ITB_26-17_Addendum_1.pdf
PDF 10 MB Posted
- Attached to
- Fire Station 48 Restroom Renovations
- Solicitation number
- 26-17
- Issued by
- Seminole County, Florida
About this file
This is Addendum No. 1 to Invitation to Bid (ITB) #26-17 issued by the City of Oviedo, Florida, dated March 3, 2026, for Fire Station 48 Restroom Renovations. The addendum clarifies that permitted drawings must be submitted for alterations including wall extensions, plumbing, and electrical work, with the contractor responsible for procuring Architect or Engineer (AOR) services to support the project. The addendum also confirms that as-built documents for the existing restrooms are available and have been attached to the solicitation package. Prospective bidders are required to acknowledge receipt of this addendum on page 33 of the original ITB packet, with failure to do so resulting in bidder disqualification. The addendum addresses questions received from interested bidders and forms an integral part of the ITB documents dated February 23, 2026.
All other areas and requirements of ITB #26-17 remain unchanged, including the original project scope, timeline, submission requirements, and evaluation criteria. Bidders should note that the contractor's responsibility for AOR services represents an additional cost consideration in the project budget and pricing proposal.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Oviedo, Florida
ITB 26-17: Fire Station 48 Restroom Renovations
Addendum No. 1
March 3, 2026
To Prospective Bidders and Others Concerned:
This Addendum is in response to questions from interested bidders and forms a part of the ITB documents dated February 23, 2026, for the above referenced ITB. Please note, questions are recorded as they are received, including grammar and spelling errors.
Receipt of this addendum must be acknowledged on page 33 of the original ITB packet. Failure to do so will subject the Bidder to disqualification.
QUESTIONS AND ANSWERS:
1. Will the City require permit drawings for the renovation scope described within the scope of work? If so, is the City providing them or is the Contractor responsible for procuring AOR services to support the project.
Response: Permitted drawings will need to be submitted for alterations the vendor will be responsible for AOR service to support the project. Alterations include but not limited to the wall extension, plumbing, and electrical work.
2. Could you please provide any available drawings, floor plans, or as-built documents for the existing restrooms?
Response: The As-Built Documents are attached.
Attachments:
I. As-Built Documents
All other areas of ITB 26-17 remain unchanged.
END OF ADDENDUM NO. 1