Issued For Construction Drawings Replace 3rd Floor FCUs.pdf
PDF 19 MB Posted
- Attached to
- Y1DA--Replace Fan Coil Units Federal contract opportunity
- Solicitation number
- 36C24623B0014
About this file
This document provides details on a federal contract opportunity with the Department of Veterans Affairs to replace fan coil units. The solicitation number is 36C24623B0014 and seeks to replace fan coil units, as detailed in the Issued for Construction Drawings Replace 3rd Floor FCUs.pdf file. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The opportunity type is listed as a solicitation but no other details are provided on response dates, award dates, pricing terms, or set asides.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SD232113-10. DWG - Dual Heat Exchanger Controls (Heating System).pdf | ||
| 36C24623B0014 0002.docx | DOCX document | |
| 36C24623B0014 0001.docx | DOCX document | |
| M502 - Detail 1.pdf | ||
| MP203B - MECHANICAL PIPING PLANS -AREA B.pdf | ||
| Site Visit Attendance.pdf | ||
| SD232213-06 Flash Tank Sizing.pdf | ||
| Wage Determination.pdf | ||
| 36C24623B0014_1.docx | DOCX document | |
| Specifications Replace 3rd Floor FCUs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL
ISSUED FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project: 20215.001 08/12/2022 20215.001
B
IM
/2
.0
V
A F a y e tt e v ill e R e p la c e F a n
C o ils rd F lo o r/
.0
V A
F a y e tt e v ill e F a n
C o ils rd F lo o r_ S
E S
.r v t
/1
/2
:1
:0
P
M
G001
COVER SHEET REPLACE FAN COIL UNITS - 3RD
FLOOR FAYETTEVILLE VAMC,
FAYETTEVILLE, NC
2300 Ramsey St, Fayetteville, NC 28301
565-21-104
08/12/2022 SLC PCM
REPLACE FAN COIL UNITS - 3RD FLOOR FAYETTEVILLE VAMC,
FAYETTEVILLE, NC
2300 Ramsey St, Fayetteville, NC 28301
565-21-104
Building 1
SHEET INDEX - MECHANICAL
Sheet Number Sheet Name
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MD102B LEVEL 2 - MECHANICAL - DEMOLITION - AREA B
MD103B LEVEL 3 - MECHANICAL - DEMOLITION - AREA B
MH203B LEVEL 3 - DUCTWORK - AREA B
MH205C PENTHOUSE - MECHANICAL - AREA C
MP203B MECHANICAL PIPING PLANS - AREA B
M300 ENLARGED MECHANICAL PLAN
M500 MECHANICAL UL DETAILS
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES
M601 MECHANICAL SCHEDULES
M700 MECHANICAL CONTROLS
Grand total: 13
SHEET INDEX - ELECTRICAL
Sheet Number Sheet Name
E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED103B LEVEL 3 - ELECTRICAL - DEMOLITION - AREA B
EP203B LEVEL 3 - POWER - AREA B
E500 ELECTRICAL SCHEDULES
E501 FIRE ALARM COMM RISER
E601 ELECTRICAL UL DETAILS
Grand total: 6
SHEET INDEX - ARCHITECTURAL
Sheet Number Sheet Name
A001 ARCHITECTURAL ABBREVIATIONS, SYMBOLS AND GENERAL NOTES
AD101 LEVEL 3 - ARCHITECTURAL - DEMOLITION PLAN(S)
A101 LEVELS 2, 4 & 5 - ARCHITECTURAL - NEW WORK PLAN(S)
A102 LEVEL 3 - ARCHITECTURAL - NEW WORK PLAN(S)
A201 LEVEL 3 - ARCHITECTURAL - NEW WORK - AREA B
A601 DOOR/FINISH SCHEDULES AND DETAILS
Grand total: 6
SHEET INDEX - PLUMBING
Sheet Number Sheet Name
P000 PLUMBING SYMBOLS AND ABBREVIATIONS
PD103B LEVEL 3 - PLUMBING - DEMOLITION - AREA B
P203B LEVEL 3 - PLUMBING - AREA B
Grand total: 3
SHEET INDEX - FIRE PROTECTION
Sheet Number Sheet Name
FP203B LEVEL 3 - FIRE PROTECTION - AREA B
Grand total: 1
SHEET INDEX - COVER SHEET
Sheet Number Sheet Name
G001 COVER SHEET
Grand total: 1
Revisions: Date:
Revision 0 August 12, 2022
GENERAL
1. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE FOR ASSISTANCE AND GUIDANCE. EXACT LOCATIONS, DISTANCES, LEVELS AND QUANTITIES SHALL BE GOVERNED BY ACTUAL CONDITIONS FOUND ON THE JOB SITE AND MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND BECOME FAMILIAR WITH ALL AREAS OF THE EXISTING BUILDING AFFECTED BY THE WORK, PRIOR TO COMMENCING WORK. CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE COR.
2. CONTRACTOR SHALL NOTIFY THE COR PRIOR TO ANY HAMMER DRILLING, SAW CUTTING OR CORE DRILLING.
3. CONTRACTOR MUST OBTAIN HOT WORK PERMITS DAILY FOR WELDING, SOLDERING, TORCH CUTTING AND BURNING 24 HOURS PRIOR TO
START OF WORK FROM THE COR. CONTRACTOR MUST ACQUIRE AND HOLD THESE PERMITS AT THE WORK SITE AT ALL TIMES. FIRE WATCH IS
REQUIRED. CONTRACTOR WILL FURNISH FIRE EXTINGUISHERS.
4. NO SMOKING IS PERMITTED ON VA PROPERTY AT ANY TIME.
5. CONTRACTOR WILL NOTIFY THE COR OF ANY DAMAGED FIRE SPRINKLER COMPONENTS AND REPAIR IMMEDIATELY.
6. ALL FLOOR OR RATED WALL PENETRATIONS SHALL BE FIRESTOPPED AT END OF WORK SHIFT PER SPECIFICATION 07 84 00, FIRESTOPPING. IF
FLOOR OR RATED WALL PENETRATION CANNOT BE FIRESTOPPED AT END OF THE WORK SHIFT DUE TO THE NEED FOR ADDITIONAL WORK IN THAT AREA, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE
PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
7. CONTRACTOR SHALL PROTECT THE EXISTING FACILITY, INCLUDING CORRIDORS, ELEVATORS, DOORS, ETC. ALL DAMAGE RESULTING FROM DEMOLITION, RENOVATION OR TRANSPORTATION OF MATERIALS ASSOCIATED WITH THIS PROJECT MUST BE REPAIRED.
8. IN AREAS WHERE MECHANICAL, ELECTRICAL OR PLUMBING WORK PENETRATES INTERIOR OR EXTERIOR WALLS, CEILINGS, GRID SYSTEMS, GYPSUM CEILINGS, AND/OR BULKHEADS, CONTRACTOR SHALL BE REQUIRED TO PATCH AND REPAIR PENETRATIONS AS A RESULT OF THE
WORK.
9. CONTRACTOR WILL LEGALLY REMOVE AND DISPOSE OF ALL DEBRIS PER THE VA APPROVED WASTE MANAGEMENT PLAN.
GENERAL NOTES:
PROTECTION COORDINATION & REQUIREMENTS
1. CONTRACTOR SHALL MAINTAIN ALL SITE AREAS IN A SAFE CONDITION AT ALL TIMES.
2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING PROTECTION FOR BUILDING, SYSTEMS, OCCUPANTS, AND PEDESTRIANS AT ALL TIMES DURING
CONSTRUCTION.
3. CONTRACTOR SHALL SUBMIT SAFETY PLAN TO COR FOR REVIEW AND APPROVAL INDICATING ALL SAFETY MEASURES TO BE IMPLEMENTED
DURING CONSTRUCTION.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL REQUIRED PPE AND SAFE WORKING CONDITIONS FOR ALL WORKERS PER OSHA
REQUIREMENTS.
POWER
1. COR WILL DETERMINE AVAILABILITY OF POWER SUPPLY (IF ANY).
2. IF THE VA IS UNABLE TO PROVIDE A TEMPORARY ELECTRICAL CONNECTION DURING CONSTRUCTION, THE CONTRACTOR WILL BE REQUIRED TO PROVIDE ELECTRICITY TO SUPPORT THE WORK AT NO ADDITIONAL COST TO VA. CONTRACTOR WILL REQUEST AN AREA TO USE THE GENERATOR AT LEAST SEVEN (7) CALENDAR DAYS PRIOR TO USE. CONTRACTOR IS RESPONSIBLE FOR PROTECTING OUTSIDE BUILDING AIR INTAKES FROM
EXHAUST FOR THE DURATION OF THE PROJECT.
3. CONTRACTOR SHALL REQUEST POWER SHUTDOWNS OF EQUIPMENT THROUGH COR. CONTRACTOR SHALL NOT SHUTDOWN EQUIPMENT OR
ENGAGE WITH VA BREAKERS OR DISCONNECTS ON ACTIVE EQUIPMENT.
MECHANICAL SYSTEMS
1. CONTRACTOR SHALL PROTECT MECHANICAL UNITS INCLUDING AIR HANDLERS, COMPRESSORS, AND PIPING AS NECESSARY, AND CONTRACTOR SHALL MAINTAIN AIR FLOW (INTAKE & EXHAUST) AT EQUIPMENT AT ALL TIMES. INTAKES ADJACENT TO WORK AREAS SHALL BE
FILTERED FROM DUST AND DEBRIS WITH MINIMUM MERV13 FILTER CLOTH.
ACCESS AND MATERIAL STAGING
1. ROOF ACCESS WILL BE COORDINATED WITH THE COR.
2. COR WILL DETERMINE AVAILABILITY OF ACCESS AND STAGING AREAS AND IDENTIFY POTENTIAL LOCATIONS (IF ANY) AT THE TIME OF THE ISSUANCE OF THE NOTICE TO PROCEED. AREA FOR STAGING OR STORAGE MAY NOT BE AVAILABLE TO THE CONTRACTOR DURING CONSTRUCTION.
3. STORAGE IS NOT PERMITTED AROUND AHU INTAKES.
4. ALL HOIST MOVEMENTS MUST TAKE PLACE AFTER HOURS OR ON WEEKENDS, UNLESS APPROVED BY COR. A LIFT PLAN MUST BE SUBMITTED TWO
WEEKS PRIOR TO ALL HOIST MOVEMENTS FOR APPROVAL.
5. CONTRACTOR SHALL PLAN STAGING AND STORAGE AREAS TO MINIMIZE IMPACT TO EXISTING INFRASTRUCTURE AND ALLOW FOR ACCESS TO
EXISTING EQUIPMENT. PROVIDE MOBILIZATION PLAN TO COR FOR REVIEW AND APPROVAL.
6. CONTRACTOR SHALL INCLUDE REQUESTS FOR ACCESS AND STAGING AREAS IN THE NARRATIVE AND SCHEDULE.
SECURITY REQUIREMENTS
1. ROOF ACCESS POINTS / DOORS SHALL BE KEPT LOCKED AT ALL TIMES TO PREVENT UNAUTHORIZED PERSONS FROM ENTERING ROOF OR
MECHANICAL ROOMS / STAIRS LEADING TO ROOF. DOORS SHALL NOT BE PROPPED OPEN.
2. ALL MATERIAL AND EQUIPMENT SHALL BE KEPT IN A SECURED STATE AT ALL TIMES.
3. EXTERIOR STORAGE AREAS SHALL BE SECURED AND KEPT LOCKED AT ALL TIMES EXCEPT WHEN ADDING OR REMOVING MATERIALS.
4. CONTRACTOR SHALL SUPPLY TEMPORARY GUARD RAILS ON ROOFTOP WHERE GUARD RAILS ARE NOT ALREADY INSTALLED AS REQUIRED.
CONTRACTOR SHALL FOLLOW ALL OHSA REQUIREMENTS.
MEDICAL CENTER OPERATIONS
1. BUILDING AREAS WILL BE OCCUPIED AT ALL TIMES. CONTRACTOR WILL SCHEDULE THE WORK TO MINIMIZE DISRUPTION TO PATIENT COMFORT AND
MEDICAL CENTER OPERATIONS.
WORK AREA PREPARATION & PROTECTION
1. CONTRACTOR MUST PROVIDE WALK-OFF MATS AND ANY OTHER METHODS OF PROTECTION NEEDED DURING THE CONSTRUCTION/REPAIR
PROCESS, IN ORDER TO PROTECT STAIRWELLS AND CORRIDORS FROM DIRT AND DEBRIS.
2. CONTRACTOR MUST INSTALL FILTERS OVER ROOF DRAINS TO PREVENT DEBRIS FROM ENTERING ROOF DRAIN. REMOVE DEBRIS FROM ROOFS ON A
DAILY BASIS.
3. CONTRACTOR SHALL PROVIDE WALK-OFF MATS AT ROOF SURFACES WHERE CONSTRUCTION TRAFFIC AND DEBRIS WILL AFFECT EXISTING ROOF.
4. ALL PROTECTION MEASURES MUST BE APPROVED BY COR PRIOR TO START OF WORK.
1. ALL ASBESTOS ABATEMENT OR ENCLOSURE WORK SHALL BE PERFORMED BY PROPERLY TRAINED/LICENSED ASBESTOS ABATEMENT
CONTRACTOR WITHIN A FULL CONTAINMENT UNDER NEGATIVE PRESSURE (NPE).
2. ALL HVAC AIR INTAKES WITHIN NPE SHALL BE SHUT DOWN AND ISOLATED WITH CRITICAL BARRIERS DURING ACTIVE ACM REMOVAL OR ENCLOSURE WORK. WORK TO BE SCHEDULED WITH GENERAL CONTRACTOR AND OWNER TO ACCOMMODATE CONSTRUCTION AND FACILITY
REQUIREMENTS.
3. WORKERS PERFORMING ACM REMOVAL OR ENCLOSURE SHALL DON, AT MINIMUM, HALF FACE AIR PURIFYING RESPIRATORS WITH P100 FILTERS, DISPOSABLE DUST SUITS (WITH BOOT COVERS) AND GLOVES DURING ACTIVE TASKS, WHICH SHALL BE SUPPLEMENTED WITH USE OF POWERED AIR
PURIFYING RESPIRATORS.
4. ACM REMOVAL WORK AREAS SHALL BE PREPARED IN ACCORDANCE WITH THE FOLLOWING: A) ALL FLOORS, CEILINGS AND WALLS SHALL BE ISOLATED USING 2-LAYERS OF 6-MIL POLY SHEETING; B) OSHA ASBESTOS SIGNAGE AT ENTRANCE TO REGULATED AREAS; C)SINGLE-POINT OF ENTRY WITH 3-STAGE WET DECONTAMINATION STATION TO ALLOW WORKERS TO REMOVE PPE, WASH AND VACUUM THEMSELVES OFF PRIOR TO EXITING THE REGULATED WORK AREA; D) MAINTAINED UNDER NEGATIVE PRESSURE (-0.02 IN WG OR BETTER) USING HEPA FILTERED AIR MACHINES WITH EXHAUST ROUTED TO OUTDOORS; E) MINIMUM OF 4 AIR CHANGES PER HOUR; F) CLEAN/CHANGE ROOM SUFFICIENT FOR WORKERS TO CHANGE INTO STREET CLOTHES (OPAQUE POLY REQUIRED AS NEEDED FOR PRIVACY); G) RENEWABLE ADHESIVE MATS IMMEDIATELY OUTSIDE OF REGULATED WORK AREA TO ENSURE FOOT TRAFFIC DOES NOT SPREAD DUST/DEBRIS TO OTHER AREAS OF FACILITY.
5. ACM WORK TO BE PERFORMED USING THE FOLLOWING CONTROLS: A) HEPA FILTERED VACUUM FOR CONTINUOUS AND FINAL CLEANUP; B) ONLY MANUAL REMOVAL MEANS/TOOLS ARE ALLOWED TO DISTURB ACM (MECHANICAL TOOLS PROHIBITED FOR ACM REMOVAL).
6. REGULATED WORK AREA IS TO BE CLEANED BY CONTRACTOR FOLLOWING COMPONENT REMOVAL USING STANDARD HEPA VACUUM & WET WIPING METHODS AND VISUALLY INSPECTED AND CLEARANCE SAMPLED BY VA REPRESENTATIVE TO VERIFY COMPLETION OF SCOPE.
7. CONTRACTOR TO BE RESPONSIBLE FOR OSHA EMPLOYEE EXPOSURE MONITORING REQUIREMENTS.
8. ALL WASTE PRODUCED DURING REMEDIATION PHASE SHALL BE COLLECTED, CONTAINERIZED, LABELED, CHARACTERIZED AND DISPOSED IN
ACCORDANCE WITH SPECIFICATIONS
9. ALL WASTE CONTAINERS, EQUIPMENT, ETC. SHALL BE WET WIPED PRIOR TO LEAVING REGULATED WORK AREA.
10. NIGHTS WORK IS TO BE PERFORMED DURING OFF HOURS FROM 5:00 PM - 7:00 AM MONDAY THROUGH FRIDAY AND WEEKEND WORK FRIDAY 6 PM THROUGH SUNDAY. WORK IS PROHIBITED ON FEDERAL HOLIDAYS UNLESS APPROVED BY VA/COR.
11. ASBESTOS RELATED MATERIALS ARE PRESENT AND MAY NOT SHOWN ON DRAWINGS FOR CLARITY. KNOWN ASBESTOS MATERIALS INCLUDE FIRE DOORS, SOILS, DOOR AND WINDOW CAULKS, WINDOWS GLAZING, FLOOR TILE GROUPS AND ASSOCIATED UNDERLYING ASBESTOS MASTIC, FOUNDATION WATERPROOFING, TRANSITE AT WINDOW CONVECTORS, ASBESTOS DRYWALL ADHESIVES WHERE APPLIED TO WALL BLOCKS, GREEN MARBLE WALL PANELS, ACOUSTICAL LOBBY PLASTER, BLACK OR WHITE DUCT SEAM SEALANTS AND APPLICATIONS, SINK SOUND PROOFING, VIBRATION ISOLATION DUCT JOINTS, ASBESTOS PIPE INSULATION AND MUDDED FITTINGS, AND ZALBESTOS COATED DUCTWORK. PROTECT AS
NECESSARY.
12. AT INTERIOR REGULATED AREAS (NPE), WHERE THE COMBINED FOOTPRINT OF WORK CHAMBER, DECONTAMINATION CHAMBERS AND LOADOUT DOES NOT FIT WITHIN THE ROOM, THE DECON/LOADOUT CONFIGURATION MAY EXTEND INTO 1/2 WIDTH OF THE HALLWAY AS REQUIRED TO
ALLOW PASSAGE IN CORRIDOR.
ENVIRONMENTAL HAZARDS (ACM - ASBESTOS CONTAINING MATERIALS)
ALUMINUM
CONCRETE
GLASS
RIGID INSULATION
BRICK IN SECTION
CONCRETE MASONRY UNIT
EARTH
GYPSUM / PLASTER
STEEL
PEA GRAVEL
STONE
BATT INSULATION
PRECAST
GRAVEL
SAND
WOOD - SOLID
PLYWOOD
BRICK
CULTURED STONE
EXTERIOR COMPOSITE
PANEL
WOOD BLOCKING
WOOD SHIM
MATERIALS LEGEND
SYMBOLS LEGEND
SEE DISCIPLINE SHEETS FOR DISCIPLINE SPECIFIC SYMBOLS
1t
A02
Room Name
0-0000
NET SF
0 GRID LINE
ROOM No.
DOOR No.
WINDOW TYPE
WALL TYPE
NORTH ARROW
N
SPECIALTY
EQUIPMENT /
FURNITURE TAG
SCOPE NOTE
CENTER LINE
FLOW ARROW
INTERIOR
ELEVATION
DETAIL
SPOT
ELEVATION
MARKERS
REVISION No.
REVISION
CLOUD
EXTERIOR
ELEVATION
BUILDING SECTION
A301
A201
A211
A501
4 2
DETAIL
SHEET
DETAIL
SHEET
DETAIL
SHEET
DETAIL
SHEET
SECTION
MARKERS
GYP BD
10'-0" CEILING TAG
CL
WALL SECTION
A301
DETAIL
SHEET
SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINALOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT:
Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
ISSUED FOR
CONSTRUCTION
ARCHITECT/ENGINEER OF RECORD
ENGINEER:
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project: 20215.001
B
IM
/2
.0
V
A F a y e tt e v ill e R e p la c e
F a n C o ils rd
F lo o r/
-0
-4
A
R C
H A
T R
IA
X
R
.r v t
/9
/2
:1
:0
P M
A001
ARCHITECTURAL ABBREVIATIONS,
SYMBOLS AND GENERAL NOTES
REPLACE FAN COIL UNITS - 3RD
FLOOR FAYETTEVILLE VAMC,
FAYETTEVILLE, NC
2300 Ramsey St, Fayetteville, NC 28301
565-21-104
8/12/2022 JS MM
TEMP TEMPERATURE
TEMP TEMPORARY
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
TK BD TACK BOARD
TKP TACKABLE PANELING
TOC TOP OF CONCRETE
TOS TOP OF SLAB
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TR ACCENT RAIL
TRTD TREATED
TRZ INTERIOR POURED EPOXY RESIN
TERRAZO
TV TELEVISION
TYP TYPICAL
UC UNDERCUT
UGND UNDERGROUND
UL UNDERWRITER'S LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UR URINAL
V VOLT
VAC VACUUM
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VENT VENTILATE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VNR VENEER
VOL VOLUME
VP VACUUM PUMP
VP VANISHING POINT
VP VAPOR PRESSURE
VP VENEER PLASTER
VPC VENEER PLASTIC CEILING/SOFFIT
VR VAPOR RETARDER
VRR VINYL (ACROVYN) RAIL
VS VENT STACK
VS VOLUMETRIC SWITCH
VS SHEET VINYL
VT SOLID VINYL TILE
VTR VENT THRU ROOF
VTS VINYL TRANSITION STRIP
VWC VINYL WALLCOVERING
W WIDE
W WEST
W / W WALL TO WALL
W/ WITH
W/D WASHER / DRYER
W/O WITHOUT
WB WOOD BASE
WC WATER CLOSET
WC WALLCOVERING
WD WOOD
WDH WOOD HAND RAIL
WDM WOOD WALL MOULDINGS
WDP WOOD PANELING
WDR WOOD CHAIR, CRASH, OR HAND RAIL
WDS ATHLETIC/ACOUSTIC ISOLATED WOOD
FLOORING
WDSHV WOOD SHELVING
WDT WOOD TILE OR PARQUET FLOORING
WDV WOOD VENEER
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WALL HUNG
WI WROUGHT IRON
WP WATERPROOF
WP WORKING POINT
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WR WIRE ROPE
WRP WATER REPELLENT
WT WEIGHT
WWF WELDED WIRE FABRIC
XPS EXTRUDED POLYSTYRENE
YD YARD
PREFIN PRE-FINISHED
PRF POLYURETHANE SPORTS FLOORING
PROP PROPERTY
PRST PRESSURE TREATED
PS POURED SEALANT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT(ED)
PT/E EPOXY PAINT
PT/F FLAT PAINT
PT/HG HIGH GLOSS PAINT
PT/SG SEMIGLOSS PAINT
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PV PAVED
PVC POLYVINYL CHLORIDE
PVG PAVING
Q HEAT TRANSFER
Q RATE OF FLOW
QT QUARRY TILE
QTY QUANTITY
QZF QUARTZ FLOORING
QZR QUARTZ RESIN
QZT QUARTZ TILE
R RISER
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REF REFRIGERATOR
REFL REFLECTED
REG REGISTER
REINF REINFORCE(D)
REQ REQUIRED
RESIL RESILIENT
REST RESTROOM
RET RETURN
REV REVISE / REVISION
RF RESILIENT FLOORING
RFG ROOFING
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RAILROAD
RR ROLL ROOFING
RS RAPID START
RS ROUGH SAWN
RS RUBBER SHEET
RSF RUBBER SHEET FLOORING
RST REINFORCING STEEL
RT RIGHT
RTF RUBBER TILE FLOORING
RTS RUBBER TRANSITION STRIP
RWD REDWOOD
RWL RAIN WATER LEADER
S SOUTH
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SD SOAP DISPENSER
SECT SECTION
SF SQUARE FEET
SGL SINGLE
SH SINGLE HUNG
SHR SHOWER
SHR HD SHOWER HEAD
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SL SEA LEVEL
SL SPOT LIGHT
SLDG SLIDING
SND SANITARY NAPKIN DISPENSER
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPC SUSPENDED PLASTER CEILING
SPEC SPECIFY / SPECIFICATION
SPH SOLID PHENOLIC POLYMER (TRESPA)
SPKR SPEAKER
SPR SOLID POLYMER RESIN (3FORM)
SQ SQUARE
SQIN SQUARE INCH(ES)
SSP SOLID SURFACE POLYMER (CORIAN)
SSPR SOLID POLYMER (CORIAN) RUB RAIL
SST STAINLESS STEEL
SSTR STAINLESS STEEL RUB RAIL
ST SINGLE THROW
ST STAIRS
ST STREET
ST STAIN
STA STATION
STD STANDARD
STIF STIFFENER
STON STONE
STOR STORAGE
STRUCT STRUCTURE / STRUCTURAL
SUH SUSPENDED UNIT HEATER
SURF SURFACE
SUSP SUSPENDED
SVP VINYL SOLID PANEL (ACROVYN)
SW SWITCH
SYMM SYMMETRICAL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T/S TUB / SHOWER
TB TOWEL BAR
TC TERRA COTTA
TCZ CEMENTITIOUS TERRAZZO
TEL TELEPHONE
HD HAND DRYER
HDBD HARDBOARD
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HDWL HEADWALL
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HP HEAT PUMP
HP HIGH PRESSURE
HP HORSEPOWER
HR HAND RAIL
HS HAND SINK
HT HEIGHT
HVAC HEATING / VENTILATION / AIR
CONDITIONING
HW HOT WATER
HWP HOT WATER PUMP
HYD HYDRANT
IC IRONING CABINET
ID INSIDE DIAMETER
IN INCH / INCHES
INCL INCLUDE(D) / INCLUDING
INSUL INSULATE / INSULATION
INT INTERIOR
INV INVERT
ITS INTERTEK TESTING SERVICES
J-BOX JUNCTION BOX
JAN CLO JANITOR'S CLOSET
JS JANITOR'S SINK
KIT KITCHEN
L ANGLE
L LITER
LAB LABORATORY
LAM LAMINATE(D)
LAV LAVATORY
LB(S) POUND(S)
LC LINEN CLOSET
LF LINEAR FOOT (FEET)
LH LEFT HAND
LIB LIBRARY
LINO LINOLEUM
LKR LOCKER
LNO LINOLEUM
LPT LOW POINT
LT LIGHT
LTF LINOLEUM TILE FLOORING
LTWT LIGHT WEIGHT
LVR LOUVER
m METER
MACH MACHINE
MAT WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MB MAIL BOX
MB MIXING BOX
MBH MOP/BROOM HOLDER
MC MEDICINE CABINET
MCP ACOUSTIC LAY-IN METAL CEILING PADS
ME MECHANICAL ENGINEER
MECH MECHANICAL
MED MEDIUM
MEZZ MEZZANINE
MFR MANUFACTURE(R)
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MKR BD MARKER BOARD
MLDG MOULDING
mm MILLIMETER
MO MASONRY OPENING
MR MOISTURE RESISTANT
MS MOP SINK
MSB MOP SERVICE BASIN
MTD MOUNTED
MTL METAL
MTS METAL TRANSITION STRIP
MULL MULLION
MVBL MOVABLE
MW MICROWAVE
N NORTH
NA NOT AVAILABLE / APPLICABLE
NAT NATURAL
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OF / CI OWNER FURNISHED / CONTRACTOR
INSTALLED
OFF OFFICE
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OZ OUNCE
PAR PARALLEL
PAR PARAPET
PART PARTIAL
PAT PATTERN
PBD PARTICLE BOARD
PCC PRECAST CONCRETE
PED PEDESTAL
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTIC
PLAS PLASTER
PLYWD PLYWOOD
PR PAIR
PREFAB PREFABRICATED
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET DETAIL
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DIV DIVISION
DMPF DAMPPROOFING
DR DOOR / DRAIN
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EF EACH FACE
EG VERTICAL END GUARDS
EHD ELECTRIC HAND DRYER
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EM ELECTROMAGNETIC
EM EXPANDED METAL
EMER EMERGENCY
ENCL ENCLOSED / ENCLOSURE
ENGR ENGINEER
ENTR ENTRANCE
EOS EDGE OF SLAB
EPB ELECTRIC PANEL BOARD
EQ EQUAL(LY)
EQUIP EQUIPMENT
ER POURED EPOXY
ERF POURED EPOXY FLOORING
ESCAL ESCALATOR
EST ESTIMATE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXF EXTERIOR FINISH
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAB FABRIC
FAI FRESH AIR INTAKE
FBRK FIREBRICK
FCP PREFABRICATED FABRIC CEILING PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF EL FINISH FLOOR ELEVATION
FGL FIBERGLASS
FH FIRE HOSE
FHC FIRE HOSE CABINET
FIN FINISH(ED)
FIN FLR FINISHED FLOOR
FIN FLR FINISH FLOOR
FIXT FIXTURE
FLASH FLASH(ING)
FLR FLOOR
FLRSK FLOOR SINK
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUDS
FOW FACE OF WALL
FP FIREPROOF
FPL FIREPLACE
FR FRAME
FRG FIBER REINFORCED GYPSUM
FRP FIBERGLASS REINFORCED PLASTIC
FRT FIRE RETARDANT TREATED
FSP FIRE STAND PIPE
FSTNR FASTENER
FTG FOOTING
FURG FURRING
FUT FUTURE
FWC FABRIC WALL COVER
FWP NON-ACOUSTIC STRETCHED FABRIC
PANEL WALL INSTALATION
G GROUND
GA GAGE
GALV GALVANIZE(D)
GB GRAB BAR
GC GENERAL CONTRACTOR
GDISP GARBAGE DISPOSAL
GEN GENERAL
GFP GFRP OR GFRG FREESTANDING PANEL
GFRG GLASS FIBER REINFORCED GYPSUM
GFRP GLASS FIBER REINFORCED POLYMER
GL GLASS / GLAZING
GL BLK GLASS BLOCK
GLT GLASS MOSIAC TILE
GLZ GLAZING
GLZ CMU GLAZED CONCRETE MASONRY UNIT
GPM GALLONS PER MINUTE
GR GROSS
GR LN GRADE LINE
GRAN GRANITE
GT GREASE TRAP
GT GROSS TON
GT GROUT
GYP GYPSUM
GYP BD GYPSUM BOARD
H HIGH
HC HOLLOW CORE
HCP HANDICAPPED
HD HEAVY DUTY
@ AT
A/C AIR CONDITIONER / CONDITIONING
ACC ACCESSIBLE
ACCSY ACCESSORY
ACOUS INSUL ACOUSTICAL INSULATION
ACOUS PNL ACOUSTICAL PANELS
ACP LAY-IN ACOUSTIC PANEL CEILING PADS
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADDL ADDITIONAL
ADDM ADDENDUM
ADJ ADJUSTABLE / ADJACENT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AHR ANCHOR
AHU AIR HANDLING UNIT
ALNMT ALIGNMENT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
APPVD APPROVED
APT APARTMENT
ARCH ARCHITECT(URAL)
ASPH ASPHALT
ASTM AMERICAN SOCIETY FOR TESTING
MATERIALS
ATC ACOUSTICAL TILE CEILING
AUTO AUTOMATIC
AVG AVERAGE
AWP WALL-MOUNTED SOUND ABSORPTION
PANEL
AWT ACOUSTIC WALL TREATMENT
BD BOARD
BITUM BITUMINOUS
BL BASELINE
BL BLACK
BLDG BUILDING
BM BEAM
BO BLOWOFF
BOT BOTTOM
BR BEDROOM
BRG BEARING
BS BOTH SIDES
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
BW BOTH WAYS
C CELSIUS
C CHANNEL
C TO C CENTER TO CENTER
CAB CABINET
CB CATCH BASIN
CCT CUBICLE CURTAIN TRACK
CEM CEMENT
CEM PLAS CEMENT PLASTER (STUCCO)
CER CERAMIC
CG CORNER GUARD
CH CHILLER
CH COAT HOOK
CHBD CHALKBOARD
CHFR CHAMFER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CL D CLOTHES DRYER
CLG CEILING
CLG HT CEILING HEIGHT
CLL CONTRACT LIMIT LINE
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CARBON MONOXIDE
CO CASED OPENING
CO CERTIFICATE OF OCCUPANCY
CO CLEANOUT
CO COMPANY
CO CUTOUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONC FLR SEALED CONCRETE FLOOR
CONSTR CONSTRUCTION
CONT CONTINUE
CONT CONTROLLER
CONV CONVERT
CORR CORRIDOR / CORRUGATED
CPT CARPET
CR CLOSET ROD
CR CONTROL RELAY
CR CONTROL ROOM
CR CRASH RAIL
CS CAST STONE
CS CONTROL SWITCH
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU COPPER
CU FT CUBIC FOOT
CU YD CUBIC YARD
CUB CUBICLE CURTAIN
CURT CURTAIN
CW CASEMENT WINDOW
CW CHEMICAL WASTE LINE
CW CLOCKWISE
CW COLD WATER PIPING
D DEEP
UP
Office
334A Office
Office
335A Toilet
Electrical
Bath
Patient Rm
Patient Rm
Patient Rm341
Patient Rm
Patient Rm
Patient Rm
Electrical Closet
338A Patient Toilet
340A Patient Toilet
342A Patient Toilet
Day Room
392A Kitchen Nourish
392B Room
392C Room
Stair
Tele Closet
C3BS
CorridorFEC
C3BN
Corridor
C3BE
Corridor
AD101
Lockers
1 1 1
Storage
Housekeeping
KN#1 ABOVE
CEILING
Lockers
C3BS
Corridor
Office
334A Office 334
Office 335A Toilet
Tele Closet
7 7
9 9
Storage
10 10
2 2
6 6
6 6
Housekeeping
6 12
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE
DEMOLISHED
DEMOLITION / RENOVATION LEGEND
DEMOLITION KEYNOTES:
1. EXISTING FAN COIL TO BE REMOVED.
2. REMOVE EXISTING FLOOR FINISH MATERIALS. PATCH AND LEVEL
CONCRETE.
3. CAREFULLY SALVAGE CEILING PANELS AND PROVIDE TO VA COR.
DEMOLISH CEILING GRID AND DISPOSE OF. PATCH, REPAIR AND CLEAN ALL
SURFACES TO REMAIN EXPOSED.
4. REMOVE EXISTING SOFFIT AND ALL ASSOCIATED FRAMING.
5. REMOVE EXISTING WALL. PATCH AND REPAIR ADJACENT SURFACES TO
MATCH EXISTING.
6. REMOVE EXISTING FINISHES FROM INTERIOR FACE OF WALLS DOWN TO
EXISTING STRUCTURAL SYSTEM.
7. REMOVE EXISTING DOOR, FRAME, HARDWARE, SILL AND JAMB AS
INDICATED.
8. REMOVE EXISTING WALL. PREPARE FLOOR, CEILING AND ADJACENT WALLS
FOR NEW WALL INSTALLATION AND NEW DOOR AND FRAME.
9. REMOVE SIGNAGE AND TURN OVER TO THE VA COR.
10. EXISTING RADIATOR TO BE REMOVED. WALL REPAIR(S) AND PATCH(ES) TO
BE COMPLETED AS DESCRIBED ON NEW WORK PLAN(S) AND DETAIL(S).
11. PROTECT EXISTING WALL.
12. REMOVE WINDOW.
13. REMOVE PLUMBING FIXTURE & PIPING. REFER TO PLUMBING DRAWINGS
FOR DETAILS.
14. REMOVE AND SAFELY STORE EXISTING CEILING PANELS AND ALL CEILING
MOUNTED LIGHTS AND EQUIPMENT AS REQUIRED TO INSTALL NEW
EQUIPMENT, DUCTING, PIPING, ETC. PREP FOR RE-NSTALLMENT.
15. REMOVE & DISCARD EXISTING CERAMIC TILES. SAFELY SAVE AND STORE
ANY EXISTING CEILING MOUNTED EQUIPMENT.
16. REFER TO GENERAL NOTE 11 ABOVE.
17. PROVIDE FIRE STOP AT ALL MECHANICAL AND PLUMBING EQUIPMENT
PENETRATIONS THRU FLOOR(S) TO MATCH FIRE RATING IN EXISTING
FLOORS. PROVIDE FIRE AND/OR SMOKE DAMPERS IN ALL DUCTWORK
PENETRATIONS (SEE MECHANICAL DRAWINGS).
DEMOLITION GENERAL NOTES:
1. PROTECT EXISTING MATERIALS AND SURFACES NOTED TO REMAIN AT ALL
TIMES THROUGHOUT ENTIRE DEMOLITION AND CONSTRUCTION OPERATIONS.
CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPAIR OF
ADJACENT MATERIALS DAMAGED DURING CONSTRUCTION TO THE
SATISFACTION OF THE COR.
2. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS AND DIMENSIONS AND
NOTIFY COR OF CONDITIONS THAT DO NOT AGREE WITHDIFFER FROM THOSE
SHOWN IN THE CONSTRUCTION DOCUMENTS.
3. CONTRACTOR SHALL COORDINATE ALL BUILDING SYSTEM SHUT-DOWNS WITH
THE COR.
4. EXISTING WINDOWS SHALL REMAIN UNO AND SHALL BE PROTECTED DURING
DEMOLITION.
5. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL SHEETS FOR ADDITIONAL
DEMOLITION NOTES.
6. PROTECT EXISTING FLOORS, BASE, WALLS AND CEILINGS TO REMAIN. REPAIR
ANY DAMAGE TO LIKE NEW CONDITION. SPOT PAINTING IS NOT ALLOWED -
WALLS SHALL BE PAINTED CORNER TO CORNER AND EDGE TO EDGE: COLOR TO
MATCH EXISTING.
7. WALL BASE DAMAGED AS A RESULT OF FAN COILS OR RADIATORS REMOVAL,
SHALL BE REMOVED TO NEAREST SEAM AND REPLACE TO MATCH EXISTING.
8. FLOOR TILE DAMAGED AS A RESULT OF FAN COILS OR RADIATORS REMOVAL,
SHALL BE REMOVED IN FULL TILE SEGMENTS AND REPLACED IN FULL TILE
SEGMENTS TO MATCH EXISTING.
9. LVT DAMAGED AS A RESULT OF FAN COILS OR RADIATORS REMOVAL, SHALL BE
REMOVED IN FULL LENGTHS AND REPLACED IN FULL LENGTHS, WITH
STAGGERED JOINTS, TO MATCH EXISTING.
10. INTEGRAL BASE DAMAGED AS A RESULT OF FAN COILS OR RADIATORS
REMOVAL, SHALL BE REPAIRED/PATCHED WITH SAME TYPE AND MATCHING
COLOR INTEGRAL BASE.
11. REMOVE, PROTECT AND REINSTALL EXISTING LIGHTING, CEILING PANELS AND
CEILING MOUNTED EQUIPMENT, UNO. SEE ELECTRICAL. THIS WORK SHALL BE
AS REQUIRED TO INSTALL ALL NEW EQUIPMENT, DUCTING, PIPING, ETC.
12. REFER TO MECHANICAL DEMO FOR REMOVAL INSTRUCTION FOR FAN COILS
AND RADIATORS.
13. ANY EXISTING WALL DAMAGE AND/OR GAPS, VOIDS CAUSED BY REMOVAL OF
EXISTING MEP SYSTEMS TO BE REPAIRED AND PAINTED TO MATCH EXISTING.
X
ASBESTOS ABATEMENT NOTES:
1. APPROX. 562 SQFT OF FLOORING AREA INDICATED HAS ASBESTOS
CONTAINING MATERIAL.
2. WINDOWS SCHEDULED FOR DEMOLITION CONTAINS ASBESTOS
CONTAINING SEALANT.
3. GC SHALL VERIFY PRESENCE OF ASBESTOS CONTAINING MATERIALS.
FOLLOW ABATEMENT PROTOCOLS AS REQUIRED.
3 3
CEILINGS IN THIS AREA ALONG WITH ALL CEILING MOUNTED EQUIPMENTTO
BE REMOVED AND RELOCATED TO A LOWER ELEVATION TO ACCOMODATE
THE NEW ABOVE CEILING EQUIPMENT. SEE INDIVIDUAL NOTES FOR EACH
SPACE.
14 14
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINALOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT:
Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
ISSUED FOR
CONSTRUCTION
ARCHITECT/ENGINEER OF RECORD
ENGINEER:
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project: 20215.001
B
IM
/2
.0
V
A F a y e tt e v ill e R e p la c e
F a n C o ils rd
F lo o r/
-0
-4
A
R C
H A
T R
IA
X
R
.r v t
/9
/2
:1
:1
P M
AD101
LEVEL 3 - ARCHITECTURAL -
DEMOLITION PLAN(S)
REPLACE FAN COIL UNITS - 3RD
FLOOR FAYETTEVILLE VAMC,
FAYETTEVILLE, NC
2300 Ramsey St, Fayetteville, NC 28301
565-21-104
8/12/2022 JS CR
1/8" = 1'-0"1
3RD FLOOR PLAN - OVERALL DEMOLITION
1/4" = 1'-0"2
3RD FLOOR PLAN - ENLARGED DEMOLITION
1/4" = 1'-0"3
3RD FLOOR REFLECTED CEILING PLAN - DEMOLITION
STAIR
ELEC.
2B121
PATIENT ROOM
TELECOM
2B118
MECHANICAL ROOM
2B117
PATIENT ROOM
2B116
PATIENT ROOM
2B117A
PATIENT TLT
2B116A
PATIENT TLT
PROVIDE FIRE STOP AT ALL PIPE
PENETRATIONS AS NECESSARY
THRU FLOOR(S) TO MATCH FIRE
RATING IN EXISTING FLOORS.
SELECTIVELY REMOVE WALLS AS
NEEDED FOR INSTALLATION OF
NEW PIPING. REPAIR AND PATCH
WALLS TO MATCH ADJACENT
SURFACES AND FIRE RATINGS
AFTER INSTALLATION.
TELECOM
CLOSET
STAIR
DWGS
STORAGE
DECON
STORAGE
EOC FILE RM
STORAGE
CORRIDOR
OFFICE
INTERIOR
DESIGN
OFFICE
SAFETY
MNGR
OFFICE
BIOMED
SPRVSR
OFFICE
WOMEN'S
TOILET
FEC
B102
2' -8
3' -8
10"
PROVIDE FIRE STOP AT ALL PIPE
PENETRATIONS THRU FLOOR(S) TO
MATCH FIRE RATING IN EXISTING
FLOORS.
STAIR
STORAGE
OFFICE
RESIDENT OFFICE
PATIENT
BELONGINGS
STORAGE
CORRIDOR
C5-13
CORRIDOR
C5BS
FEC
TELECOM CLOSET
STAFF TLT. 2
PATIENT RM
SOILED
UTILITY
HAC
CORRIDOR
C5-9
CORRIDOR
C5-8
B102
3' -1
0" 2'
-4
10"
PROVIDE FIRE STOP AT ALL PIPE
PENETRATIONS THRU FLOOR(S) TO
MATCH FIRE RATING IN EXISTING
FLOORS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINALOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT:
Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
ISSUED FOR
CONSTRUCTION
ARCHITECT/ENGINEER OF RECORD
ENGINEER:
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project: 20215.001
B
IM
/2
.0
V
A F a y e tt e v ill e R e p la c e
F a n C o ils rd
F lo o r/
-0
-4
A
R C
H A
T R
IA
X
R
.r v t
/9
/2
:1
:1
P M
A101
LEVELS 2, 4 & 5 - ARCHITECTURAL
- NEW WORK PLAN(S)
REPLACE FAN COIL UNITS - 3RD
FLOOR FAYETTEVILLE VAMC,
FAYETTEVILLE, NC
2300 Ramsey St, Fayetteville, NC 28301
565-21-104
8/12/2022 JS CR
1/8" = 1'-0"1
SECOND FLOOR PLAN -NEW WORK
1/8" = 1'-0"2
FOURTH FLOOR PLAN -DEMO
1/8" = 1'-0"3
FIFTH FLOOR PLAN -NEW WORK
UP
Office
334A Office
Office
335A Toilet
Electrical
Bath
Patient Rm
Patient Rm
Patient Rm341
Patient Rm
Patient Rm
Patient Rm
Electrical Closet
338A Patient Toilet
340A Patient Toilet
342A Patient Toilet
Day Room
392A Kitchen Nourish
392B Room
392C Room
Stair
Tele Closet
Mechanical
C3BS
CorridorFEC
C3BN
Corridor
C3BE
Corridor
A102
A601
TYPICAL DETAIL FOR
PATCH/REPAIR WORK AT REMOVED
FAN COIL UNIT PENETRATION
LOCATIONS.
8 8 8
A601 4
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE
DEMOLISHED
DEMOLITION / RENOVATION LEGEND
NEW WORK GENERAL NOTES:
1. PROTECT EXISTING MATERIALS AND SURFACES NOTED TO REMAIN
THROUGHOUT ENTIRE DEMOLITION AND CONSTRUCTION OPERATIONS.
CONTRACTOR SHALL PATCH AND REPAIR MATERIALS DAMAGED DURING
CONSTRUCTION TO THE SATISFACTION OF THE COR.
2. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS AND DIMENSIONS AND
NOTIFY COR OF CONDITIONS THAT DIFFER FROM THOSE SHOWN IN THE
CONSTRUCTION DOCUMENTS.
3. CONTRACTOR SHALL COORDINATE ALL BUILDING SYSTEM SHUT-DOWNS
WITH THE COR.
4. INSTALL INSULATION AT EXTERIOR WALL IN NEW AIR HANDLING EQUIPMENT
ROOM AND AT ALL LOCATIONS WHERE FAN COILS HAVE BEEN REMOVED.
5. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL SHEETS FOR
ADDITIONAL DEMOLITION NOTES.
6. DAMAGE AND/OR GAPS/VOIDS IN EXISTING WALLS CAUSED BY REMOVAL OF
EXISTING MEP EQUIPMENT SHALL BE REPAIRED/PATCHED AND PAINTED TO
MATCH ADJACENT SURFACES.
7. NEW CEILING GRIDS SHALL BE HUNG WITH NEW HANGERS.
NEW WORK KEYNOTES:
1. CONSTRUCT NEW WALL AS INDICATED ON SHEET A-601. ALIGN WALL
WITH ADJACENT WALLS, MATCH PAINT COLOR AND RUBBER BASE
WITH ADJACENT EXISTING WALLS.
2. INSTALL NEW DOOR, FRAME, HARDWARE, SILL AND JAMB.
3. INSTALL NEW WALL / PATCH WHERE EXISTING DOOR(S) HAVE BEEN
REMOVED. MATCH WALL CONSTRUCTION, FINISH AND COLOR WITH
ADJACENT WALLS.
4. NO CEILING – EXPOSED TO STRUCTURE. CLEAN AS REQUIRED.
5. NEW LOUVER IN EXISTING WINDOW ROUGH OPENING. MATCH
EXISTING COLOR/FINISH.
6. NEW CEILING GRID SYSTEM INSTALLED AT 8'-0" AFF. SALVAGED
CEILING PANELS AND CEILING MOUNTED EQUIPMENT SHALL BE RE-
INSTALLED AT ORIGINAL LOCATION INCLUDING BARIATRIC LIFT
TRACKS AND EQUIPMENT.
7. NEW MOLD & MOISTURE RESISTENT GYPSUM BOARD CEILING AT 8'-0"
AFF. REPAIR, PAINT AND PATCH TO MATCH EXISTING ADJACENT
WALLS.
8. PATCH AND PAINT WALL, REPLACE MISSING FLOORING AND BASE TO
MATCH EXISTING ADJACENT FINISHES.
9. LOCATION OF EXISTING PLUMBING / MECHANICAL EQUIPMENT.
PROVIDE FIRE STOP AT ALL MECHANICAL AND PLUMBING EQUIPMENT
PENETRATIONS THRU FLOOR(S) TO MATCH FIRE RATING IN EXISTING
FLOORS. PROVIDE FIRE AND/OR SMOKE DAMPERS IN ALL DUCTWORK
PENETRATIONS (SEE MECHANICAL DRAWINGS).
X
Mechanical
C3BS
Corridor
Office
334A Office 334
Office 335A Toilet
Tele Closet
B13S1
4"
ALIGN WALL WITH SEAMLESS
TRANSITION
ALIGN WALL WITH
SEAMLESS TRANSITION
5 5
B13S1
CEILINGS IN THIS AREA ALONG WITH ALL CEILING MOUNTED EQUIPMENTTO
BE REMOVED AND RELOCATED TO A LOWER ELEVATION TO ACCOMODATE
THE NEW ABOVE CEILING EQUIPMENT. SEE INDIVIDUAL NOTES FOR EACH
SPACE. NEW CEILINGS SHALL BE HUNG WITH NEW HANGERS.
6 6
Mechanical
C3BS
Corridor
Office
334A Office
Office
Bath
335A Toilet
Bath
Electrical
Tele Closet
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINALOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT:
Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
ISSUED FOR
CONSTRUCTION
ARCHITECT/ENGINEER OF RECORD
ENGINEER:
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project: 20215.001
B
IM
/2
.0
V
A F a y e tt e v ill e R e p la c e
F a n C o ils rd
F lo o r/
-0
-4
A
R C
H A
T R
IA
X
R
.r v t
/9
/2
:1
:1
P M
A102
LEVEL 3 - ARCHITECTURAL - NEW
WORK PLAN(S)
REPLACE FAN COIL UNITS - 3RD
FLOOR FAYETTEVILLE VAMC,
FAYETTEVILLE, NC
2300 Ramsey St, Fayetteville, NC 28301
565-21-104
8/12/2022 JS CR
1/8" = 1'-0"1
3RD FLOOR PLAN - OVERALL NEW WORK
1/4" = 1'-0"2
3RD FLOOR PLAN - ENLARGED NEW WORK
1/4" = 1'-0"3
3RD FLOOR REFLECTED CEILING PLAN - NEW WORK
A201
LEVEL 3 - ARCHITECTURAL - NEW
WORK - AREA B
MM MM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD
ENGINEER:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT:
Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
ISSUED FOR
CONSTRUCTION
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project: 20215.001
BI
M
5.
- V A
Fa ye tte vi lle R ep la ce F an C oi ls rd
F lo or /2
.0
VA
F ay et te vi lle
F an
C oi ls rd F lo or
_S
ES
_2
1.
rv t 8/
8/
:2 0:
A
M
REPLACE FAN COIL UNITS - 3RD
FLOOR FAYETTEVILLE VAMC,
FAYETTEVILLE, NC
2300 Ramsey St, Fayetteville, NC 28301
08/12/2022
565-21-104100% FINAL
Revisions: Date:
Revision 0 August 12, 2022
1.
2.
DEMOLITION KEYNOTES:
REMOVE EXISTING WINDOWS, PREP WALL FOR NEW MECHANICAL LOUVER
INSTALLATION. SEE MECHANICAL DRAWINGS FOR DETAILS.
REMOVE EXISTING FAN COIL VENT, DUCTWORK BEHIND AND ALL
ASSOCIATED MECHANICAL EQUIPMENT COMPLETE. PREPARE WALL FOR
BRICK PATCH.
X 1.
2.
RENOVATION KEYNOTES:
INSTALL NEW MECHANICAL LOUVERS. SEE MECHANICAL DRAWINGS AND
SCHEDULES FOR DETAILS.
PATCH VENT OPENINGS WITH NEW BRICK AND GROUT TO MATCH
EXISTING.
X
WHERE A DOOR IS NOTED AS RATED, IT SHALL DESIGNATE A RATED ASSEMBLY WHICH SHALL INCLUDE DOOR, FRAME, HARDWARE AND ALL PARTS OF THE DOOR. ALL ITEMS MAKING UP THE TOTAL ASSEMBLY SHALL BE RATED AND/OR LISTED WITH TESTING AGENCY RECOGNIZED BY THE LOCAL GOVERNING BUILDING AUTHORITY AND WITH ALL COMPONENTS MEETING THE LABEL REQUIRMENTS FOR THAT RATING/LISTING.
NOTE: RATED DOORS
SUGGESTED HARDWARE LOCATIONS
LOCKSET/LATCH SET
DEAD BOLT
DOOR PULL
PUSH PLATE
PUSH BARS
HOSPITAL ARM PULLS
HOSPITAL LATCH
EXIT DEVICES
PUSH BAR
LEVER BAR
C/L OF LEVER
C/L OF BOLT
C/L OF GRIP
C/L OF PLATE
C/L OF BAR
C/L OF LOWER BASE
C/L OF LATCH
C/L OF TOUCH BAR
C/L OF CROSS BAR
-39 5/16" FROM FINISHED FLOOR
-42" WHERE NO DOOR KNOB
-44" WHERE DOOR KNOB
-42" FROM FINISHED FLOOR
-45" FROM FINISHED FLOOR
-40" FROM FINISHED FLOOR
-45" FROM FINISHED FLOOR
-45 3/4" FROM FINISHED FLOOR
-40" FROM FINISHED FLOOR
-36" FROM FINISHED FLOOR
NOTE: ALL CONDITIONS SHOWN ARE NOT NECESSARILY ON EVERY PROJECT.
TYPICAL DOOR
JAMB LOCATION
18" MIN UNO
HAS BOTH CLOSER & LATCH
12" MIN WHERE DOOR
2"
SCHEDULE
SEE DOOR 2"
7' -0
2"
G Y
P W
A
LL
SEE OPENING SCHEDULE
S E
E O
P E
N
IN
G S
C H
E D
U
LE
METAL STUD
JAMB ANCHOR 4 PER
JAMB-SPOT GROUT
@ ANCHORS
CAULK TYPICAL
(BOTH SIDES)
GYP BD EA SIDE
2" 5/8"
/1 6"1/
2"
1/2"
/1 6"
5/8" GYPSUM BOARD EACH SIDE
33 MIL STUDS TO STRUCTURE ABOVE
6" HIGH X WIDTH OF WALL BOX
HEADER OFF 33 MIL MINIMUM
METAL STUDS
DOUBLE 33 MIL STUDS AT EACH JAMB BEYOND
5/8" GLASS MAT
GYP. SHEATHING
PATCH EXISTING WEATHER
BARRIER WITH COMPATABLE
MATERIAL
2-1/2" METAL FRAMING
@ 16" OC (MAX)
NEW BRICK & GROUT
TO MATCH EXISTING
INSTALL GYP BOARD TO
MATCH ADJACENT
SURFACES ON METAL
FRAMING WITH BATT
INSULATION
SEALANT ALL AROUND
SEALANT ALL AROUND
NOTE:
1. APPLICABLE TO PENETRATIONS OF ALL FIRE RATED MEMBRANES, IN ACCORDANCE
WITH NFPA 101. REFER TO SPECIFICATIONS SECTION 07 84 00, FIRE
STOPPING SYSTEMS.
INSULATED PIPE
OR DUCT
FLOOR
FIRESTOP MATERIAL
3/4" APPROVED FIRESTOP
INSULATION WITH VAPOR
BARRIER
PIPE SLEEVE WHERE
SPECIFIED
1/4" ∅ ANCHOR ROD
FOR NEW CONSTRUCTION
WELD
FLOOR OR DECK PENETRATION
PARTITION OR CHASE PENETRATION
MASONRY PARTITION
PARTITION SUPPORT
FIRESTOP
MATERIAL
3/4" APPROVED FIRESTOP
INSULATION WITH VAPOR BARRIER
DRYWALL PARTITION
INSULATED PIPE
OR DUCT
" 1"
6" 6"
6" 6"
6" 6"
EXIST PLASTER TO REMAIN -
PATCH IF REQ'D
PTW BLOCKING AS
REQ'D
18 GA. MTL JAMB &
HEAD W/STOP
METAL LOUVER
REMOVE EXIST. WINDOW
& ALL WD TRIM
CAULK
18 GA. MTL SILL
W/STOP (WIDTH TO
BE EQ. OR GREATER
THAN WD TRIM)
PTW BLOCKING AS
REQ'D
STL CHANNEL TO
REMAIN
EXIST MASONRY &
FLASHING TO REMAIN
SEALANT (TYP.)
STONE SILL TO
REMAIN
8 1/2"
RATING
-FIRE- -SOUND-
TEST # STC TEST #
SCALE: 1 1/2"=1'-0"
1 hr UL U465
FIRE RATED - ONE HOUR
WHERE INDICATED ON PLANS
WALL TYPE IDENTIFIERS
B13S1 3 5/8" METAL STUDS = 4 7/8" WALL
B13S1 WALL TYPE
1" DEFLECTION
1" DEFLECTION
FLOOR
PLAN SECTION
HEAD PERPENDICULAR TO MTL DECK
HEAD PARALLEL TO MTL DECK
STUD SIZE &
WALL TYPE
IDENTIFIER -
METAL TRACK
ACOUSTIC SEALANT- TYPICAL
(FIRE SEALANT @ FIRE BARRIERS)
CONCRETE FLOOR SLAB
SOUND ATTENUATION INSULATION , THICKNESS PER STC RATING
FULL HEIGHT METAL STUDS @ 16" O.C.
5/8" GYPSUM BOARD PROPRIETARY
SOUND REDUCTION TYPE "X"
SLOTTED TOP DEFLECTION TRACK PER TESTED
DESIGN - FASTEN TO METAL DECK
FIRE SEALANT PER TESTED DESIGN BOTH SIDES
(@ FIRE RATED PARTITIONS)
CONCRETE
INSULATION PER HEAD OF WALL TESTED DESIGN
(@ FIRE RATED PARTITIONS)
BOTTOM
OF METAL
DECK
DEFLECTION TRACK PER TESTED DESIGN - FASTEN TO
STRAPS PER DESIGN - STRAPS @ 16" O.C.
FIRE SEALANT PER TESTED DESIGN BOTH SIDES
(@ FIRE BARRIERS)
CONCRETE
METAL DECK
INSULATION PER TESTED HEAD OF WALL DESIGN
(@ FIRE BARRIERS)
5/8" GYPSUM BOARD
1" 1"
1/ 2"
SEE BELOW
STI SYSTEM No. HW-D-0456
STI SYSTEM No. HW-D-0456
5/8" GYPSUM BOARD
CEILING RUNNER
CEILING RUNNER
5/8" GYPSUM
BOARD
5/8" GYPSUM BOARD PROPRIETARY
SOUND REDUCTION TYPE "X"
5/8" GYPSUM BOARD PROPRIETARY
SOUND REDUCTION TYPE "X"
NGC 2013005
48 OL-11-0638& UL V435
EXISTING VENT OPENING
RATING
-FIRE- -SOUND-
TEST # STC TEST #
NONEHEAD OF WALL DESIGN
SCALE: 1 1/2"=1'-0"
0 hr - N/A N/A
NON RATED
5/8" GYPSUM BOARD
WALL TYPE IDENTIFIERS
B102 2 1/2" METAL STUDS
METAL TRACK ATTACHED TO
CONC FLR DECK W/ 1 1/2" POWDER
ACTIVATED FASTENERS @ 24" O.C. - 4" FROM
ENDS - MIN EMBEDMENT: 1 1/4"
METAL STUDS AT 16" O.C.
METAL STUD TRACK
ABOVE CEILING
BELOW CEILING
METAL STUD CLIP, ATTACHED TO
WALL, 32" O.C.
B102 WALL TYPE
FLOOR
SECTION AT TOP OF WALL
1/ 4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINALOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT:
Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
ISSUED FOR
CONSTRUCTION
ARCHITECT/ENGINEER OF RECORD
ENGINEER:
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project: 20215.001
B
IM
/2
.0
V
A F a y e tt e v ill e R e p la c e
F a n C o ils rd
F lo o r/
-0
-4
A
R C
H A
T R
IA
X
R
.r v t
/9
/2
:1
:1
P M
A601
DOOR/FINISH SCHEDULES AND
DETAILS
REPLACE FAN COIL UNITS - 3RD
FLOOR FAYETTEVILLE VAMC,
FAYETTEVILLE, NC
2300 Ramsey St, Fayetteville, NC 28301
565-21-104
8/12/2022 JS CR
DOOR & FRAME SCHEDULE
DOOR
NO. ROOM NAME
DOOR FRAME
F
IR
E R
A T
IN
G
S T
C
H A
R D
W A
R E
S E
T
NOTESW
ID
T H
H E
IG
H
T
T H
IC
K
N E
S S
G L A
Z
IN
G
L O
U V
E R
P A
N E
L M
A T
E R
IA
L
F R
A M
E M
A T
E R
IA
L
F R
A M
E T
Y P
E
B U
C K
T Y
P E
397 Mechanical 6' - 0" 7' - 0" 90MIN 40 SH-9A ASTRAGAL & CLOSER
FINISH SCHEDULE
Number ROOM NAME
FLOOR
FINISH
BASE
FINISH
CEILING
FINISH NOTES / REMARKS
397 Mechanical UTILITY GREY
EPOXY
NONE EXPOSED No rubber base. Epoxy flooring should be extended 4" vertically on wall all the way around the space and up the sides of the poured equipment pads. Pour so floor slopes to drain. Equipment pad should have chamfered edges.
F-3 D-1
1 1/2" = 1'-0"2
DOOR JAMB DETAIL
B-1
1 1/2" = 1'-0"1
INTERIOR DOOR HEADER DETAIL- 8'-0" MAX OPENING
WALL TYPE(S)DETAIL(S)
1 1/2" = 1'-0"3
DETAIL @ SECTION (TYP.)
1" = 1'-0"6
PIPE PENETRATION DETAIL
NTS
WALL SECTION @ METAL LOUVERS
1" = 1'-0"4
DETAIL @ INTERIOR ELEVATION (TYP.)
DOOR TYPE(S)FRAME TYPE(S)BUCK TYPE(S)
Room
392C
Stair
Patient Rm
Patient Toilet
342A
Patient Rm
Patient Rm
Patient Toilet
338A
Patient Rm
Bath
Office
Toilet
335A
Office
Electrical Closet
Patient Rm
Electrical
Patient Toilet
340A
Corridor
C3BW
Corridor
C3BE
Corridor
C3BN
Conference Room
392B
Kitchen Nourish
392A
Day Room
Patient Rm
Office
334A
Tele Closet
Mechanical
Corridor
C3BS
A.5
A.5
A.6
A.6
A.7
A.7
A.8
A.8
A.9
A.9
A.10
A.10
A.11A.11
A.12A.12
A.13A.13
A.15A.15
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
ENGINEER:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT:
Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964
NC Engineering License No.: P-0214 NC Architectural License No.: 51254
ISSUED FOR
CONSTRUCTION
AREA A AREA B AREA C
PROJECT KEY PLAN
PLAN NORTH TRUE NORTH
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project: 20215.001
B
IM
/2
.0
V
A F a y e tt e v ill e R e p la c e F a n
C o ils rd F lo o r/
.0
V A
F a y e tt e v ill e F a n
C o ils rd F lo o r_ S
E S
.r v t
/1
/2
:0
:5
P
M
FP203B
LEVEL 3 - FIRE PROTECTION -
AREA B
REPLACE FAN COIL UNITS - 3RD
FLOOR FAYETTEVILLE VAMC,
FAYETTEVILLE, NC
2300 Ramsey St, Fayetteville, NC 28301
08/12/2022 GWB NLC
565-21-104
100% FINAL
1/8" = 1'-0"
LEVEL 3 - FIRE PROTECTION - AREA B
GENERAL NOTES:
A. UNLESS NOTED OTHERWISE DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT, AND FIXTURE INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
B. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS
OR FOR THE MEANS AND METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES
REQUIRED TO PERFORM THIS WORK.
C. THE FIRE PROTECTION CONTRACTOR SHALL COORDINATE EXISTING CONDITIONS AND TRADES FOR
NEW PIPING AND HEAD LOCATIONS AS REQUIRED.
D. THE EXISTING SPRINKLER SYSTEM IS A WET SYSTEM. ALL PIPING IS ABOVE CEILING.
E. ALL SPRINKLER WORK SHALL COMPLY WITH NFPA 13 AND LOCAL CODES.
F. CONTRACTOR IS REQUIRED TO ADJUST ANY SPRINKLER HEADS IN ANY PART OF THE PROJECT AREA
NECESSARY TO ACCOMMODATE NEW INSTALLATION WORK.
SHEET NOTES:
1. REMOVE EXISTING HEADS. TURN PIPING UP AND INSTALL QUICK RESPONSE UPRIGHT HEADS WITH
PROTECTIVE CAGES.
2. ADJUST HEADS TO NEW 8' CEILING HEIGHT.
08/12/2022 20215.001
ABBREVIATION
GENERAL ABBREVIATIONS
DESCRIPTION ABBREVIATION DESCRIPTION
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
AD ACCESS DOOR/PANEL
AFF ABOVE FINISHED FLOOR
AMB AMBIENT
DIA DIAMETER
DN DOWN
E EXISTING
EC ELECTRICAL CONTRACTOR
EFF EFFICIENCY
GC GENERAL CONTRACTOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
L LENGTH
LF LINEAR FEET
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MFR MANUFACTURER
MIN MINIMUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
PC PLUMBING CONTRACTOR
PSIG POUNDS PER SQUARE INCH GAUGE
RPM REVOLUTIONS PER MINUTE
SHT SHEET
TOB TOP OF BEAM
GPM GALLONS PER MINUTE
TOS TOP OF STEEL
BOB BOTTOM OF BEAM
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
UNION
STRAINER WITH BLOW-OFF VALVE
ELBOW UP
ELBOW DOWN
TEE UP
PIPING
- SOLID LINE INDICATES SYSTEM SUPPLY
-- DASHED LINE INDICATES SYSTEM RETURN
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
FIRE PROTECTION GENERAL SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
# SHEET NOTE
DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS
AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.
DIAMETER
DENOTES CONNECTION OF NEW
WORK TO EXISTING SYSTEM
PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.
#/# ARROW INDICATES DOWNWARD PIPE SLOPE
#/# INDICATES SLOPE IN INCHES PER FOOT
WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR
REQUIREMENTS
ARROW INDICATES DIRECTION OF FLOW IN
PIPING
ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CHECK VALVE
ARROW INDICATES DIRECTION OF NORMAL FLOW
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
BALANCING DEVICE
# INDICATES FLOW TO BE BALANCED IN GPM
CIRCUIT SETTER, AUTOFLOW, ETC.
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM#
PRESSURE GAUGE
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER
TEE DOWN
TEE HORIZONTAL
PIPE REDUCER
INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.
SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.
REQUIRED SERVICE CLEARANCE FOR EQUIPMENT
CONTINUATION SYMBOLS
FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.
SECOND SYMBOL APPLIES TO RECTANGULAR AND OVAL DUCT.
ABBREVIATION
FIRE PROTECTION ABBREVIATIONS
DESCRIPTION
BACK FLOW PREVENTERBFP
FIRE PROTECTIONF
FIRE DEPARTMENT CONNECTIONFDC
ABBREVIATION DESCRIPTION
FLOW SWITCHFS
POST INDICATOR VALVEPIV
SPRINKLERSPR
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
SYMBOL
FIRE PROTECTION SYMBOLS
DESCRIPTION ADDITIONAL REMARKS
FLOW SWITCH COORDINATE INTERFACE WITH FIRE ALARM SYSTEM CONTRACTOR
FIRE DEPARTMENT CONNECTION MOUNT BETWEEN 18" AND 48" ABOVE FINISHED GRADE
REFER TO SPECIFICATIONS FOR TYPES AND FINISHES.
PENDANT REFERS TO FULL, SEMI-RECESSED AND RECESSED TYPES. LOCATIONS
FOR EACH ARE INDICATED IN THE SPECIFICATIONS OR ON THE PLANS.
SIDEWALL SPRINKLER -
EXISTING SIDEWALL SPRINKLER
SPRINKLER
EXISTING SPRINKLER
EXISTING SPRINKLER TO BE REMOVED
FIRE PIPEF
O.S. & Y. VALVE
SHUT-OFF VALVE WITH TAMPER SWITCHTS
FIRE DEPARTMENT VALVEFDV
DRY PIPE FIRE PROTECTIONDP
FIRE PUMP TEST HEADERFPTH
HAZARD
SPRINKLER FLOW DENSITIES
AREA (SF) GPM/SF
1500LIGHT HAZARD 0.10
ORDINARY HAZARD I 1500
0.15
0.20ORDINARY HAZARD II
HOSPITALS:
SPRINKLER HAZARD CLASSIFICATION
LIGHT HAZARD:
• PATIENT ROOMS
• CORRIDORS
• OFFICES
• CHAPELS
• DINING AREAS
ORDINARY HAZARD, GROUP 1:
• MECHANICAL ROOMS
• ELECTRICAL ROOMS
• KITCHENS
• STORAGE ROOMS (CEILING HEIGHT 8 FEET OR LESS) 1
• SOILED UTILITY ROOMS
• CLEAN UTILITY ROOMS
• LABORATORIES (HAZARD CLASSIFICATION WILL DEPEND ON THE AMOUNTS
OF FLAMMABLE AND COMBUSTIBLE LIQUIDS USED AND STORED IN THE
LABORATORIES)
ORDINARY HAZARD, GROUP 2:
• STORAGE ROOMS (CEILING HEIGHT 12 FEET OR LESS) 1
• SOILED LINEN ROOMS
1 MEETING THE CRITERIA FOR QUANTITY/COMBUSTIBILITY OF CONTENTS FOR AN
ORDINARY, GROUP 1 HAZARD.
UNION
STRAINER WITH BLOW-OFF VALVE
ELBOW UP
ELBOW DOWN
TEE UP
PIPING
- SOLID LINE INDICATES SYSTEM SUPPLY
-- DASHED LINE INDICATES SYSTEM RETURN
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
GENERAL PLUMBING SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
# SHEET NOTE
DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS
AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.
DIAMETER
DENOTES CONNECTION OF NEW
WORK TO EXISTING SYSTEM
PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.
#/# ARROW INDICATES DOWNWARD PIPE SLOPE
#/# INDICATES SLOPE IN INCHES PER FOOT
WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR
REQUIREMENTS
ARROW INDICATES DIRECTION OF FLOW IN
PIPING
ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CHECK VALVE
ARROW INDICATES DIRECTION OF NORMAL FLOW
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
BALANCING DEVICE
# INDICATES FLOW TO BE BALANCED IN GPM
CIRCUIT SETTER, AUTOFLOW, ETC.
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM#
PRESSURE GAUGE
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER
TEE DOWN
TEE HORIZONTAL
PIPE REDUCER
INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.
SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.
REQUIRED SERVICE CLEARANCE FOR EQUIPMENT
CONTINUATION SYMBOLS
FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.
SECOND SYMBOL APPLIES TO RECTANGULAR AND OVAL DUCT.
ABBREVIATION
PLUMBING ABBREVIATIONS
DESCRIPTION
CHEMICAL VENTCV
BOTTLE/GLASS FILLERBF
ABBREVIATION DESCRIPTION
DOMESTIC HOT WATERHW
DOMESTIC HOT WATER CIRCULATIONHWC
LAVATORYL
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
BACK FLOW PREVENTERBFP
BATH TUBBT
COMPRESSED AIR (NON-MEDICAL)CA
PROPANELPG
LEAVING WATER TEMPERATURELWT
BTU (1000'S)MBH
CONDENSATE DRAINCD
CLEANOUTCO
CONDENSATE PUMPCP
MOP SINKMS
NORMALLY CLOSEDNC
NORMALLY OPENNO
CLINICAL SINKCS
DOMESTIC COLD WATERCW
DRINKING FOUNTAINDF NON-POTABLE WATERNPW
POST INDICATOR VALVEPIV
PRESSURE REDUCING VALVEPRV
DOUBLE GRADE CLEANOUTDGCO
DEIONIZED WATERDI
DEIONIZED WATER CIRCULATINGDIC
ROOF DRAINRD
REVERSE OSMOSIS WATERRO
DEIONIZED HOT WATERDIH
RPZ
S
REDUCED PRESSURE ZONE (BACK FLOW PREVENTER)
SINK
DEIONIZED HOT WATER CIRCULATINGDIHC
DISTILLED WATERDIS
DISTILLED WATER CIRCULATINGDISC
SANITARY SEWERSAN
SUMP PUMP DRAINSPD
DIALYSIS WATER RETURNDR
DIALYSIS WATER SUPPLYDS
DRAIN TILEDT
SEWAGE EJECTORSE
SHOWERSH
EMERGENCY EYE WASHEEW
EMERGENCY SHOWERES
EMERGENCY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .