ITB_32701-14020_Amd_2.docx
DOCX document 106 KB Posted
- Attached to
- BCMSP Janitorial Services - UPDATED
- Solicitation number
- Event 32701-14020
- Issued by
- Davidson County, Tennessee
About this file
This Amendment #2 to Invitation to Bid 32701-14020 is issued by the Tennessee Department of Environment and Conservation for janitorial services at Bicentennial Capitol Mall State Park in Nashville. The scope encompasses comprehensive, full-service janitorial operations performed seven days per week, including daily cleaning of public restrooms (one men's restroom with two stalls and four urinals; one women's restroom with ten stalls; one staff restroom), the Park office and Visitor Center, Carillon building, Amphitheater storage rooms, and grounds covering approximately twenty acres. The contractor must provide all personnel, cleaning supplies, equipment (buffers, vacuums, mops), uniforms, toilet tissue, hand towels, waste liners, air fresheners, and deodorizers, with the park providing only hand soap. Services include twice-daily restroom cleaning (complete cleaning before 8:30 AM opening and floor mopping with surface touch-ups and restocking at 2:00 PM closure), daily litter pickup from fifty-six outdoor waste receptacles ranging from thirty to ninety gallons, and weekly or monthly cleaning of various operational areas. The mandatory pre-response conference is scheduled for October 15, 2026 at 10:00 AM CST, with written questions due October 19, 2026 at 2:00 PM CST and bids due October 28, 2026 at 2:00 PM CST. The contract has a 24-month base term beginning December 9, 2026, with a state option to extend an additional 180 days under identical terms, and an estimated maximum liability not to exceed $200,000 for the entire 24-month period.
Bidders must submit a fixed monthly rate for comprehensive base services covering approximately seven daily labor hours and a separate hourly rate for additional authorized cleaning. Prices must remain firm for 730 days from execution, with increases above seven percent requiring contract amendment and independent cost documentation. The state does not guarantee minimum quantities or purchases and will only pay for services provided after issuance of a purchase order. No set-aside is indicated. Respondents must register with the Tennessee Department of Revenue, conduct mandatory site visits prior to submission to take measurements and examine premises, confirm non-debarred status, attest Iran Divestment Act and foreign adversary compliance, obtain parking passes (maximum of two initially, with additional passes addressed on a case-by-case basis), and submit responses through the Tennessee Edison Supplier Portal. Additional cleaning services will be authorized and approved by a Park Manager or Maintenance Supervisor with hourly rate billing calculated as one worker-hour per individual employee. The contract does not require a Tennessee contractor license, and subcontracting requires prior written approval from the Park Manager and Maintenance Supervisor with submission of the subcontractor's name and contact information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF TENNESSEE
DEPARTMENT OF ENVIRONMENT AND CONSERVATION
INVITATION TO BID # 32701-14020
AMENDMENT # 2
FOR BICENTENNIAL CAPITOL MALL STATE PARK JANITORIAL SERVICES
DATE: OCTOBER 21, 2026
ITB # 32701-14020 IS AMENDED AS FOLLOWS:
1. This ITB Schedule of Events updates and confirms scheduled ITB dates. Any event, time, or date containing revised or new text is highlighted.
| Event |
| Time |
| Date |
| Event Posted |
| 8:00 am CT |
| 10-1-2026 |
| Pre-Response Conference |
| 10:00 am CT |
| 10-15-2026 |
| Questions and Comments Due |
| 2:00 pm CT |
| 10-19-2026 |
| Bids Due |
| 2:00 pm CT |
| 10-28-2026 |
2. State responses to questions and comments in the table below amend and clarify this ITB.
Any restatement of ITB text in the Question/Comment column shall NOT be construed as a change in the actual wording of the ITB document.
| ITB SECTION |
| PAGE |
| QUESTION / COMMENT |
| STATE RESPONSE |
1) What is the current annual contract value for these janitorial services?
Per Terms & Conditions Section 1.1, the expected maximum liability will exceed two hundred thousand dollars and zero cents ($200,000.00). That is representative of the twenty-four (24) contract term.
2) How many restrooms are included in the scope of work, and what is their total square footage?
There is a one (1) public men’s restroom with two (2) stalls and four (4) urinals and one (1) public women’s restroom with ten (10) stalls. Within the Park office, there is one (1) restroom for the Park staff.
3) Could you please provide the estimated total square footage of all buildings and areas included in the scope of work?
The State does not have an estimate on the square footage of the buildings. The Park is approximately twenty (20) acres, including the roads.
4) Could you please confirm the total number of buildings and separate areas included in the scope of work?
The buildings would be the Park office & Visitor Center (one (1) building), the public restrooms (one (1) building), Carillon building, Amphitheater storage room, and the Park grounds.
5) Building square footage: Is there a breakdown of the total cleanable square footage for each building and facility included in the contract?
The State does not have an estimate of the square footage of the buildings.
6) Floor plans: Are floor plans or facility layouts available for the areas requiring janitorial services?
No.
7) Service schedule: Are there specific required cleaning hours, particularly for the twice-daily restroom servicing?
The public restrooms shall be cleaned prior to them opening at 8:30 AM CST. The public restrooms will be closed at 2:00 PM CST for the second daily cleaning.
8) Current staffing: Can the state provide the approximate daily labor hours currently allocated to this contract?
Seven (7) hours is the approximate number of hours for the daily tasks.
9) Supplies and equipment: Are there designated storage areas for contractor-owned equipment and cleaning supplies?
Yes. There is a small janitorial closet and a larger storage room located in the men’s public restroom.
10) Scope clarification: Are all listed facilities included in the regular daily cleaning schedule, or are certain areas serviced weekly, monthly, or as needed?
Please refer to the Specifications document provided in the ITB.
11) Estimated Contract Value: The Edison portal indicates that the expected maximum liability will exceed $200,000. Could you clarify whether this amount represents the estimated value for the entire 24-month contract or an annual amount? If available, could you provide an approximate budget range for the full contract term?
Per Terms & Conditions Section 1.1, the expected maximum liability will exceed two hundred thousand dollars and zero cents ($200,000.00). That is representative of the twenty-four (24) contract term.
12) Scope of Work: Could you clarify the approximate area of the park and facilities that the contractor is responsible for cleaning, including the two public restrooms and designated outdoor areas?
The Park is approximately twenty (20) acres, including the roads. The State does not have an estimate of the square footage of the buildings.
13) Daily Cleaning Requirements: Is the contractor expected to perform two separate cleaning visits each day, one in the morning and one in the afternoon? Are there specific service hours or time windows that must be followed?
The public restrooms shall be cleaned prior to them opening at 8:30 AM CST. The public restrooms will be closed at 2:00 PM CST for the second daily cleaning.
14) Staffing Requirements: Does the State have a minimum staffing or labor-hour requirement, or may the contractor determine the staffing needed to complete all required services satisfactorily?
No, the Contractor shall determine the staffing needed to complete all required services satisfactorily.
15) Cleaning Supplies and Consumables: My understanding from the pre-bid conference is that the contractor must provide the cleaning supplies and consumables, except soap. Could you please confirm which items the contractor is responsible for providing?
The Contractor shall provide all supplies and equipment necessary to perform the services outlined in the Specifications. The Park will provide the soap for the soap dispensers in the public restrooms.
16) Additional Cleaning Services: The solicitation includes a separate hourly rate for additional cleaning. Could you clarify what types of services may be requested under this provision and how those services would be authorized and paid?
Additional cleaning services would be requested and approved by a Park Manager or Maintenance Supervisor. The Contractor would need to provide an estimate of how many hours they expect the task to take, and a Park Manager or Maintenance Supervisor would approve.
17) Pricing and Evaluation: Could you confirm how the 24 monthly prices and the hourly rate for additional cleaning will be evaluated when determining the lowest responsive and responsible bidder?
Each line item multiplies the Unit Bid Price and the Line Bid Quantity to calculate the Total Line Bid Amount. The sum of all the Total Line Bid Amounts determines the Total Bid Amount.
18) The specifications require the contractor to empty all outside waste receptacles across the park (about 56) and deposit the trash in the dumpster. Will the park provide a cart or utility vehicle for this trash collection, or should the contractor supply its own? If the contractor supplies one, may it be driven on the park's interior walkways, given Requirement 8 of the specifications (no vehicles in the park interior without first consulting park staff)?
The Park has a cart that the Contractor can utilize to take the trash to the dumpster. If the Contractor desires to use a utility vehicle to take the trash to the dumpster, the Contractor shall consult with the Park staff first. The utility vehicle shall not be stored at the Park or driven on the sidewalks.
19) November 1 through March 15: We understand park hours are 7 a.m. to 8 p.m. We recall a restroom closing time of 6 p.m. being mentioned during the walkthrough. Please confirm the required restroom closing time.
The restrooms shall close at 6:00 PM CST.
20) March 16 through October 31: We understand park hours are 7 a.m. to 10 p.m. What is the required restroom closing time?
Public restrooms are temporarily closed for cleaning at 2:00 PM CST and reopened after. The public restrooms shall close at 6:00 PM CST.
21) Who is responsible for closing and locking the restrooms during each season?
The Park staff will lock the restrooms.
22) If the contractor is responsible for lockup, may the crew leave after the 2 to 3 p.m. cleaning and return at the designated closing time, or must personnel remain on site until closing?
The Contractor is not responsible for locking the restrooms at the designated closing time.
23) Is a final cleaning or inspection required before lockup? Do restroom closing times change for events?
No. The public restrooms are open during events except for New Years Eve.
24) Are additional visits required for special events, heavy attendance, or incidents outside scheduled cleaning times? If so, how are these services requested, authorized, and priced?
Third parties who host special events at the Park typically bring in portable toilet units for guests to use. There does not appear to be any significant increase in usage during these events, and no additional services are anticipated in relation to them.
25) Please confirm the highlighted service area on the attached map, including the northern endpoint at Jefferson Street and the boundaries along 6th and 7th Avenues North. Does litter pickup extend to the curbs along each side? Which sidewalks and parking areas, if any, are included?
Litter pickup extends to the outer curbs on 6th and 7th Avenue. No parking lots are included in the scope.
26) Does daily litter pickup include Tennessee Map Plaza, both bus pull-off areas, and the surrounding sidewalks south of the railroad trestle, extending to James Robertson Parkway? This area is highlighted in yellow on the attached map.
Yes, daily litter pickup includes all areas of the Park, from James Robertson Parkway to Jefferson Street and from 6th to 7th Ave.
27) Is authorized contractor parking located in the lot labeled “Nashville Sounds Suite Holder Parking,” at approximately 800–858 5th Avenue North? Please identify Lot 8 and its entrance on the map. Are there restrictions during games, events, weekends, or holidays? How many parking hang tags will be available?
Contractor parking is available in Lot 8. The entrances to the lot are located on 5th Ave and 6th Ave. If the lot is closed due to a special event, the Park will inform the Contractor of alternate parking. Parking passes will be provided to Contractor personnel.
28) Please provide the exact address, vehicle entrance, and designated dumpster or unloading point for the location referred to as the “Data Center.” Is this the Tennessee Capitol Complex Service Center? We understand that access to the disposal area is around the rear of the building. Please confirm the route, access procedures, and disposal hours, including weekends and holidays.
Access to the dumpster is located on 5th Ave., and it is the only entrance on that side of the building. The Contractor will be provided with an access card to open the gate. The dumpster is clearly marked. Park staff will accompany the Contractor on their first visit to point out all necessary details. Access is available every day, including weekends.
29) Please confirm whether the contractor is authorized to use the park’s cart to transport collected trash to the designated disposal location. If so, please identify any restrictions or conditions of use.
Yes, the Contractor may utilize the Park’s cart for collecting and disposing of the trash. If the Contractor utilizes the provided cart, they shall keep it cleaned and maintained. The cart is stored in the restroom lobby.
30) Please confirm the number and locations of cigarette receptacles and whether the contractor must supply replacement sand or another material.
The Park does not maintain any cigarette receptacles.
31) Please confirm whether the same tasks and staffing expectations apply on weekends and holidays as on other operating days. How should the contractor handle weather closures, restricted access, or other park closures, and how would these circumstances affect the monthly payment?
Yes. The Park shall contact the Contractor regarding weather closures, restricted access, or other Park closures. Closures would not impact the monthly payment.
32) Please provide the anticipated event calendar or available historical attendance information. Which event-related cleaning and replenishment duties are included in the base monthly fee, and which qualify as separately authorized additional cleaning?
The Contractor will be notified in advance of any events and informed of the areas for which they will not be responsible for cleaning.
33) Office kitchen: Does the cleaning scope include refrigerator and microwave interiors, washing dishes or coffee pots, and disposing of leftover coffee or used coffee grounds?
No.
34) Markers of Memory: Must the globe be wiped down when visibly soiled, or is it included in a scheduled cleaning task? If scheduled, please confirm the frequency.
No.
35) Please confirm the total number of picnic tables and standalone benches. We understand that picnic table cleaning includes attached seats, legs, and undersides. Do standalone benches require scheduled cleaning or cleaning only when visibly soiled?
There are twenty (20) picnic tables. The benches do not require scheduled cleaning.
36) Please confirm in writing the walkthrough guidance that leaf and dirt removal is handled by landscaping, pressure washing is excluded, and cleaning inside drains is excluded. For culverts and drain areas, is the contractor’s responsibility limited to accessible surface litter pickup?
The Contractor is not responsible for leaf and dirt removal, pressure washing, or cleaning inside drains and culverts. The Contractor is responsible for accessible surface litter clean up in the culvert and drain areas.
37) The operations section appears under monthly cleaning and includes sweeping, window cleaning, emptying waste receptacles, and removing spiderwebs. Should the Carillon Building’s trash receptacles be emptied daily, with the other listed tasks performed monthly?
No. The Carillon building will need to be swept, and the windows cleaned periodically at the request of Park staff.
38) Please confirm whether monthly service is required for the East and West Amphitheater storage rooms and the 6th Avenue and 7th Avenue storage areas. What is the storage closet near the Amphitheater used for? Does service include sweeping accessible floors, removing spiderwebs, and removing trash? How will access be provided?
Per the Specifications, monthly cleaning services are required for the East and West Amphitheater storage rooms, as well as the 6th Avenue and 7th Avenue storage rooms. The specific services needed are detailed in the Specifications.
The Park staff will provide access to the storage rooms for cleanings. The rooms are utilized for storing items.
39) Is a designated janitor closet available? May the contractor securely store supplies, brooms, mops, dustpans, chemicals, and equipment on site for daily use? Please identify available janitor sinks, water, electricity, wastewater disposal, and equipment-charging locations. Is any existing equipment authorized for contractor use? Please identify any equipment restrictions or required specialized machines.
Yes. There is a small janitorial closet and a larger storage room located in the men’s restroom. There is a mop sink, shelves for storage, an electrical outlet. Equipment can be stored in the janitorial closet or in the larger storage room.
40) Toilet tissue: The specifications list two-ply tissue with 4.5 × 4.5-inch sheets and 500 sheets per roll. Please confirm compatible dispenser models, whether equivalent sizes or roll formats are acceptable, and the approval process before bidding.
Standard size commercial dispensers are used in the restrooms.
41) Paper towels: The public restrooms have hand dryers. Are paper towels required only in the office restroom, or must the contractor also supply them in the kitchen or other areas? Please identify dispenser models and required towel formats, folds, and quantities or case specifications, if applicable.
The Park will provide the paper towels for the Park office restroom and kitchen area.
42) Indoor waste liners: Please confirm receptacle capacities and any required liner sizes or thicknesses.
The indoor waste receptacles are seven (7) to ten (10) gallons. There is no required thickness.
43) Outdoor waste and recycling liners: Please confirm receptacle capacities and required liner sizes, thicknesses, and strength for both waste and recycling receptacles.
There are fifty-six (56) outdoor waste receptacles that are thirty (30), fifty (50), or ninety (90) gallons. There is no required thickness or strength.
44) Hand soap: We understand that the park provides soap and the contractor refills dispensers. Please confirm the restocking process and the procedure if park-provided soap is unavailable.
The Contractor will notify the Maintenance Supervisor when the supply of hand soap is running low. The Park will always supply the soap and dispensers.
45) Air fresheners: Please identify device types, compatible refills, and required replacement intervals. Are any units plug-in devices?
None of the air freshener units are plug-in. The Contractor may use their discretion for compatible refills in the air fresheners. There are not required replacement intervals other than refilling the air fresheners once they’re empty.
46) Toilet and urinal deodorizers: Please identify approved products or acceptable equivalents and required replacement intervals.
The product type and replacement intervals should be industry standard.
47) Cigarette receptacle material: Please confirm whether the contractor supplies replacement sand or another specified material.
The Park does not maintain any cigarette receptacles.
48) Wet floor signs: Will the park provide these, or must the contractor furnish them?
The Park has a few wet floor signs that the Contractor can utilize. The Contractor may also use their own wet floor signs.
49) Toilets, urinals, and stall dividers: Since acid bowl cleaners and scouring powders are prohibited, which non-acid, nonabrasive liquid cleaners or disinfectants are approved for toilets and urinals? What material are the stall dividers made of, and which products are approved for them?
The Park does not have a specific or approved cleaning agent. The cleaning agent can be chosen by the Contractor so long as it does not damage the surface. Eco-friendly products are encouraged but are not required.
The stall dividers are a laminated wood material.
50) Toilet areas: Which multipurpose disinfectant-deodorizer cleaners are approved?
The Park does not have a specific or approved cleaning agent. The cleaning agent can be chosen by the Contractor so long as it does not damage the surface. Eco-friendly products are encouraged but are not required.
51) Floors and outdoor spills: Which cleaning agents are approved to remove soil and spills without leaving residue or streaks or damaging surfaces?
The Park does not have a specific or approved cleaning agent. The cleaning agent can be chosen by the Contractor so long as it does not damage the surface. Eco-friendly products are encouraged but are not required.
52) Sinks and porcelain: Which cleaning agents are approved for removing stains, rust, dirt, and debris?
The Park does not have a specific or approved cleaning agent. The cleaning agent can be chosen by the Contractor so long as it does not damage the surface. Eco-friendly products are encouraged but are not required.
53) Metal fixtures: If wiping and drying do not restore the required polished appearance, which metal polishes or cleaning agents are approved?
The Park does not have a specific or approved cleaning agent. The cleaning agent can be chosen by the Contractor so long as it does not damage the surface. Eco-friendly products are encouraged but are not required.
54) Dust mops and dust cloths: What treatment product or method is approved before use to avoid oily marks or streaks?
The Park does not have a specific or approved cleaning agent. The cleaning agent can be chosen by the Contractor so long as it does not damage the surface. Eco-friendly products are encouraged but are not required.
55) Carpet spot treatment: Which carpet pre-spotters or spot-cleaning agents are approved?
The Park does not have a specific or approved cleaning agent. The cleaning agent can be chosen by the Contractor so long as it does not damage the surface. Eco-friendly products are encouraged but are not required.
56) Carpet cleaning: Which detergents are approved? If wet shampooing is used, please confirm the required synthetic detergent.
The Park does not have a specific or approved cleaning agent. The cleaning agent can be chosen by the Contractor so long as it does not damage the surface. Eco-friendly products are encouraged but are not required.
57) Window cleaning: Which window-cleaning chemicals are approved?
The Park does not have a specific or approved cleaning agent. The cleaning agent can be chosen by the Contractor so long as it does not damage the surface. Eco-friendly products are encouraged but are not required.
58) What equipment does the current contractor use for high windows: extension poles, ladders, or a lift? May the contractor use telescoping poles from ground level, including a purified-water system for exterior glass? If a ladder or lift is necessary, will the State provide it, or must the contractor furnish it?
The Contractor shall use telescoping poles from ground level.
59) Must cleaners move merchandise, decorative items, stored boxes, or equipment to clean underneath? Please clarify responsibility for display-case interiors, cooler interiors, kitchen appliance interiors, and the animal enclosure.
No. The Contractor shall not move merchandise, decorative items or equipment.
The Contractor is not responsible for display-case interiors, cooler interiors, kitchen appliance interiors, or the animal enclosure.
60) Will there be an incumbent handoff and an initial condition inspection to identify pre-existing damage or deferred cleaning? Is an initial deep cleaning required at contract start? How should existing stains, damage, or buildup that routine cleaning cannot remove be documented and handled?
No, there will most likely not be a hand-off.
An initial deep cleaning is not required per the contract, but the Contractor may do so if they wish.
Any existing damage, stains or buildup can be reported to the Park staff.
61) Are specific cleaning or service logs, inspection checklists, supply-restocking records, incident-reporting forms, or sign-in and sign-out procedures required? Who is the designated contact for access problems, maintenance issues, and service approval?
There are no cleaning or service logs, inspection checklists, supply restocking records, or incident reporting forms. Per the Specifications, the Contractor personnel shall sign in and sign out with the Park staff.
Please refer to the Park Contacts provided in the Specifications.
62) Please provide, or direct us to, records for the most recent prior janitorial award for this park, believed to have been solicited in 2024. Requested records include the incumbent’s name, solicitation and contract numbers, award notice, bid tabulation, winning pricing sheet, signed contract, and amendments. Please distinguish the monthly rate, additional-service rate, base-term total, option or extension amounts, and maximum liability. Are historical supply-use records available?
A Public Records Request would need to be submitted by the Respondent.
63) Please provide available prior specifications, staffing and service schedules, and payment or invoice records for the most recent 12 months. Please identify material scope changes between the prior contract and this solicitation. If these records require a separate public-records request, please identify the appropriate custodian or request process.
A Public Records Request would need to be submitted by the Respondent.
64) Please confirm the required insurance coverages and limits, including whether this contract requires workers’ compensation coverage when the contractor has fewer than five employees. Please also clarify the insurance requirements applicable to subcontractors and any documentation required to establish an accepted exemption.
Please refer to Terms and Conditions Section 9.1.1. (b).
There are no specific requirements for subcontractors. However, it is the Contractor’s responsibility to ensure any subcontractors they hire maintain appropriate insurance coverage.
The State can request documentation confirming subcontractor coverage when needed, but the responsibility for ensuring those subcontractors are properly insured remains with the primary contractor.
65) How will the State calculate the lowest evaluated cost across both line items? Will the calculation use 24 times the monthly price plus one hour at the Line 2 rate, or another weighting or estimated quantity for additional cleaning?
Each line item multiplies the Unit Bid Price and the Line Bid Quantity to calculate the Total Line Bid Amount. The sum of all the Total Line Bid Amounts determines the Total Bid Amount.
66) Section 6.1.1 lists November 9, 2026, as the effective date, while the certificate of insurance is due ten business days beforehand and bids are due October 28, 2026. Please clarify the anticipated award and notice-to-proceed dates and how the insurance submission deadline will be administered.
Terms & Conditions Section 6.1.1. has been updated. The awarded Contractor shall provide a Certificate of Insurance and any endorsements upon contract award.
67) Is a website, a janitorial-specific webpage, or a capability statement required for responsiveness or qualification? If so, please identify the required information and confirm whether a Government and Commercial Services section on the prime contractor’s existing website is acceptable.
No.
68) If a pet owner does not properly dispose of pet waste, is the contractor responsible for picking it up and disposing of it? Is the contractor also responsible for purchasing and replenishing pet waste disposal bags? If so, please identify the dispenser locations, approved bag type and size, required stocking quantities, and replenishment frequency.
No. The purchase and refilling of pet supply stations will be completed by the Park.
69) Restroom cleaning frequency: The specifications state that restrooms must be open by 8:30 a.m. and be cleaned daily at 2:00 p.m. The Daily/Nightly Services section also specifically states that public restroom floors are to be cleaned twice daily, while the remaining restroom fixtures, dispensers, mirrors, and related tasks are listed as daily/nightly services.
Please clarify whether the entire restroom cleaning scope is required twice daily, or whether one complete daily cleaning is required with the second service applying primarily to restroom floors and/or necessary touch-up and restocking.
The Contractor shall do a complete cleaning in the morning before the public restrooms open at 8:30 AM CST. For the second cleaning at 2:00 PM CST the Contractor shall mop the floor, touch-up clean any surfaces and restock items.
70) Square footage / floor plan: The specifications state that building square footage is an estimate and that respondents are responsible for determining the actual size and scope of the job for bid purposes.
Please confirm whether the State has an approximate square-footage figure, floor plan, or building-area information available to all bidders for the Visitor Center and other regularly serviced interior areas, or whether bidders should rely solely on their own site measurements.
The Park does not have an approximate square footage of the buildings. Respondents shall rely on their own site measurements.
71) Certificate of Insurance timing: Section 9.1.1 of the updated T&Cs states that the required Certificate of Insurance must be provided ten business days prior to the November 9, 2026 Effective Date. This timing appears to fall before the October 28 bid due date.
Please clarify when the successful bidder will actually be required to provide the required COI and endorsements following award.
Terms & Conditions Section 6.1.1. has been updated. The awarded Contractor shall provide a Certificate of Insurance and any endorsements upon contract award.
72) Tennessee Contractor License requirement: Section 3.21 states that respondents must comply with the Tennessee Contractors Licensing Act when applicable, and Section 3.25 requires any necessary business or professional licenses.
Please confirm whether a Tennessee contractor license under Tenn. Code Ann. § 62-6-101 et seq. is required specifically for this janitorial services ITB.
No.
73) Staffing and restroom access: The specifications require janitorial services seven days per week during the stated park operating hours. Please confirm whether contractor personnel are required to remain onsite continuously throughout those operating hours, or whether the required services may be completed through scheduled service visits during the applicable service window. Please also confirm whether contractor personnel are responsible for opening and/or locking the public restrooms each day, or whether Park personnel handle restroom access.
The Contractor shall be onsite to perform the tasks outlined in the Specifications. The Contractor does not have to remain onsite continuously during Park operating hours.
The Park will open and lock the restrooms each day.
74) Historical consumable usage: Because the contractor is responsible for furnishing toilet tissue, hand towels, waste-receptacle liners, air fresheners, and toilet deodorizers, would the State please provide, if available, approximate usage quantities for these items during the most recent 12-month period?
If available, please also identify whether usage increases materially during peak seasons or special events.
The State does not have approximate usage quantities for supplies.
| 75) Site quantities and grounds information: If the State maintains an existing facility or site inventory, please provide, if available: | |
| • | restroom fixture counts; |
| • | outdoor trash/waste-receptacle counts and approximate sizes; and |
| • | a park or site map identifying the grounds included within the janitorial scope, including any secure or excluded areas. |
There is a one (1) public men’s restroom with two (2) stalls and four (4) urinals and one (1) public women’s restroom with ten (10) stalls. Within the Park office, there is one (1) restroom for the staff.
There are fifty-six (56) outdoor waste receptacles that are thirty (30), fifty (50), or ninety (90) gallons.
The Park is approximately twenty (20) acres, including the roads.
| 76) Events, unusual conditions, and additional cleaning: Please clarify which event-related or unusual cleaning conditions are considered part of the fixed monthly janitorial rate and which would qualify as separately authorized additional cleaning under Line 2. Specifically, please clarify the treatment of: | |
| • | cleanup associated with special events; |
| • | vandalism-related cleanup; |
| • | bodily-fluid cleanup; and |
| • | discarded needles or other sharps. |
The third party hosting the special event will be responsible for cleaning up during the event and at the conclusion of their event. The Park does a final walkthrough inspection once the event has concluded.
If the third party does not clean up once the event has concluded, the Park may ask the Contractor to estimate the number of hours needed to clean up. This would include picking up litter in the rented area and emptying overflowing trash cans. Those hours would be charged to Line 2.
Vandalism-related cleanup, bodily-fluid cleanup, and discarded needles or other sharps will be handled on a case-by-case basis.
77) Separately, if [Contractor name] does not identify a subcontractor with its initial bid but later seeks approval to use a subcontractor during contract performance, please advise what documentation must accompany the request for Central Procurement Office approval.
The Contractor shall submit the subcontractor approval request to the Park Manager and Maintenance Supervisor. For the request, the State would need the subcontractor’s name and contact information.
| 78) Additional-cleaning hourly rate: Line 2 requests an hourly rate for additional cleaning authorized by Park management. Please confirm whether the requested unit should be interpreted as: | |
| • | one worker-hour per individual employee, or |
| • | one crew-hour regardless of the number of personnel assigned. |
Please also clarify how the Line 2 hourly rate will be incorporated into the evaluated cost used to determine the lowest-cost responsive bidder.
The unit price should be interpreted as one (1) worker-hour per individual employee.
Each line item multiplies the Unit Bid Price and the Line Bid Quantity to calculate the Total Line Bid Amount. The sum of all the Total Line Bid Amounts determines the Total Bid Amount.
79) Are you able to share the previous contract value and the bid documents that were submitted for the last award?
No, those documents would need to be obtained through a Public Records Request.
80) Can you clarify the two sections below. Are you expecting for the services to "exceed" ($200,000.00) from section 1.1 although section 7.1 states "In no event shall the maximum liability of the State under this contract "exceed" $200,000.00)
This is a twenty-four (24) month contract for janitorial services at Bicentennial Capitol Mall State Park. The expected maximum liability will exceed two hundred thousand dollars and zero cents ($200,000.00).
Maximum Liability. In no event shall the maximum liability of the State under this Contract exceed Written Dollar Amount ($Number) ("Maximum Liability"). This Contract does not grant the Contractor any exclusive rights. The State does not guarantee that it will buy any minimum quantity of goods or services under this Contract. Subject to the terms and conditions of this Contract, the Contractor will only be paid for goods or services provided under this Contract after a purchase order is issued to Contractor by the State or as otherwise specified by this Contract.
Per Terms & Conditions Section 1.1, the expected maximum liability will exceed two hundred thousand dollars and zero cents ($200,000.00). That is representative of the twenty-four (24) contract term.
Terms & Conditions Section 7.1 will be updated upon contract award.
81) Do you have a map of the site the available that has a layout of everything where the trash cans can possibly be marked?
No.
82) When is the contract scheduled to begin?
The anticipated start date is December 9, 2026.
83) Will the awarded date allow for enough time to order supplies so that we're not purchasing supplies without being awarded the event first.
Yes.
84) Is there a max number of parking passes that are issued?
The State typically issues a maximum of two (2) passes. Parking passes are the property of the State and must be turned back in when contracted employee is no longer on this contract. Other passes can be addressed on a case-by-case basis.
85) What information is needed for the parking passes to be issued, and is there a certain amount of time needed for the request?
The State will need the name, vehicle make and model, VIN, and issued parking pass number.
86) If awarded, are we able to utilize a golf cart within the park?
Yes, but there are restrictions on where the golf cart can be driven.
87) What gallon are trash cans?
There are fifty-six (56) outdoor waste receptacles that are thirty (30), fifty (50), or ninety (90) gallons.
88) Is there a certain color of trash liners required such as "clear" or does it matter?
No.
89) Billing and payments: If the event starts Nov 1st and we are to bill Dec 1st ... when can expect our first payment if the State pays within 30 days? Will the first payment be made prior to the close of 2026 or should we expect this income to apply to 2027?
Given that the contract has an anticipated start date of December 9, 2026, the State anticipates an invoice for December services to be sent the first week of January 2027 with a due date no later than the first week of February 2027.
3. Delete ITB attachment “BCMSP Janitorial Specifications Final” in its entirety and insert the following in its place (any sentence or paragraph containing revised or new test is highlighted):
“BCMSP Janitorial Specifications (UPDATED)”
4. Delete ITB attachment “32701-14020 T&Cs (UPDATED)” in its entirety and insert the following in its place (any sentence or paragraph containing revised or new test is highlighted):
“32701-14020 T&Cs (10.21.26)”
5. ITB Amendment Effective Date. The revisions set forth herein shall be effective upon release. All other terms and conditions of this ITB not expressly amended herein shall remain in full force and effect.
| ITB # 32701-14020 – Amendment # 2 |
| Page 1 of 11 |
image1.jpeg
File details come from the government source that posted it. Updated .