 01/31/00

BF This revision implements MMCN 0794R2 and CICS LMC- 239A for DDG 91 and follow. For DDG 98-102 this revision implements CICS LMC-238. MB 11/30/00

BG This revision implements 51-1477R2 for DDG 85 and follow. For DDG 85 and follow (BIW hulls only), this revision implements CACN 0375. For DDG 91 and follow this revision implements MMCN 0829R3. For DDG 79 and follow this revision implements WF-2489R1. For DDG 90 and follow this revision implements WF-2662R1. For DDG 83 & 84 this revision implements DP-2626R2. For DDG 84 this revision implements CICS LMC-248.

RH 03/31/01

BH This revision implements 51-1482R1 (with FMR-4420) for DDG 85, 87, 89 and follow. For DDG 83-88 this revision implements DP-2632 (with FMRs-4158 & 4357). For DDG 85 and follow this revision implements CACN 0380.

MB 07/31/01

BJ This revision implements CACN 0389, which deletes three RIMSS tests and adds a HP Breathing Air Compressor test and an ICAS Cable test. Affects SWBS 310, 493, 502 and 551 for DDG 85-101 (BIW hulls only).

RH 11/30/01

BK This revision implements 51-1517R1C2, which adds one new digital wind measuring test and changes hull effectivity for two analog wind measuring tests. Affects SWBS 437 for DDG 89 and follow. This revision implements 51-1478R2C1, which adds three new ISNS tests and changes the hull effectivity for two data processing set tests. Affects SWBS 493 for DDG 91 and follow.

RH 03/31/02

B8

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

BL This revision is a complete reprint to remove DDG 79-88 from the applicability matrix and add DDG 103-112. This revision shifts shipyard applicability for DDG 102 from NGSS to BIW. This revision implements the following changes:

51-1493R3 Electric Windlass for DDG 103AF 51-1508R2C2 Integrated Bridge System for DDG 94AF 51-1510R1 CEC Planar Arrays for DDG 103AF 51-1530R2 Replace AIEWS with SLQ-32 for DDG 91AF 51-1542 Install CIWS Block 1B for DDG 107AF DB-2692R2C1 AWS BL 7.1 Clean-up for DDG 91AF DB-2753R1C2 Install Tactical Tomahawk for DDG 103AF DB-2760 Install VDDS DDG for 103AF WF-2439R2C1 Circuit 3TV Upgrade for DDG 103AF WF-2690R3C1 Replace AN/SPS-73 (V) 12 with COTS Nav Radar for DDG 87, 89-102 CACN 0375 Combine UW WCS Cable Integrity Tests for

DDG 102AF (BIW)

CACN 0380 XFR Contractor Conducted Tests to Government Conducted for DDG 102AF (BIW) CACN 0389 Adds two BIW Tests for DDG 103AF (BIW)

This revision extends hull effectivity for the following changes to DDG 103AF:

51-1390C2 Install CAPDS for 103AF 51-1398C1 Clean-up Integrated JMCIS and AWS for DDG

103AF

51-1403C5 RIMMS and FACD LOCOP for DDG 103AF 51-1414R1C1 Replace AN/SLQ-32A (V) 3 with (V) 2 for DDG

103AF

51-1450 CICS for 51-1390C2 for DDG 103AF 51-1461 CICS for 51-1414R1C1 for DDG 103AF 51-1477R2 CEC Clean-up for DDG 103AF 51-1478R1 Install (Class/Unclass) Aegis LANs for DDG

103AF

51-1482R1 Install AN/USC-38 (V) 9 Installation for DDG

103AF

51-1517R1C2 Install DWMIS for DDG 103AF WF-2489R1 Deletes Microfiche Test for DDG 103AF CACN 0350 Adds Test for Digital Flux Gate Magnetic Compass for DDG103AF

RH 08/31/02

BM This revision corrects the hull effectivity for the following changes that were implemented in Rev BL:

DB-2753R1C2 Install Tactical Tomahawk for DDG 103AF CACN 0380 XFR Contractor Conducted Tests to Government Conducted for DDG 102AF (BIW)

RH 03/10/03

B9

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

BN This revision implements the following change:

51-1490R1 Replace AN/WQN-2(V) Doppler Sonar Velocity Log (DSVL) w/Speed Log system for DDG 96AF.

MATI 02/24/03

BP This revision implements the following changes: CACN 00408 Ships Testing Index clean up for DDG 92 AF

51-1505R5 Installation of a Blown Optical Fiber (BOF) Cable Plant for DDG 103AF

SWCN200R5 Install IT-21 Block 1for DDG 103AF

MATI 06/23/03

BR This revision implements the following changes:

WF-2845C2 Multi-Function Monitor (MFM) III Shipboard Test Procedure for DDG 92AF

CACN-0420 Testing Index clean-up for cable test for DDG-

91AF

CACN-0415 Correction To Testing Index to Suit DB-2175 for

DDG 90AF

DB-2753R1C2 Install Tactical Tomahawk Weapons Control System (TTWCS) for DDG 96-102

WF-2873 Revise Testing Requirements for Integrated Shipboard Network System (ISNS) for DDG 93AF

CACN-0414 Update Test Index for DDG 91AF

MAT 09/30/03

BT This revision implements the following changes:

WF-2839R2C1 RMS (Remote Minehunting System) Corrective ECP #2 (MMCN1066) for DDG 91-96

51-1566R2 Delete Remote Minehunting System for DDG 99 and 101AF

DP-2641 Remote Minehunting System Removal for DDG 97, 98, 100

51-1573R2 Install CEC Planar Active Aperature Array (PAAA) for DDG 102 only

MAT 01/31/04

B10

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

BU This revision implements the following changes:

MMCN 0985R Install AWS Baseline 7 Phase Tech Refresh

DDG 103 AF

WF-2892R1C1 Stop Work Release and Below Deck Installation of Cooperative Engagement Capability (CEC) Planar Active Aperture Array (PAAA) DDG 102 only

MAT 05/31/04

BV This revision implements the following changes:

WF-2930R2C1 COBLU GFI Update, DDG 97-104.

CACN-0419 Correction to Test Index to suit ECP 51-1482, DDG 94,96,99,101,102,104,106,108,109,111, and 112.

KG 02/23/05

BW This revision implements the following changes:

WF-2823R1 Aircraft Electrical Service System (AESS) Modification, DDG 99,101,102,104,106,108,109,111, and 112.

DB-2889R1C1 Change CIWS Block 1B FWD Mount to SPACE/WEIGHT with foundations, cables & services, DDG

107AF.

KG 05/31/05

BY This revision implements the following changes:

WF-3018R1C1 Fiber Optic Light Loss Ship Spec Change, DDG 103 AF.

KG 03/31/06

CA This revision implements the following changes:

WF-3045 Install Hydrogen Sulfide Gas Detection system in VCHT Rooms, DDG 109AF.

KG 10/13/06

CB This revision implements the following changes:

CICS LMC-345.

Deletes 5A411C239 Tactical Ballistic Missile Defense (TBMD) Functional Test and 5A409C214 ACTS and TBMD Functional Test for 103AF.

Adds 2A400C033 CEC Cable Integrity Test for DDG 105AF

KG 03/31/07

B11

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

CB (CONT) CICS LMC-344R1

Changes CDLMS/C2P ILO and Functional Test from 4A441C212 to 3A441C021 DDG 103AF.

Test Title change, 3A411C212 Next Generation Peripherals (NGPs) ILO to 3A411C212 Rack Based Console (RBC) ILO for DDG 103AF.

Deletes 5A484C202 WCS and CIWS Functional Test for

DDG 107AF.

DB-3034R1

Adds 7A409C212 Integrated Training System Operational Demonstration for DDG 103AF

51-1599C1

Adds 2C439C105 Digital Video Surveillance System (DVSS) Cable integrity Test and 4C439C101Digital Video Surveillance System (DVSS) ILO and Functional Test for

DDG 111AF.

CC This revision implements the following changes:

DP-2855

Install Hydrogen Sulfide Gas Detection System in VCHT Rooms

DB-3048R1

SSEE Increment E Installation

DB-3053R1C1

CIWS Block 1B Baseline 1 Configuration

KG 03/31/08

CD This revision implements the following changes:

51-1597R1C1

DDG Modernization FODMS to GEDMS Upgrade

WF 3072R1

Waterfront Corrective ECP # 14

KG 09/30/08

B12

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

CE This revision implements the following changes:

CACN 00463

Addition of Chilled Water Automation System ILO Monitoring and Control Test.

WF-3093R2C1

Installation of Automatic Identification System (AIS)

KG 07/31/09

CF This revision implements the following changes:

CICs LMC-366

Correction of the test number for CACN 5087

CACN 5087

PPD NAVSEA 802-6215563, Add Testing Index and Test Number for Machinery Control System (MCS) Embedded Trainer System Operational Test

KG 11/30/09

CG This revision implements the Following changes:

WF-3108R2

DDG Modernization Clean-Up Package

CICS LMC-368

Correction test adds and deletes for WF-3113R1C2

WF-3113R1C2

Replace AN/PDR-65/65A High Range Gamma Detector with the Bridge Mounted MFR IM-265/PDQ Multifunction Radiac control Unit (BMMFR).

CACN 00464

Revision of CWAS ILO Monitoring and Control Test in Test Index Listing

SCN 50202

For Project Peculiar Drawing NAVSEA Dwg 802-6215563 Add Testing Index and Test Number for CWAS ILO and Interface Test

KG 05/31/10

B13

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

CH This revision implements the Following changes:

CACN 00467

Test Index Clean-up

CICS LMC-369

Correction to CACN 00467

KG 11/30/10

CJ This revision implements the Following changes:

WF-3115R2

Waterfront Corrective ECP #15

CACN 0469

Change CIWS OP DEMO Test from Contractor to Government Performed

KG 05/31/11

CK This revision is a complete reprint to remove DDG 89-91 from the applicability matrix and add DDG 113-115.This revision implements the Following changes:

51-1661R1/ Install SPA-25H Radar Repeaters

DB-3204/

51-1661R3

51-1685R5 MK 41 Vertical Launching System (VLS) with

VGI

51-1650R4 AWS, Common Processing System, LRADDS 51-1651R4 Multi-Mission Signal Processor (MMSP) for

SPY-1D(V)

51-1659R5 Common Display System Upgrade, and Main Combat System Space Arrangements 51-

1663 51-1686R4 AN/USQ-T46D(V) BFTT

51-1665/ Commercial Broadband Satellite Program

DB-3204/ (CBSP)

51-1665R2

51-1676R5 ISNS, NTCSS, GCCS-M

51-1694R1/ Installation of Joint Biological Point Detection DB-3204/ System (JBPDS) 51-1694R3

CACN 00471/ Delete the 5” Gun Pre-Trial Inspection DB-3205 Assessment from the Test Index

KG 10/31/11

B14

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

CL This revision implements the Following changes:

CICS LMC-384

CICS LMC-385

CICS LMC-389

KG 11/01/11

CM This revision implements the Following changes:

51-1732 Install MFTA IN-LINE.

51-1799R1 FY12 Multi-Function Towed Array (MFTA) revert to space and weight and services.

KG 08/31/12

CN This revision implements the Following changes:

51-1747R1 MK 41 VLS BMD Fiber Optic Distribution Modifications

KG 02/28/13

CP This revision implements the Following changes:

51-1716R3 Replace AN/USQ-153(V)9 with Consolidated Afloat Networks Enterprise Services

51-1716R3/ Replace AN/USQ-153(V)9 with Consolidated RICA 8709 Afloat Networks Enterprise Services

51-1778R1 Adding Man Overboard Indicator (MOBI) System

51-1781R1 IPDS-LR Improved Point Detection System (Chemical Warfare Agent Detector), Life Cycle Replacement

CICS LMC-397 Correction of Test Numbers

CICS LMC-398 Correction of Test Numbers

Made administrative changes

KG 07/31/13

B15

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

CR This revision implements the Following changes:

51-1806C3 Deliver Updated Multi-Mission Signal Processor (MMSP) for SPY-1D(V) GFI

51-1807R2 Deliver Updated OA Computing Plant GFI

51-1810 AN/USQ-T46(V) BFTT GFI Delivery

51-1812R1 GWS and Electro-Optical Sensor System (EOSS) GFI Delivery

WF-3208R1 IPDS LR Improved Point Detection System (Chemical Warfare Agent Detector) Life Cycle Replacement

WF-3209C1 SSES NOW Removal

DB-3223C1 GFI Update to AN/SQQ-89(V)15 w/EC-216

WF-3231R2C1 Add Flight Deck Electrical Grounds

CICS LM-402

CICS LM-403

CICS LM-404

CICS LM-405

CICS LM-409

KG 04/30/14

CT This revision implements the Following changes:

51-1806C3 Deliver Updated Multi-Mission Signal Processor (MMSP) for SPY-1D(V) GFI

51-1807R2 Deliver Updated OA Computing Plant GFI

51-1810 GFI Update to AN/USQ-T46D(V) 3

51-1812R1 Deliver Updated Gun Weapon System (GWS) and Electro-Optical Sensor System (EOSS) GFI

51-1817 Deliver Updated Tactical Tomahawk Weapon Control System (TTWCS) GFI

51-1831R1 ASGSI Cleanup

CACN-0486 Revision to DDG-115 & Follow, Lead Yard Only Hulls, Test Index

CICS LMC-404

CICS LMC-405

CICS LMC-409

KG 06/30/15

B16

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

CU This revision implements the Following changes:

CACN 05096 Replacement Test Index Rev CR Requests for Changes

CACN 05097 Test Index Rev CR Requests for Changes

WF-3231R2C1 Add Flight Deck Electrical Grounds

WF-3326 AN/SPS-67 (V) 5 Antenna Assembly OE- 374B/SPS-67 (V) Nomenclature Change

51-1827R2C1 AEGIS Modernization Lessons Learned Cleanup

CACN 0487 Update to PPD 802-6215563 for DDG 115 & Follow, Lead Yard Hulls only

DB-3230R1C1 Deliver Updated Common Display System Upgrade GFI

DB-3223C1 GFI update to SQQ-89 (V) 15 w/EC-216

DP-3271 Test Index Rev CR Request for Changes

WF-3209C1 SSES NOW Removal

CICS LMC-402

CICS LMC-442

KG 07/31/16

CV This revision implements the Following changes:

WF-3345 Replacement of the Deck Edge Antenna Distribution Boxes

KG 02/28/17

CW This revision implements the Following changes:

51-1850R7/ RCIA-10297 Replace AN/SPY-1D (V) Radar with AN/SPY-6 (V) 1 Radar

51-1969 Replace AN/SPY-1D (V) Radar with AN/SPY-6

(V) 1 Radar

51-1891R5 CANES Required IRD Updates for System Operability

51-1889R3 CANES IRD Update

51-1866 Update to MCS testing due to FLT III

51-1866R1 Update to MCS testing due to FLT III

KG 10/31/17

B17

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

CW (CONT) 51-1867R2 Replace the HALON 1301 Fire Extinguishing System with a Heptafluoropropane (HFP) Fire Extinguishing System for PGTs and Flammable Liquids Rooms

51-1867R3 Replace the HALON 1301 Fire Extinguishing System with a Heptafluoropropane (HFP) Fire Extinguishing System for PGTs and Flammable Liquids Rooms

51-1878R1 Replace the HALON 1301 Fire Extinguishing System with a Water Mist (WM) Fire Extinguishing System for AMR 1, Engine Room 1 and 2, and Generator Room

51-1878R2 Replace the HALON 1301 Fire Extinguishing System with a Water Mist (WM) Fire Extinguishing System for AMR 1, Engine Room 1 and 2, and Generator Room

CACN-00503 Revision to Test Index NAVSEA Drawing 802- 6215563

DP-3272 Clean-up to Schedules A, B, C, D & E (CACN 00494)

CY This revision implements the Following changes:

51-1912 Replace AN/WSN-8A Electro Magnetic (EM) Speed Log Transmitter with AN/WSN-9 (V) 1 Digital Hybrid Speed Log (DHYSL) with 28” Fixed Rodmeter.

51-1959 Install Fire Detection Actuation System (FDAS) to Magazine Sprinkling System in Magazines with Automatic Sprinkling (Except VLS).

51-1981C2 Battle Force Tactical Trainer (BFTT) AN/USQ- T46D (V) 2 to AN/USQ-T52 (V) 1 Update.

CACN-0508 Change EMI at Sea Test to a Government Conducted Test.

CACN 05099 Test Index Rev CR Requests for Changes.

CACN 05100 Test Index Rev CR Requests for Changes.

CACN-5105 Test Index Rev CU Requests for Changes.

LMC-511 Test Index update

LMC-518 Test Impact Statement Cleanup

KG 10/31/18

NAVSEA DWG 802-6215563DC

B18

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

DA This revision implements the Following changes:

51-1909R2 GPS-Based Positioning, Navigation, and Timing Services (GPNTS) to replace NAVSSI.

51-1983C1 Update FY14/DDG 119AF Combat System Design.

51-1984R2 Update DDG 121AF Combat System Design.

CACN-0513 Restrict Test 3A491C101 for AN/KAS-1A.

CACN-0514 Update Hull Applicability in Test Index.

KT 5/31/19

DB This revision implements the Following changes:

CACN-5101 Test Index Rev CR Request for Changes

CACN-5103 Test Index Rev CU Request for Changes

CACN-5106 Test Index Request for Changes

CACN-5107 Test Index Request for Changes

CACN-5108 Test Index Request for Changes

LMC-532

JG 11/30/19

DC This revision implements the Following changes:

Administrative changes

WF-3407 Add Pulse Current Injection (PCI) Test Requirement to Test Index

WF-3439 DDG Salvo Alarm Timing and Hardware Modifications

CACN-0521 Update and Revise Test Index and Test numbering for DDG 118 AF

CACN-5104 Test Index Rev CU Requests for Changes

CACN-5109 Test Index Request for Changes

CACN-5111 Test Index Request for Changes

CACN-5112A Test Index Request for Changes Rev A

LM-535 Test Index update

LM-536 Test Index update

KG 03/31/20

B19

REVISION

LETTER

TITLE OR BRIEF DESCRIPTION APPROVED DATE

DD This revision implements the Following changes:

Administrative changes

51-1918R1 Install Multi-Function Towed Array (MFTA) OK- 410(V)4 Handling & Stowage Group H&SG In-Line

CACN-5113 Test Index Requests for Changes

JG 8/31/2020

DE This revision implements the Following changes:

Administrative changes

CACN-0531 Update and Revise Test Index and Numbering for DDG 126, 128AF for Power Conversion Modules (PCMs) and

AN/SPY-6.

CACN-0532 Update Test Index to Restrict Test 7C512C100 to

DDG 116

JG 4/30/2021

i

TABLE OF CONTENTS

Title Page

Table of Contents i

Preface ii

Test Numbering System iii-vi

Testing Index vii

Index Pages 1 to 44

NAVSEA DWG 802-6215563DB

ii

PREFACE

The Testing Index and Test Numbering System for DDG 51 and Follow Ships is provided by the Government and is specified as a project peculiar document in the Ship Specification. The Testing Index and Test Numbering System for DDG 51 and Follow Ships list the tests that are to be conducted by the Contractor and the Government during the Ship Test Program. The information is supplemental to the test requirements of Ship Specification Sections 092, 094 and 095.

This document supersedes the Testing Index and Test Numbering System for DDG 51, NAVSEA DWG 802-5959354 and the Testing Index and Test Numbering System for DDG 52 and Follow Ships, NAVSEA DWG 802-6215557.

Revision DA is a complete reprint of the Testing Index.

iii

TEST NUMBERING SYSTEM

1. The test numbering system is depicted in Figure 1. Each test is assigned a unique number in accordance with NAVSEA 0900-LP-095-2010. All test documentation (TO's, ATO's, Test Procedures, and Test Reports) associated with a single test are identified by the same test number. A sample breakdown and explanation of test numbers 3A711C002, 3C310C100, and 3A462C200 follows:

Test Equip/Sys SWBS Test Test Event Stage Category Number Location Number

3 A 711 C 002

(Combat System equipment level test for the 5" Gun conducted in the shipyard by the Contractor utilizing a Government prepared test procedure)

3 C 310 C 100

(Support System equipment level test for the Ship Service Generator conducted in the shipyard by the Contractor utilizing a Contractor prepared test procedure.)

3 A 462 C 200

(Combat System equipment level test for the Sonar Receiving Set conducted in the shipyard by the Government.)

2. Test stages are used to identify the levels of testing required for demonstration of the shipboard systems and equipment. Although seven stages of testing are defined, it is not intended to require testing at all stages for each equipment or system. The seven stages of testing are defined as follows:

• Stage 1 - Material Receipt Inspection

Stage 1 will provide for inventory management and physical inspection of all equipment and associated documentation; it is intended to ensure satisfactory receipt by the Contractor of items such as equipment, components, spare parts, manuals and drawings, and that the items are of proper configuration and have not been physically damaged or lost in shipment. (Stage 1 will generally be covered by a quality assurance program).

iv

• Stage 2 - Installation and Inspection Tests

Stage 2 inspections and tests demonstrate installation in accordance with requirements of the ship specifications. Inspection and static tests to prove integrity, strength, and continuity are applied to foundation, cabling, sonar domes, piping, ventilation, air conditioning, switchboards, etc. Insulation resistance, VSWR, and time domain reflectometer tests are included in this stage. The reviews of the locations of the optical systems, piping systems, etc., are also Stage 2 tests. (Stage 2 will be covered in part by a quality assurance program.)

EXAMPLES:

2A184C101 Foundation Alignment Verification 2B200C100 Propulsion Shafting Padeyes Load Test 2C300C100 Grounded Receptacles Continuity and Resistance Test

• Stage 3 - Equipment Tests

Stage 3 tests demonstrate that the individual equipment and groups of equipment meet their design parameters and perform within the limits and tolerances required by the ship specification after shipboard installation.

Included are equipment and safety checks to be conducted prior to equipment operation.

EXAMPLES:

3A402C200 Communications Security Equipment ILO 3B200C100 Machinery Space Lifting Gear Demonstration 3C302C100 Starting Voltage Dip Test

• Stage 4 - Intrasystem Tests

Stage 4 tests demonstrate that the intrasystem (equipment and functions entirely within one system) operation and alignment are within the limits required by the ship specification. The transmission of intrasystem signals, commands, and functions (including those generated by computer programs integral to the system) are included. (Stage 4 is normally that intrasystem testing within a single subelement of the combat, mobility, support or containment area of the ship).

EXAMPLES:

4A411C202 C&D Tactical Program Loading Test 4B202C100 Shaft Control Unit Demonstration 4C310C100 G.T. Generator System Operational Test v

• Stage 5 - Intersystem Tests

Stage 5 tests demonstrate that intersystem (two or more independent systems that interface) operation and alignment are within the limits required by the ship specification. The exchange of intersystem signals, commands, functions, and all associated computer interfaces are included. (Stage 5 is that testing normally conducted between two or more sub-elements within the combat, mobility, and support or containment areas of the ship.)

EXAMPLES:

5A409C200 Combat System (CS) Alternate Program Loading Test 5B200C100 Propulsion Plant Dock Trials 5C320C100 Equipment Infrared Heat Detection Test

• Stage 6 - Special Tests

Stage 6 tests are those tests, which require special simulation facilities or significant facilities/resources external to the immediate testing location. Tests for special purposes, such as access to equipment for maintenance repairs or removal, reliability, maintainability and availability demonstrations, radiation hazards (RADHAZ) testing, electromagnetic interference (EMI) testing and the ship inclining experiment are included. Special tests can apply to equipment, a system or a number of systems, and may require total ship operability.

EXAMPLES:

6A409C200 Combat System Alignment Verification (BT) 6B234C100 Propulsion Gas Turbine Engine Removal Demonstration 6C073C100 Structureborne Noise Survey

• Stage 7 - Builder's and Acceptance Trials Tests

Stage 7 is defined as those tests that are unique to Builder's Trials (BT) and Acceptance Trials (AT), including the associated prerequisite dockside testing prior to getting underway. Lower level tests conducted prior to BT and AT which are required to be reconducted during these trials shall be given a Stage 7 number also. Toward the goal of utilizing BT as a rehearsal for AT, the same test procedures should be used on both trials wherever possible.

EXAMPLES:

7A073C001 Sonar Self-Noise Survey (BT) (AT) 7B200C100 Propulsion Plant Performance Tests (BT) (AT) 7C320C100 Electric Plant Control System Operational Demonstration (BT) (AT) vi

0 X 000 X 000

TEST STAGE EQUIPMENT/SYSTEM

CATEGORY

SHIP WORK

BREAKDOWN

STRUCTURE

TEST LOCATION TEST EVENT NUMBER

1 - Material Receipt Inspection

2 - Installation Inspections and Tests

3 - Equipment Tests

4 - Intrasystem Tests

5 - Intersystem Tests

6 - Special Tests

7 - Builder's and Acceptance Trials Tests

A - Combat

B - Mobility

C - Support

D - Containment

E - Management

F - Maintenance

000 - General Guidance and Administration

100 - Hull Structure

200 - Propulsion Plant

300 - Electric Plant

400 - Command and Surveillance

500 - Auxiliary Systems

600 - Outfit and Furnishings

700 - Weapons Systems

800 - Integration/Engineering

900 - Ship Assembly and Support Services

A - Factory

B - Land-Based Test Site

C- Shipyard

D - Post Delivery

000 – Government furnished test documentation, Contractor conducted test

100 - BIW furnished test documentation, BIW conducted test

200 – Government furnished test documentation, Government conducted test

700 - Ingalls furnished test documentation, Ingalls conducted test

FIGURE 1

Test Numbering System vii

TESTING INDEX

1. The Testing Index (TI) is a list of required tests, by test number and title that are to be conducted during the Ship Test Program.

2. Tests are listed in each part of the Testing Index in numerical order as follows:

• SWBS Number

• Test Stage Number within each SWBS

• Test event number within each stage

3. The Test Event Number (last three digits of the test number) indicates the responsibility for test procedure preparation and test conduct as follows:

• The 000 series are tests to be conducted by the Contractor using Government provided test procedures

• The 100 series are tests to be conducted by Bath Iron Works using Contractor prepared test procedures.

• The 200 series are tests to be conducted by the Government using Contractor support.

• The 700 series are tests to be conducted by Huntington Ingalls Industries using Contractor prepared test procedures.

DDG 51 AND FOLLOW SHIPS TESTING INDEX

SWBS 000 GENERAL GUIDANCE AND ADMINISTRATION

114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 Test No. Test Title

X X X X X X X X X X X X X 2A073C100 Noise Measuring Hydrophones System Cables Test

X X X X X X X X X X X X X 2A073C701 Bathythermograph, Hydrophone & Acoustic System Cable Integrity Test

X X X X X X X X X X X X X 3A073C100 Noise Measuring Hydrophones Functional Test

X X X X X X X X X X X X X 3A073C700 Noise Measuring Hydrophones Functional Test

X X X X X X X X X X X X X 6C073C100 Structure borne Noise Survey

X X X X X X X X X X X X X 6C073C700 Structure borne Noise Survey

X X X X X X X X X X X X X 7C073C100 Airborne Noise Survey (BT)

X X X X X X X X X X X X X 7C073C700 Airborne Noise Survey (BT)

X X X X X X X X X X X X X X 7A073C001 Sonar Self-Noise Survey (BT)

X X X X X X X X X X X X 7A073C201 Sonar Self-Noise Survey (BT)

X X X X X X X X X X X X X 7C073C702 Hull Vibration Test (BT)

X X X X X X X X X X X X X 7C073C104 MRG Structure borne Noise Survey (BT)

X X X X X X X X X X X X X 7C094C102 General Sea Trial Test (BT) (AT)

X X X X X X X X X X X X X 7C094C702 General Sea Trial Test (BT) (AT)

SWBS 100 HULL STRUCTURE

114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 Test No. Test Title

X X X X X X X X X X X X X 2A184C100 Reference Planes and Benchmark Verification

X X X X X X X X X X X X X 2A184C700 Reference Planes and Benchmark Verification

X X X X X X X X X X X X X 2A184C101 Foundation Alinement Verification

X X X X X X X X X X X X X 2A184C701 Foundation Alinement Verification

X X X X X X X X X X X X X 2A184C102 Mechanical Battery Alinement Verification

X X X X X X X X X X X X X 2A184C702 Mechanical Battery Alinement Verification

X X X X X X X X X X X X X 2A184C103 Multi-Function Radar Array Foundation Alinement Verification

X X X X X X X X X X X X X 2A184C703 Multi-Function Radar Array Foundation Alinement Verification

X X X X X X X X X X X X X 2C192C100 Compartment Test

X X X X X X X X X X X X X 2C192C700 Compartment Test

SWBS 200 PROPULSION PLANT

114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 Test No. Test Title

X X X X X X X X X X X X X 2B200C101 Propulsion Shafting and Machinery Space Hoists Load Test

X X X X X X X X X X X X X 2B200C701 Propulsion Shafting and Machinery Space Hoists Load Test

X X X X X X X X X X X X X 2B200C103 Rudder and Propeller Padeyes Load Test

X X X X X X X X X X X X X 2B200C703 Rudder and Propeller Padeyes Load Test

X X X X X X X X X X X X X 2B200C106 Padeyes Load Test Zone 1

X X X X X X X X X X X X X 2B200C706 Padeyes Load Test Zone 1

X X X X X X X X X X X X X 2B200C107 Padeyes Load Test Zone 2

X X X X X X X X X X X X X 2B200C707 Padeyes Load Test Zone 2

X X X X X X X X X X X X X 2B200C108 Padeyes Load Test Zone 3

X X X X X X X X X X X X X 2B200C708 Padeyes Load Test Zone 3

X X X X X X X X X X X X X 2B200C109 Padeyes Load Test Zone 4

X X X X X X X X X X X X X 2B200C709 Padeyes Load Test Zone 4

X X X X X X X X X X X X X 3B200C100 Machinery Space Lifting Gear Demonstration

X X X X X X X X X X X X X 3B200C700 Machinery Space Lifting Gear Demonstration

X X X X X X X X X X X X X 3B200C101 Auxiliary Machinery Space Lifting Gear Demonstration

X X X X X X X X X X X X X 3B200C701 Auxiliary Machinery Space Lifting Gear Demonstration

X X X X X X X X X X X X X 3B200C102 Propulsion Shafting Lifting Gear Demonstration

X X X X X X X X X X X X X 3B200C702 Propulsion Shafting Lifting Gear Demonstration

X X X X X X X X X X X X X 3B200C103 Shaft Torsion Meter Performance Test

X X X X X X X X X X X X X 3B200C703 Shaft Torsion Meter Performance Test

X X X X X X X X X X X X X 5B200C100 Propulsion Plant Dock Trials

X X X X X X X X X X X X X 5B200C700 Propulsion Plant Dock Trials

X X X X X X X X X X X X X 7B200C102 Propulsion Plant and Ships Control Systems Dockside Performance Tests (BT) (AT)

X X X X X X X X X X X X X 7B200C702 Propulsion Plant and Ships Control Systems Dockside Performance Tests (BT) (AT)

X X X X X X X X X X X X X 7B200C103 Propulsion Plant and Ships Control Systems At-Sea Performance Tests (BT) (AT)

X X X X X X X X X X X X X 7B200C703 Propulsion Plant and Ships Control Systems At-Sea Performance Tests (BT) (AT)

114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 Test No. Test Title

X X X X X X X X X X X X X 2B202C100 Machinery Control Cable Insulation Resistance Test

X X X X X X X X X X X X X 2B202C700 Machinery Control Cable Insulation Resistance Test

X X X X X X X X 2B202C101 Machinery Control Network Interface Cable Insulation Resistance and Continuity Test

X X X X X X X X X X X X X 3B202C101 CBR Washdown Monitoring and Control System Demonstration

X X X X X X X X X X X X X 3B202C701 CBR Washdown Monitoring and Control System Demonstration

X X X X X X X X X X X X X 3B202C105 Firemain Monitoring and Control System Demonstration

X X X X X X X X X X X X X 3B202C705 Firemain Monitoring and Control System Demonstration

X X X X X X X X X X X X X 3B202C110 Programmed Control Order/Transfer/Indicating System Demonstration

X X X X X X X X X X X X X 3B202C710 Programmed Control Order/Transfer/Indicating System Demonstration

X X X X X X X X X X X X X 3B202C113 Fuel Monitoring and Control System Calibration and Demonstration

X X X X X X X X X X X X X 3B202C713 Fuel Monitoring and Control System Calibration and Demonstration

X X X X X X X X X X X X X 3B202C116 Machinery Control System (Propulsion and Auxiliary) Calibration and Demonstration

X X X X X X X X X X X X X 3B202C716 Machinery Control System (Propulsion and Auxiliary) Calibration and Demonstration

X X X X X X X X X X X X X 3B202C717 Machinery Control System (MCS) Embedded Training System (ETS) Demonstration

X X X X X X X X X X X X X 3B202C118 UCC Operational Demonstration

X X X X X X X X X X X X X 3B202C119 UCC Embedded Trainer Demonstration

X X X X X X X X X X X X X 3B202C120 Machinery Control Network Port Verification

X X X X X X X X X X X X X 4B202C103 Engineering Officer of the Watch/Logging Unit Calibration and Demonstration

X X X X X X X X X X X X X 4B202C703 Engineering Officer of the Watch/Logging Unit Calibration and Demonstration

X X X X X X X X X X X X X 4B202C106 Damage Control and Repair Station Console Calibration and Demonstration

X X X X X X X X X X X X X 4B202C709 Repair Station Console Calibration and Demonstration

X X X X X X X X X X X X X 5B202C100 Machinery Control System Interunit Communication Demonstration

X X X X X X X X X X X X X 5B202C700 Machinery Control System Interunit Communication Demonstration

X X X X X X 5B202C101 DCS Water Mist Control & Monitor

X X X X X X X X 5B202C701 DCS Water Mist Control & Monitor

114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 Test No. Test Title

X X X X X X X X X X X X X 3B234C100 Propulsion Gas Turbine Warning and Shutdown Test

X X X X X X X X X X X X X 3B234C700 Propulsion Gas Turbine Warning and Shutdown Test

X X X X X X X X X X X X X 6B234C101 Propulsion Gas Turbine Engine Removal Route Demonstration

X X X X X X X X X X X X X 6B234C701 Propulsion Gas Turbine Engine Removal Route Demonstration

X X X X X X X X X X X X X 3B241C100 Shaft Turning Gear & Turning Gear Locking Device Functional Test

X X X X X X X X X X X X X 3B241C700 Shaft Turning Gear & Turning Gear Locking Device Functional Test

X X X X X X X X X X X X X 4B241C100 Propulsion Reduction Gears Dehumidifier Operational Test

X X X X X X X X X X X X X 4B241C700 Propulsion Reduction Gears Dehumidifier Operational Test

X X X X X X X X X X X X X 3B242C100 Propulsion System Clutch & Brake Actuation Device Functional Test

X X X X X X X X X X X X X 3B242C700 Propulsion System Clutch & Brake Actuation Device Functional Test

X X X X X X X X X X X X X 7B243C700 Propulsion Shafting System Vibration Test (Type IV Only) (BT)

X X X X X X X X X X X X X 2B244C101 Stern Tube and Rudderstock Seals Pressure and Leakage Test

X X X X X X X X X X X X X 2B244C701 Stern Tube and Rudderstock Seals Pressure and Leakage Test

X X X X X X X X X X X X X 2B244C703 Bulkhead Seal Pressure and Leakage Test

X X X X X X X X X X X X X 2B245C100 CPPS Pre-Launch Pressure and Installation Test

X X X X X X X X X X X X X 2B245C700 CPPS Pre-Launch Pressure and Installation Test

X X X X X X X X X X X X X 2B245C101 CPPS Cable Insulation Resistance and Continuity Test

X X X X X X X X X X X X X 3B245C100 CPPS Pre-Waterborne Operational Test

X X X X X X X X X X X X X 3B245C700 CPPS Pre-Waterborne Operational Test

X X X X X X X X X X X X X 3B245C101 CPPS Waterborne Operational Test

X X X X X X X X X X X X X 3B245C701 CPPS Waterborne Operational Test

X X X X X X X X X X X X X 2C256C100 Sea Water Cooling Systems Hydrostatic Test

X X X X X X X X X X X X X 2C256C700 Sea Water Cooling Systems Hydrostatic Test

X X X X X X X X X X X X X 2C256C101 Sea Water Service Systems Cable Insulation Resistance and Continuity Test

X X X X X X X X X X X X X 4C256C100 Sea Water Cooling Systems Operational Test

X X X X X X X X X X X X X 4C256C700 Sea Water Cooling Systems Operational Test

114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 Test No. Test Title

X X X X X X X X X X X X X 2B259C100 Propulsion GT Air Intake and Exhaust Systems Tightness Tests

X X X X X X X X X X X X X 2B259C700 Propulsion GT Air Intake and Exhaust Systems Tightness Tests

X X X X X X X X X X X X X 2B259C101 GT Generator Air Intake and Exhaust Systems Tightness Test

X X X X X X X X X X X X X 2B259C701 GT Generator Air Intake and Exhaust Systems Tightness Test

X X X X X X X X X X X X X 2B259C102 Gas Turbine Cooling System Cable Insulation Resistance and Continuity Test

X X X X X X X X X X X X X 3B259C101 Gas Turbine Enclosure Cooling System Operational Test

X X X X X X X X X X X X X 3B259C701 Gas Turbine Enclosure Cooling System Operational Test

X X X X X X X X X X X X X 3B259C102 Gas Turbine Moisture Separator System Operational Test

X X X X X X X X X X X X X 3B259C702 Gas Turbine Moisture Separator System Operational Test

X X X X X X X X X X X X X 2B262C100 Main L.O. System Hydrostatic Test

X X X X X X X X X X X X X 2B262C700 Main L.O. System Hydrostatic Test

X X X X X X X X X X X X X 2B262C101 L.O. Purifying, Transfer and Filling Systems Hydrostatic Test

X X X X X X X X X X X X X 2B262C701 L.O. Purifying, Transfer and Filling Systems Hydrostatic Test

X X X X X X X X X X X X X 2B262C102 Main Lube Oil System Cable Insulation Resistance and Continuity Test

X X X X X X X X X X X X X 4B262C100 L.O. System Operational Test

X X X X X X X X X X X X X 4B262C700 L.O. System Operational Test

SWBS 300 ELECTRICAL PLANT

114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 Test No. Test Title

X X X X X X X X X X X X X 2C300C100 Grounded Receptacles Continuity and Resistance Test

X X X X X X X X X X X X X 2C300C700 Grounded Receptacles Continuity and Resistance Test

X X X X X X 2C300C101 High Resistance Grounding Assembly Installation Test

X X X X X X X X X X X X X 3C310C100 G.T. Generator Initial Start-Up Test

X X X X X 3C310C700 G.T. Generator Initial Start-Up Test DD

X X X X X X X X X X X X X 3C310C702 RIMSS Control System Calibration Test

X X X X X X X X X X X X X 3C310C103 RIMSS Initial Start and Operation Test

X X X X X X X X X X X X X 3C310C703 RIMSS Initial Start and Operation Test

X X X X X X X X 3C310C704 Gas Turbine Generator (AG9160RF) Initial Start-Up Test DD

X X X X X X X X X X X X X 4C310C100 G.T. Generator System Operational Test

X X X X X 4C310C700 G.T. Generator System Operational Test DD

X X X X X X X X X X X X X 4C310C101 G.T. Generator Parallel and Reverse Pow er Relay Test

X X X X X 4C310C701 G.T. Generator Parallel and Reverse Pow er Relay Test DD

X X X X X X X X 4C310C702 Gas Turbine Generator (AG9160RF) System Operational Test DD

X X X X X X X X 4C310C703 Gas Turbine Generator (AG9160RF) Parallel, Reverse Pow er and Fault Current Relay Test DD

X X X X X X X X X X X X X 6C310C101 G.T.