About this file

This amendment to solicitation 36C24623B0014 extends the bid due date to February 13, 2023 at 3:00 PM Eastern time for an invitation for bids issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The scope of work includes removing existing fan coil units and installing a new VAV air handling unit and associated mechanical, electrical and plumbing systems at the Fayetteville, North Carolina VA Medical Center to replace the third floor fan coil units. Bids are due on February 13th and the virtual bid opening will be held on that same date at 4:00 PM Eastern.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Replace Fan Coil Units, newest first.
File Type Posted
36C24623B0014 0002.docx DOCX document
SD232113-10. DWG - Dual Heat Exchanger Controls (Heating System).pdf PDF
Site Visit Attendance.pdf PDF
SD232213-06 Flash Tank Sizing.pdf PDF
M502 - Detail 1.pdf PDF
MP203B - MECHANICAL PIPING PLANS -AREA B.pdf PDF
Wage Determination.pdf PDF
Issued For Construction Drawings Replace 3rd Floor FCUs.pdf PDF
36C24623B0014_1.docx DOCX document
Specifications Replace 3rd Floor FCUs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) February 3, 2023 565-21-104 Department of Veterans Affairs Network Contracting Office 6 2300 Ramsey Street, Bldg. 4-006 Fayetteville NC 28301 Department of Veterans Affairs Network Contracting Office 6 2300 Ramsey Street, Bldg. 4-006 Fayetteville NC 28301 To all Offerors/Bidders

36C24623B0014 01-11-2023

X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: FEBRUARY 13, 2023 3:00PM EASTERN See CONTINUATION Page

SEE CONTINUATION SHEETS FOR DESCRIPTION OF AMENDMENT.

THE DATE AND TIME SPECIFIED FOR RECEIPT OF BIDS HAS CHANGED( FEBRUARY 13, 2023 : 3:00 PM EASTERN )

CONTINUATION PAGE

THE PURPOSE OF THIS AMENDMENT IS TO MAKE ADJUSTMENTS TO THE INSTRUCTION TO BIDDERS, INCORPORATE THE SCOPE OF WORK PROVIDED HEREIN, AND RESPOND TO REQUEST FOR INFORMATION RECEIVED PRIOR TO THE DATE SPECIFIED.

SUBMISSION OF BIDS

The bidder shall submit the following in response to this Invitation for Bids:

(a) A completed and signed Standard Form 1442.

(b) A completed copy of the Representations and Certifications (See FAR 52.204-8 Annual Representations and Certifications (MAR 2012)).

(c) A fully executed bid bond.

(d) Documentation of their safety record.

(e) All forms and/or certifications as directed in the solicitation, including the specifications.

NOTE: Email all required documents to wayne.goodmond@va.gov

BID DUE DATE: FEBRUARY 13, 2023 – 3:00 PM EASTERN

Virtual Bid Opening Information:

All bids received, on or before, the date and time specified above will be held unopened until the virtual bid opening which will be conducted on February 13, 2023 at 4:00 PM. To attend the virtual bid opening the following information is provided.

Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 269 725 520 170 Passcode: ASMx6C Download Teams | Join on the web Or call in (audio only) +1 872-701-0185,,190899632# United States, Chicago Phone Conference ID: 190 899 632#

QUESTIONS AND ANSWERS

1. M300- The flash tank (FT-1) and air separator (AS-3B) are not scheduled: Provide a schedule for both.

1. See attached air separator schedule and flash tank detail.

1. AD101/1- Stair 395 shows a unit to be removed, but the note is incorrect. Per the site visit, this is not a FCU, but a radiator. Is this radiator scheduled to be demolished?

1. YES, demolition is part of this contract and includes piping.

1. P203B- Note 1- are trap guards acceptable in lieu of trap primers on the floor drains?

1. See below excerpt from the VA Plumbing Design Manual. Trap guards are acceptable pending VA approval.

1. MP203B- Detail 4. There is an existing 600A electrical panel between the two windows where the steam lines are shown to run to the third floor. There is no room to install them in this location.

1. Install steam lines plan east of grid line A.9 to avoid electrical panel. See MP203B attached.

1. There are also chilled water lines in this corner in the same location as the proposed steam lines. These are not indicated on the plans

1. See response #4. Steam lines have been moved.

1. MH203B- Is there a drawing that shows the existing duct sizes within the chase? We are asked to provide fire/smoke dampers at each of those locations.

1. Contactor shall field verify duct sizes.

1. M502- Detail 1. Cannot read this on the drawings

1. See attached detail PDF.

1. M600- pipe insulation schedule. Please clarify the insulation thickness for the MPS. We are going to have a possible issue with installing the 2.5” MPS piping with this thickness with the available space in the areas where the riser is to be located.

1. Thinner insulation can be used but must maintain equivalent thermal properties.

1. What are the working hours for the second-floor space below the footprint of this project?

1. Work hours are expected to be during normal business hours of the contract, but subject to VA approval of a final work plan the contractor must submit to work in occupied spaces.

1. Is demo of equipment by a demo sub or is it by plumbing/mechanical?

1. VA will not direct means and methods so long as all demolition is accomplished properly. Demolition on any existing system where partial system stays in operation will require a related discipline technician ensure remaining system is balanced and operating correctly.

565-21-104 Replace 3rd Floor Fan Coil Units Statement of Work

FNCVAMC

See drawings for fan coil units identified for removal: Most of these are located below windows and one is located above the ceiling. There are three radiators located beneath windows also identified for removal. The new third floor air handling unit will be located directly above the existing second floor air handling unit. Rooms 397 and 399 will be renovated to accommodate the new 3rd floor air handling unit. The contractor shall protect in place any equipment remaining in this space. Ceilings in Office Rooms 334, 334A, 335 to be replaced and lowered to accommodate the new ductwork and mechanical systems. Bath 337 where ceramic tiles in the ceilings exist, will be demolished and replaced by water resistant gypsum board installed at lower elevation. Where ACT ceilings exist, the ceiling and all ceiling mounted equipment will be replaced and lowered to accommodate the new ductwork above ceiling. All ceiling mounted equipment in the spaces described above to be removed, saved and re-installed back on the ceilings that are lowered.

Clearing the project area: The contractor shall lease or subcontract a VA COR approved off site warehouse with adequate space to store all existing equipment, furnishings and furniture (this project estimates a minimum requirement of 2,500 SF – clear floor space with no stacking of items unless VA COR approved to do so). This must be a completely secured clean conditioned space free of infestations. Preference is one located within a ten-mile radius of this facility for ease of inspections and limit hauling distances. The VA must approve any warehouse prior to the contractor making a commitment.

The contractor will be responsible for documenting (VA COR approved information/chart/list), protecting/wrapping/boxing, removing, hauling storing and then returning all items and clearing off all wrapping/protecting/box debris from the site. Items will be returned to the area as previously installed with possibly some on site relocation as directed by the VA COR. Stored items will not sit directly on floors unless designed to do so (such as patient beds or tables/chairs). All other items shall be stored on pallets or shelving.

The VA can at the COR’s discretion also use this space if needed for items deemed too sensitive to allow the contractor to handle or for future items that will go into this space once work is completed. This will be if the approved space has space available once the contractors required items are stored.

The Contractor shall be responsible for removal of existing fan coil units and steam radiators along with associated piping, ductwork and control cabling. Existing piping serving fan coil units on Third Floor B-Wing, Building 1 is accessible in the ceiling space on Second Floor below and shall be removed in this project. Piping demolition on the Second Floor will be phased to accommodate patient occupancy. Demolition on Second Floor will be performed in one room at a time. Demolition of existing piping, accessible in the ceiling space on Third Floor, serving fan coil units removed from the Fourth Floor B-Wing, Building 1 in a previous project shall also be removed during this project. Access to Third Floor B-Wing, Building 1 will be available during project construction.

The contractor shall install new equipment, piping and ductwork as indicated on the drawings. Scope of work includes installation of a new VAV Air Handling Unit (AHU-3B) in a new Mechanical Room on the Third Floor B-Wing, Building 1. AHU-3B will include chilled water cooling and hot water preheat coils along with a supply fan array. A duct-mounted, in-line return fan will be specified to reduce unit weight. New 6” chilled water supply and return piping shall be connected to the existing Campus Loop and run through the building to the existing chase located in the New B-Wing Mechanical Room and run up to the attic adjacent to the existing chase. New hot water supply and return piping shall be fed from the new hot water system in the new Mechanical Room. Installation of new VAV terminal units and associated hot water piping is also included in this project.

Scope of work also includes installation of a new steam-to-hot water heat exchanger with hot water circulating pumps and hot water supply and return piping. New medium pressure supply and condensate return piping shall be connected to the existing mains located in Second Floor B-Wing, Building 1 Mechanical Room.

New outside air intake and relief louvers will be installed in the exterior wall of the new Mechanical Room. Existing windows will be removed, and the new louvers will be installed in the existing wall openings.

Plumbing work will include the removal of an existing lavatory and installation of new floor drains in the new Mechanical Room. New floor drains will be connected to the existing sanitary sewer system.

Fire protection work will include relocation of existing heads where the ceiling height changes and to avoid conflicts with new duct mains. New upright sprinkler heads will be required in the new Mechanical Room.

Electrical work will include the removal of the electrical connections for the fan coil units that are to be removed. A new 400A feeder will be fed from the basement to a new 3rd floor Emergency power 400A panel that will serve a new AHU in a new mechanical room. Electrical lighting and receptacles will be provided for the new mechanical room.

ATTACHMENTS

1. SITE VISIT ATTENDANCE

1. SD232213-06 Flash Tank Sizing.

1. MP203B - MECHANICAL PIPING PLANS -AREA B.

1. M502 - Detail 1.