ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_Exhibit_F_-_Price_Proposal.xlsx

XLSX spreadsheet 55 KB Posted

Attached to
Well Drilling WTP No. 2-Upper Aquifer Well #11 and #12
Solicitation number
ITB# ENG/250268
Issued by
Marion County, Orlando City, Florida

About this file

This is an Invitation to Bid (ITB) document for the City of Ocala, Florida, specifically ITB# ENG/250268 for Well Drilling at Water Treatment Plant No. 2. The project involves drilling two Upper Floridan Aquifer Wells (#11 and #12) located at 3744 S Pine Avenue in Ocala, with a non-mandatory pre-bid meeting scheduled for February 12, 2025, at 10:00 AM EST. The contractor will be responsible for providing all materials, labor, and equipment to complete well drilling, casing installation, concrete pouring, and testing. An alternate scope includes abandoning eight monitoring wells and modifying existing Well #7 by extending its casing.

The pricing will be conducted on a unit price basis, with bidders required to submit pricing for all line items using Exhibit F - Price Proposal. The bid includes a 10% bid bond, and award will be made to the lowest bidder meeting all outlined requirements. Bidders must be a Florida-licensed water well contractor with a minimum of 5 years of experience, with work performed under the direct supervision of a driller having at least five years of similar work experience. Prices will be honored for 90 days after award, and contractors must remain current on all obligations to the City of Ocala during the service performance.

View the file

Other files

File Type Posted
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_NEW_Exhibit_H_-_Monitoring_Well_Depths_-_NEW_Exhibit_H_-_Monitoring_Well_Depths.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_SIGN-IN_SHEET.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_Addendum_1.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_REV_2.6.25_Exhibit_F_-_Price_Proposal_Rev1.xlsx XLSX spreadsheet
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_REV_2.6.25_Exhibit_A_-_Scope_of_Work.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_REV_2.5.25_Exhibit_B_Plan_Set_Rev1.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_REV_1.32.25_Exhibit_A_-_Scope_of_Work.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_Exhibit_E_-_Grant_Clauses_6b83d874.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_Exhibit_A_-_Scope_of_Work.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_Exhibit_G_-_Executed_Grant_Amendment_1_and_2.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_Exhibit_B_-_Plan_Set_.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_Exhibit_C_-_Monitoring_Wells_and_Well__7_Location.pdf PDF
ITB_ENG250268_Well_Drilling_WTP_No.2-Upper_Aquifer_Well_11_and_12_-_Exhibit_D_-_62-532_Water_Well_Permitting_and_Construction_Requirements.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Road & storm (orig)_void

(08101) SW 44TH AVE. CONSTRUCTION - Phase III Bid B-____
ITEM NO.DESCRIPTIONUNITQUANTITYPRICEAMOUNT
General Construction
101-01.01MOBILIZATIONLS1.00$ 20,000.00$ 20,000.00
102-01.01MAINTENANCE OF TRAFFICLS1.00$ 85,850.00$ 85,850.00
104-01EROSION, SEDIMENTATION AND WATER POLUTION CONTROLLS1.00$ 50,000.00$ 15,000.00
104-13.01TYPE 3 SILT FENCELF12,000.00$ 2.00$ 24,000.00
110-01CLEARING & GRUBBINGLS1.00$ 100,000.00$ 100,000.00
477-01CONSTRUCTION SURVEY & LAYOUTLS1.00$ 60,000.00$ 60,000.00
486-01AS-BUILT SURVEY (INCLUDES ROAD/STORM/WATER/SEWERLS1.00$ 25,000.00$ 25,000.00
ROADWAY
120-01.01REGULAR EXCAVATION (ROADWAY)CY878.71$ 3.00$ 2,636.13
120-09.01FINISHED GRADINGLS1.00$ 25,000.00$ 25,000.00
120-06.01EMBANKMENT ROADWAY (ON-SITE MATERIALS) NO PAY ITEMCY4,110.00$ - 0$ - 0
160-004.001TYPE "B" STABILIZATION 12" LBR-40SY42,973.00$ 4.50$ 193,378.50
285-07.0210" LIMEROCK BASE W/PRIME COATSY35,811.00$ 7.25$ 259,629.75
MILLINGSY480.00
334-01.013" SP-12.5 ASPHALT (STRUCTURAL) (TACK COAT)SY35,811.00$ 11.00$ 393,921.00
334-01.021" SP-9.5 ASPHALT (SURFACE) (INCLUDES TACK COAT)SY36,291.00$ 5.00$ 181,455.00
334-01.03TEMPORARY ROAD (INCLUDES REMOVAL)SY4,919.00$ 12.00$ 59,028.00
575-01.01SOD ROADWAYSY17,094.00$ 2.00$ 34,188.00
520-01.01TYPE "F" CURB & GUTTER (INCLUDES CURB PAD)LF10,809.00$ 10.00$ 108,090.00
520-01.03TYPE "E" CURBLF5,251.00$ 12.00$ 63,012.00
522-014" CONCRETE SIDEWALKSY5,301.00$ 27.00$ 143,127.00
522-02-01CONCRETE CURB RAMP CR 20 W/DETECTABLE WARNING SURFACEEA11.00$ 1,700.00$ 18,700.00
522-02.02CONCRETE CURB RAMP CR 23 W/DETECTABLE WARNING SURFACEEA2.00$ 2,500.00$ 5,000.00
522-03.016" FIBER REINFORCED CONCRETE DRIVEWAYS/ SIDEWALKS/ISLANDSSY949.00$ 37.00$ 35,113.00
GENERAL CONSTRUCTION & ROADWAY SUB-TOTAL:$ 1,852,128.38
STORM DRAINAGE
120-04.03REMOVE UNSUITABLE MATERIAL (STORM TRENCH)CY5,500.00$ 5.00$ 27,500.00
120-04.06REMOVE UNSUITABEL ROCK MATERIAL (STORM TRENCH)CY2,000.00$ 10.00$ 20,000.00
120-06.02REPLACE UNSUITABLE MATERIAL (STORM TRENCH)CY5,500.00$ 8.00$ 44,000.00
425-01.01DITCH BOTTOM INLET TYPE "C"EA5.00$ 2,000.00$ 10,000.00
425-01.02CURB INLET TYPE 5 (0'-6') W/ "P" BOTTOMEA8.00$ 3,800.00$ 30,400.00
425-01.03CURB INLET TYPE-5 (6'-12') W/ "P" BOTTOMEA12.00$ 4,000.00$ 48,000.00
425-01.04CURB INLET TYPE 6 (0'-6') W/ "P" BOTTOMEA3.00$ 4,000.00$ 12,000.00
425-01.07CURB INLET TYPE 6 (0'-6') W/ "J" BOTTOMEA1.00$ 5,300.00$ 5,300.00
425-02.02 ?STORM MANHOLE TYPE "J-7T" (6'-12')EA2.00$ 3,800.00$ 7,600.00
425-02.04 ?STORM MANHOLE TYPE "J-7T" (12'-18')EA1.00$ 4,500.00$ 4,500.00
425-11.01CONNECT NEW STORM PIPE TO EXISTING STRUCTUREEA4.00$ 600.00$ 2,400.00
430-17.01MODIFICATION OF EXISTING DRAINAGE (TEMPORARY FOR PHASE I MOT)LS1.00$ 10,000.00$ 10,000.00
430-17.02 ?12" CMPLF54.00$ 30.00$ 1,620.00
430-17.0318" RCPLF1,701.00$ 42.00$ 71,442.00
430-17.0424" RCPLF1,425.00$ 58.00$ 82,650.00
430-17.0530" RCPLF764.00$ 75.00$ 57,300.00
430-17.0636" RCPLF325.00$ 135.00$ 43,875.00
430-17.0748" RCPLF347.50$ 130.00$ 45,175.00
430-17.0814"x23" RCP ELLIPTICALLF861.00$ 115.00$ 99,015.00
430-17.0924"x38" RCP ELLIPTICALLF149.00$ 115.00$ 17,135.00
430-98.01MITERED END SECTION 12" CMPEA1.00$ 1,200.00$ 1,200.00
430-98.02MITERED END SECTION 36" RCPEA2.00$ 3,200.00$ 6,400.00
530-03.01RUBBLE RIP RAP (2' THICK W/FILETER FABRICSY115.00$ 55.00$ 6,325.00
SILT FENCELF12,000.00$ 1.50$ 18,000.00
STORM SUBTOTAL:$ 653,837.00
DRAINAGE RETENTION AREAS
120-02.01REGULAR EXCAVATION DRA & HAUL OFFCY56,901.00$ 2.50$ 142,252.50
120-04.04OVER EXCAVATE DRA BOTTOM & REPLACE W/ SUITABLE MATERIAL (3 FEET OF DEPTH)CY?$ 8.00$ 8.00
550-02.01CHAIN LINK FENCING 6' TYPE "B" (NEW)LF2,394.00$ 15.00$ 35,910.00
12' CHAIN LINK FENCE GATEEA3$2,000.00$6,000.00
550-02.02CHAIN LINK FENCING 6' TYPE "B" (RELOCATE)LF1,173.00$ 7.00$ 8,211.00
575-01.02SOD (DRA)SY14,407.00$ 2.00$ 28,814.00
DRA SUBTOTAL DRA:$ 221,195.50
WATER SYSTEM
120-02.03.02BACKFILL W/ OFF-SITE MATERIALCY3000$9.00$27,000.00
120-4.2REMOVE UNSUITABLE MATERIALCY3000$7.00$21,000.00
120-4.3REMOVE ROCK MATERIALCY100$11.00$1,100.00
486.1WATER SYSTEM ASBUILTLS1$7,000.00$7,000.00
487.01.01.011" PVC PIPINGLF50$4.60$230.00
487.01.01.031" BACKFLOW PREVENTEREA1$450.00$450.00
487.01.01.128" PVC WATER MAINLF660$18.00$11,880.00
487.01.01.1412" PVC WATER MAINLF20$26.40$528.00
487.01.02.0716" DIP WATER MAINLF3500$50.00$175,000.00
487.01.04.011" PVC FITTINGSEA4$20.00$80.00
487.01.09.018" DIP MJ 22.5 DEGREE BENDEA4$238.00$952.00
487.01.09.028" DIP MJ 45 DEGREE BENDEA8$238.00$1,904.00
487.01.09.038" DIP MJ 90 DEGREE BENDEA1$250.00$250.00
487.01.09.058" DIP MJ PLUGEA3$120.00$360.00
487.01.09.098" X 16" DIP MJ TEEEA2$350.00$700.00
487.01.11.0112" DIP MJ 22.5 DEGREE BENDEA2$350.00$700.00
487.01.11.0212" DIP MJ 45 DEGREE BENDEA2$350.00$700.00
487.01.11.0312" DIP MJ 90 DEGREE BENDEA1$390.00$390.00
487.01.11.0512" DIP MJ PLUGEA1$185.00$185.00
487.01.13.0116" DIP MJ 22.5 DEGREE BENDEA6$700.00$4,200.00
487.01.13.0216" DIP MJ 45 DEGREE BENDEA12$720.00$8,640.00
487.01.13.0316" DIP MJ 90 DEGREE BENDEA2$845.00$1,690.00
487.02.01.138" GATE VALVE W/ SST STEM & VALVE BOXEA4$1,000.00$4,000.00
487.02.04.0112" BUTTERFLY VALVE & VALVE BOXEA1$1,350.00$1,350.00
487.02.04.0316" BUTTERFLY VALVE & VALVE BOXEA5$2,760.00$13,800.00
487.03.01.01FH ASSEMBLY ON 8" MAIN, TYPE AEA3$3,200.00$9,600.00
487.03.01.05FH ASSEMBLY ON 16" MAIN, TYPE AEA7$3,800.00$26,600.00
487.05.05.248" TAP ON EXISTING 16" WATER MAIN W/VALVE & SST STEMEA1$3,500.00$3,500.00
487.11.01.00CONNECT NEW 1" MAIN TO EX 1" MAINEA1$450.00$450.00
487.11.04.02CONNECT NEW 8" MAIN TO EX 8" MAINEA1$900.00$900.00
487.11.08.06CONNECT NEW 16" MAIN TO EX 16" MAINEA3$1,000.00$3,000.00
487.12.01.01ADJUST EXISTING WATER VALVE BOXEA6$400.00$2,400.00

WATER SYSTEM SUBTOTAL $330,539.00

SANITARY SEWER SYSTEM
477.6.1.1CONCRETE ENCASEMENTSCY10$180.00$1,800.00
477.6.2.1CONCRETE THRUST BLOCKSCY10$200.00$2,000.00
477.6.4.1CONCRETE DRIVEWAYS R & RSY150$62.00$9,300.00
477.6.13.18" MEGA-LUG FITTING RESTRAINTEA8$125.00$1,000.00
477.6.13.28" DIP PIPE JOINT RESTRAINTEA2$145.00$290.00
477.6.15.112" MEGA-LUG FITTING RESTRAINTEA4$200.00$800.00
477.6.15.212" DIP PIPE JOINT RESTRAINTEA2$250.00$500.00
477.6.17.116" MEGA LUG FITTING RESTRAINTEA16$325.00$5,200.00
477.6.17.216" DIP PIPE JOINT RESTRAINTEA8$350.00$2,800.00
477.6.32.28" PVC PIPE JOINT RESTRAINTEA2$160.00$320.00
477.6.34.212" PVC PIPE JOINT RESTRAINTEA2$260.00$520.00
497.01.01.018" PVC, 0' - 6'LF100$25.00$2,500.00
497.01.01.028" PVC, 6' - 12'LF2335$30.00$70,050.00
497.01.01.038" PVC, 12' - 18'LF762$35.00$26,670.00
497.01.02.0210" PVC, 6' - 12'LF15$32.00$480.00
497.01.03.0212" PVC, 6' - 12'LF680$40.00$27,200.00
497.01.03.0312" PVC, 12' - 18'LF355$50.00$17,750.00
497.01.03.0412" PVC, 18' - 24'LF167$60.00$10,020.00
497.10.01.02SEWER MANHOLE W/ EPOXY, 6' - 12'EA7$2,600.00$18,200.00
497.10.01.03SEWER MANHOLE W/ EPOXY, 12' - 18'EA7$3,700.00$25,900.00
497.10.01.04SEWER MANHOLE W/ EPOXY, 18' - 24'EA1$5,000.00$5,000.00
497.10.06.03REMOVE EXISTING 22" RING & COVER & REPLACE WITHEA1$700.00$700.00
22" HINGED RING & COVER
497.10.06.04REMOVE EXISTING 32" RING & COVER & REPLACE WITHEA8$1,000.00$8,000.00
32" HINGED RING & COVER
497.10.10.01RAISE EXISTING MANHOLE TO GRADEEA9$500.00$4,500.00
497.10.11.01R & R INVERTS IN EXISTING MANHOLEEA4$600.00$2,400.00
497.10.20.018" SEWER MANHOLE DROP CON, 0'-6'EA1$600.00$600.00
497.10.20.028" SEWER MANHOLE DROP CON, 6'-12'EA1$750.00$750.00
497.10.20.2012" SEWER MANHOLE DROP CON, 0'-6'EA1$860.00$860.00
497.10.20.2112" SEWER MANHOLE DROP CON, 6'-12'EA1$930.00$930.00
497.10.40.10RESURFACE EXISTING MH INTERIOR, 4' DIAFT12$360.00$4,320.00
497.10.60.01CONNECT NEW 8" MAIN TO EX MANHOLEEA3$550.00$1,650.00
497.10.60.02CONNECT NEW 10" MAIN TO EX MANHOLEEA1$600.00$600.00
497.10.60.03CONNECT NEW 12" MAIN TO EX MANHOLEEA1$700.00$700.00
497.20.01.016" PVC SEWER SERVICELF100$21.00$2,100.00
497.20.01.086" PVC SEWER SERVICE DROP CONNECTION, 12'-18'EA2$800.00$1,600.00
497.30.01.01TV INSPECTION - 8" MAINLF3197$1.95$6,234.15
497.30.01.02TV INSPECTION - 10" MAINLF15$2.00$30.00
497.30.01.03TV INSPECTION - 12" MAINLF1202$2.00$2,404.00
497.30.02.01LOW PRESSURE AIR TESTLS1$600.00$600.00
497.30.02.02HYDROSTATIC TESTING OF FORCEMAINLS1$2,000.00$2,000.00
497.30.02.03MANHOLE LEAK TESTINGEA15$250.00$3,750.00
497.50.01.00ABANDON SANITARY SEWER SERVICELS1$600.00$600.00
497.50.01.01ABANDON SANITARY SEWER MAINLS1$800.00$800.00
497.50.01.02ABANDON SEWER MANHOLELS1$850.00$850.00
497.50.01.03ABANDON & REMOVE EXISTING LIFT STATIONLS1$3,500.00$3,500.00
497.50.01.05ABANDON & REMOVE EXISTING BIOFILTERLS1$1,500.00$1,500.00
497.73.07.01BIOFILTERLS1$6,000.00$6,000.00
497.73.07.028" SCH 80 PVC ODOR CONTROL PIPINGLS1$1,000.00$1,000.00
497.74.03.01REMOVAL OF EXISTING PIPING & FITTINGSLS1$4,000.00$4,000.00
497.80.04.01DIP FLANGED PIPING & FITTINGSLS1$10,000.00$10,000.00
497.81.02.0718" FLANGED PLUG VALVEEA1$4,200.00$4,200.00
497.81.04.0718" FLANGED MAGMETERLS1$10,500.00$10,500.00
497.85.08.01CONNECT 18" FM TO EXISTING 18" FMEA2$750.00$1,500.00
497.80.01.036" PVC FORCEMAINLF20$18.00$360.00
497.80.07.026" DIP MJ 45 DEGREE BENDEA2$200.00$400.00
497.81.10.05AIR RELEASE VALVE REMOVAL & REPLACEMENTEA1$2,500.00$2,500.00
497.85.01.03CONNECT 6" FORCEMAIN TO EX MANHOLEEA1$750.00$750.00
497.85.03.01CONNECT 6" FM TO EXISTING 6" FMEA1$750.00$750.00
550.2CHAIN LINK FENCINGLF150$20.00$3,000.00
550.2.1CHAIN LINK FENCING R & RLF50$25.00$1,250.00
550.2.214' CHAIN LINK FENCE GATEEA1$2,000.00$2,000.00
550.2.6TEMPORARY CHAIN LINK FENCINGLF200$11.00$2,200.00
570.3.1INSTALL #57 STONE AROUND LSSY200$11.00$2,200.00

SANITARY SEWER SYSTEM SUBTOTAL $332,888.15

TOTAL ESTIMATE $663,427.15

TRAFFIC SIGNAGE & MARKING
620-01.01GROUND RODS (SCHOOL FLASHING BEACON)LF6.00$ 3.50$ 21.00
630-01.12CONDUIT BELOW GROUND (SCHOOL FLASHING BEACON)LF200.00$ 3.00$ 600.00
635-01.11PULL BOX (SCHOOL FLASHING BEACON)EA2.00$ 211.00$ 422.00
639-01-22ELECTRIC SERVICE UNDERGROUND (SCHOOL FLASHING BEACON)AS2.00$ 600.00$ 1,200.00
639-02.01ELECTRICAL SERVICE WIRE (SCHOOL FLASHING BEACON)LF200.00$ 0.80$ 160.00
641-111.12CONCRETE SERVICE POLE (SCHOOL FLASHING BEACON)EA?$ 800.00$ 800.00
670-04.01FLASHING BEACON CONTROLLER ASSEMBLYEA1.00$ 3,000.00$ 3,000.00
691-01.01PERMANENT COUNT STATIONLS1.00$ 7,500.00$ 7,500.00
700-001.001STOP SIGN R1-1/ STREET QUADRANTSAS8.00$ 375.00$ 3,000.00
700-001.002END SCHOOL ZONE SIGN S5-2AS2.00$ 225.00$ 450.00
700-001.003SPEED LIMIT 40 SIGN- R2-1AS3.00$ 225.00$ 675.00
700-001.005SPEED LIMIT 30 SIGN R2-1AS3.00$ 225.00$ 675.00
700-001.009SIGNS SCHOOL CROSS WALK/AHEAD S1-1/ W16-9PAS2.00$ 280.00$ 560.00
700-90.11SCHOOL/ SPEED LIMIT SIGN S5-1 WITH FLASHING BEACONAS2.00$ 800.00$ 1,600.00
700-001.012INFORMATION SIGN- SHELTER BUCKLE UPAS1.00$ 275.00$ 275.00
706-003REFLECTIVE PAVEMENT MARKERS (TEMPORARY)EA369.00$ 4.60$ 1,697.40
710-006.001DIRECTIONAL ARROWS (TEMPORARY)EA37.00$ 40.00$ 1,480.00
710-007.001PAVEMENT MESSAGE "SCHOOL" TEMPORARYEA4.00$ 50.00$ 200.00
710-025.001SOLID STRIPE 6" WHITE (TEMPORARY)LF9,053.00$ 0.25$ 2,263.25
710-025.002SOLID STRIPE 24" WHITE STOP BAR (TEMPORARY)LF221.00$ 2.50$ 552.50
710-026.001SOLID STRIPE 6" YELLOW (TEMPORARY)LF12,402.00$ 0.25$ 3,100.50
710-026.002SOLID STRIPE 18" YELLOW (TEMPORARY)LF52.00$ 1.50$ 78.00
710-027.001SKIP STRIPE 6" WHITE 10'- 30' (TEMPORARY)- GROSSLF10,100.00$ 0.20$ 2,020.00
710-___.__SKIP STRIPE 6" WHITE 2'- 4' (TEMPORARY)- GROSSLF24.00$ 0.20$ 4.80
710-___.__SKIP STRIPE 6" YELLOW 2'- 4' (TEMPORARY)- GROSSLF54.00$ 0.20$ 10.80
710-___.__SOLID STRIPE 12" WHITE (TEMPORARY)LF1,800.00$ 1.25$ 2,250.00
710-___.__SOLID STRIPE 18" WHITE (TEMPORARY)LF25.00$ 1.50$ 37.50
710-___.__SKIP STRIPE 6" YELLOW 10'-30' (TEMPORARY)- GROSSLF100.00$ 0.20$ 20.00
R6-3 SIGNEA7.00$ 8.00$ 56.00
R4-7 SIGNEA13.00$ 8.00$ 104.00
OM1 A/G SIGNEA28.00$ 8.00$ 224.00
R3-5 SIGNEA1.00$ 8.00$ 8.00
R6-1 SIGNEA3.00$ 8.00$ 24.00
S4-5 SIGNEA1.00$ 8.00$ 8.00
W3-3 SIGNEA1.00$ 8.00$ 8.00
TRAFFIC SIGNAGE & MARKING SUBTOTAL:$ 35,084.75
ALTERNATE BID ITEMS
487-01.01.116" PVC WATER MAINLF400.00$ 14.45$ 5,780.00
487-01.01.128" PVC WATER MAINLF500.00$ 19.15$ 9,575.00
487-01.01.1412" PVC WATER MAINLF20.00$ 26.40$ 528.00
487-02.01.036" GATE VALVE & VALVE BOXEA2.00$ 650.00$ 1,300.00
487-02.01.048" GATE VALVE & VALVE BOXEA6.00$ 827.00$ 4,962.00
GRAND TOTAL=$ 3,425,672.78
GENERAL/ ROADWAY$ 1,852,128.38
STORM$ 653,837.00
DRAINAGE RETENTION AREAS$ 221,195.50
TRAFFIC$ 35,084.75
TOTAL$ 2,762,245.63
GENERAL/ UTILITIES$8,450.00
WATER$274,439.00
SANITARY SEWER$308,358.15
TOTAL$591,247.15

&D

&12&UCOST ESTIMATE&"Arial,Bold"&14 &"Arial,Regular"&10&U

&P

Bid Tab

Exhibit F - PRICE PROPOSALCONTRACT# CIP/250268
Bidder nameBidder Location
ENTER COMPANY NAME HEREENTER OFFICE LOCATION HERE
Well Drilling WTP No.2-Upper Aquifer Well #11 and #12

Item Description Unit Qty Unit Cost Extended Cost

GENERAL CONSTRUCTION
G-01MOBILIZATION & GENERAL CONDITIONSLS1$0.00$0.00
G-02BONDSLS1$0.00$0.00
G-10CLEARING & GRUBBINGSY500$0.00$0.00
GENERAL CONSTRUCTION SUB-TOTAL:GENERAL CONSTRUCTION & RAILROAD TI SUB-TOTAL:$0.00
UPPER FLORIDAN WELL DRILLING #11
W-101-11DRILL 42" HOLE, FURNISH & INSTALL 36" CASINGLF55$0.00$0.00
W-102-11GROUTING OF 36" CASINGCY10$0.00$0.00
W-103-11DRILL 36" HOLE to 120'LF120$0.00$0.00
W-104-11FURNISH & INSTALL 30" CASINGLF120$0.00$0.00
W-105-11GROUTING OF 30" CASINGCY15$0.00$0.00
W-106-11DRILL 30" HOLE to 175'LF175$0.00$0.00
W-107-11FURNISH & INSTALL 20" CASINGLF175$0.00$0.00
W-108-11GROUTING OF 20" CASINGCY20$0.00$0.00
W-109-11DRILL 20" PILOT HOLE to 250'LF250$0.00$0.00
W-110-11CAVITY FILLINGCY100$0.00$0.00
W-111-11WELL FLOW TESTINGLS1$0.00$0.00
W-112-11GEOPHYSICAL LOGGING / BACTERIA TESTINGLS1$0.00$0.00
UPPER FLORIDAN WELL DRILLING #11 SUB-TOTAL:GENERAL CONSTRUCTION & RAILROAD TI SUB-TOTAL:$0.00
UPPER FLORIDAN WELL DRILLING #12
W-101-12DRILL 42" HOLE, FURNISH & INSTALL 36" CASINGLF55$0.00$0.00
W-102-12GROUTING OF 36" CASINGCY10$0.00$0.00
W-103-12DRILL 36" HOLE to 120'LF120$0.00$0.00
W-104-12FURNISH & INSTALL 30" CASINGLF120$0.00$0.00
W-105-12GROUTING OF 30" CASINGCY15$0.00$0.00
W-106-12DRILL 30" HOLE to 175'LF175$0.00$0.00
W-107-12FURNISH & INSTALL 20" CASINGLF175$0.00$0.00
W-108-12GROUTING OF 20" CASINGCY20$0.00$0.0020
W-109-12DRILL 20" PILOT HOLE to 250'LF250$0.00$0.00
W-110-12CAVITY FILLINGCY100$0.00$0.00
W-111-12WELL FLOW TESTINGLS1$0.00$0.00
W-112-12GEOPHYSICAL LOGGING / BACTERIA TESTINGLS1$0.00$0.00
UPPER FLORIDAN WELL DRILLING #12 SUB-TOTAL:GENERAL CONSTRUCTION & RAILROAD TI SUB-TOTAL:$0.00
GENERAL CONSTRUCTION$0.00
UPPER FLORIDAN WELL DRILLING #11$0.00
UPPER FLORIDAN WELL DRILLING #12$0.00
*TOTAL BID AMOUNT$0.00
* Enter TOTAL BID AMOUNT into Total Bid Amount Section on your electronic bid response.
BID ALTERNATES
ItemDescriptionUnitQtyUnit CostExtended Cost
A-1WELL ABANDONMENT & GROUT FILL, LFA MW-1LS1$0.00$0.00
A-2WELL ABANDONMENT & GROUT FILL, MCU MW-1LS1$0.00$0.00
A-3WELL ABANDONMENT & GROUT FILL, MCU MW-1aLS1$0.00$0.00
A-4WELL ABANDONMENT & GROUT FILL, MCU MW-1bLS1$0.00$0.00
A-5WELL ABANDONMENT & GROUT FILL, LFA MW-2LS1$0.00$0.00
A-6WELL ABANDONMENT & GROUT FILL, UFA MW-2LS1$0.00$0.00
A-7WELL ABANDONMENT & GROUT FILL, UFA MW-2aLS1$0.00$0.00
A-8WELL ABANDONMENT & GROUT FILL, UFA MW-2bLS1$0.00$0.00
A-9LFA WELL #7 MODIFICATIONSLS1$0.00$0.00
BID ALTERNATES SUB-TOTAL:GENERAL CONSTRUCTION & RAILROAD TI SUB-TOTAL:$0.00
GRAND TOTAL:GENERAL CONSTRUCTION & RAILROAD TI SUB-TOTAL:$0.00

water & sewer

COST ESTIMATE

PROJECT: SW 44TH AVENUE PHASE III DATE: 07/14/08

ITEMDESCRIPTIONUNITESTIMATEDUNITTOTAL
NO.QUANITYPRICEPRICE
1GENERAL CONSTRUCTION
101-01MOBILIZATIONLS1$20,000.00$20,000.00
120-02.03.02BACKFILL W/ OFF-SITE MATERIALCY3000$9.00$27,000.00
120-4.2REMOVE UNSUITABLE MATERIALCY3000$7.00$21,000.00
120-4.3REMOVE ROCK MATERIALCY100$11.00$1,100.00
486.1WATER SYSTEM ASBUILTLS1$7,000.00$7,000.00
496.1SANITARY SEWER SYSTEM ASBUILTLS1$7,000.00$7,000.00
477.6.1.1CONCRETE ENCASEMENTSCY10$180.00$1,800.00
477.6.2.1CONCRETE THRUST BLOCKSCY10$200.00$2,000.00
477.6.4.1CONCRETE DRIVEWAYS R & RSY150$62.00$9,300.00
477.6.13.18" MEGA-LUG FITTING RESTRAINTEA8$125.00$1,000.00
477.6.13.28" DIP PIPE JOINT RESTRAINTEA2$145.00$290.00
477.6.15.112" MEGA-LUG FITTING RESTRAINTEA4$200.00$800.00
477.6.15.212" DIP PIPE JOINT RESTRAINTEA2$250.00$500.00
477.6.17.116" MEGA LUG FITTING RESTRAINTEA16$325.00$5,200.00
477.6.17.216" DIP PIPE JOINT RESTRAINTEA8$350.00$2,800.00
477.6.32.28" PVC PIPE JOINT RESTRAINTEA2$160.00$320.00
477.6.34.212" PVC PIPE JOINT RESTRAINTEA2$260.00$520.00
550.2CHAIN LINK FENCINGLF150$20.00$3,000.00
550.2.1CHAIN LINK FENCING R & RLF50$25.00$1,250.00
550.2.214' CHAIN LINK FENCE GATEEA1$2,000.00$2,000.00
550.2.6TEMPORARY CHAIN LINK FENCINGLF200$11.00$2,200.00
570.3.1INSTALL #57 STONE AROUND LSSY200$11.00$2,200.00

GENERAL CONSTRUCTION SUBTOTAL $118,280.00

ITEMDESCRIPTIONUNITESTIMATEDUNITTOTAL
NO.QUANITYPRICEPRICE
487WATER SYSTEM
487.01.01.011" PVC PIPINGLF50$4.60$230.00
487.01.01.031" BACKFLOW PREVENTEREA1$450.00$450.00
487.01.01.128" PVC WATER MAINLF660$18.00$11,880.00
487.01.01.1412" PVC WATER MAINLF20$26.40$528.00
487.01.02.0716" DIP WATER MAINLF3500$50.00$175,000.00
487.01.04.011" PVC FITTINGSEA4$20.00$80.00
487.01.09.018" DIP MJ 22.5 DEGREE BENDEA4$238.00$952.00
487.01.09.028" DIP MJ 45 DEGREE BENDEA8$238.00$1,904.00
487.01.09.038" DIP MJ 90 DEGREE BENDEA1$250.00$250.00
487.01.09.058" DIP MJ PLUGEA3$120.00$360.00
487.01.09.098" X 16" DIP MJ TEEEA2$350.00$700.00
487.01.11.0112" DIP MJ 22.5 DEGREE BENDEA2$350.00$700.00
487.01.11.0212" DIP MJ 45 DEGREE BENDEA2$350.00$700.00
487.01.11.0312" DIP MJ 90 DEGREE BENDEA1$390.00$390.00
487.01.11.0512" DIP MJ PLUGEA1$185.00$185.00
487.01.13.0116" DIP MJ 22.5 DEGREE BENDEA6$700.00$4,200.00
487.01.13.0216" DIP MJ 45 DEGREE BENDEA12$720.00$8,640.00
487.01.13.0316" DIP MJ 90 DEGREE BENDEA2$845.00$1,690.00
487.02.01.138" GATE VALVE W/ SST STEM & VALVE BOXEA4$1,000.00$4,000.00
487.02.04.0112" BUTTERFLY VALVE & VALVE BOXEA1$1,350.00$1,350.00
487.02.04.0316" BUTTERFLY VALVE & VALVE BOXEA5$2,760.00$13,800.00
487.03.01.01FH ASSEMBLY ON 8" MAIN, TYPE AEA3$3,200.00$9,600.00
487.03.01.05FH ASSEMBLY ON 16" MAIN, TYPE AEA7$3,800.00$26,600.00
487.05.05.248" TAP ON EXISTING 16" WATER MAIN W/VALVE & SST STEMEA1$3,500.00$3,500.00
487.11.01.00CONNECT NEW 1" MAIN TO EX 1" MAINEA1$450.00$450.00
487.11.04.02CONNECT NEW 8" MAIN TO EX 8" MAINEA1$900.00$900.00
487.11.08.06CONNECT NEW 16" MAIN TO EX 16" MAINEA3$1,000.00$3,000.00
487.12.01.01ADJUST EXISTING WATER VALVE BOXEA6$400.00$2,400.00

WATER SYSTEM SUBTOTAL $274,439.00

ITEMDESCRIPTIONUNITESTIMATEDUNITTOTAL
NO.QUANITYPRICEPRICE
497SANITARY SEWER SYSTEM
497.01.01.018" PVC, 0' - 6'LF100$25.00$2,500.00
497.01.01.028" PVC, 6' - 12'LF2335$30.00$70,050.00
497.01.01.038" PVC, 12' - 18'LF762$35.00$26,670.00
497.01.02.0210" PVC, 6' - 12'LF15$32.00$480.00
497.01.03.0212" PVC, 6' - 12'LF680$40.00$27,200.00
497.01.03.0312" PVC, 12' - 18'LF355$50.00$17,750.00
497.01.03.0412" PVC, 18' - 24'LF167$60.00$10,020.00
497.10.01.02SEWER MANHOLE W/ EPOXY, 6' - 12'EA7$2,600.00$18,200.00
497.10.01.03SEWER MANHOLE W/ EPOXY, 12' - 18'EA7$3,700.00$25,900.00
497.10.01.04SEWER MANHOLE W/ EPOXY, 18' - 24'EA1$5,000.00$5,000.00
497.10.06.03REMOVE EXISTING 22" RING & COVER & REPLACE WITHEA1$700.00$700.00
22" HINGED RING & COVER
497.10.06.04REMOVE EXISTING 32" RING & COVER & REPLACE WITHEA8$1,000.00$8,000.00
32" HINGED RING & COVER
497.10.10.01RAISE EXISTING MANHOLE TO GRADEEA9$500.00$4,500.00
497.10.11.01R & R INVERTS IN EXISTING MANHOLEEA4$600.00$2,400.00
497.10.20.018" SEWER MANHOLE DROP CON, 0'-6'EA1$600.00$600.00
497.10.20.028" SEWER MANHOLE DROP CON, 6'-12'EA1$750.00$750.00
497.10.20.2012" SEWER MANHOLE DROP CON, 0'-6'EA1$860.00$860.00
497.10.20.2112" SEWER MANHOLE DROP CON, 6'-12'EA1$930.00$930.00
497.10.40.10RESURFACE EXISTING MH INTERIOR, 4' DIAFT12$360.00$4,320.00
497.10.60.01CONNECT NEW 8" MAIN TO EX MANHOLEEA3$550.00$1,650.00
497.10.60.02CONNECT NEW 10" MAIN TO EX MANHOLEEA1$600.00$600.00
497.10.60.03CONNECT NEW 12" MAIN TO EX MANHOLEEA1$700.00$700.00
497.20.01.016" PVC SEWER SERVICELF100$21.00$2,100.00
497.20.01.086" PVC SEWER SERVICE DROP CONNECTION, 12'-18'EA2$800.00$1,600.00
497.30.01.01TV INSPECTION - 8" MAINLF3197$1.95$6,234.15
497.30.01.02TV INSPECTION - 10" MAINLF15$2.00$30.00
497.30.01.03TV INSPECTION - 12" MAINLF1202$2.00$2,404.00
497.30.02.01LOW PRESSURE AIR TESTLS1$600.00$600.00
497.30.02.02HYDROSTATIC TESTING OF FORCEMAINLS1$2,000.00$2,000.00
497.30.02.03MANHOLE LEAK TESTINGEA15$250.00$3,750.00
ITEMDESCRIPTIONUNITESTIMATEDUNITTOTAL
NO.QUANITYPRICEPRICE
497.50.01.00ABANDON SANITARY SEWER SERVICELS1$600.00$600.00
497.50.01.01ABANDON SANITARY SEWER MAINLS1$800.00$800.00
497.50.01.02ABANDON SEWER MANHOLELS1$850.00$850.00
497.50.01.03ABANDON & REMOVE EXISTING LIFT STATIONLS1$3,500.00$3,500.00
497.50.01.05ABANDON & REMOVE EXISTING BIOFILTERLS1$1,500.00$1,500.00
497.73.07.01BIOFILTERLS1$6,000.00$6,000.00
497.73.07.028" SCH 80 PVC ODOR CONTROL PIPINGLS1$1,000.00$1,000.00
497.74.03.01REMOVAL OF EXISTING PIPING & FITTINGSLS1$4,000.00$4,000.00
497.80.04.01DIP FLANGED PIPING & FITTINGSLS1$10,000.00$10,000.00
497.81.02.0718" FLANGED PLUG VALVEEA1$4,200.00$4,200.00
497.81.04.0718" FLANGED MAGMETERLS1$10,500.00$10,500.00
497.85.08.01CONNECT 18" FM TO EXISTING 18" FMEA2$750.00$1,500.00
497.80.01.036" PVC FORCEMAINLF20$18.00$360.00
497.80.07.026" DIP MJ 45 DEGREE BENDEA2$200.00$400.00
497.81.10.05AIR RELEASE VALVE REMOVAL & REPLACEMENTEA1$2,500.00$2,500.00
497.85.01.03CONNECT 6" FORCEMAIN TO EX MANHOLEEA1$750.00$750.00
497.85.03.01CONNECT 6" FM TO EXISTING 6" FMEA1$750.00$750.00

SANITARY SEWER SYSTEM SUBTOTAL $297,708.15

TOTAL ESTIMATE $690,427.15

C:\engshare\EdEarnest\CostEstimates&Bids\CostEstimates\CostEstimateSW44thAvePhaseIII.xls