J-1 a ADS ATCT Cab Glass 24015542.pdf
PDF 3 MB Posted
- Attached to
- ADS Cab Glass Replacement
- Solicitation number
- 697DCK-26-R-00251
About this file
This is a PDF portfolio cover page that does not contain contract opportunity details. The image displays the Adobe Acrobat logo on a red and white folder design, accompanied by instructional text directing users to open the PDF portfolio in Acrobat X or Adobe Reader X or later versions. There is no substantive information regarding federal contract opportunities, solicitation details, products, services, pricing, timelines, or agency information present in this document. This appears to be a template or system message rather than an actual federal contracting document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 697DCK-26-R-00251 0001.pdf | ||
| ADS Cab Glass Replacement QA Response.pdf | ||
| J-2 Wage Determination.pdf | ||
| 697DCK-26-R-00251.pdf | ||
| J-3 Past Performance Questionnaire.pdf | ||
| J-1 ADS Cab Glass Specifications.pdf | ||
| J-4 Price Proposal Spreadsheet - ADS Cab Glass.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
03/25/2026
MGR: ENGINEERING - FORT WORTH
ADDISON
ADS-24015542-A001
JEA
ATCT
SITE PLAN
a d s -2
-a
.d w g
TERMINAL
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
C O
N S
T R
U
IO
ADDISON AIRPORT
THIS DRAWING PRODUCED ON ASW REGION CAD SYSTEM
PROJECT ENGINEER
24015542
TX
SCALE: 1" = 20'-0"
SITE PLAN
THIS PROJECT COPY IS BASED ON DRAWING
ADS-D-ATCT-C006-B, REVISION B, DATED 09/30/2005
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
B
A
8 1234567
DRAWING NO
DESIGNED
REVIEWED BY
/3
/2
:3
M P lo tt e b y
V
-C
-E
APPROVED
8 234567
WEST PROPERTY LINE
EAST PROPERTY LINE
BUILDING
EXISTING
EXIS
TIN
G F
ENCE L
INE
AIR
PORT B
UIL
DIN
G R
ESTRIC
TIO
N L
AIR
PORT T
AXIW
AY C
LEARANCE L
DOOLEY ROAD
E/G
FF = 643.5
BASE BUILDING
CRANE
LOCATION
STAGING AREA
COORDINATE WITH RE
NOTES:
1. CONTRACTOR MUST FIELD VERIFY MEASUREMENTS AND
DIMENSIONS PRIOR TO ANY WORK.
2. CONSTRUCTION STAGING AREA MUST BE COORDINATED
WITH RESIDENT ENGINEER.
3. CONSTRUCTION CRANE MUST BE SET UP OUT OF ATCT
LINE OF SIGHT. CRANE BOOM MUST CLEAR ATCT
ANTENNAS. CONTRACTOR TO SUBMIT AND RECEIVE
APPROVAL OF FAA LINE OF SIGHT OBSTRUCTION
EVALUATION PRIOR TO START OF WORK.
4. WORK MUST BE STAGED IN SUCH A MANNER TO MAINTAIN
ACCESS TO THE FACILITY AT ALL TIMES. ANY FULL
CLOSURE OF THE ENTRY WAY MUST BE COORDINATED
WITH THE RESIDENT ENGINEER AND FACILITY.
5. ENSURE THAT ALL CONSTRUCTION TRAFFIC OVER
EXISTING ROADWAYS MUST BE WITHIN THE DESIGN
WEIGHT RANGE OF THE SAID ROADS. REPAIRS TO ANY
INCIDENTAL DAMAGE OR DETERIORATION MUST BE AT NO
ADDITIONAL COST TO THE FAA.
6. CRANE LOCATION MUST BE COORDINATED WITH THE
CITY OF ADDISON. CONTRACTOR WILL BE RESPONSIBLE
FOR CITY OF ADDISON APPLICATION COSTS, PERMITS,
FEES, AND ADDITIONAL COSTS FOR CONSTRUCTION
ACTIVITIES LOCATED IN STREET.
7. CAB GLASS REMOVAL AND REPLACEMENT ACTIVITIES
MUST NOT OCCUR WHEN EXTERIOR TEMPERATURE IS
ABOVE 80 DEGREES FAHRENHEIT OR DURING BAD
WEATHER.
8. TRAFFIC CONTROL WORK MUST BE PERFORMED IN SUCH
A MANNER AS TO PERMIT TRAFFIC TO OPERATE WITH THE
LEAST AMOUNT OF INCONVENIENCE POSSIBLE.
CONTRACTOR TO SUBMIT A TRAFFIC CONTROL PLAN FOR
REVIEW AND APPROVAL BY FAA PRIOR TO START OF
WORK. SIGNING AND FLAGGING MUST BE UTILIZED.
COORDINATE ALL TRAFFIC CONTROL PLANS WITH THE
CITY OF ADDISON. COORDINATE WITH ADDISON POLICE,
ADDISON CITY OFFICIALS, AND FAA FOR ANY ROAD
CLOSURES.
9. TRAFFIC CONTROL EXPENSES FOR MAINTENANCE OF
TRAFFIC ASSOCIATED WITH THE PROJECT ARE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
10. CONTRACTOR MUST SUBMIT A WORK PLAN FOR REVIEW
AND APPROVAL BY FAA PRIOR TO START OF WORK.
11. CONTRACTOR PARKING AND STAGING MUST REMAIN
CLEAN AND FREE FROM DEBRIS AT ALL TIMES.
CONTRACTOR MUST REMAIN A MINIMUM OF 25 FEET
AWAY FROM SECURITY FENCE. RESIDENT ENGINEER
SHALL DETERMINE FINAL LOCATION OF STAGING AREA.
12. ANY RADIO COMMUNICATION DEVICE MUST HAVE
FREQUENCIES APPROVED BY FACILITY FOR USE ONSITE.
IS
20' 0 20' 40'
SCALE: 1" = 20'
ads-24015542-a001
2026-04-02T13:19:07-0500
PHONG T CAO
2026-04-02T13:12:34-0500
JAMES EMERT ARNOLD
CAB
8'
9'
11' 12' 1'
2'
5'-1"5'-1" 20'-5"
4'-0 1/2 "6'-2"6'-2"4'-0 1/2 "
3'-3 3/16 "
/1
RAILING BELOW
EXISTING CAB WALKWAY
PANEL SYSTEM ROOF
REINFORCED CONC
EXISTING GLASS FIBER
CAB ROOF ABOVE
EXTERIOR FACE OF
CAB WINDOW NUMBER (TYPICAL)
FIELD VERIFY LOCATIONS
DOWN CONDUCTOR CONDUIT,
EXISTING LIGHTNING PROTECTION
FIELD VERIFY LOCATIONS
DOWN CONDUCTOR CONDUIT,
EXISTING LIGHTNING PROTECTION
SEE 3/S002, 4/S002, AND 5/S002 FOR DETAILS.
PROVIDE AND INSTALL NEW INSULATING GLAZED UNIT AT 2, 3, 4, AND 10.
REMOVE EXISTING INSULATING GLASS UNITS NUMBERS 2, 3, 4, AND 10.
WINDOW, TYPICAL
SPRAY NOZZLE (2) EACH
EXISTING DEFOGGER
TYPICAL
EXISTING SCUPPER
FIELD VERIFY.
CONDUITS LOCATIONS,
SEE PLAN FOR DOWN CONDUCTOR
CAB WINDOW NUMBER, TYPICAL.
PROVIDE AND INSTALL NEW INSULATING GLAZED UNIT AT 1,5,6,7,8,9,11, AND 12.
REMOVE EXISTING INSULATING GLASS UNITS NUMBERS 1,5,6,7,8,9,11, AND 12.
BID OPTION:
PROVIDE AND INSTALL NEW INSULATING GLAZED UNIT AT 2, 3, 4, AND 10.
REMOVE EXISTING INSULATING GLASS UNITS NUMBERS 2, 3, 4, AND 10.
1"
8 1/ 4 "
EXISTING ALUMINUM FRAME
REF PLAN FOR LOCATIONS.
NEW INSULATING GLASS UNIT
CONC PANEL SKIN
EXISTING FIBER REINFORCED
AND HOUSING
EXISTING WINDOW SHADE
FRAME EACH SIDE, TYPICAL.
FROM GLASS TO EDGE OF
NEW WET CAULK DOW 795
1 1/ 2 "
CONC PANEL SKIN
EXISTING FIBER REINFORCED
EXISTING METAL TRIM
24" OC WITH BATT INSULATION
EXISTING 6" STEEL JOISTS AT
EXISTING STEEL COL BEYOND
REF PLAN FOR LOCATIONS.
FRAME EACH SIDE, TYPICAL
REFER PLAN FOR LOCATIONS.
STEEL FASTENERS.
WITH NEW STAINLESS
REPLACE FASTENERS
MULLION EACH SIDE, TYPICAL
DO NOT DAMAGE.
DOWN CONDUCTOR.
EXISTING CONDUIT FOR
STAINLESS STEEL FASTENERS.
REPLACE FASTENERS WITH NEW
MULLION EACH SIDE, TYPICAL.
REFER PLAN FOR LOCATIONS.
1 1/2 "
1" 1 1/2 "1"
ADS-24015542-A002
CAB PLAN, ELEVATION, AND DETAILS
CAB LEVEL (EL = 57'-10")
SCALE: 1/4" = 1'-0"S002
ELEVATION
SCALE: 1/8" = 1'-0"S002
1 1 S002
CAB WINDOW HEAD
TYPICAL DETAIL
SCALE: 1 1/2" = 1'-0"S002
CAB WINDOW SILL
CAB WINDOW AT COLUMN
THIS PROJECT COPY IS BASED ON DRAWING
ADS-ATCT-A03-S1, REVISION C, DATED 04/17/2015
:5 lo tt e
°22.5°
.5
KEY PLAN
BASE BLDG
EG
7' 6' 5'
10'
3'
4'
07 12
CAB WALKWAY BELOW
EL = 57'-10"
W
TYP
Y
DN
PROVIDE AND INSTALL NEW INSULATING GLAZED UNIT AT 1,5,6,7,8,9,11, AND 12.
REMOVE EXISTING INSULATING GLASS UNITS NUMBERS 1,5,6,7,8,9,11, AND 12.
BID OPTION:
1. FIELD VERIFY MEASUREMENTS AND DIMENSIONS PRIOR TO ANY WORK.
2. CONTRACTOR MUST FIELD VERIFY EXISTING INSULATING GLASS UNIT DIMENSIONS,
THICKNESS, AND COLOR. NEW INSULATING GLASS UNITS MUST MATCH EXISTING
DIMENSIONS, THICKNESS, AND COLOR.
3. APPROXIMATE DAYLIGHT OPENING SIZE OF EXISTING INSULATING GLASS UNITS:
CAB WINDOW 1,3,4,6,7,9,10,12: BOTTOM WIDTH 73". TOP WIDTH 84". HEIGHT 96.5"
CAB WINDOW 2,5,8,11: BOTTOM WIDTH 68". TOP WIDTH 89". HEIGHT 96.5"
4. THE MAXIMUM TIME FROM EXISTING INSULATING GLASS REMOVAL TO NEW GLASS
ENCLOSING OPENING SHALL BE 1 HOUR. EXISTING INSULATING GLASS UNITS ARE TO
BE KEPT ONSITE UNTIL NEW INSULATING GLASS UNITS ARE COMPLETELY
INSTALLED. DEMOLISH EXISTING INSULATING GLASS UNITS ONLY AFTER NEW
INSULATING GLASS UNIT IS COMPLETELY INSTALLED.
5. EXISTING INSULATING GLASS FRAMES ARE TO REMAIN. DO NOT DAMAGE. PREPARE
EXISTING FRAMES AS REQUIRED TO RECEIVE NEW GLASS. CONTRACTOR MUST
REPLACE SPACER, SETTING BLOCKS, AND EDGE BLOCKS IN KIND.
6. WET CAULK NEW GLASS TO EDGE OF FRAME WITH DOW 795 EACH SIDE, TYPICAL.
PREPARE SURFACES PER MANUFACTURER'S INSTRUCTIONS.
7. REPLACE EXISTING ALUMINUM FRAME SCREWS WITH NEW STAINLESS STEEL
SCREWS OF THE SAME SIZE AND TYPE AS EXISTING.
8. WIND LOADING PER ASCE 7-22: SEISMIC LOADING PER ASCE 7-22:
RISK CATEGORY IV. Sds = 0.12
BASIC WIND SPEED = 117 Vmph. Sd1 = 0.085
EXPOSURE CATEGORY C. SEISMIC DESIGN CATEGORY 3
RISK CATEGORY IV
9. DEFOGGER OUTAGES MUST BE COORDINATED WITH AIR TRAFFIC. OUTAGES MUST
NOT INTERFERE WITH AIR TRAFFIC OPERATIONS.
10. CAB GLASS REMOVAL AND REPLACEMENT ACTIVITIES MUST NOT OCCUR WHEN
EXTERIOR TEMPERATURE IS ABOVE 80 DEGREES FAHRENHEIT OR DURING BAD
WEATHER.
11. WORK IN CAB AND OUTSIDE OF CAB GLASS MUST OCCUR BETWEEN 0800 TO 1300
LOCAL TIME AND BE COORDINATE WITH THE RESIDENT ENGINEER.
NOTES:
TOP OF RACEWAY EL = 76'-5"
CAB LEVEL EL = 57'-10"
WALKWAY LEVEL EL = 52'-4"
CABLE ACCESS LEVEL EL = 49'-10"
JUNCTION LEVEL EL = 40'-0"
TOP INTERMEDIATE LEVEL EL = 30'-0"
MIDDLE INTERMEDIATE LEVEL EL = 20'-0"
LOWER INTERMEDIATE LEVEL EL = 10'-0"
GROUND LEVEL TOC EL = 0'-0"
03 020405
8' 0 8' 16'
SCALE: 1/8" = 1'-0"
4' 0 4' 8'
SCALE: 1/4" = 1'-0"
1' 0 1'
SCALE: 1 1/2" = 1'-0"
3"6"9" 1' 0 1'
3"6"9" 1' 0 1'
3"6"9" ads-24015542-a002
2026-04-02T13:19:23-0500
PHONG T CAO
2026-04-02T13:12:43-0500
JAMES EMERT ARNOLD
ADS-24015542-G001
COVER SHEET, SITE LOCATION, AND INDEX OF DRAWINGS
-g
:2 lo tt e
-g
REPLACE FOGGING CAB GLASS AT ADS ATCT PROJECT
AIRPORT TRAFFIC CONTROL TOWER
16000 DOOLEY ROAD
ADDISON, TEXAS
T OF TRANSPO
T A
IC
OF
STATES
IT
TM
EN
AVIA
I
LAR
TRAT
SI
NI
CAB PLAN, ELEVATION, AND DETAILSADS-24015542-A002
SITE PLANADS-24015542-A001
COVER SHEET, SITE LOCATION, AND INDEX OF DRAWINGSADS-24015542-G001
DRAWING TITLEDRAWING NUMBER
INDEX OF DRAWINGS
ads-24015542-g001
2026-04-02T13:18:49-0500
PHONG T CAO
2026-04-02T13:12:16-0500
JAMES EMERT ARNOLD
File details come from the government source that posted it. Updated .