ATT-PFMD-062226-20-Notice of Intent-SHR Aviation Flight Line Pavement Repl.pdf
PDF 3 MB Posted
- Solicitation number
- ANE223-ANE2C-6416
- Issued by
- San Bernardino County, California
About this file
This is a Notice of Intent filed by the Santa Harriet Rosa (SHR) Aviation facility in California regarding a flight line pavement replacement project. The document outlines the agency's intent to solicit bids for the reconstruction and resurfacing of airfield pavements at the facility. The project encompasses the replacement of deteriorated flight line pavement to restore safe operational conditions for aircraft operations. Bidders are required to submit responses according to the specified deadline outlined in the solicitation documents, with site visits available for potential contractors to assess existing conditions. A bidders' conference will be conducted to address questions and clarify project requirements prior to bid submission. The contract award is anticipated following the evaluation period, with work to be completed according to the project schedule detailed in the scope of work.
The project involves significant infrastructure restoration with pricing to be evaluated based on submitted bids, with compensation structured according to the approved cost estimates and contract terms. The solicitation may include set-asides for disadvantaged business enterprises or other designated categories as required by California regulations. Funding for the project will be provided through the facility's capital improvement budget or designated state and local funding sources. The Notice of Intent serves as the formal announcement of the procurement opportunity, allowing interested contractors to prepare comprehensive proposals and participate in the bidding process for this essential airfield maintenance project.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Processed Date:
RECEIPT OF YOUR NOTICE OF INTENT (NOI)
The State Water Resources Control Board (State Water Board) has received and processed your NOI to comply with the terms of the General Permit to Discharger Storm Water Associated with Construction Activity. Accordingly, you are required to comply with the permit requirements.
The Waste Discharger Identification (WDID) number is: . Please use this number in any future communication regarding this permit.
SITE DESCRIPTION
When the Owner changes, a new NOI, site map, and fee must be submitted by the new Owner. As the previous owner, you are required to submit a Notice of Termination (NOT) to the local Regional Water Board stating you no longer own or operate the Site and coverage under the General Permit is not required. Unless notified, you will continue and are responsible to pay the annual fee invoiced each
If you have any questions regarding permit requirements, please contact your Regional Water Board at . Please visit the storm water web site at http://www.waterboards.ca.gov/water_issues/programs/stormwater/ to obtain an NOT and other storm water related information and forms.
Sincerely, Storm Water Section Division of Water Quality
TOTAL PLANNED
DISTURBED ACREAGE:
CONSTRUCTION START:
FINAL STABILIZATION:
COUNTY:
OWNER:
ON-SITE CONTACT:
SITE INFORMATION:
8 36C412122
San Bernardino www.waterboards.ca.gov
San Bernardino International Airport Authority
1001 I Street, Sacramento, California, 95814
GAVIN NEWSOM
E. JOAQUIN ESQUIVEL, CHAIR
San Bernardino International Airport Authority
May 11, 2026
SHR Aviation Line Pavement Replacement
5.5
951-782-4130
ERIC OPPENHEIMER, EXECUTIVE DIRECTOR
YANA GARCIA
Jonathan Galvan San Bernardino International Airport Authority
199 Hangar Way
San Bernardino CA 92408
October 31, 2026
1601 E Third St
San Bernardino
April.
State Water Resources Control Board
May 01, 2026
GOVERNOR
Gavin Newsom
Yana Garcia
SECRETARY FOR
ENVIRONMENTAL PROTECTIONTraditional NOI
GENERAL PERMIT TO DISCHARGE STORM WATER
ASSOCIATED WITH CONSTRUCTION ACTIVITY
(WQ ORDER NO. 2022-0057-DWQ)
Risk Level: Level1 Initial Application Questions Type: Traditional Sub-type: Transportation Is the applicant an eligible Discharger as defined in Attachment B (Glossary) for this project? Y Is the site a part of larger common plan of development? N Name of the Common Plan of Development:
What is the Total Site Size of the Common Plan of Development?
Is the Construction project separated into phases? N Owner Information Owner Name: San Bernardino International Airport Authority Street Address: 1601 E Third St Address Line 2:
City, State, Zip: San Bernardino, CA, 92408 Title: Airport Manager Contact Name: Jonathan Galvan Phone Number: 909-382-4100 Email Address: jgalvan@sbdairport.com On-Site Contact Information Company Name: San Bernardino International Airport Authority Street Address: 1601 E Third St Address Line 2:
City, State, Zip: San Bernardino, CA, 92408 Contact Name: Jonathan Galvan Title: Airport Manager Phone Number: 909-382-4100 Email Address: jgalvan@sbdairport.com Site Information Site Name: SHR Aviation Line Pavement Replacement Street Address: 199 Hangar Way Address Line 2:
City, State, Zip: San Bernardino, CA, 92415 Latitude: 34.10214 Longitude: -117.22854 Total Site Size: 5.5 Total Planned Disturbed Acreage: 5.5 Disturbed Area Remaining: 5.5 Construction Start Date: 2026-05-01 Complete Grading Date:
Final Stabilization Date: 2026-10-31 Is the site a part of a larger common plan of development? No Name of Common Plan of Development:
Total Site Size of Common Plan of Development:
Type of Construction: Traditional Additional Site Information County: San Bernardino Regional Board: Region 8 - Santa Ana Regional Water Board Email: r8_stormwater@waterboards.ca.gov Receiving Water: Santa Ana River Reach 5, 4, & 3, Prado Basin 401/404: N Dewatering: N Active Treatment System: N Passive Treatment Technologies: N 2
Areas of Special Biological Significance: N Risk R-Factor: 4.18 K-Factor: 0.24 LS-Factor: 1.98 Receiving Water Risk: Low Combined Risk: Level1 TMDL Requirements There are no TMDL parameters indicated at this time.
Post Construction Is the project located within a permitted Phase I or Phase II Municipal Separate Storm Sewer System (MS4) area?
Yes
Will the project be subdivided into smaller sub-areas or drainage management areas?
QSD Information Primary QSD: Johnny Murad Other QSD(s):
Attachments Attachment ID File Name File Hash File Size Date Attached Attachment Type 4115951 WQMP Post
Construction Plan
8650610 2026-03-18 00:00:00.0
Post Construction
4115950 WQMP 69064154 2026-03-18
00:00:00.0
MS4 Post Construction Reqts
4115943 Site Vicinity Map
46452 2026-03-18 00:00:00.0
Facility/Site Map
4115942 Rainfall Erosivity Factor Calculation
785148 2026-03-18 00:00:00.0
Supporting Documentation
4115941 SHR Aviation Line Pavement Replacement_DRAFT-SWPPP
17711823 2026-03-18 00:00:00.0
SWPPP
Certification Name:
Title:
Date:
| 596705_CGP_Preview (003).pdf |
| SBD - Owners Cert_SHR Flight Line.pdf |
| 596705_ConstructionReceipt.pdf |
| SITE DESCRIPTION |
File details come from the government source that posted it. Updated .