36C24623B0014 0002.docx
DOCX document 51 KB Posted
- Attached to
- Y1DA--Replace Fan Coil Units Federal contract opportunity
- Solicitation number
- 36C24623B0014
About this file
This document contains an amendment to a solicitation for a federal construction contract. The Department of Veterans Affairs is seeking to replace fan coil units at one of its facilities. The amendment extends the deadline for receipt of offers to February 17, 2023 at 3:00 PM Eastern time. It also includes responses to contractor questions seeking clarification on aspects of the project scope, such as schedules for additional mechanical equipment, notes regarding demolition and piping removal, acceptable alternatives for trap primers, relocated locations for steam lines to avoid electrical equipment, and the need for field verification of existing duct sizes. Details are provided on working hours, supervision roles, and controls diagrams.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SD232113-10. DWG - Dual Heat Exchanger Controls (Heating System).pdf | ||
| 36C24623B0014 0001.docx | DOCX document | |
| Site Visit Attendance.pdf | ||
| SD232213-06 Flash Tank Sizing.pdf | ||
| M502 - Detail 1.pdf | ||
| MP203B - MECHANICAL PIPING PLANS -AREA B.pdf | ||
| Specifications Replace 3rd Floor FCUs.pdf | ||
| Wage Determination.pdf | ||
| Issued For Construction Drawings Replace 3rd Floor FCUs.pdf | ||
| 36C24623B0014_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-08-2023 565-21-104 Department of Veterans Affairs Network Contracting Office 6 2300 Ramsey Street, Bldg. 4-006 Fayetteville NC 28301 Department of Veterans Affairs Network Contracting Office 6 2300 Ramsey Street, Bldg. 4-006 Fayetteville NC 28301 To all Offerors/Bidders
36C24623B0014 01-11-2023
X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: FEBRUARY 17, 2023 3
:00PM EASTERN
See CONTINUATION Page
SEE CONTINUATION SHEETS FOR DESCRIPTION OF AMENDMENT.
THE DATE AND TIME SPECIFIED FOR RECEIPT OF BIDS HAS
CHANGED( FEBRUARY
17, 2023 : 3:00 PM EASTERN )
CONTINUATION PAGE
Questions and Answers Rev. 1
1. M300- The flash tank (FT-1) and air separator (AS-3B) are not scheduled: Provide a schedule for both.
· See attached air separator schedule and flash tank detail.
1. AD101/1- Stair 395 shows a unit to be removed, but the note is incorrect. Per the site visit, this is not a FCU, but a radiator. Is this radiator scheduled to be demolished?
· YES, demolition is part of this contract and includes piping.
1. P203B- Note 1- are trap guards acceptable in lieu of trap primers on the floor drains?
· See below excerpt from the VA Plumbing Design Manual. Trap guards are acceptable pending VA approval.
1. MP203B- Detail 4. There is an existing 600A electrical panel between the two windows where the steam lines are shown to run to the third floor. There is no room to install them in this location.
· Install steam lines plan east of grid line A.9 to avoid electrical panel. See MP203B attached.
1. There are also chilled water lines in this corner in the same location as the proposed steam lines. These are not indicated on the plans
· See response #4. Steam lines have been moved.
1. MH203B- Is there a drawing that shows the existing duct sizes within the chase? We are asked to provide fire/smoke dampers at each of those locations.
· Contactor shall field verify duct sizes.
1. M502- Detail 1. Cannot read this on the drawings
· See attached detail PDF.
1. M600- pipe insulation schedule. Please clarify the insulation thickness for the MPS. We are going to have a possible issue with installing the 2.5” MPS piping with this thickness with the available space in the areas where the riser is to be located.
· Thinner insulation can be used but must maintain equivalent thermal properties.
1. What are the working hours for the second-floor space below the footprint of this project?
· Work hours are expected to be during normal business hours of the contract, but subject to VA approval of a final work plan the contractor must submit to work in occupied spaces.
1. Is demo of equipment by a demo sub or is it by plumbing/mechanical?
· VA will not direct means and methods so long as all demolition is accomplished properly. Demolition on any existing system where partial system stays in operation will require a related discipline technician ensure remaining system is balanced and operating correctly.
1. Can the superintendent and QC manager have collateral duties?
· The VA is willing to accept a Site Superintendent as the QC Manager, but their resume must reflect experience required to be proficient to a level necessary to accomplish this project scope and magnitude. It must also indicate the designated person has performed as each position. Any contract requirements for these must both be met by this single individual.
1. In reference to Detail 4 on M700, the control diagram includes a supplemental heating valve “V-2” which is not typically included on a VAV box. Please ask the engineer if we can remove these points as they are not standard on existing VAV boxes at the VA in Fayetteville.
Please provide a detail for controls and sequence of operations for the heat exchanger.
· See attached detail – Dual Heat Exchanger Controls (Heating System) SD232223-10.DWG
ATTCH(S)
SD232113-10. DWG - Dual Heat Exchanger Controls (Heating System).
image1.png
File details come from the government source that posted it. Updated .