ITBCDS240985_Residential_Rehab_at_2612_NE_22nd_Ave_Clarke_-_Addendum_No._2.pdf

PDF 78 KB Posted

Attached to
Residential Rehab at 2612 NE 22nd Ave (Clarke)
Solicitation number
ITB#CDS/240985
Issued by
Marion County, Orlando City, Florida

About this file

This document is Addendum #2 issued by the City of Ocala for Solicitation Number ITB#CDS/240985, pertaining to a Residential Rehab project at 2612 NE 22nd Ave in Ocala, Florida. The addendum provides critical updates to the original bid specifications, specifically addressing permit requirements and project sequencing for the residential rehabilitation work. The document outlines that the contractor will be responsible for obtaining four specific City of Ocala permits at no additional cost: building, plumbing, electrical, and HVAC permits.

The addendum introduces a key project sequencing requirement, mandating that HVAC and water heater installations must be completed first in the rehabilitation process. This specification ensures that critical mechanical systems are addressed before other renovation work proceeds, potentially indicating a strategic approach to the home's overall system upgrades and efficiency. The document is dated December 17, 2024, and is addressed to all bidders, suggesting that this is a modification to the original bid documents that all potential contractors must review and incorporate into their proposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum # 2

Date: December 17, 2024

To: All bidders

From: Brittany Craven, Buyer

Solicitation Number: ITB#CDS/240985

Solicitation Title: Residential Rehab at 2612 NE 22nd Ave (Clarke)

SECTION 1. PERMIT AND SPECIFICATION REQUIREMENTS - Correction

1. Permits Required: Contractor will be responsible for obtaining the following City of Ocala permits at no additional cost to the City:

a. Building

b. Plumbing

c. Electrical

d. HVAC

SECTION 2. HVAC & WATER HEATER – Additional Information

1. HVAC and water heater must be completed first.

File details come from the government source that posted it. Updated .