Booker T Washington State Park Pool Demolition
Solicitation number
Event 32701-13545
Issued by
Hamilton County, Chattanooga City, Tennessee

About this file

This is Amendment #1 to ITB #32701-13545 issued by the Tennessee Department of Environment and Conservation for the Booker T Washington State Park Pool Demolition project. The amendment provides updated key dates including: event posted on 12/23/2024, pre-response conference on 1/7/2025 at 10:00 am ET, questions due by 1/8/2025 at 4:30 pm CT, and bids due on 1/17/2025 at 2:00 pm CT. The scope includes demolition of the pool, removal of all pool equipment, electrical components, piping, tanks, valving, and fencing. The contractor must complete work during normal park hours and match grades between shallow and deep ends, with the deep end point used for potential fill.

The project requires 95% proctor compaction with concrete no less than 12" underneath in the shallow end only, while the deep end must be completely demolished. Contractors must provide proctor testing and results. A Payment Bond of 25% of the maximum liability is required, but no Performance Bond is needed. Contractors must have a valid BC or BC-B license with CE-electrical certification or subcontract a CE. The project is funded through State General Appropriation, which will be approved and set aside once the Contract or Purchase Order is issued. No permits, SWPPP design, as-built drawings, or ADA requirements are needed, and no salvaging of materials is required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB # 32701-13545 – Amendment # 1 Page 1 of 4

STATE OF TENNESSEE

DEPARTMENT OF ENVIRONMENT AND CONSERVATION

REQUEST FOR PROPOSALS # 32701-13545

AMENDMENT # 1

FOR BOOKER T WASHINGTON STATE PARK POOL

DEMOLITION

DATE: January 14, 2025

ITB # 32701-13545 IS AMENDED AS FOLLOWS:

1. This ITB Schedule of Events updates and confirms scheduled ITB dates. Any event, time, or date containing revised or new text is highlighted.

Event Time Due Date

Event Posted 8:00 am CT 12-23-2024

Pre-Response Conference 10:00 am ET 1-7-2025

Questions and Comments Due

4:30 pm CT 1-8-2025

Bids Due 2:00 pm CT 1-17-2025

2. State responses to questions and comments in the table below amend and clarify this ITB.

Any restatement of ITB text in the Question/Comment column shall NOT be construed as a change in the actual wording of the ITB document.

QUESTION / COMMENT STATE RESPONSE

1. We did speak with TDEC Chattanooga Filed Office and the preliminary conversation indicated that a TDEC permit maybe required given the proximity to the lake and size of the excavation.

There is a follow-up discussion with a TDEC representative (Jennifer) for greater clarity today or tomorrow. We have no issue with managing the permitting but it has been our experience that permit issuance is much faster when led by the Government/State. If there are any Environmental Permits (TDEC, USACE, TVA, etc.), they are to be managed by the Government or Contractor?

Please note the Architect of record for the State could also verify permitting requirements.

No permit required

2. DBE – Are there any DBE mandatory requirements for this Contract?

No

ITB # 32701-13545 – Amendment # 1 Page 2 of 4

3. DBE Classification – Is SDVOSB classified at DBE under this Contract?

Yes, this would be a certification type that is accepted for this contract. You would indicate on their Diversity Utilization Plan that you are certified with Go-DBE (certifying agency) as an SDVBE (certification designation type).

4. Execution – Access – Will Contractor have restricted work hours/days as part of this project?

Work schedule shall be during normal Park hours

5. Scope – Undergrounds – There is no As-Built Drawings required for the undergrounds, drainage/piping systems, and or electrical demolitions?

No

6. Scope – Grade – If possible, is there Drawings or a Sketch that indicates final grade/slopes for the demolished area?

No, the grade shall be matched behind shallow end to deep end. Deep end point shall be used as potential fill.

7. During pre-bid it was indicated that a structure would be placed over the foot print of the demolished pool and that compacted fill would be required.

Please verify is this is a requirement?

Compaction should be 95% proctor and proof rolled.

8. If fill/compaction is a requirement, please indicate the exact area in which compaction would be required? All other areas are just unconsolidated fill?

Shallow end only; deep end shall be completely demolished. Contractor shall provide for proctor testing and results.

9. If fill/compaction is a requirement, please indicate specifications for the compaction and the quality control requirements for compaction?

95% with concrete no less than 12” underneath.

10. During the Pre-Bid it was indicated that existing soil/demolished concrete could be used as compacted fill. Please verify?

Yes

11. If subgrade fails to meet minimum compaction requirements and undercutting is required, is this considered a Change Order (CO) or to be estimated within the bid?

Within the bid

12. Scope – Submittals/Shop Drawings – It would be helpful to understand what Submittals and or Shop Drawings requirements

No submittals or drawings are being required by the State

ITB # 32701-13545 – Amendment # 1 Page 3 of 4 are generally expected? This is particularly relevant for compacted fill.

13. Scope – As-Builts – Are final As-Built Drawings expected from Contractor at completion of the Project?

No

14. Scope – Demolition of Equipment – During the Pre-Bid it was indicated that all electrical, piping, tanks, valving, etc. for two structures were to be removed and demolished. Please verify?

All pool equipment shall be removed.

15. Scope – Demolition of Fence

– Entire existing fence is to be demolished and removed?

Yes

16. Scope – ADA Requirements – Are there any ADA requirements for this Work?

No

17. Scope – Salvaging – is any part of the Work required to be salvaged?

No

18. Geo Report – Is there any Geotechnical Reporting data available for the area?

No

19. Invoicing – Can Contractor invoice based upon agreed upon progress or proof of purchase of materials?

No

20. Funding – Is any of the Work funded by the Federal Government? Has this funding for this Work been fully approved and set-aside?

State General Appropriation approved and set aside once the Contract or Purchase Order is issued.

21. Licensure – Any Contractor license issued by the Tennessee Board of Commerce & Insurance (TBCI) is sufficient to bid on this solicitation? Will the Government verify that all TBCI issued Contractor licenses are still valid prior to award? Has TBCI been consulted on the licensure most appropriate for this scope of work prior to award?

Contracts are required to have a valid BC or BC-B with a CE-electrical or subcontract a CE to bid on this solicitation.

22. Bid Bond – What are the Bid/Payment/Performance bond percentages?

No Performance Bond is required, a Payment Bond is required in an amount equal to 25% of the Max Liability of this project. Please see Section 8.5 of the Terms and

ITB # 32701-13545 – Amendment # 1 Page 4 of 4

Conditions.

23. Is the contractor required to pull any permits?

Please see response to question 1.

24. Is the contractor required to design the SWPPP for the erosion control?

No

25. Are any of the pool houses being removed with the pool?

No

26. Could you provide an outline of where the demolition limits of disturbance are?

No

27. Is this a prevailing wage project? Are there any background check requirements?

No

3. Delete ITB document “BTWSP Pool Demolition Specifications” in its entirety and insert the following in its place: “BTWSP Pool Demolition Specifications Version 2” (any sentence or paragraph containing revised or new text is highlighted):

4. ITB Amendment Effective Date. The revisions set forth herein shall be effective upon release. All other terms and conditions of this ITB not expressly amended herein shall remain in full force and effect.

File details come from the government source that posted it. Updated .