MP203B - MECHANICAL PIPING PLANS -AREA B.pdf

PDF 459 KB Posted

Attached to
Y1DA--Replace Fan Coil Units Federal contract opportunity
Solicitation number
36C24623B0014
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document package includes mechanical piping plans and specifications for replacing fan coil units in a Veterans Affairs medical center. The project involves installing new steam and condensate piping mains to connect equipment in the second floor mechanical room, as well as chilled water supply and return piping to serve air handling units. Detailed drawings show the layout of piping systems for areas A, B, and C on levels 1 through 5, with notes outlining demolition of existing piping and connections to new mains. The related federal contract opportunity is solicitation number 36C24623B0014 for replacing fan coil units at the Veterans Affairs Veterans Integrated Service Network 6 facility in Fayetteville, North Carolina.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Replace Fan Coil Units, newest first.
File Type Posted
36C24623B0014 0002.docx DOCX document
SD232113-10. DWG - Dual Heat Exchanger Controls (Heating System).pdf PDF
Site Visit Attendance.pdf PDF
SD232213-06 Flash Tank Sizing.pdf PDF
36C24623B0014 0001.docx DOCX document
M502 - Detail 1.pdf PDF
Specifications Replace 3rd Floor FCUs.pdf PDF
Wage Determination.pdf PDF
Issued For Construction Drawings Replace 3rd Floor FCUs.pdf PDF
36C24623B0014_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TTT

T

T

T T

T T

T

T

T

TT

AHU-3B

0.7 GPM

VAV-3B-1

0.6 GPM

VAV-3B-9

1.2 GPM

VAV-3B-8

0.4 GPM

VAV-3B-6

0.5 GPM

VAV-3B-7

0.4 GPM

VAV-3B-4

0.8 GPM

VAV-3B-10

0.3 GPM

VAV-3B-11

2.3 GPM

VAV-3B-12

0.7 GPM

VAV-3B-13

0.6 GPM

VAV-3B-14

0.4 GPM

VAV-3B-5

0.4 GPM

VAV-3B-2

0.4 GPM

VAV-3B-3

Room

392C

Stair

Patient Rm

Patient Toilet

342A

Patient Rm

Patient Rm

Patient Toilet

338A

Patient Rm

Bath

Office

Toilet

335A

Office

Electrical Closet

Patient Rm

Electrical

Patient Toilet

340A

Corridor

C3BW

Corridor

C3BE

Corridor

C3BN

Conference Room

392B

Kitchen Nourish

392A

Day Room

Patient Rm

Office

334A

Tele Closet

Mechanical

Corridor

C3BS

M300

A.5

A.5

A.6

A.6

A.7

A.7

A.8

A.8

A.9

A.9

A.10

A.10

A.11A.11

A.12A.12

A.13A.13

A.15A.15

2" HWR

2" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3" HWS

3" HWR

2" HWS

2" HWR

1 1/4" HWS

1 1/4" HWR 1 1/4" HWS

1 1/4" HWR

1" HWS

1" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWR

3/4" HWS

1" HWS

1" HWR

3/4" HWR

3/4" HWS

3/ 4"

H W

S 3/

4" H

W R

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1 1/4" HWR

1 1/4" HWS

1 1

A.9

A.9

A.10

A.10

A.11A.11

A.12A.12

3" CWR UP/DN

3" CWS UP/DN

A.9

A.9

A.10

A.10

A.11A.11

A.12A.12

4" CWR UP

4" CWS UP

4" MPS UP/DN

2" PC UP/DN

PC UP/DN

MPS UP/DN(E)

(E)

MECHANICAL ROOM

2B118

CORRIDOR

2AC4

A.9

A.9

A.10

A.10

A.11A.11

A.12A.12

M300

1 1/4" PC UP

4" CWR UP

4" CWS UP

2 1/2" MPS UP

PC UP/DN

MPS UP/DN(E)

(E)

A.9

A.9

A.10

A.10

A.11 A.11

A.12 A.12

A.9

A.9

A.10

A.10

M300

3" CWR DN

3" CWS DN

3" CWR UP

3" CWS UP

A.9

A.9

A.10

A.10

A.11 A.11

A.12 A.12

3" CWR DN

3" CWS DN

A.9

A.9

A.10

A.10

A.11 A.11

A.12 A.12

PC UP/DN

MPS UP/DN(E)

(E)

2" PC UP/DN

4" MPS UP/DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

ENGINEER:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT:

Atriax, PLLC 102 3rd Avenue, NE PO Box 1629, Hickory, NC 28603 Phone: 828.315.9962 Fax: 828.315.9964

NC Engineering License No.: P-0214 NC Architectural License No.: 51254

ISSUED FOR

CONSTRUCTION

AREA A AREA B AREA C

PROJECT KEY PLAN

PLAN NORTH TRUE NORTH

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project: 20215.001

B

IM

/2

.0

V

A F a y e tt e v ill e R e p la c e F a n

C o ils rd F lo o r/

.0

V A

F a y e tt e v ill e F a n

C o ils rd F lo o r_ S

E S

.r v t

/1

/2

:0

:3

P

M

MP203B

MECHANICAL PIPING PLANS -

AREA B

REPLACE FAN COIL UNITS - 3RD

FLOOR FAYETTEVILLE VAMC,

FAYETTEVILLE, NC

2300 Ramsey St, Fayetteville, NC 28301

08/12/2022 GWB NLC

565-21-104

100% FINAL

1/8" = 1'-0"

LEVEL 3 - PIPING - AREA B

GENERAL NOTES:

A. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

B. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON

ALL OTHER PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

C. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

D. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS

OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES

REQUIRED TO PERFORM THIS WORK.

E. MECHANICAL CONTRACTOR SHALL COORDINATE NEW DUCTWORK WITH ELECTRICAL CONTRACTOR

AND FIRE PROTECTION CONTRACTOR.

SHEET NOTES:

1. PROVIDE 3-WAY CONTROL VALVE FOR THIS VAV TERMINAL UNIT.

2. CONNECT TO EXISTING CHILLED WATER MAINS ABOVE CEILING IN HOUSEKEEPING ROOM.

3. CONNECT EXISTING EQUIPEMNT IN SECOND FLOOR MECHANICAL ROOM TO NEW STEAM MAINS.

DEMOLISH EXISTING STEAM MAINS BACK TO PIPE SPACE AFTER NEW MAINS ARE INSTALLED.

4. EXISTING 3" CHILLED WATER SUPPLY AND RETURN TO AIR HANDLING UNITS 10 AND 24.

5. CONNECT NEW 4" MPS AND 2" PC TO MAINS IN PIPE SPACE BELOW.

1/8" = 1'-0"

LEVEL 5 - PIPING - AREA B

1/8" = 1'-0"

LEVEL 1 - PIPING - AREA B

1/8" = 1'-0"

LEVEL 2 - PIPING - AREA B

1/8" = 1'-0"

LEVEL 4 - PIPING - AREA B

1/8" = 1'-0"

PENTHOUSE - PIPING - AREA B

1/8" = 1'-0"

BASEMENT - PIPING - AREA B

08/12/2022 20215.001

Revisions: Date:

Revision 0 August 12, 2022 ncesmat PolyLine ncesmat PolyLine ncesmat Ellipse ncesmat Ellipse ncesmat Callout

2 1/2" MPS UP

ncesmat Callout

1 1/4" PC UP

File details come from the government source that posted it. Updated .