Item C-103 Water Pollution Control.pdf
PDF 101 KB Posted
- Solicitation number
- ANE223-ANE2C-6416
- Issued by
- San Bernardino County, California
About this file
This is an Addendum document for Item C-103 Water Pollution Control issued by San Bernardino County Project and Facilities Management Department for the SHR Aviation Flight Line Pavement Replacement Project. The project involves demolishing approximately 350,000 square feet of existing pavement and constructing new Portland Cement Concrete pavement, storm drain systems, lighting, and temporary structures across approximately 5.53 acres of ground disturbance at 199 N. Hangar Way, San Bernardino. The mandatory pre-bid meeting and site walk is scheduled for July 15, 2026 at 11:00 a.m., with sealed bids due August 5, 2026 at 10:00 a.m. The contract term is 180 calendar days from Notice to Proceed, with liquidated damages of $1,000 per day for delays. Bidders must hold a State Contractor's General Engineering Contractor Class "A" License and attend the mandatory pre-bid meeting or face disqualification.
The contractor must comply with the 2025 Construction Contractor's Guide and Specifications of the Stormwater Best Management Practice Handbook and California's 2022 General Permit (Order No. 2022-0057-DWQ). The contractor is responsible for providing a Qualified SWPPP Developer/Practitioner (QSD/QSP) to update the draft Stormwater Pollution Prevention Plan, maintain compliance documentation, conduct required inspections (30-day, weekly, pre/during/post-storm), and submit inspection reports within three days to the Project Manager. Full compensation for all water pollution control work, including labor, tools, equipment, documentation, and materials, is included in the contract lump sum price with no additional compensation allowed. The construction estimate is $10,201,239, and a 10 percent bid bond, Performance Bond, and Labor and Material Payment Bond (each 100 percent of contract price) are required. Prevailing wage requirements apply under California Labor Code, and contractors must register with the Department of Industrial Relations prior to submission.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item C-103 Water Pollution Control Addendum 1
Item C-103 Water Pollution Control
DESCRIPTION
The water pollution control work shall conform to the requirements in the 2025 Construction Contractor’s
Guide and Specifications of the Stormwater Best Management Practice Handbook, dated December 2019, and addenda thereto issued up to and including the date of advertisement of the project, hereafter referred to as the “Handbook”. Copies of the Handbook may be obtained from CASQA website at:
https://www.casqa.org/resources/bmp-handbooks; Telephone: (424) 241-2249; or email at:
CASQA@casqa.orgmailto:info@casqa.org. The Contractor shall become fully informed of, and comply with, the applicable provisions of the Handbook, Permit, and Federal, State, and local regulations that govern the Contractor’s operations and storm water discharges from both the project site and areas of disturbance outside the project limits during construction. The Contractor shall maintain a copy of the
Permit at the project site and shall make the Permit available during construction activities.
Contractor is not responsible for filing a Notice of Intent (NOI) for Permit coverage or a Notice of
Termination (NOT) at project end or for preparing a SWPPP. A draft SWPPP will be provided to the contractor as a starting point for water pollution control compliance. The SWPPP is a living document and the Contractor’s Qualified SWPPP Developer/Practitioner (QSD/QSP) will assume responsibility for updating and maintaining applicable records upon the start of work. The WDID number is shown on the plans.
The contractor is responsible for providing a Qualified SWPPP Developer/Practitioner (QSD/QSP).
The (QSD/QSP) is responsible for complying with the requirements of the 2022 Construction General
Permit (CGP), Order 2022-0057-DWQ issued by the California State Water Resources Control Board including the following duties, inspections, and reports:
• Update the draft SWPPP with final information, subcontractors, training logs, etc.
• Maintain a hard copy of the SWPPP on-site
• Maintain a "living map" showing the changes in BMP implementation, to be posted in the construction trailer
• 30-day inspection (start of project)
• August thru October and January thru March inspections
• Weekly inspections
• Pre, during and post storm inspections
• Submittal of inspection reports to Project Manager within 3 days
• Review and submittal of the Annual Report
• Contact the Public Works Inspector - Miguel Puente - 909-633-9506 to inspect the SWPPP implementation
• Coordinate with PW Inspector to address issues in a timely manner
Item C-103 Water Pollution Control Addendum 1
The Contractor is responsible to protect the Project site from erosion damage at all times by utilizing interim erosion control measures which, due to the site’s ever changing condition during construction, is achieved by implementing Best Management Practices (BMPs). The Contractor shall ensure that Best
Management Practices (BMPs) within the SWPPP are implemented by a Qualified SWPPP Practitioner
(QSP).
Storm, surface and/or nuisance water may be encountered at various times and locations during performance of the Work. Such waters may interfere with Contractor’s operation and may cause damage to adjacent or downstream private and/or public property by flooding, lateral erosion, sedimentation, or pollution if not properly controlled by Contractor. Contractor, by entering into the Contract, assumes all risk and responsibility for water control. Contractor’s responsibility includes, at a minimum, handling any nuisance and/or storm waters that may result during the term of the Contract in a manner which will protect construction throughout the various stages of work up to the point of final acceptance by Owner.
The Contractor shall install and maintain all required or necessary erosion control measures to cover the entire duration of the term of the Contract.
BASIS OF PAYMENT
Full compensation for conforming to the requirements of this Bid Item, “C-103 – Water Pollution
Control” including furnishing all labor, tools, equipment, documentation, and materials for doing the work shall be included in the contract LUMP SUM price bid, and no additional compensation will be allowed.
File details come from the government source that posted it. Updated .