Issued For Construction Drawings Replace 3rd Floor FCUs.pdf

PDF 19 MB Posted

Attached to
Y1DA--Replace Fan Coil Units Federal contract opportunity
Solicitation number
36C24623B0014
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document provides details on a federal contract opportunity with the Department of Veterans Affairs to replace fan coil units. The solicitation number is 36C24623B0014 and seeks to replace fan coil units, as detailed in the Issued for Construction Drawings Replace 3rd Floor FCUs.pdf file. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The opportunity type is listed as a solicitation but no other details are provided on response dates, award dates, pricing terms, or set asides.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Replace Fan Coil Units, newest first.
File Type Posted
SD232113-10. DWG - Dual Heat Exchanger Controls (Heating System).pdf PDF
36C24623B0014 0002.docx DOCX document
36C24623B0014 0001.docx DOCX document
M502 - Detail 1.pdf PDF
MP203B - MECHANICAL PIPING PLANS -AREA B.pdf PDF
Site Visit Attendance.pdf PDF
SD232213-06 Flash Tank Sizing.pdf PDF
Wage Determination.pdf PDF
36C24623B0014_1.docx DOCX document
Specifications Replace 3rd Floor FCUs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL

ISSUED FOR

CONSTRUCTION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 20215.001 08/12/2022 20215.001

B

IM

/2

.0

V

A F a y e tt e v ill e R e p la c e F a n

C o ils rd F lo o r/

.0

V A

F a y e tt e v ill e F a n

C o ils rd F lo o r_ S

E S

.r v t

/1

/2

:1

:0

P

M

G001

COVER SHEET REPLACE FAN COIL UNITS - 3RD

FLOOR FAYETTEVILLE VAMC,

FAYETTEVILLE, NC

2300 Ramsey St, Fayetteville, NC 28301

565-21-104

08/12/2022 SLC PCM

REPLACE FAN COIL UNITS - 3RD FLOOR FAYETTEVILLE VAMC,

FAYETTEVILLE, NC

2300 Ramsey St, Fayetteville, NC 28301

565-21-104

Building 1

SHEET INDEX - MECHANICAL

Sheet Number Sheet Name

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MD102B LEVEL 2 - MECHANICAL - DEMOLITION - AREA B

MD103B LEVEL 3 - MECHANICAL - DEMOLITION - AREA B

MH203B LEVEL 3 - DUCTWORK - AREA B

MH205C PENTHOUSE - MECHANICAL - AREA C

MP203B MECHANICAL PIPING PLANS - AREA B

M300 ENLARGED MECHANICAL PLAN

M500 MECHANICAL UL DETAILS

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

M601 MECHANICAL SCHEDULES

M700 MECHANICAL CONTROLS

Grand total: 13

SHEET INDEX - ELECTRICAL

Sheet Number Sheet Name

E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED103B LEVEL 3 - ELECTRICAL - DEMOLITION - AREA B

EP203B LEVEL 3 - POWER - AREA B

E500 ELECTRICAL SCHEDULES

E501 FIRE ALARM COMM RISER

E601 ELECTRICAL UL DETAILS

Grand total: 6

SHEET INDEX - ARCHITECTURAL

Sheet Number Sheet Name

A001 ARCHITECTURAL ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

AD101 LEVEL 3 - ARCHITECTURAL - DEMOLITION PLAN(S)

A101 LEVELS 2, 4 & 5 - ARCHITECTURAL - NEW WORK PLAN(S)

A102 LEVEL 3 - ARCHITECTURAL - NEW WORK PLAN(S)

A201 LEVEL 3 - ARCHITECTURAL - NEW WORK - AREA B

A601 DOOR/FINISH SCHEDULES AND DETAILS

Grand total: 6

SHEET INDEX - PLUMBING

Sheet Number Sheet Name

P000 PLUMBING SYMBOLS AND ABBREVIATIONS

PD103B LEVEL 3 - PLUMBING - DEMOLITION - AREA B

P203B LEVEL 3 - PLUMBING - AREA B

Grand total: 3

SHEET INDEX - FIRE PROTECTION

Sheet Number Sheet Name

FP203B LEVEL 3 - FIRE PROTECTION - AREA B

Grand total: 1

SHEET INDEX - COVER SHEET

Sheet Number Sheet Name

G001 COVER SHEET

Grand total: 1

Revisions: Date:

Revision 0 August 12, 2022

GENERAL

1. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE FOR ASSISTANCE AND GUIDANCE. EXACT LOCATIONS, DISTANCES, LEVELS AND QUANTITIES SHALL BE GOVERNED BY ACTUAL CONDITIONS FOUND ON THE JOB SITE AND MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND BECOME FAMILIAR WITH ALL AREAS OF THE EXISTING BUILDING AFFECTED BY THE WORK, PRIOR TO COMMENCING WORK. CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE COR.

2. CONTRACTOR SHALL NOTIFY THE COR PRIOR TO ANY HAMMER DRILLING, SAW CUTTING OR CORE DRILLING.

3. CONTRACTOR MUST OBTAIN HOT WORK PERMITS DAILY FOR WELDING, SOLDERING, TORCH CUTTING AND BURNING 24 HOURS PRIOR TO

START OF WORK FROM THE COR. CONTRACTOR MUST ACQUIRE AND HOLD THESE PERMITS AT THE WORK SITE AT ALL TIMES. FIRE WATCH IS

REQUIRED. CONTRACTOR WILL FURNISH FIRE EXTINGUISHERS.

4. NO SMOKING IS PERMITTED ON VA PROPERTY AT ANY TIME.

5. CONTRACTOR WILL NOTIFY THE COR OF ANY DAMAGED FIRE SPRINKLER COMPONENTS AND REPAIR IMMEDIATELY.

6. ALL FLOOR OR RATED WALL PENETRATIONS SHALL BE FIRESTOPPED AT END OF WORK SHIFT PER SPECIFICATION 07 84 00, FIRESTOPPING. IF

FLOOR OR RATED WALL PENETRATION CANNOT BE FIRESTOPPED AT END OF THE WORK SHIFT DUE TO THE NEED FOR ADDITIONAL WORK IN THAT AREA, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE

PROTECTION AGAINST FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

7. CONTRACTOR SHALL PROTECT THE EXISTING FACILITY, INCLUDING CORRIDORS, ELEVATORS, DOORS, ETC. ALL DAMAGE RESULTING FROM DEMOLITION, RENOVATION OR TRANSPORTATION OF MATERIALS ASSOCIATED WITH THIS PROJECT MUST BE REPAIRED.

8. IN AREAS WHERE MECHANICAL, ELECTRICAL OR PLUMBING WORK PENETRATES INTERIOR OR EXTERIOR WALLS, CEILINGS, GRID SYSTEMS, GYPSUM CEILINGS, AND/OR BULKHEADS, CONTRACTOR SHALL BE REQUIRED TO PATCH AND REPAIR PENETRATIONS AS A RESULT OF THE

WORK.

9. CONTRACTOR WILL LEGALLY REMOVE AND DISPOSE OF ALL DEBRIS PER THE VA APPROVED WASTE MANAGEMENT PLAN.

GENERAL NOTES:

PROTECTION COORDINATION & REQUIREMENTS

1. CONTRACTOR SHALL MAINTAIN ALL SITE AREAS IN A SAFE CONDITION AT ALL TIMES.

2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING PROTECTION FOR BUILDING, SYSTEMS, OCCUPANTS, AND PEDESTRIANS AT ALL TIMES DURING

CONSTRUCTION.

3. CONTRACTOR SHALL SUBMIT SAFETY PLAN TO COR FOR REVIEW AND APPROVAL INDICATING ALL SAFETY MEASURES TO BE IMPLEMENTED

DURING CONSTRUCTION.

4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL REQUIRED PPE AND SAFE WORKING CONDITIONS FOR ALL WORKERS PER OSHA

REQUIREMENTS.

POWER

1. COR WILL DETERMINE AVAILABILITY OF POWER SUPPLY (IF ANY).

2. IF THE VA IS UNABLE TO PROVIDE A TEMPORARY ELECTRICAL CONNECTION DURING CONSTRUCTION, THE CONTRACTOR WILL BE REQUIRED TO PROVIDE ELECTRICITY TO SUPPORT THE WORK AT NO ADDITIONAL COST TO VA. CONTRACTOR WILL REQUEST AN AREA TO USE THE GENERATOR AT LEAST SEVEN (7) CALENDAR DAYS PRIOR TO USE. CONTRACTOR IS RESPONSIBLE FOR PROTECTING OUTSIDE BUILDING AIR INTAKES FROM

EXHAUST FOR THE DURATION OF THE PROJECT.

3. CONTRACTOR SHALL REQUEST POWER SHUTDOWNS OF EQUIPMENT THROUGH COR. CONTRACTOR SHALL NOT SHUTDOWN EQUIPMENT OR

ENGAGE WITH VA BREAKERS OR DISCONNECTS ON ACTIVE EQUIPMENT.

MECHANICAL SYSTEMS

1. CONTRACTOR SHALL PROTECT MECHANICAL UNITS INCLUDING AIR HANDLERS, COMPRESSORS, AND PIPING AS NECESSARY, AND CONTRACTOR SHALL MAINTAIN AIR FLOW (INTAKE & EXHAUST) AT EQUIPMENT AT ALL TIMES. INTAKES ADJACENT TO WORK AREAS SHALL BE

FILTERED FROM DUST AND DEBRIS WITH MINIMUM MERV13 FILTER CLOTH.

ACCESS AND MATERIAL STAGING

1. ROOF ACCESS WILL BE COORDINATED WITH THE COR.

2. COR WILL DETERMINE AVAILABILITY OF ACCESS AND STAGING AREAS AND IDENTIFY POTENTIAL LOCATIONS (IF ANY) AT THE TIME OF THE ISSUANCE OF THE NOTICE TO PROCEED. AREA FOR STAGING OR STORAGE MAY NOT BE AVAILABLE TO THE CONTRACTOR DURING CONSTRUCTION.

3. STORAGE IS NOT PERMITTED AROUND AHU INTAKES.

4. ALL HOIST MOVEMENTS MUST TAKE PLACE AFTER HOURS OR ON WEEKENDS, UNLESS APPROVED BY COR. A LIFT PLAN MUST BE SUBMITTED TWO

WEEKS PRIOR TO ALL HOIST MOVEMENTS FOR APPROVAL.

5. CONTRACTOR SHALL PLAN STAGING AND STORAGE AREAS TO MINIMIZE IMPACT TO EXISTING INFRASTRUCTURE AND ALLOW FOR ACCESS TO

EXISTING EQUIPMENT. PROVIDE MOBILIZATION PLAN TO COR FOR REVIEW AND APPROVAL.

6. CONTRACTOR SHALL INCLUDE REQUESTS FOR ACCESS AND STAGING AREAS IN THE NARRATIVE AND SCHEDULE.

SECURITY REQUIREMENTS

1. ROOF ACCESS POINTS / DOORS SHALL BE KEPT LOCKED AT ALL TIMES TO PREVENT UNAUTHORIZED PERSONS FROM ENTERING ROOF OR

MECHANICAL ROOMS / STAIRS LEADING TO ROOF. DOORS SHALL NOT BE PROPPED OPEN.

2. ALL MATERIAL AND EQUIPMENT SHALL BE KEPT IN A SECURED STATE AT ALL TIMES.

3. EXTERIOR STORAGE AREAS SHALL BE SECURED AND KEPT LOCKED AT ALL TIMES EXCEPT WHEN ADDING OR REMOVING MATERIALS.

4. CONTRACTOR SHALL SUPPLY TEMPORARY GUARD RAILS ON ROOFTOP WHERE GUARD RAILS ARE NOT ALREADY INSTALLED AS REQUIRED.

CONTRACTOR SHALL FOLLOW ALL OHSA REQUIREMENTS.

MEDICAL CENTER OPERATIONS

1. BUILDING AREAS WILL BE OCCUPIED AT ALL TIMES. CONTRACTOR WILL SCHEDULE THE WORK TO MINIMIZE DISRUPTION TO PATIENT COMFORT AND

MEDICAL CENTER OPERATIONS.

WORK AREA PREPARATION & PROTECTION

1. CONTRACTOR MUST PROVIDE WALK-OFF MATS AND ANY OTHER METHODS OF PROTECTION NEEDED DURING THE CONSTRUCTION/REPAIR

PROCESS, IN ORDER TO PROTECT STAIRWELLS AND CORRIDORS FROM DIRT AND DEBRIS.

2. CONTRACTOR MUST INSTALL FILTERS OVER ROOF DRAINS TO PREVENT DEBRIS FROM ENTERING ROOF DRAIN. REMOVE DEBRIS FROM ROOFS ON A

DAILY BASIS.

3. CONTRACTOR SHALL PROVIDE WALK-OFF MATS AT ROOF SURFACES WHERE CONSTRUCTION TRAFFIC AND DEBRIS WILL AFFECT EXISTING ROOF.

4. ALL PROTECTION MEASURES MUST BE APPROVED BY COR PRIOR TO START OF WORK.

1. ALL ASBESTOS ABATEMENT OR ENCLOSURE WORK SHALL BE PERFORMED BY PROPERLY TRAINED/LICENSED ASBESTOS ABATEMENT

CONTRACTOR WITHIN A FULL CONTAINMENT UNDER NEGATIVE PRESSURE (NPE).

2. ALL HVAC AIR INTAKES WITHIN NPE SHALL BE SHUT DOWN AND ISOLATED WITH CRITICAL BARRIERS DURING ACTIVE ACM REMOVAL OR ENCLOSURE WORK. WORK TO BE SCHEDULED WITH GENERAL CONTRACTOR AND OWNER TO ACCOMMODATE CONSTRUCTION AND FACILITY

REQUIREMENTS.

3. WORKERS PERFORMING ACM REMOVAL OR ENCLOSURE SHALL DON, AT MINIMUM, HALF FACE AIR PURIFYING RESPIRATORS WITH P100 FILTERS, DISPOSABLE DUST SUITS (WITH BOOT COVERS) AND GLOVES DURING ACTIVE TASKS, WHICH SHALL BE SUPPLEMENTED WITH USE OF POWERED AIR

PURIFYING RESPIRATORS.

4. ACM REMOVAL WORK AREAS SHALL BE PREPARED IN ACCORDANCE WITH THE FOLLOWING: A) ALL FLOORS, CEILINGS AND WALLS SHALL BE ISOLATED USING 2-LAYERS OF 6-MIL POLY SHEETING; B) OSHA ASBESTOS SIGNAGE AT ENTRANCE TO REGULATED AREAS; C)SINGLE-POINT OF ENTRY WITH 3-STAGE WET DECONTAMINATION STATION TO ALLOW WORKERS TO REMOVE PPE, WASH AND VACUUM THEMSELVES OFF PRIOR TO EXITING THE REGULATED WORK AREA; D) MAINTAINED UNDER NEGATIVE PRESSURE (-0.02 IN WG OR BETTER) USING HEPA FILTERED AIR MACHINES WITH EXHAUST ROUTED TO OUTDOORS; E) MINIMUM OF 4 AIR CHANGES PER HOUR; F) CLEAN/CHANGE ROOM SUFFICIENT FOR WORKERS TO CHANGE INTO STREET CLOTHES (OPAQUE POLY REQUIRED AS NEEDED FOR PRIVACY); G) RENEWABLE ADHESIVE MATS IMMEDIATELY OUTSIDE OF REGULATED WORK AREA TO ENSURE FOOT TRAFFIC DOES NOT SPREAD DUST/DEBRIS TO OTHER AREAS OF FACILITY.

5. ACM WORK TO BE PERFORMED USING THE FOLLOWING CONTROLS: A) HEPA FILTERED VACUUM FOR CONTINUOUS AND FINAL CLEANUP; B) ONLY MANUAL REMOVAL MEANS/TOOLS ARE ALLOWED TO DISTURB ACM (MECHANICAL TOOLS PROHIBITED FOR ACM REMOVAL).

6. REGULATED WORK AREA IS TO BE CLEANED BY CONTRACTOR FOLLOWING COMPONENT REMOVAL USING STANDARD HEPA VACUUM & WET WIPING METHODS AND VISUALLY INSPECTED AND CLEARANCE SAMPLED BY VA REPRESENTATIVE TO VERIFY COMPLETION OF SCOPE.

7. CONTRACTOR TO BE RESPONSIBLE FOR OSHA EMPLOYEE EXPOSURE MONITORING REQUIREMENTS.

8. ALL WASTE PRODUCED DURING REMEDIATION PHASE SHALL BE COLLECTED, CONTAINERIZED, LABELED, CHARACTERIZED AND DISPOSED IN

ACCORDANCE WITH SPECIFICATIONS

9. ALL WASTE CONTAINERS, EQUIPMENT, ETC. SHALL BE WET WIPED PRIOR TO LEAVING REGULATED WORK AREA.

10. NIGHTS WORK IS TO BE PERFORMED DURING OFF HOURS FROM 5:00 PM - 7:00 AM MONDAY THROUGH FRIDAY AND WEEKEND WORK FRIDAY 6 PM THROUGH SUNDAY. WORK IS PROHIBITED ON FEDERAL HOLIDAYS UNLESS APPROVED BY VA/COR.

11. ASBESTOS RELATED MATERIALS ARE PRESENT AND MAY NOT SHOWN ON DRAWINGS FOR CLARITY. KNOWN ASBESTOS MATERIALS INCLUDE FIRE DOORS, SOILS, DOOR AND WINDOW CAULKS, WINDOWS GLAZING, FLOOR TILE GROUPS AND ASSOCIATED UNDERLYING ASBESTOS MASTIC, FOUNDATION WATERPROOFING, TRANSITE AT WINDOW CONVECTORS, ASBESTOS DRYWALL ADHESIVES WHERE APPLIED TO WALL BLOCKS, GREEN MARBLE WALL PANELS, ACOUSTICAL LOBBY PLASTER, BLACK OR WHITE DUCT SEAM SEALANTS AND APPLICATIONS, SINK SOUND PROOFING, VIBRATION ISOLATION DUCT JOINTS, ASBESTOS PIPE INSULATION AND MUDDED FITTINGS, AND ZALBESTOS COATED DUCTWORK. PROTECT AS

NECESSARY.

12. AT INTERIOR REGULATED AREAS (NPE), WHERE THE COMBINED FOOTPRINT OF WORK CHAMBER, DECONTAMINATION CHAMBERS AND LOADOUT DOES NOT FIT WITHIN THE ROOM, THE DECON/LOADOUT CONFIGURATION MAY EXTEND INTO 1/2 WIDTH OF THE HALLWAY AS REQUIRED TO

ALLOW PASSAGE IN CORRIDOR.

ENVIRONMENTAL HAZARDS (ACM - ASBESTOS CONTAINING MATERIALS)

ALUMINUM

CONCRETE

GLASS

RIGID INSULATION

BRICK IN SECTION

CONCRETE MASONRY UNIT

EARTH

GYPSUM / PLASTER

STEEL

PEA GRAVEL

STONE

BATT INSULATION

PRECAST

GRAVEL

SAND

WOOD - SOLID

PLYWOOD

BRICK

CULTURED STONE

EXTERIOR COMPOSITE

PANEL

WOOD BLOCKING

WOOD SHIM

MATERIALS LEGEND

SYMBOLS LEGEND

SEE DISCIPLINE SHEETS FOR DISCIPLINE SPECIFIC SYMBOLS

1t

A02

Room Name

0-0000

NET SF

0 GRID LINE

ROOM No.

DOOR No.

WINDOW TYPE

WALL TYPE

NORTH ARROW

N

SPECIALTY

EQUIPMENT /

FURNITURE TAG

SCOPE NOTE

CENTER LINE

FLOW ARROW

INTERIOR

ELEVATION

DETAIL

SPOT

ELEVATION

MARKERS

REVISION No.

REVISION

CLOUD

EXTERIOR

ELEVATION

BUILDING SECTION

A301

A201

A211

A501

4 2

DETAIL

SHEET

DETAIL

SHEET

DETAIL

SHEET

DETAIL

SHEET

SECTION

MARKERS

GYP BD

10'-0" CEILING TAG

CL

WALL SECTION

A301

DETAIL

SHEET

SMOKE PARTITION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINALOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

ISSUED FOR

CONSTRUCTION

ARCHITECT/ENGINEER OF RECORD

ENGINEER:

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 20215.001

B

IM

/2

.0

V

A F a y e tt e v ill e R e p la c e

F a n C o ils rd

F lo o r/

-0

-4

A

R C

H A

T R

IA

X

R

.r v t

/9

/2

:1

:0

P M

A001

ARCHITECTURAL ABBREVIATIONS,

SYMBOLS AND GENERAL NOTES

REPLACE FAN COIL UNITS - 3RD

FLOOR FAYETTEVILLE VAMC,

FAYETTEVILLE, NC

2300 Ramsey St, Fayetteville, NC 28301

565-21-104

8/12/2022 JS MM

TEMP TEMPERATURE

TEMP TEMPORARY

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

TK BD TACK BOARD

TKP TACKABLE PANELING

TOC TOP OF CONCRETE

TOS TOP OF SLAB

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TR ACCENT RAIL

TRTD TREATED

TRZ INTERIOR POURED EPOXY RESIN

TERRAZO

TV TELEVISION

TYP TYPICAL

UC UNDERCUT

UGND UNDERGROUND

UL UNDERWRITER'S LABORATORY

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

UR URINAL

V VOLT

VAC VACUUM

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VENT VENTILATE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VNR VENEER

VOL VOLUME

VP VACUUM PUMP

VP VANISHING POINT

VP VAPOR PRESSURE

VP VENEER PLASTER

VPC VENEER PLASTIC CEILING/SOFFIT

VR VAPOR RETARDER

VRR VINYL (ACROVYN) RAIL

VS VENT STACK

VS VOLUMETRIC SWITCH

VS SHEET VINYL

VT SOLID VINYL TILE

VTR VENT THRU ROOF

VTS VINYL TRANSITION STRIP

VWC VINYL WALLCOVERING

W WIDE

W WEST

W / W WALL TO WALL

W/ WITH

W/D WASHER / DRYER

W/O WITHOUT

WB WOOD BASE

WC WATER CLOSET

WC WALLCOVERING

WD WOOD

WDH WOOD HAND RAIL

WDM WOOD WALL MOULDINGS

WDP WOOD PANELING

WDR WOOD CHAIR, CRASH, OR HAND RAIL

WDS ATHLETIC/ACOUSTIC ISOLATED WOOD

FLOORING

WDSHV WOOD SHELVING

WDT WOOD TILE OR PARQUET FLOORING

WDV WOOD VENEER

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WALL HUNG

WI WROUGHT IRON

WP WATERPROOF

WP WORKING POINT

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WR WIRE ROPE

WRP WATER REPELLENT

WT WEIGHT

WWF WELDED WIRE FABRIC

XPS EXTRUDED POLYSTYRENE

YD YARD

PREFIN PRE-FINISHED

PRF POLYURETHANE SPORTS FLOORING

PROP PROPERTY

PRST PRESSURE TREATED

PS POURED SEALANT

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT(ED)

PT/E EPOXY PAINT

PT/F FLAT PAINT

PT/HG HIGH GLOSS PAINT

PT/SG SEMIGLOSS PAINT

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PV PAVED

PVC POLYVINYL CHLORIDE

PVG PAVING

Q HEAT TRANSFER

Q RATE OF FLOW

QT QUARRY TILE

QTY QUANTITY

QZF QUARTZ FLOORING

QZR QUARTZ RESIN

QZT QUARTZ TILE

R RISER

R RADIUS

RA RETURN AIR

RB RUBBER BASE

RB RUBBER BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

RECPT RECEPTACLE

REF REFERENCE

REF REFRIGERATOR

REFL REFLECTED

REG REGISTER

REINF REINFORCE(D)

REQ REQUIRED

RESIL RESILIENT

REST RESTROOM

RET RETURN

REV REVISE / REVISION

RF RESILIENT FLOORING

RFG ROOFING

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RR RAILROAD

RR ROLL ROOFING

RS RAPID START

RS ROUGH SAWN

RS RUBBER SHEET

RSF RUBBER SHEET FLOORING

RST REINFORCING STEEL

RT RIGHT

RTF RUBBER TILE FLOORING

RTS RUBBER TRANSITION STRIP

RWD REDWOOD

RWL RAIN WATER LEADER

S SOUTH

SAN SANITARY

SC SOLID CORE

SCHED SCHEDULE

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SD SOAP DISPENSER

SECT SECTION

SF SQUARE FEET

SGL SINGLE

SH SINGLE HUNG

SHR SHOWER

SHR HD SHOWER HEAD

SHT SHEET

SHTHG SHEATHING

SIM SIMILAR

SL SEA LEVEL

SL SPOT LIGHT

SLDG SLIDING

SND SANITARY NAPKIN DISPENSER

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPC SUSPENDED PLASTER CEILING

SPEC SPECIFY / SPECIFICATION

SPH SOLID PHENOLIC POLYMER (TRESPA)

SPKR SPEAKER

SPR SOLID POLYMER RESIN (3FORM)

SQ SQUARE

SQIN SQUARE INCH(ES)

SSP SOLID SURFACE POLYMER (CORIAN)

SSPR SOLID POLYMER (CORIAN) RUB RAIL

SST STAINLESS STEEL

SSTR STAINLESS STEEL RUB RAIL

ST SINGLE THROW

ST STAIRS

ST STREET

ST STAIN

STA STATION

STD STANDARD

STIF STIFFENER

STON STONE

STOR STORAGE

STRUCT STRUCTURE / STRUCTURAL

SUH SUSPENDED UNIT HEATER

SURF SURFACE

SUSP SUSPENDED

SVP VINYL SOLID PANEL (ACROVYN)

SW SWITCH

SYMM SYMMETRICAL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

T/S TUB / SHOWER

TB TOWEL BAR

TC TERRA COTTA

TCZ CEMENTITIOUS TERRAZZO

TEL TELEPHONE

HD HAND DRYER

HDBD HARDBOARD

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HDWL HEADWALL

HM HOLLOW METAL

HNDRL HANDRAIL

HORIZ HORIZONTAL

HP HEAT PUMP

HP HIGH PRESSURE

HP HORSEPOWER

HR HAND RAIL

HS HAND SINK

HT HEIGHT

HVAC HEATING / VENTILATION / AIR

CONDITIONING

HW HOT WATER

HWP HOT WATER PUMP

HYD HYDRANT

IC IRONING CABINET

ID INSIDE DIAMETER

IN INCH / INCHES

INCL INCLUDE(D) / INCLUDING

INSUL INSULATE / INSULATION

INT INTERIOR

INV INVERT

ITS INTERTEK TESTING SERVICES

J-BOX JUNCTION BOX

JAN CLO JANITOR'S CLOSET

JS JANITOR'S SINK

KIT KITCHEN

L ANGLE

L LITER

LAB LABORATORY

LAM LAMINATE(D)

LAV LAVATORY

LB(S) POUND(S)

LC LINEN CLOSET

LF LINEAR FOOT (FEET)

LH LEFT HAND

LIB LIBRARY

LINO LINOLEUM

LKR LOCKER

LNO LINOLEUM

LPT LOW POINT

LT LIGHT

LTF LINOLEUM TILE FLOORING

LTWT LIGHT WEIGHT

LVR LOUVER

m METER

MACH MACHINE

MAT WALK-OFF MAT

MATL MATERIAL

MAX MAXIMUM

MB MACHINE BOLT

MB MAIL BOX

MB MIXING BOX

MBH MOP/BROOM HOLDER

MC MEDICINE CABINET

MCP ACOUSTIC LAY-IN METAL CEILING PADS

ME MECHANICAL ENGINEER

MECH MECHANICAL

MED MEDIUM

MEZZ MEZZANINE

MFR MANUFACTURE(R)

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MKR BD MARKER BOARD

MLDG MOULDING

mm MILLIMETER

MO MASONRY OPENING

MR MOISTURE RESISTANT

MS MOP SINK

MSB MOP SERVICE BASIN

MTD MOUNTED

MTL METAL

MTS METAL TRANSITION STRIP

MULL MULLION

MVBL MOVABLE

MW MICROWAVE

N NORTH

NA NOT AVAILABLE / APPLICABLE

NAT NATURAL

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OF / CI OWNER FURNISHED / CONTRACTOR

INSTALLED

OFF OFFICE

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OZ OUNCE

PAR PARALLEL

PAR PARAPET

PART PARTIAL

PAT PATTERN

PBD PARTICLE BOARD

PCC PRECAST CONCRETE

PED PEDESTAL

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTIC

PLAS PLASTER

PLYWD PLYWOOD

PR PAIR

PREFAB PREFABRICATED

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET DETAIL

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DIV DIVISION

DMPF DAMPPROOFING

DR DOOR / DRAIN

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWR DRAWER

E EAST

EA EACH

EF EACH FACE

EG VERTICAL END GUARDS

EHD ELECTRIC HAND DRYER

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EM ELECTROMAGNETIC

EM EXPANDED METAL

EMER EMERGENCY

ENCL ENCLOSED / ENCLOSURE

ENGR ENGINEER

ENTR ENTRANCE

EOS EDGE OF SLAB

EPB ELECTRIC PANEL BOARD

EQ EQUAL(LY)

EQUIP EQUIPMENT

ER POURED EPOXY

ERF POURED EPOXY FLOORING

ESCAL ESCALATOR

EST ESTIMATE

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXF EXTERIOR FINISH

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAB FABRIC

FAI FRESH AIR INTAKE

FBRK FIREBRICK

FCP PREFABRICATED FABRIC CEILING PANEL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF EL FINISH FLOOR ELEVATION

FGL FIBERGLASS

FH FIRE HOSE

FHC FIRE HOSE CABINET

FIN FINISH(ED)

FIN FLR FINISHED FLOOR

FIN FLR FINISH FLOOR

FIXT FIXTURE

FLASH FLASH(ING)

FLR FLOOR

FLRSK FLOOR SINK

FLUOR FLUORESCENT

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUDS

FOW FACE OF WALL

FP FIREPROOF

FPL FIREPLACE

FR FRAME

FRG FIBER REINFORCED GYPSUM

FRP FIBERGLASS REINFORCED PLASTIC

FRT FIRE RETARDANT TREATED

FSP FIRE STAND PIPE

FSTNR FASTENER

FTG FOOTING

FURG FURRING

FUT FUTURE

FWC FABRIC WALL COVER

FWP NON-ACOUSTIC STRETCHED FABRIC

PANEL WALL INSTALATION

G GROUND

GA GAGE

GALV GALVANIZE(D)

GB GRAB BAR

GC GENERAL CONTRACTOR

GDISP GARBAGE DISPOSAL

GEN GENERAL

GFP GFRP OR GFRG FREESTANDING PANEL

GFRG GLASS FIBER REINFORCED GYPSUM

GFRP GLASS FIBER REINFORCED POLYMER

GL GLASS / GLAZING

GL BLK GLASS BLOCK

GLT GLASS MOSIAC TILE

GLZ GLAZING

GLZ CMU GLAZED CONCRETE MASONRY UNIT

GPM GALLONS PER MINUTE

GR GROSS

GR LN GRADE LINE

GRAN GRANITE

GT GREASE TRAP

GT GROSS TON

GT GROUT

GYP GYPSUM

GYP BD GYPSUM BOARD

H HIGH

HC HOLLOW CORE

HCP HANDICAPPED

HD HEAVY DUTY

@ AT

A/C AIR CONDITIONER / CONDITIONING

ACC ACCESSIBLE

ACCSY ACCESSORY

ACOUS INSUL ACOUSTICAL INSULATION

ACOUS PNL ACOUSTICAL PANELS

ACP LAY-IN ACOUSTIC PANEL CEILING PADS

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADDL ADDITIONAL

ADDM ADDENDUM

ADJ ADJUSTABLE / ADJACENT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AHR ANCHOR

AHU AIR HANDLING UNIT

ALNMT ALIGNMENT

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATELY

APPVD APPROVED

APT APARTMENT

ARCH ARCHITECT(URAL)

ASPH ASPHALT

ASTM AMERICAN SOCIETY FOR TESTING

MATERIALS

ATC ACOUSTICAL TILE CEILING

AUTO AUTOMATIC

AVG AVERAGE

AWP WALL-MOUNTED SOUND ABSORPTION

PANEL

AWT ACOUSTIC WALL TREATMENT

BD BOARD

BITUM BITUMINOUS

BL BASELINE

BL BLACK

BLDG BUILDING

BM BEAM

BO BLOWOFF

BOT BOTTOM

BR BEDROOM

BRG BEARING

BS BOTH SIDES

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT UP ROOFING

BW BOTH WAYS

C CELSIUS

C CHANNEL

C TO C CENTER TO CENTER

CAB CABINET

CB CATCH BASIN

CCT CUBICLE CURTAIN TRACK

CEM CEMENT

CEM PLAS CEMENT PLASTER (STUCCO)

CER CERAMIC

CG CORNER GUARD

CH CHILLER

CH COAT HOOK

CHBD CHALKBOARD

CHFR CHAMFER

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CL D CLOTHES DRYER

CLG CEILING

CLG HT CEILING HEIGHT

CLL CONTRACT LIMIT LINE

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

CO CARBON MONOXIDE

CO CASED OPENING

CO CERTIFICATE OF OCCUPANCY

CO CLEANOUT

CO COMPANY

CO CUTOUT

COL COLUMN

COMB COMBINATION

CONC CONCRETE

CONC FLR SEALED CONCRETE FLOOR

CONSTR CONSTRUCTION

CONT CONTINUE

CONT CONTROLLER

CONV CONVERT

CORR CORRIDOR / CORRUGATED

CPT CARPET

CR CLOSET ROD

CR CONTROL RELAY

CR CONTROL ROOM

CR CRASH RAIL

CS CAST STONE

CS CONTROL SWITCH

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER

CU COPPER

CU FT CUBIC FOOT

CU YD CUBIC YARD

CUB CUBICLE CURTAIN

CURT CURTAIN

CW CASEMENT WINDOW

CW CHEMICAL WASTE LINE

CW CLOCKWISE

CW COLD WATER PIPING

D DEEP

UP

Office

334A Office

Office

335A Toilet

Electrical

Bath

Patient Rm

Patient Rm

Patient Rm341

Patient Rm

Patient Rm

Patient Rm

Electrical Closet

338A Patient Toilet

340A Patient Toilet

342A Patient Toilet

Day Room

392A Kitchen Nourish

392B Room

392C Room

Stair

Tele Closet

C3BS

CorridorFEC

C3BN

Corridor

C3BE

Corridor

AD101

Lockers

1 1 1

Storage

Housekeeping

KN#1 ABOVE

CEILING

Lockers

C3BS

Corridor

Office

334A Office 334

Office 335A Toilet

Tele Closet

7 7

9 9

Storage

10 10

2 2

6 6

6 6

Housekeeping

6 12

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE

DEMOLISHED

DEMOLITION / RENOVATION LEGEND

DEMOLITION KEYNOTES:

1. EXISTING FAN COIL TO BE REMOVED.

2. REMOVE EXISTING FLOOR FINISH MATERIALS. PATCH AND LEVEL

CONCRETE.

3. CAREFULLY SALVAGE CEILING PANELS AND PROVIDE TO VA COR.

DEMOLISH CEILING GRID AND DISPOSE OF. PATCH, REPAIR AND CLEAN ALL

SURFACES TO REMAIN EXPOSED.

4. REMOVE EXISTING SOFFIT AND ALL ASSOCIATED FRAMING.

5. REMOVE EXISTING WALL. PATCH AND REPAIR ADJACENT SURFACES TO

MATCH EXISTING.

6. REMOVE EXISTING FINISHES FROM INTERIOR FACE OF WALLS DOWN TO

EXISTING STRUCTURAL SYSTEM.

7. REMOVE EXISTING DOOR, FRAME, HARDWARE, SILL AND JAMB AS

INDICATED.

8. REMOVE EXISTING WALL. PREPARE FLOOR, CEILING AND ADJACENT WALLS

FOR NEW WALL INSTALLATION AND NEW DOOR AND FRAME.

9. REMOVE SIGNAGE AND TURN OVER TO THE VA COR.

10. EXISTING RADIATOR TO BE REMOVED. WALL REPAIR(S) AND PATCH(ES) TO

BE COMPLETED AS DESCRIBED ON NEW WORK PLAN(S) AND DETAIL(S).

11. PROTECT EXISTING WALL.

12. REMOVE WINDOW.

13. REMOVE PLUMBING FIXTURE & PIPING. REFER TO PLUMBING DRAWINGS

FOR DETAILS.

14. REMOVE AND SAFELY STORE EXISTING CEILING PANELS AND ALL CEILING

MOUNTED LIGHTS AND EQUIPMENT AS REQUIRED TO INSTALL NEW

EQUIPMENT, DUCTING, PIPING, ETC. PREP FOR RE-NSTALLMENT.

15. REMOVE & DISCARD EXISTING CERAMIC TILES. SAFELY SAVE AND STORE

ANY EXISTING CEILING MOUNTED EQUIPMENT.

16. REFER TO GENERAL NOTE 11 ABOVE.

17. PROVIDE FIRE STOP AT ALL MECHANICAL AND PLUMBING EQUIPMENT

PENETRATIONS THRU FLOOR(S) TO MATCH FIRE RATING IN EXISTING

FLOORS. PROVIDE FIRE AND/OR SMOKE DAMPERS IN ALL DUCTWORK

PENETRATIONS (SEE MECHANICAL DRAWINGS).

DEMOLITION GENERAL NOTES:

1. PROTECT EXISTING MATERIALS AND SURFACES NOTED TO REMAIN AT ALL

TIMES THROUGHOUT ENTIRE DEMOLITION AND CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPAIR OF

ADJACENT MATERIALS DAMAGED DURING CONSTRUCTION TO THE

SATISFACTION OF THE COR.

2. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS AND DIMENSIONS AND

NOTIFY COR OF CONDITIONS THAT DO NOT AGREE WITHDIFFER FROM THOSE

SHOWN IN THE CONSTRUCTION DOCUMENTS.

3. CONTRACTOR SHALL COORDINATE ALL BUILDING SYSTEM SHUT-DOWNS WITH

THE COR.

4. EXISTING WINDOWS SHALL REMAIN UNO AND SHALL BE PROTECTED DURING

DEMOLITION.

5. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL SHEETS FOR ADDITIONAL

DEMOLITION NOTES.

6. PROTECT EXISTING FLOORS, BASE, WALLS AND CEILINGS TO REMAIN. REPAIR

ANY DAMAGE TO LIKE NEW CONDITION. SPOT PAINTING IS NOT ALLOWED -

WALLS SHALL BE PAINTED CORNER TO CORNER AND EDGE TO EDGE: COLOR TO

MATCH EXISTING.

7. WALL BASE DAMAGED AS A RESULT OF FAN COILS OR RADIATORS REMOVAL,

SHALL BE REMOVED TO NEAREST SEAM AND REPLACE TO MATCH EXISTING.

8. FLOOR TILE DAMAGED AS A RESULT OF FAN COILS OR RADIATORS REMOVAL,

SHALL BE REMOVED IN FULL TILE SEGMENTS AND REPLACED IN FULL TILE

SEGMENTS TO MATCH EXISTING.

9. LVT DAMAGED AS A RESULT OF FAN COILS OR RADIATORS REMOVAL, SHALL BE

REMOVED IN FULL LENGTHS AND REPLACED IN FULL LENGTHS, WITH

STAGGERED JOINTS, TO MATCH EXISTING.

10. INTEGRAL BASE DAMAGED AS A RESULT OF FAN COILS OR RADIATORS

REMOVAL, SHALL BE REPAIRED/PATCHED WITH SAME TYPE AND MATCHING

COLOR INTEGRAL BASE.

11. REMOVE, PROTECT AND REINSTALL EXISTING LIGHTING, CEILING PANELS AND

CEILING MOUNTED EQUIPMENT, UNO. SEE ELECTRICAL. THIS WORK SHALL BE

AS REQUIRED TO INSTALL ALL NEW EQUIPMENT, DUCTING, PIPING, ETC.

12. REFER TO MECHANICAL DEMO FOR REMOVAL INSTRUCTION FOR FAN COILS

AND RADIATORS.

13. ANY EXISTING WALL DAMAGE AND/OR GAPS, VOIDS CAUSED BY REMOVAL OF

EXISTING MEP SYSTEMS TO BE REPAIRED AND PAINTED TO MATCH EXISTING.

X

ASBESTOS ABATEMENT NOTES:

1. APPROX. 562 SQFT OF FLOORING AREA INDICATED HAS ASBESTOS

CONTAINING MATERIAL.

2. WINDOWS SCHEDULED FOR DEMOLITION CONTAINS ASBESTOS

CONTAINING SEALANT.

3. GC SHALL VERIFY PRESENCE OF ASBESTOS CONTAINING MATERIALS.

FOLLOW ABATEMENT PROTOCOLS AS REQUIRED.

3 3

CEILINGS IN THIS AREA ALONG WITH ALL CEILING MOUNTED EQUIPMENTTO

BE REMOVED AND RELOCATED TO A LOWER ELEVATION TO ACCOMODATE

THE NEW ABOVE CEILING EQUIPMENT. SEE INDIVIDUAL NOTES FOR EACH

SPACE.

14 14

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINALOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

ISSUED FOR

CONSTRUCTION

ARCHITECT/ENGINEER OF RECORD

ENGINEER:

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 20215.001

B

IM

/2

.0

V

A F a y e tt e v ill e R e p la c e

F a n C o ils rd

F lo o r/

-0

-4

A

R C

H A

T R

IA

X

R

.r v t

/9

/2

:1

:1

P M

AD101

LEVEL 3 - ARCHITECTURAL -

DEMOLITION PLAN(S)

REPLACE FAN COIL UNITS - 3RD

FLOOR FAYETTEVILLE VAMC,

FAYETTEVILLE, NC

2300 Ramsey St, Fayetteville, NC 28301

565-21-104

8/12/2022 JS CR

1/8" = 1'-0"1

3RD FLOOR PLAN - OVERALL DEMOLITION

1/4" = 1'-0"2

3RD FLOOR PLAN - ENLARGED DEMOLITION

1/4" = 1'-0"3

3RD FLOOR REFLECTED CEILING PLAN - DEMOLITION

STAIR

ELEC.

2B121

PATIENT ROOM

TELECOM

2B118

MECHANICAL ROOM

2B117

PATIENT ROOM

2B116

PATIENT ROOM

2B117A

PATIENT TLT

2B116A

PATIENT TLT

PROVIDE FIRE STOP AT ALL PIPE

PENETRATIONS AS NECESSARY

THRU FLOOR(S) TO MATCH FIRE

RATING IN EXISTING FLOORS.

SELECTIVELY REMOVE WALLS AS

NEEDED FOR INSTALLATION OF

NEW PIPING. REPAIR AND PATCH

WALLS TO MATCH ADJACENT

SURFACES AND FIRE RATINGS

AFTER INSTALLATION.

TELECOM

CLOSET

STAIR

DWGS

STORAGE

DECON

STORAGE

EOC FILE RM

STORAGE

CORRIDOR

OFFICE

INTERIOR

DESIGN

OFFICE

SAFETY

MNGR

OFFICE

BIOMED

SPRVSR

OFFICE

WOMEN'S

TOILET

FEC

B102

2' -8

3' -8

10"

PROVIDE FIRE STOP AT ALL PIPE

PENETRATIONS THRU FLOOR(S) TO

MATCH FIRE RATING IN EXISTING

FLOORS.

STAIR

STORAGE

OFFICE

RESIDENT OFFICE

PATIENT

BELONGINGS

STORAGE

CORRIDOR

C5-13

CORRIDOR

C5BS

FEC

TELECOM CLOSET

STAFF TLT. 2

PATIENT RM

SOILED

UTILITY

HAC

CORRIDOR

C5-9

CORRIDOR

C5-8

B102

3' -1

0" 2'

-4

10"

PROVIDE FIRE STOP AT ALL PIPE

PENETRATIONS THRU FLOOR(S) TO

MATCH FIRE RATING IN EXISTING

FLOORS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINALOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

ISSUED FOR

CONSTRUCTION

ARCHITECT/ENGINEER OF RECORD

ENGINEER:

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 20215.001

B

IM

/2

.0

V

A F a y e tt e v ill e R e p la c e

F a n C o ils rd

F lo o r/

-0

-4

A

R C

H A

T R

IA

X

R

.r v t

/9

/2

:1

:1

P M

A101

LEVELS 2, 4 & 5 - ARCHITECTURAL

- NEW WORK PLAN(S)

REPLACE FAN COIL UNITS - 3RD

FLOOR FAYETTEVILLE VAMC,

FAYETTEVILLE, NC

2300 Ramsey St, Fayetteville, NC 28301

565-21-104

8/12/2022 JS CR

1/8" = 1'-0"1

SECOND FLOOR PLAN -NEW WORK

1/8" = 1'-0"2

FOURTH FLOOR PLAN -DEMO

1/8" = 1'-0"3

FIFTH FLOOR PLAN -NEW WORK

UP

Office

334A Office

Office

335A Toilet

Electrical

Bath

Patient Rm

Patient Rm

Patient Rm341

Patient Rm

Patient Rm

Patient Rm

Electrical Closet

338A Patient Toilet

340A Patient Toilet

342A Patient Toilet

Day Room

392A Kitchen Nourish

392B Room

392C Room

Stair

Tele Closet

Mechanical

C3BS

CorridorFEC

C3BN

Corridor

C3BE

Corridor

A102

A601

TYPICAL DETAIL FOR

PATCH/REPAIR WORK AT REMOVED

FAN COIL UNIT PENETRATION

LOCATIONS.

8 8 8

A601 4

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE

DEMOLISHED

DEMOLITION / RENOVATION LEGEND

NEW WORK GENERAL NOTES:

1. PROTECT EXISTING MATERIALS AND SURFACES NOTED TO REMAIN

THROUGHOUT ENTIRE DEMOLITION AND CONSTRUCTION OPERATIONS.

CONTRACTOR SHALL PATCH AND REPAIR MATERIALS DAMAGED DURING

CONSTRUCTION TO THE SATISFACTION OF THE COR.

2. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS AND DIMENSIONS AND

NOTIFY COR OF CONDITIONS THAT DIFFER FROM THOSE SHOWN IN THE

CONSTRUCTION DOCUMENTS.

3. CONTRACTOR SHALL COORDINATE ALL BUILDING SYSTEM SHUT-DOWNS

WITH THE COR.

4. INSTALL INSULATION AT EXTERIOR WALL IN NEW AIR HANDLING EQUIPMENT

ROOM AND AT ALL LOCATIONS WHERE FAN COILS HAVE BEEN REMOVED.

5. REFER TO MECHANICAL, PLUMBING AND ELECTRICAL SHEETS FOR

ADDITIONAL DEMOLITION NOTES.

6. DAMAGE AND/OR GAPS/VOIDS IN EXISTING WALLS CAUSED BY REMOVAL OF

EXISTING MEP EQUIPMENT SHALL BE REPAIRED/PATCHED AND PAINTED TO

MATCH ADJACENT SURFACES.

7. NEW CEILING GRIDS SHALL BE HUNG WITH NEW HANGERS.

NEW WORK KEYNOTES:

1. CONSTRUCT NEW WALL AS INDICATED ON SHEET A-601. ALIGN WALL

WITH ADJACENT WALLS, MATCH PAINT COLOR AND RUBBER BASE

WITH ADJACENT EXISTING WALLS.

2. INSTALL NEW DOOR, FRAME, HARDWARE, SILL AND JAMB.

3. INSTALL NEW WALL / PATCH WHERE EXISTING DOOR(S) HAVE BEEN

REMOVED. MATCH WALL CONSTRUCTION, FINISH AND COLOR WITH

ADJACENT WALLS.

4. NO CEILING – EXPOSED TO STRUCTURE. CLEAN AS REQUIRED.

5. NEW LOUVER IN EXISTING WINDOW ROUGH OPENING. MATCH

EXISTING COLOR/FINISH.

6. NEW CEILING GRID SYSTEM INSTALLED AT 8'-0" AFF. SALVAGED

CEILING PANELS AND CEILING MOUNTED EQUIPMENT SHALL BE RE-

INSTALLED AT ORIGINAL LOCATION INCLUDING BARIATRIC LIFT

TRACKS AND EQUIPMENT.

7. NEW MOLD & MOISTURE RESISTENT GYPSUM BOARD CEILING AT 8'-0"

AFF. REPAIR, PAINT AND PATCH TO MATCH EXISTING ADJACENT

WALLS.

8. PATCH AND PAINT WALL, REPLACE MISSING FLOORING AND BASE TO

MATCH EXISTING ADJACENT FINISHES.

9. LOCATION OF EXISTING PLUMBING / MECHANICAL EQUIPMENT.

PROVIDE FIRE STOP AT ALL MECHANICAL AND PLUMBING EQUIPMENT

PENETRATIONS THRU FLOOR(S) TO MATCH FIRE RATING IN EXISTING

FLOORS. PROVIDE FIRE AND/OR SMOKE DAMPERS IN ALL DUCTWORK

PENETRATIONS (SEE MECHANICAL DRAWINGS).

X

Mechanical

C3BS

Corridor

Office

334A Office 334

Office 335A Toilet

Tele Closet

B13S1

4"

ALIGN WALL WITH SEAMLESS

TRANSITION

ALIGN WALL WITH

SEAMLESS TRANSITION

5 5

B13S1

CEILINGS IN THIS AREA ALONG WITH ALL CEILING MOUNTED EQUIPMENTTO

BE REMOVED AND RELOCATED TO A LOWER ELEVATION TO ACCOMODATE

THE NEW ABOVE CEILING EQUIPMENT. SEE INDIVIDUAL NOTES FOR EACH

SPACE. NEW CEILINGS SHALL BE HUNG WITH NEW HANGERS.

6 6

Mechanical

C3BS

Corridor

Office

334A Office

Office

Bath

335A Toilet

Bath

Electrical

Tele Closet

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINALOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

ISSUED FOR

CONSTRUCTION

ARCHITECT/ENGINEER OF RECORD

ENGINEER:

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 20215.001

B

IM

/2

.0

V

A F a y e tt e v ill e R e p la c e

F a n C o ils rd

F lo o r/

-0

-4

A

R C

H A

T R

IA

X

R

.r v t

/9

/2

:1

:1

P M

A102

LEVEL 3 - ARCHITECTURAL - NEW

WORK PLAN(S)

REPLACE FAN COIL UNITS - 3RD

FLOOR FAYETTEVILLE VAMC,

FAYETTEVILLE, NC

2300 Ramsey St, Fayetteville, NC 28301

565-21-104

8/12/2022 JS CR

1/8" = 1'-0"1

3RD FLOOR PLAN - OVERALL NEW WORK

1/4" = 1'-0"2

3RD FLOOR PLAN - ENLARGED NEW WORK

1/4" = 1'-0"3

3RD FLOOR REFLECTED CEILING PLAN - NEW WORK

A201

LEVEL 3 - ARCHITECTURAL - NEW

WORK - AREA B

MM MM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD

ENGINEER:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

ISSUED FOR

CONSTRUCTION

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 20215.001

BI

M

5.

- V A

Fa ye tte vi lle R ep la ce F an C oi ls rd

F lo or /2

.0

VA

F ay et te vi lle

F an

C oi ls rd F lo or

_S

ES

_2

1.

rv t 8/

8/

:2 0:

A

M

REPLACE FAN COIL UNITS - 3RD

FLOOR FAYETTEVILLE VAMC,

FAYETTEVILLE, NC

2300 Ramsey St, Fayetteville, NC 28301

08/12/2022

565-21-104100% FINAL

Revisions: Date:

Revision 0 August 12, 2022

1.

2.

DEMOLITION KEYNOTES:

REMOVE EXISTING WINDOWS, PREP WALL FOR NEW MECHANICAL LOUVER

INSTALLATION. SEE MECHANICAL DRAWINGS FOR DETAILS.

REMOVE EXISTING FAN COIL VENT, DUCTWORK BEHIND AND ALL

ASSOCIATED MECHANICAL EQUIPMENT COMPLETE. PREPARE WALL FOR

BRICK PATCH.

X 1.

2.

RENOVATION KEYNOTES:

INSTALL NEW MECHANICAL LOUVERS. SEE MECHANICAL DRAWINGS AND

SCHEDULES FOR DETAILS.

PATCH VENT OPENINGS WITH NEW BRICK AND GROUT TO MATCH

EXISTING.

X

WHERE A DOOR IS NOTED AS RATED, IT SHALL DESIGNATE A RATED ASSEMBLY WHICH SHALL INCLUDE DOOR, FRAME, HARDWARE AND ALL PARTS OF THE DOOR. ALL ITEMS MAKING UP THE TOTAL ASSEMBLY SHALL BE RATED AND/OR LISTED WITH TESTING AGENCY RECOGNIZED BY THE LOCAL GOVERNING BUILDING AUTHORITY AND WITH ALL COMPONENTS MEETING THE LABEL REQUIRMENTS FOR THAT RATING/LISTING.

NOTE: RATED DOORS

SUGGESTED HARDWARE LOCATIONS

LOCKSET/LATCH SET

DEAD BOLT

DOOR PULL

PUSH PLATE

PUSH BARS

HOSPITAL ARM PULLS

HOSPITAL LATCH

EXIT DEVICES

PUSH BAR

LEVER BAR

C/L OF LEVER

C/L OF BOLT

C/L OF GRIP

C/L OF PLATE

C/L OF BAR

C/L OF LOWER BASE

C/L OF LATCH

C/L OF TOUCH BAR

C/L OF CROSS BAR

-39 5/16" FROM FINISHED FLOOR

-42" WHERE NO DOOR KNOB

-44" WHERE DOOR KNOB

-42" FROM FINISHED FLOOR

-45" FROM FINISHED FLOOR

-40" FROM FINISHED FLOOR

-45" FROM FINISHED FLOOR

-45 3/4" FROM FINISHED FLOOR

-40" FROM FINISHED FLOOR

-36" FROM FINISHED FLOOR

NOTE: ALL CONDITIONS SHOWN ARE NOT NECESSARILY ON EVERY PROJECT.

TYPICAL DOOR

JAMB LOCATION

18" MIN UNO

HAS BOTH CLOSER & LATCH

12" MIN WHERE DOOR

2"

SCHEDULE

SEE DOOR 2"

7' -0

2"

G Y

P W

A

LL

SEE OPENING SCHEDULE

S E

E O

P E

N

IN

G S

C H

E D

U

LE

METAL STUD

JAMB ANCHOR 4 PER

JAMB-SPOT GROUT

@ ANCHORS

CAULK TYPICAL

(BOTH SIDES)

GYP BD EA SIDE

2" 5/8"

/1 6"1/

2"

1/2"

/1 6"

5/8" GYPSUM BOARD EACH SIDE

33 MIL STUDS TO STRUCTURE ABOVE

6" HIGH X WIDTH OF WALL BOX

HEADER OFF 33 MIL MINIMUM

METAL STUDS

DOUBLE 33 MIL STUDS AT EACH JAMB BEYOND

5/8" GLASS MAT

GYP. SHEATHING

PATCH EXISTING WEATHER

BARRIER WITH COMPATABLE

MATERIAL

2-1/2" METAL FRAMING

@ 16" OC (MAX)

NEW BRICK & GROUT

TO MATCH EXISTING

INSTALL GYP BOARD TO

MATCH ADJACENT

SURFACES ON METAL

FRAMING WITH BATT

INSULATION

SEALANT ALL AROUND

SEALANT ALL AROUND

NOTE:

1. APPLICABLE TO PENETRATIONS OF ALL FIRE RATED MEMBRANES, IN ACCORDANCE

WITH NFPA 101. REFER TO SPECIFICATIONS SECTION 07 84 00, FIRE

STOPPING SYSTEMS.

INSULATED PIPE

OR DUCT

FLOOR

FIRESTOP MATERIAL

3/4" APPROVED FIRESTOP

INSULATION WITH VAPOR

BARRIER

PIPE SLEEVE WHERE

SPECIFIED

1/4" ∅ ANCHOR ROD

FOR NEW CONSTRUCTION

WELD

FLOOR OR DECK PENETRATION

PARTITION OR CHASE PENETRATION

MASONRY PARTITION

PARTITION SUPPORT

FIRESTOP

MATERIAL

3/4" APPROVED FIRESTOP

INSULATION WITH VAPOR BARRIER

DRYWALL PARTITION

INSULATED PIPE

OR DUCT

" 1"

6" 6"

6" 6"

6" 6"

EXIST PLASTER TO REMAIN -

PATCH IF REQ'D

PTW BLOCKING AS

REQ'D

18 GA. MTL JAMB &

HEAD W/STOP

METAL LOUVER

REMOVE EXIST. WINDOW

& ALL WD TRIM

CAULK

18 GA. MTL SILL

W/STOP (WIDTH TO

BE EQ. OR GREATER

THAN WD TRIM)

PTW BLOCKING AS

REQ'D

STL CHANNEL TO

REMAIN

EXIST MASONRY &

FLASHING TO REMAIN

SEALANT (TYP.)

STONE SILL TO

REMAIN

8 1/2"

RATING

-FIRE- -SOUND-

TEST # STC TEST #

SCALE: 1 1/2"=1'-0"

1 hr UL U465

FIRE RATED - ONE HOUR

WHERE INDICATED ON PLANS

WALL TYPE IDENTIFIERS

B13S1 3 5/8" METAL STUDS = 4 7/8" WALL

B13S1 WALL TYPE

1" DEFLECTION

1" DEFLECTION

FLOOR

PLAN SECTION

HEAD PERPENDICULAR TO MTL DECK

HEAD PARALLEL TO MTL DECK

STUD SIZE &

WALL TYPE

IDENTIFIER -

METAL TRACK

ACOUSTIC SEALANT- TYPICAL

(FIRE SEALANT @ FIRE BARRIERS)

CONCRETE FLOOR SLAB

SOUND ATTENUATION INSULATION , THICKNESS PER STC RATING

FULL HEIGHT METAL STUDS @ 16" O.C.

5/8" GYPSUM BOARD PROPRIETARY

SOUND REDUCTION TYPE "X"

SLOTTED TOP DEFLECTION TRACK PER TESTED

DESIGN - FASTEN TO METAL DECK

FIRE SEALANT PER TESTED DESIGN BOTH SIDES

(@ FIRE RATED PARTITIONS)

CONCRETE

INSULATION PER HEAD OF WALL TESTED DESIGN

(@ FIRE RATED PARTITIONS)

BOTTOM

OF METAL

DECK

DEFLECTION TRACK PER TESTED DESIGN - FASTEN TO

STRAPS PER DESIGN - STRAPS @ 16" O.C.

FIRE SEALANT PER TESTED DESIGN BOTH SIDES

(@ FIRE BARRIERS)

CONCRETE

METAL DECK

INSULATION PER TESTED HEAD OF WALL DESIGN

(@ FIRE BARRIERS)

5/8" GYPSUM BOARD

1" 1"

1/ 2"

SEE BELOW

STI SYSTEM No. HW-D-0456

STI SYSTEM No. HW-D-0456

5/8" GYPSUM BOARD

CEILING RUNNER

CEILING RUNNER

5/8" GYPSUM

BOARD

5/8" GYPSUM BOARD PROPRIETARY

SOUND REDUCTION TYPE "X"

5/8" GYPSUM BOARD PROPRIETARY

SOUND REDUCTION TYPE "X"

NGC 2013005

48 OL-11-0638& UL V435

EXISTING VENT OPENING

RATING

-FIRE- -SOUND-

TEST # STC TEST #

NONEHEAD OF WALL DESIGN

SCALE: 1 1/2"=1'-0"

0 hr - N/A N/A

NON RATED

5/8" GYPSUM BOARD

WALL TYPE IDENTIFIERS

B102 2 1/2" METAL STUDS

METAL TRACK ATTACHED TO

CONC FLR DECK W/ 1 1/2" POWDER

ACTIVATED FASTENERS @ 24" O.C. - 4" FROM

ENDS - MIN EMBEDMENT: 1 1/4"

METAL STUDS AT 16" O.C.

METAL STUD TRACK

ABOVE CEILING

BELOW CEILING

METAL STUD CLIP, ATTACHED TO

WALL, 32" O.C.

B102 WALL TYPE

FLOOR

SECTION AT TOP OF WALL

1/ 4"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINALOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

ISSUED FOR

CONSTRUCTION

ARCHITECT/ENGINEER OF RECORD

ENGINEER:

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 20215.001

B

IM

/2

.0

V

A F a y e tt e v ill e R e p la c e

F a n C o ils rd

F lo o r/

-0

-4

A

R C

H A

T R

IA

X

R

.r v t

/9

/2

:1

:1

P M

A601

DOOR/FINISH SCHEDULES AND

DETAILS

REPLACE FAN COIL UNITS - 3RD

FLOOR FAYETTEVILLE VAMC,

FAYETTEVILLE, NC

2300 Ramsey St, Fayetteville, NC 28301

565-21-104

8/12/2022 JS CR

DOOR & FRAME SCHEDULE

DOOR

NO. ROOM NAME

DOOR FRAME

F

IR

E R

A T

IN

G

S T

C

H A

R D

W A

R E

S E

T

NOTESW

ID

T H

H E

IG

H

T

T H

IC

K

N E

S S

G L A

Z

IN

G

L O

U V

E R

P A

N E

L M

A T

E R

IA

L

F R

A M

E M

A T

E R

IA

L

F R

A M

E T

Y P

E

B U

C K

T Y

P E

397 Mechanical 6' - 0" 7' - 0" 90MIN 40 SH-9A ASTRAGAL & CLOSER

FINISH SCHEDULE

Number ROOM NAME

FLOOR

FINISH

BASE

FINISH

CEILING

FINISH NOTES / REMARKS

397 Mechanical UTILITY GREY

EPOXY

NONE EXPOSED No rubber base. Epoxy flooring should be extended 4" vertically on wall all the way around the space and up the sides of the poured equipment pads. Pour so floor slopes to drain. Equipment pad should have chamfered edges.

F-3 D-1

1 1/2" = 1'-0"2

DOOR JAMB DETAIL

B-1

1 1/2" = 1'-0"1

INTERIOR DOOR HEADER DETAIL- 8'-0" MAX OPENING

WALL TYPE(S)DETAIL(S)

1 1/2" = 1'-0"3

DETAIL @ SECTION (TYP.)

1" = 1'-0"6

PIPE PENETRATION DETAIL

NTS

WALL SECTION @ METAL LOUVERS

1" = 1'-0"4

DETAIL @ INTERIOR ELEVATION (TYP.)

DOOR TYPE(S)FRAME TYPE(S)BUCK TYPE(S)

Room

392C

Stair

Patient Rm

Patient Toilet

342A

Patient Rm

Patient Rm

Patient Toilet

338A

Patient Rm

Bath

Office

Toilet

335A

Office

Electrical Closet

Patient Rm

Electrical

Patient Toilet

340A

Corridor

C3BW

Corridor

C3BE

Corridor

C3BN

Conference Room

392B

Kitchen Nourish

392A

Day Room

Patient Rm

Office

334A

Tele Closet

Mechanical

Corridor

C3BS

A.5

A.5

A.6

A.6

A.7

A.7

A.8

A.8

A.9

A.9

A.10

A.10

A.11A.11

A.12A.12

A.13A.13

A.15A.15

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

ENGINEER:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

ISSUED FOR

CONSTRUCTION

AREA A AREA B AREA C

PROJECT KEY PLAN

PLAN NORTH TRUE NORTH

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 20215.001

B

IM

/2

.0

V

A F a y e tt e v ill e R e p la c e F a n

C o ils rd F lo o r/

.0

V A

F a y e tt e v ill e F a n

C o ils rd F lo o r_ S

E S

.r v t

/1

/2

:0

:5

P

M

FP203B

LEVEL 3 - FIRE PROTECTION -

AREA B

REPLACE FAN COIL UNITS - 3RD

FLOOR FAYETTEVILLE VAMC,

FAYETTEVILLE, NC

2300 Ramsey St, Fayetteville, NC 28301

08/12/2022 GWB NLC

565-21-104

100% FINAL

1/8" = 1'-0"

LEVEL 3 - FIRE PROTECTION - AREA B

GENERAL NOTES:

A. UNLESS NOTED OTHERWISE DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT, AND FIXTURE INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

B. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS

OR FOR THE MEANS AND METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES

REQUIRED TO PERFORM THIS WORK.

C. THE FIRE PROTECTION CONTRACTOR SHALL COORDINATE EXISTING CONDITIONS AND TRADES FOR

NEW PIPING AND HEAD LOCATIONS AS REQUIRED.

D. THE EXISTING SPRINKLER SYSTEM IS A WET SYSTEM. ALL PIPING IS ABOVE CEILING.

E. ALL SPRINKLER WORK SHALL COMPLY WITH NFPA 13 AND LOCAL CODES.

F. CONTRACTOR IS REQUIRED TO ADJUST ANY SPRINKLER HEADS IN ANY PART OF THE PROJECT AREA

NECESSARY TO ACCOMMODATE NEW INSTALLATION WORK.

SHEET NOTES:

1. REMOVE EXISTING HEADS. TURN PIPING UP AND INSTALL QUICK RESPONSE UPRIGHT HEADS WITH

PROTECTIVE CAGES.

2. ADJUST HEADS TO NEW 8' CEILING HEIGHT.

08/12/2022 20215.001

ABBREVIATION

GENERAL ABBREVIATIONS

DESCRIPTION ABBREVIATION DESCRIPTION

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

AD ACCESS DOOR/PANEL

AFF ABOVE FINISHED FLOOR

AMB AMBIENT

DIA DIAMETER

DN DOWN

E EXISTING

EC ELECTRICAL CONTRACTOR

EFF EFFICIENCY

GC GENERAL CONTRACTOR

FPM FEET PER MINUTE

FPS FEET PER SECOND

L LENGTH

LF LINEAR FEET

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

MFR MANUFACTURER

MIN MINIMUM

NIC NOT IN CONTRACT

NTS NOT TO SCALE

PC PLUMBING CONTRACTOR

PSIG POUNDS PER SQUARE INCH GAUGE

RPM REVOLUTIONS PER MINUTE

SHT SHEET

TOB TOP OF BEAM

GPM GALLONS PER MINUTE

TOS TOP OF STEEL

BOB BOTTOM OF BEAM

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

UNION

STRAINER WITH BLOW-OFF VALVE

ELBOW UP

ELBOW DOWN

TEE UP

PIPING

- SOLID LINE INDICATES SYSTEM SUPPLY

-- DASHED LINE INDICATES SYSTEM RETURN

NUMBER INDICATES NOMINAL DIAMETER IN INCHES,

LETTER(S) INDICATES SYSTEM.

REFER TO ABBREVIATIONS FOR SYSTEM TYPE.

FIRE PROTECTION GENERAL SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

# SHEET NOTE

DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS

AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.

DIAMETER

DENOTES CONNECTION OF NEW

WORK TO EXISTING SYSTEM

PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.

#/# ARROW INDICATES DOWNWARD PIPE SLOPE

#/# INDICATES SLOPE IN INCHES PER FOOT

WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR

REQUIREMENTS

ARROW INDICATES DIRECTION OF FLOW IN

PIPING

ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

CHECK VALVE

ARROW INDICATES DIRECTION OF NORMAL FLOW

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

BALANCING DEVICE

# INDICATES FLOW TO BE BALANCED IN GPM

CIRCUIT SETTER, AUTOFLOW, ETC.

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM#

PRESSURE GAUGE

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER

TEE DOWN

TEE HORIZONTAL

PIPE REDUCER

INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.

SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.

REQUIRED SERVICE CLEARANCE FOR EQUIPMENT

CONTINUATION SYMBOLS

FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.

SECOND SYMBOL APPLIES TO RECTANGULAR AND OVAL DUCT.

ABBREVIATION

FIRE PROTECTION ABBREVIATIONS

DESCRIPTION

BACK FLOW PREVENTERBFP

FIRE PROTECTIONF

FIRE DEPARTMENT CONNECTIONFDC

ABBREVIATION DESCRIPTION

FLOW SWITCHFS

POST INDICATOR VALVEPIV

SPRINKLERSPR

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

SYMBOL

FIRE PROTECTION SYMBOLS

DESCRIPTION ADDITIONAL REMARKS

FLOW SWITCH COORDINATE INTERFACE WITH FIRE ALARM SYSTEM CONTRACTOR

FIRE DEPARTMENT CONNECTION MOUNT BETWEEN 18" AND 48" ABOVE FINISHED GRADE

REFER TO SPECIFICATIONS FOR TYPES AND FINISHES.

PENDANT REFERS TO FULL, SEMI-RECESSED AND RECESSED TYPES. LOCATIONS

FOR EACH ARE INDICATED IN THE SPECIFICATIONS OR ON THE PLANS.

SIDEWALL SPRINKLER -

EXISTING SIDEWALL SPRINKLER

SPRINKLER

EXISTING SPRINKLER

EXISTING SPRINKLER TO BE REMOVED

FIRE PIPEF

O.S. & Y. VALVE

SHUT-OFF VALVE WITH TAMPER SWITCHTS

FIRE DEPARTMENT VALVEFDV

DRY PIPE FIRE PROTECTIONDP

FIRE PUMP TEST HEADERFPTH

HAZARD

SPRINKLER FLOW DENSITIES

AREA (SF) GPM/SF

1500LIGHT HAZARD 0.10

ORDINARY HAZARD I 1500

0.15

0.20ORDINARY HAZARD II

HOSPITALS:

SPRINKLER HAZARD CLASSIFICATION

LIGHT HAZARD:

• PATIENT ROOMS

• CORRIDORS

• OFFICES

• CHAPELS

• DINING AREAS

ORDINARY HAZARD, GROUP 1:

• MECHANICAL ROOMS

• ELECTRICAL ROOMS

• KITCHENS

• STORAGE ROOMS (CEILING HEIGHT 8 FEET OR LESS) 1

• SOILED UTILITY ROOMS

• CLEAN UTILITY ROOMS

• LABORATORIES (HAZARD CLASSIFICATION WILL DEPEND ON THE AMOUNTS

OF FLAMMABLE AND COMBUSTIBLE LIQUIDS USED AND STORED IN THE

LABORATORIES)

ORDINARY HAZARD, GROUP 2:

• STORAGE ROOMS (CEILING HEIGHT 12 FEET OR LESS) 1

• SOILED LINEN ROOMS

1 MEETING THE CRITERIA FOR QUANTITY/COMBUSTIBILITY OF CONTENTS FOR AN

ORDINARY, GROUP 1 HAZARD.

UNION

STRAINER WITH BLOW-OFF VALVE

ELBOW UP

ELBOW DOWN

TEE UP

PIPING

- SOLID LINE INDICATES SYSTEM SUPPLY

-- DASHED LINE INDICATES SYSTEM RETURN

NUMBER INDICATES NOMINAL DIAMETER IN INCHES,

LETTER(S) INDICATES SYSTEM.

REFER TO ABBREVIATIONS FOR SYSTEM TYPE.

GENERAL PLUMBING SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

# SHEET NOTE

DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS

AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.

DIAMETER

DENOTES CONNECTION OF NEW

WORK TO EXISTING SYSTEM

PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.

#/# ARROW INDICATES DOWNWARD PIPE SLOPE

#/# INDICATES SLOPE IN INCHES PER FOOT

WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR

REQUIREMENTS

ARROW INDICATES DIRECTION OF FLOW IN

PIPING

ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

CHECK VALVE

ARROW INDICATES DIRECTION OF NORMAL FLOW

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

BALANCING DEVICE

# INDICATES FLOW TO BE BALANCED IN GPM

CIRCUIT SETTER, AUTOFLOW, ETC.

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM#

PRESSURE GAUGE

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER

TEE DOWN

TEE HORIZONTAL

PIPE REDUCER

INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.

SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.

REQUIRED SERVICE CLEARANCE FOR EQUIPMENT

CONTINUATION SYMBOLS

FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.

SECOND SYMBOL APPLIES TO RECTANGULAR AND OVAL DUCT.

ABBREVIATION

PLUMBING ABBREVIATIONS

DESCRIPTION

CHEMICAL VENTCV

BOTTLE/GLASS FILLERBF

ABBREVIATION DESCRIPTION

DOMESTIC HOT WATERHW

DOMESTIC HOT WATER CIRCULATIONHWC

LAVATORYL

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

BACK FLOW PREVENTERBFP

BATH TUBBT

COMPRESSED AIR (NON-MEDICAL)CA

PROPANELPG

LEAVING WATER TEMPERATURELWT

BTU (1000'S)MBH

CONDENSATE DRAINCD

CLEANOUTCO

CONDENSATE PUMPCP

MOP SINKMS

NORMALLY CLOSEDNC

NORMALLY OPENNO

CLINICAL SINKCS

DOMESTIC COLD WATERCW

DRINKING FOUNTAINDF NON-POTABLE WATERNPW

POST INDICATOR VALVEPIV

PRESSURE REDUCING VALVEPRV

DOUBLE GRADE CLEANOUTDGCO

DEIONIZED WATERDI

DEIONIZED WATER CIRCULATINGDIC

ROOF DRAINRD

REVERSE OSMOSIS WATERRO

DEIONIZED HOT WATERDIH

RPZ

S

REDUCED PRESSURE ZONE (BACK FLOW PREVENTER)

SINK

DEIONIZED HOT WATER CIRCULATINGDIHC

DISTILLED WATERDIS

DISTILLED WATER CIRCULATINGDISC

SANITARY SEWERSAN

SUMP PUMP DRAINSPD

DIALYSIS WATER RETURNDR

DIALYSIS WATER SUPPLYDS

DRAIN TILEDT

SEWAGE EJECTORSE

SHOWERSH

EMERGENCY EYE WASHEEW

EMERGENCY SHOWERES

EMERGENCY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .