This is a Solicitation, Offer and Award (SF 1449) for a negotiated procurement issued by the Federal Aviation Administration (FAA), Regional Acquisitions office in Burlington, MA. The solicitation number is 697DCK-26-R-00251, issued on April 20, 2026, with offers due by May 20, 2026 at 1700 hours local time. The contracting officer is Erin M. Crabtree (Erin.M.Crabtree@faa.gov, 501-319-4326).

The procurement covers replacement of Airport Traffic Control Tower (ATCT) fogging cab glass at Addison Airport in Addison, TX. This is a firm fixed price, one-job lump sum contract to be awarded to a single offeror with an estimated magnitude of $300,000 to $400,000. The contractor must begin performance within 10 calendar days of the award notice to proceed and complete all work within 30 calendar days. Contract Authority acceptance of offers will not be considered if submitted more than 90 calendar days after the offer due date. Sealed offers (15 copies) must be submitted to the FAA address with acknowledgment of all amendments. A pre-offer site visit is scheduled for April 24, 2026 at 1200 CT; while not mandatory, attendance is strongly urged. Clarification requests must be submitted by email to the contracting officer by 1200 CT on April 28, 2026. Award will be made to the lowest-priced technically acceptable offer (LPTA). Offerors must be registered in the System for Award Management (SAM), provide evidence of bonding capability and insurance coverage, demonstrate acceptable past performance, submit detailed technical proposals addressing quality management, safety management, subcontractor management, and risk management, and provide a detailed cost-loaded schedule of values. Performance and payment bonds equal to 100 percent of the contract price are required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED BID (RFP)

CS-26-00902

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1200 DISTRICT AVENUE

BURLINGTON MA 01803

AAQ510BOS-AFN

Erin.M.Crabtree@faa.gov

ERIN CRABTREE 501-319-4326

x

04/20/2026 86

PURCHASE REQUEST NO.

697DCK-26-R-00251

10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This solicitation is for the replacement of Airport Traffic Control Tower (ATCT) fogging cab glass at the Addison Airport in Addison, TX.

This is a negotiated procurement that will result in a firm fixed price, one job lump sum contract, which will be awarded to a single Offeror.

Estimated magnitude: $300,000 - $400,000.

IN ORDER TO DO BUSINESS WITH THE FEDERAL GOVERNMENT YOU MUST BE REGISTERED IN THE

SYSTEM FOR AWARD MANAGEMENT (SAM). SEE CLAUSE 3.3.1-33 “SYSTEM FOR AWARD

MANAGEMENT”: (JAN 2024).

The FAA, as the Federal Government, is tax exempt. The awarded contractor will be responsible for any/all applicable local, state, and/or federal taxes.

11. The Contractor shall begin performance within

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and is not required.is, B. An offer guarantee

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.

D. Offers providing less than

12B. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in item 12B.)

10 30 calendar days and complete it within ________________ ________________ calendar days after receiving

05/20/2026 x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (MUST BE FULLY COMPLETED BY OFFEROR)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Contract Authority)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE

BY

2PAGE OF

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1200 DISTRICT AVENUE

BURLINGTON MA 01803

AAQ510BOS-AFN

ERIN M. CRABTREE

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

Continued...

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 86

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

697DCK-26-R-00251

(A) (B) (C) (D) (E) (F)

00001 ADS of fogging ATCT cab glass Replacement

(JCN: 24015542)

Electronic & IT: 03

Section B - Supplies or Services/Prices Section B - Schedule

Contractor shall furnish all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees in accordance with applicable Federal, State, and local regulatory requirements.

All work shall be in accordance with the specifications, drawings, contract clauses, and wage rates, as described in this Solicitation.

Resultant contract award will result in a firm fixed price, one job lump sum contract, which will be awarded to a single contractor.

Your total lump sum proposal must be recorded and signed on page 2 of this Solicitation, Offer, and Award form of this solicitation (RFP) package. A detailed offer breakdown must be submitted with your proposal (this offer breakdown must include all costs related to direct and indirect labor, fringe benefits, overhead, G&A expenses, profit, material, equipment, other direct costs, insurance, bonds, freight, handling, transportation, any applicable federal, state, and local taxes, all applicable fees permits, licenses, and any other applicable miscellaneous charges). The awarded Prime Contractor will be responsible for all items of work identified in the attached FAA Specifications and all other attachments as described in Section J.

B.2 MARKUPS

Successful offeror's markup percentages (i.e. Overhead %, Profit %, Insurance %, and Bonding %) once negotiated and awarded, will remain the consistent markup percentages used on any applicable negotiations and/or Contract Modifications during the life of the Award.

B.3 CONTRACT TERM

Contract Period of Performance (PoP) will be 30 calendar days after effective date of the Notice to proceed (NTP) unless negotiated before award. This calendar day period of performance was calculated having already taken into account any known Moratoriums (as detailed in SA35) and/or Federal Holidays (as detailed in SA13).

As such, the awarded Prime Contractor will be responsible to take these into account on any subsequent schedule submission(s).

Work Restrictions: Contractor work hours shall be 40 hours per week from M-T. Contractor must coordinate specific normal working hours with the COR. Offerors are required to base their schedule on the stated 40 hour work week Any additional time may be considered, and/or granted by the FAA, but cannot be assumed in developing any schedules.

B.4 SCHEDULE OF VALUES (SOV)

After award but prior to issuance of NTP, a SOV (Schedule of Values – cost loaded schedule with milestones and details in accordance with provided schedule, used to evaluate all submitted Pay Applications) must be approved by an FAA COR/RE, and will be required to be updated with all subsequent Pay Applications/Invoices submitted during the duration of the performance of any resultant Award.

B.5 SITE VISIT

A pre-offer site visit has been scheduled for April 24, 2026 at 1200 CT.

While this site visit is not mandatory, interested offerors are strongly urged and expected to attend.

Due to security requirements, all attendees must have a valid Government issued photo ID, i.e. state driver’s license.

All prospective attendees must submit a list of attendees 24 hours prior to the site visit to Erin.M.Crabtree@faa.gov.

B.6 REQUEST FOR CLARIFICATIONS/RFI's Any offeror proposing on this project desiring an interpretation or clarification of the solicitation documents must make their written request by e-mail to Erin.M.Crabtree@faa.gov by 1200 CT on April 28, 2026.

Telephone questions will not be accepted, nor any directed to anyone other than myself. The requestor (potential Prime Contractor, not a subcontractor or supplier) shall provide a company name, point-of -contact name, address and telephone number, as well as a return e-mail address. The Contracting Officer is the only person authorized to issue clarifications, interpretations, and/or changes to this solicitation. Any offeror proposing an alternative material/equipment, they must call it out in their proposal package, and this must be in accordance with the Brand Name or Equal clause.

Clause List

The remainder of this page has been intentionally left blank.

Section C - Description/Specifications Scope of Work

All work is to be performed in accordance with the Attachments set forth in Section J of this Solicitation.

Section D - Packaging and Marking

Section E - Inspection and Acceptance Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.4-11 INSPECTION - DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS

(APR 1996)

3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)

(a) 'Work' includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.

The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless the Government determines that it is in the public interest to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may:

(1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or

(2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(j) In the absence of any formal disputes, a project will be deemed physically and financially complete within one year after final acceptance and excess funds will be deobligated at that time.

(End of clause)

Section F - Deliveries or Performance Clause List

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.10.1-24 NOTICE OF DELAY (MAR 2009)

3.8.2-22 SUBSTITUTION OR ADDITION OF PERSONNEL (OCT 2006)

(1) The Contractor must assign only those individuals whose resumes, personnel data, or personnel qualification statements have been submitted and determined by the Contracting Officer to meet the minimum requirements of the contract. The Contractor must not substitute or add personnel except in accordance with this clause.

(2) Substitution of Personnel.

(a) For the first 60 days of contract performance, the Contractor must not substitute personnel for the individuals whose resumes or other personal qualification were submitted with its offer and that were determined by the Contracting Officer to be acceptable at the time of contract award, unless such substitutions are because of an individual's sudden illness, death, or termination of employment. In any of these events, the Contractor must promptly notify the Contracting Officer and propose substitute personnel as required by paragraph (4) below.

(b) If an individual becomes, for whatever reason, unavailable for work under the contract for a continuous period exceeding thirty (30) working days, or is expected to devote substantially less effort to the planned work, the Contractor must propose a substitute personnel as required by paragraph (4) below.

(3) Addition of Personnel. If an FAA requirement will increase the specified level of effort for a designated labor category, but not the overall level of effort of the contract, then the Contractor must notify the Contracting Officer to add personnel to the designated labor category. The Contractor must request added personnel as required by paragraph (4) below.

(4) Request and Review. The Contractor must submit the request for substitute or added personnel in writing to the Contracting Officer at least 60 days (if a security clearance must be obtained, at least 60 days) before the proposed date of substitution or addition. The Contractor's request must provide a detailed explanation of the circumstances causing the proposed substitution or addition, a complete resume for the proposed substitute or added personnel, and any additional information required by the Contracting Officer. Proposed substitutes and added personnel must have qualifications equal to or higher than those stated in the contract for the labor category. The Contracting Officer will evaluate the Contractor's request and promptly notify the Contractor of the decision to accept or reject the qualifications of the substitute or added personnel.

(5) The Contracting Officer may terminate the contract if the Contractor has not made suitable, timely, and reasonably forthcoming replacement of personnel who have been reassigned or terminated or otherwise become unavailable to work under the contract or the resulting loss of productive effort would impair the successful completion of the contract. Alternatively, if the Contracting Officer finds the Contractor to be at fault for the condition, then the Contracting Officer may equitably adjust (downward) the contract price or fixed fee to compensate the Government for any delay, loss or damage as a result of the Contractor's action.

SA13 HOLIDAYS

The following Federal holidays are observed by the Federal Aviation Administration.

New Year's Day January 1st

Martin Luther King's Birthday Third Monday in January

Presidents Day Third Monday in February

Memorial Day Last Monday in May

Juneteeth June 19th

Independence Day July 4th

Labor Day First Monday in September

Columbus Day Second Monday in October

Veterans Day November 11th

Thanksgiving Day Fourth Thursday in November

Christmas Holidays - December 24th - 26th

SA35 FAA HOLIDAY MORATORIUM

Maintenance Moratorium Program NAS Security and Enterprise Operations manages the Maintenance Moratorium program to ensure a stable NAS during peak travel times and special events. A maintenance moratorium may be local or national in scope. Local maintenance moratoria are used to manage NAS activities for localized events such as the Olympics, Super Bowl, air shows and political conventions. These moratoria are managed by the Service Area with Tactical Operations Programs assistance. Scheduled maintenance tasks are restricted during a moratorium period to ensure Technical Operations maintenance activities do not impact the National Airspace System (NAS). Facility restoration and certification activities continue, and other work is allowed with an approved waiver. National moratoria are imposed annually during peak holiday travel times, and when deemed necessary by senior Technical Operations management. Maintenance moratoria are communicated to specialists via a National Maintenance Alert, which contains all of the pertinent information about an individual moratorium.

National Moratorium Events A holiday maintenance moratorium is imposed annually by Technical Operations during the peak holiday travel periods, and as such no work shall be scheduled or take place during any FAA Moratoriums. Known Moratoriums are listed as follows:

Calendar Year 2026 Memorial Day - May 21, 2026 @ 0000Z to May 26, 2026 @ 0800Z Independence Day - July 1, 2026 @ 0000Z to July 6, 2026 @ 0800Z Labor Day - September 3, 2026 @ 0000Z to September 8, 2026 @ 0800Z Thanksgiving - November 21, 2026 @ 0000Z to November 30, 2026 @ 0800Z Christmas/New Year - December 19, 2026 @ 0000Z to January 4, 2027 @ 0800Z

*Any future recurring of these listed Holiday Moratoriums can be expected to be scheduled similarly.

Local Moratorium Events The dates, times, and affected facilities for local moratorium events are determined at the district level in consultation with local Air Traffic and aren't known at this time, these will have to be addressed on a case-by-case basis, if realized.

(End of Clause)

Section G - Contract Administration Data Clause List

3.10.1-23 CONTRACTING OFFICER'S REPRESENTATIVE-CONSTRUCTION CONTRACTS (APR

2012)

(a) The Contracting Officer may appoint other Government personnel to accomplish certain contract administration matters. While there shall be various titles and divisions of duties for these individuals, generically they are known as Contracting Officer's Representatives (CORs). The Contracting Officer will provide written notice of COR appointment(s), setting forth the authorities and limitations, to the Contractor within 1 calendar days prior to the notice to proceed. COR duties may include, but are not limited to:

(1) Perform as the authorized representative of the Contracting Officer for technical matters, including interpretation of specifications and drawings, and inspection and review of work performed.

(2) Perform as the authorized representative of the Contracting Officer for administrative matters, including reviewing payments, and updated delivery schedules.

(b) These representatives are authorized to act for the Contracting Officer in all specifically delegated matters pertaining to the contract, except:

(1) contract modifications that change the contract price or cost, technical requirements or time for performance, unless delegated field change order authority;

(2) suspension or termination of the Contractor's right to proceed, either for default or for convenience;

(3) final decisions on any matters subject to appeal, e.g., disputes under the "Contract Disputes" clause; and

(4) final acceptance under the contract.

(End of clause)

SA14 AUTHORITY OF THE GOVERNMENT

No one other than the Contracting Officer has the authority to authorize or make changes in the terms, conditions, change the scope of work or specifications in the contract, make any commitments or otherwise obligate the Government, or authorize any changes which affect the contract price, delivery schedule, period of performance, or other terms and conditions of the contract.

SA38 SUBCONTRACT ACKNOWLEDGMENT

Within 15 days after contract award of any tier subcontract for performance or work at the construction site, the contractor shall deliver to the Contracting Officer an executed SF 1413, Statement and Acknowledgment form by which the contractor and the subcontractor acknowledge that the labor standards clauses of this contract have been included in the subcontract and in any lower tier subcontract awarded for work under this contract [also reference contract clause 3.6.2-22 Subcontracts (Labor Standards)]. The contractor may request this form from the Contracting Officer. Nothing contained in this contract shall create any contractual relation between a subcontractor and the Government.

(End of Clause)

G.1 INDEX FOR SPECIFICATION PACKAGE

If an index or table of contents is furnished in connection with specifications, it is understood that such index or table of contents is for convenience only. Its accuracy and completeness cannot be guaranteed, and it is not to be considered as part of the specification. In case of discrepancy between the index or table of contents and specifications, the specification must govern.

G.2 PAYMENT

The Contractor must submit an application for payment monthly, or at more frequent intervals if determined by the FAA CO or COR. The applications for payment must be broken down to include a schedule of values (SOV).

This SOV must be approved by an FAA Delegated COR (or RE/Resident Engineer, if a COR has yet to be delegated by the CO). These payment application/invoice submissions must be in accordance with the electronic submissions procedures as governed by 3.3.1-40 Electronic Submission of Payment Requests (INTERIM December 2025).

Also, in accordance with Clause 3.3.1-2 entitled "Payments under Fixed Price Construction Contracts" (Oct 2024), any applications for payment submitted require the certification stated in paragraph (c) of this referenced clause. Requests for payment that do not contain the required certification may not be processed for payment.

Section H - Special Contract Requirements Clause List

3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)

(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:

(1) Contracts written on paper and contracts in electronic form;

(2) Pen-and-ink signatures and electronic signatures; and

(3) Other legally-required written records and the same information in electronic form.

(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.

(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.

(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.

(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section

5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.

(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:

Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.

(End of Clause)

3.8.2-17 KEY PERSONNEL AND FACILITIES (JUL 2019)

(a) The personnel and/or facilities as specified below are considered essential to the work being performed hereunder and may, with the consent of the contracting parties, be changed from time to time during the course of the contract.

(b) Prior to removing, replacing, or diverting any of the specified personnel and/or facilities, the Contractor must notify in writing, and receive consent from, the Contracting Officer reasonably in advance of the action and must submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this contract.

(c) No diversion will be made by the Contractor without the written consent of the Contracting Officer.

(d) The key personnel and/or facilities under this contract are:

Construction/Project Manager Construction Quality Manager Superintendent Project Scheduler

Building Information Modeling Personnel [ ]

(List key personnel and/or facilities)

(End of clause)

SA15 INSURANCE REQUIREMENTS SCHEDULE

"(See Section I, Clause 3.4.1-10, Insurance--Work on Federal Aviation Administration Installation)

During the term of the contract, the Contractor and each subcontractor shall at their own expense, purchase and maintain the following minimum insurance requirements in companies properly licensed and satisfactory to the Contracting Officer:

Automobile and Truck Liability

$200,000 - bodily injury per person, not to exceed $500,000 per occurrence.

$100,000 - property damage per occurrence.

Comprehensive General Liability

$500,000 - Combined bodily injury and property damage per occurrence.

Workmen's Compensation

$100,000 or statutory, whichever is greater.

Umbrella or Excess Liability

$1,000,000 combined single limits bodily injury and property damage.

Insurance certificates shall contain a provision that coverages afforded under the policies will not be canceled until at least 30 days prior written notice has been given to the Contracting Officer at the following address:

Federal Aviation Administration

ATTN: Erin Crabtree Contracting Officer, AAQ- 550

It is agreed that the Federal Aviation Administration, the property owner(s) and their representatives will be held harmless by the Contractor for any loss or damage to sheds, tools, equipment, property and materials of the Contractor, and his subcontractors, their servants and employees, it being understood that the Contractor may at his expense carry any insurance which may be required to provide the necessary protection against such loss or damage.

The Contractor shall not commence work under the contract until he has obtained all the insurance required hereunder and such insurance has been approved by the Contracting Officer. Approval of the insurance by the Contracting Officer shall not relieve or decrease the liability of the Contractor.

The policy shall name "The United States of America, acting by and thought the Federal Aviation Administration" as an additional insured with respect to operations performed under this contract.

SA17 STATE REGULATION OF FEDERAL CONSTRUCTION PROJECTS

FAA contractors may encounter requests from State and local governments for the FAA's contractors to obtain building permits, zoning approval, sanitation approval, etc. Based on the 'Supremacy Clause' set forth in Article 6 of the United States Constitution, construction contractors may not be required to obtain permits or approvals from State and local governments for work done under government contracts on government projects. However, State and local governments do have enforcement authority for safety and environmental protection as specified by the Occupational Safety and Health Administration (OSHA), the Comprehensive Environmental Response, compensation and Liability (Superfund) Act (CERCLA), and the Resource Conservation and Recovery Act

(RCRA).

Contractors who encounter attempts by State or local government entities to assess various types of fees, permits or approvals are advised to inform the Contracting Officer immediately if the assessing entity attempts in any way to prevent or hinder the contractor at the job site.

(End of Clause)

H.1 WAGE RATE DETERMINATION

In accordance with Clause No. 3.6.2-18 entitled "Davis- Bacon Act", for any laborer or mechanic that is employed in a classification that is not listed in the following wage determination, after contract award the contractor is required to submit to the Contracting Officer, Standard Form 1444, Request for Authorization of Additional Classification and Rate. The request shall contact the proposed additional classification and minimum wage rate including any fringe benefit payments.

The applicable Wage Determination is U.S. Department of Labor General Decision Davis-Bacon Act WD# ND20250014 attached hereto, and made a part thereof.

H.4 NON-FAA AND NON-GOVERNMENT PERSONNEL PARTICIPATION

Offerors are hereby notified that the FAA may have submissions or other written information provided in response to this acquisition reviewed by personnel from various Government Agencies and support contractors who may serve as advisors to FAA evaluation personnel during the evaluation phase of this acquisition. All non-Government personnel and their companies have signed, or will sign before the evaluation process begins, nondisclosure and conflict-of-interest statements. The exclusive responsibility for source selection, however, will remain with the FAA. The FAA plans to use the following non-FAA and support contractor companies to take part in the source selection process but may use others instead or in addition.

1. Science Applications International Corporation (SAIC)

- Shari Teel

2. Gransberg and Associates

- Doug Gransberg

- Ricardo Tapia

- Mara Herrera

- Marjorie Herrera

H.5 COMMUNICATIONS

APPROACH FOR COMMUNICATIONS – “SCOPE OF COMMUNICATIONS”

During source selection phase, the purpose of communications is to promote best value outcomes for agency acquisitions by reducing risk, increasing value, and ensuring mutual understanding between the FAA and offerors about all aspects of a procurement.

Communications will be conducted at the CO’s discretion. This includes the discretion to determine the timing and scope of communications and with whom. Communications may be held with some, all, one, or none of the offerors.

Under AMS, there is no right to “meaningful discussions” or cause of action for “unequal communications.” Instead, at his/her discretion, the CO will communicate with similarly situated offerors. “Similarly situated” is dependent on the circumstances and does not mean that each communication with each offeror is the same; instead, the communications are specific to the individual offeror but do not provide an unfair advantage to the offeror. The CO will determine which offerors are similarly situated for the purpose of any communications.

Communications are intended to be flexible, interactive, and tailored as appropriate to the offeror involved in the communications. Communications may continue throughout the process for multiple reasons, including but not limited to addressing minor omissions, clarifications, and for purposes of persuasion, alteration of assumptions and positions, give-and-take. Communications may apply to price, schedule, technical approach (including all non-priced factors), strengths, weaknesses or risks and other terms/conditions of the proposed contract. Information disclosed in oral or written communications may be considered in the evaluation or re-evaluation of an offeror’s proposal/submittal(s). The CO has the discretion to request revised proposals as a result of communications.

Communications may lead to the identification of new strengths, weaknesses or risks and may lead to the reassessment of offerors and their relative scoring and ranking.

Communications with one offeror do not necessitate communications with all offerors.

COMMUNICATIONS REGARDING REQUESTS FOR WAIVER OF REQUIREMENTS

Request for waivers to requirements will be considered and may be the subject of communications. The SSO maintains the right to waive requirements at any time without notification to the offerors so long as the waiver does not change the essential character or condition of the procurement.

SCREENING DECISIONS

The CO may make one of more screening decisions throughout the source selection process. If the SSO is someone other than the CO, the SSO will affirm the CO’s decisions in the selection decision document if doing so is in the best interest of the FAA. Screening decisions may be made before or after engaging in communications. The CO may make a screening decision, identifying one of some offerors most likely to receive award. The CO must communicate with those offerors that are similarly situated but need not communicate with all of those determined most likely to received award.

After receipt of proposals, the CO may proceed to evaluation, decide to engage in communications or make a screening decision to only those offerors determined responsive and responsible. Responsiveness is outlined in the SIR and responsibility may include all elements covered in AMS. Specifically, responsibility may include an initial review of the offeror’s past performance records. Communication, at this stage in the source selection, may include addressing minor omissions and/or other clarifications. With regards to omissions, the CO may allow similarly situated offerors to provide missing proposal information if it is in the best interest of the FAA. The CO may also deem those offerors non-responsive. The CO may also determine an offeror so grossly deficient that it is not likely to receive award, and thus not invited to address its omissions.

During technical evaluations, the CO may seek clarification requests from the offerors.

After technical evaluations, the CO may make a source selection recommendation, engage in communications or make a screening decision based on key differentiators. Communications, at this state, may include but are not limited to, addressing minor omissions and/or clarifications, persuasion, alterations or assumptions and positions, give-and-take, and may apply to price, schedule, technical approach, identification of strengths, weaknesses and risks, and other terms of the proposed contract.

Offerors who are determined not to be “most likely to receive award” at any stage in this process are not entitled to notification at the time the screening decision is made because each may still be eligible for an award if communications with the screened vendors do not result in an award.

If the CO engages in communications prior to making a screening decision, and the communications lead to a change in the requirement, each offeror must be given an opportunity to revise its proposal. If communications are conducted after making a screening decision, and communications lead to a change in the requirement, only those offerors previously determined most likely to receive award will be given the opportunity to revise their proposals.

However, the CO may allow the offeror an opportunity to revise its proposal if doing so is in the best interest of the

FAA.

Where communications do not result in any changes in the FAA’s requirements, the FAA is not required to request or accept offeror revisions, but the CO has the discretion to invite offerors to submit revised proposals. Changes in requirement are distinguished from changes in the Offeror’s technical approach. If an Offeror revises its technical approach after communications, the CO is not required to request proposal revisions from other offerors.

The process is iterative. After making a screening decision, the CO may continue communications with those determined to be most likely to receive award or continue in the source selection process. If the CO elects to continue with communications, these communications may include negotiations that involve persuasion, alteration of assumptions and positions, give-and-take, and may apply to price, schedule, technical requirements, identification of additional strengths, weaknesses or risks, or other terms of the proposed contract. Communications may not reveal another offeror’s approach.

If the parties fail to reach agreement after communications or communications take an unreasonable amount of time, the CO may terminate communications with the offerors and return to the offerors previously screened or make another screening decision reassessing those most likely to receive award.

Once the CO determines communications are no longer necessary, no information will be provided to offerors until award has been made. Final offers may not necessarily be accepted by the Government; they are still subject to final selection by the SSO.

Section I - Contract Clauses Clause List

3.3.1-40 Electronic Submission of Payment Requests (INTERIM December 2025)

(a) Definitions. As used in this clause—

(1) “Contract financing” is a contractual authorization for payments to a contractor prior to acceptance of products or services by FAA.

(2) “Payment request” means a bill, voucher, invoice, or request for contract financing payment or invoice payment with associated supporting documentation. The payment request must comply with the requirements identified in this clause and the applicable Payment clause and invoicing requirements included in this contract.

(3) “Electronic form” means an automated system transmitting information electronically according to the accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.

(4) “Invoice payment” means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government. This includes payments for partial deliveries that have been accepted by the Government, final payments under T&M and labor-hour contracts, and final cost or fee payments where amounts owed have been settled between the Government and the contractor.

(b) Electronic payment requests. Except as provided in paragraph (f) of this clause, the Contractor must submit payment requests in electronic form. Purchases paid with a Government purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.

(c) The Federal Aviation Administration utilizes the Delphi eInvoicing web-portal for processing invoices.

Contractors submitting invoices are required to submit invoices via the Delphi eInvoicing web portal which is accessed and authenticated via www.login.gov

(d) In order to receive payment and in accordance with prompt payment standards, the Contractor must submit a proper invoice. All invoices submitted as attachments in the Delphi eInvoicing web-portal must contain the following:

(1) Invoice number and invoice date.

(2) Period of performance covered by invoice.

(3) Contract number and title.

(4) Task/Delivery Order number and title (if applicable).

(5) Amount billed (by CLIN), current and cumulative.

(6) Total ($) of billing.

(7) Cumulative total billed for all contract work to date.

(8) Name, title, phone number, mailing address, and email address (if available) of person to be contacted in the event of a defective invoice.

(9) The following statement: “The Contractor certifies that, by submitting this invoice to the FAA, the supplies and/or services billed have been shipped, rendered, or delivered in accordance with instructions issued by the ordering officer; that they are reflected in the quantities and/or period of performance stated on the invoice; and that such supplies and/or services conform to the quantity and quality requirements specified in the applicable contract, order, or blanket purchase agreement.

(10) The following statement: “Pursuant to Executive Order 14173, Ending Illegal Discrimination And Restoring Merit-Based Opportunity, the Contractor certifies that it is in compliance with the Equal Protection principles of the Constitution and all applicable Federal anti-discrimination laws, and acknowledges that such compliance is material to the Government’s payment decision under the False Claims Act (31 U.S.C. § 3729(b)(4)). The Contractor also affirms that it does not operate any diversity, equity, and inclusion (DEI) initiatives that are inconsistent with the Equal Protection principles of the Constitution and the non-discrimination requirements of Federal law, as interpreted by the Supreme Court in Students for Fair Admissions v. Harvard, 600 U.S. 181 (2023).”

Note: the statement in item (10) in the preceding list is only required for invoices submitted to receive payment for contract performance occurring after this AMS clause 3.3.1-40 Electronic Submission of Payment Requests (INTERIM December 2025) is included in the contract.

If the contract includes allowances for travel, all invoices that include charges pertaining to travel expenses must catalog a breakdown of reimbursable expenses with the appropriate receipts to substantiate the travel expenses.

(e) Payment system registration. Each person accessing the Delphi eInvoicing web-portal will be required to have a unique user Delphi eInvoicing ID and password and be credentialed through login.gov.

(1) Electronic authentication. See www.login.gov for instructions. Click on the following link for instructions on establishing a login.gov account: https://login.gov/help/creating-an-account/how-do-i-create-an-account-with-logingov/.

(2) To create a login.gov account, the user will need a valid email address and a working phone number. The user will create a password and then login.gov will reply with an email confirming the email address.

(3) DELPHI registration instructions. New users should request access to Delphi eInvoicing by sending an email to 9-AMC-FAA-iSupplier@faa.gov. Once access is granted, users should navigate to http://einvoice.esc.gov to activate the account. Users are required to log in every 45 days to keep it active.

(4) Training on DELPHI. To facilitate use of DELPHI, comprehensive user information is available at http://einvoice.esc.gov

(5) Account Management. Contractors must contact the DELPHI Help Desk when their firm’s points of contact will no longer be submitting invoices so they can be removed from the system. Instructions for contacting the DELPHI Help D can be found at http://einvoice.esc.gov

(f) Waivers: If the Contractor does not believe electronic invoicing can be used if they are awarded this contract, the Contractor must respond accordingly to AMS clause 3.3.1-41 Electronic Invoicing-Representation. Waiver requests must be approved by the FAA and DOT and will be processed expeditiously upon contract award. If the waiver request is not approved, the Contractor must use electronic invoicing consistent with this clause. If the waiver request is approved, conversion to electronic invoicing at a later date may be required. While the waiver is in effect, the current invoicing process must be used per AMS Guidance T3.3.1A.14 and the terms of the contract. The decision regarding a waiver request is not subject to AMS clause 3.9.1-1 Contract Disputes.

Prescription: Must be used in all SIRs and contracts except for (1) classified contracts or purchases when electronic submission and processing of invoices could compromise classified information or national security; (2) those paid with a Government purchase card; or (3) real property contracts. Alternate payment procedures to electronic invoicing may be used if a waiver is granted per (f) above and consistent with AMS Guidance T3.3.1A.15. This clause does not apply if an approved waiver is in effect. As applicable, see also AMS clause 3.3.1-17 Prompt Payment, AMS clause 3.3.1-18 Prompt Payment for Fixed-Price Architect-Engineer Contracts, or AMS clause 3.3.1-19 Prompt Payment for Construction Contracts.

3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)

This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:

https://fast.faa.gov/contractclauses.cfm.

(End of clause)

3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023)

3.2.2.3-25 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA (APR

2024)

3.2.2.3-27 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (APR 2024)

3.2.2.3-33 ORDER OF PRECEDENCE (APR 2024)

3.2.2.3-42 DIFFERING SITE CONDITIONS (APR 2024)

3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 2024)

3.2.2.3-45 MATERIAL AND WORKMANSHIP (JUL 2024)

3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2024)

3.2.2.3-47 PERMITS AND RESPONSIBILITIES (JUL 2024)

3.2.2.3-48 OTHER CONTRACTS (JUL 2024)

3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,

AND IMPROVEMENTS (JUL 2024)

3.2.2.3-51 OPERATIONS AND STORAGE AREAS (JUL 2024)

3.2.2.3-52 USE AND POSSESSION BEFORE THE PROJECT IS COMPLETE (JUL 2024)

3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2024)

3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2024)

3.2.2.3-56 SCHEDULES FOR CONSTRUCTION CONTRACTS (JUL 2024)

3.2.2.3-58 LAYOUT OF WORK (JUL 2024)

3.2.2.3-62 PRECONSTRUCTION CONFERENCE (JUL 2024)

3.2.2.3-64 DISMANTLING AND DEMOLISHING OF PROPERTY (JUL 2024)

3.2.2.3-66 CONTRACTOR'S DAILY LOG (JUL 2024)

3.2.2.3-67 SPECIAL PRECAUTIONS FOR WORK AT OPERATING AIRPORTS (JUL 2024)

3.2.2.3-68 SAFETY AND HEALTH (OCT 2014)

3.2.2.3-69 SUBCONTRACTS - CONSTRUCTION (JUL 2024)

3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (OCT 2015)

3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)

3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)

3.2.5-1 OFFICIALS NOT TO BENEFIT (OCT 2024)

3.2.5-3 GRATUITIES OR GIFTS (OCT 2024)

3.2.5-4 CONTINGENT FEES (OCT 2024)

3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2024)

3.2.5-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE FAA (OCT 2024)

3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 2024)

3.2.5-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2024)

3.2.5-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2024)

3.3.1-9 INTEREST (APR 2023)

3.3.1-15 ASSIGNMENT OF CLAIMS (JUL 2018)

3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2021)

3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS

(OCT 2012)

3.3.1-31 PROGRESS PAYMENTS (JUL 2018)

3.3.1-31 PROGRESS PAYMENTS (JUL 2018) - ALTERNATE I (JUL 2018)

3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD

MANAGEMENT (OCT 2024)

3.4.1-6 ADDITIONAL BOND SECURITY (APR 1996)

3.4.1-7 NOTICE TO PROCEED (OCT 2019)

3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (OCT 2020)

3.4.2-8 FEDERAL,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .