RFI 2.docx
DOCX document 167 KB Posted
- Solicitation number
- ISO211-024
About this file
This document is a Request for Information (RFI) from Armcorp Construction, Inc. regarding an upcoming federal contract opportunity for the renovation of the 1st and 2nd floors of Building 3173 at Naval Support Activity (NSA) Crane in Crane, Indiana.
The RFI requests clarification on several aspects of the project, including the availability of additional drawings, specifications for flooring materials, quality of the mechanical drawings, access to facility restrooms, the need for sprinkler work, key personnel requirements, the scope of work for ceiling replacement, and the extent of epoxy floor removal. The government has provided responses to each of these inquiries, referring the contractor to the relevant sections of the Statement of Work for the project.
The related federal contract opportunity is a solicitation for the renovation project, with a scope that includes the removal and disposal of existing flooring, walls, doors, and data/communication/electrical infrastructure, followed by the installation of new walls, floors, doors, and infrastructure. The project is being managed by the Department of Justice Bureau of Prisons Correctional Facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B-3173- Existing HVAC.pdf | ||
| W-9_2024.pdf | ||
| B-3173 Renovations on 1st and 2nd Floors (SOW final)- Rev 13-May-24.docx | DOCX document | |
| AMD02 ISO211-24.pdf | ||
| RFI 3.pdf | ||
| ST-105_2024.pdf | ||
| RFI 4.pdf | ||
| RFI 1.docx | DOCX document | |
| Scan from 2024-05-09 09_57_17 AM.jpg | JPG image | |
| Scan from 2024-05-09 10_40_56 AM.jpg | JPG image | |
| Scan from 2024-05-09 10_16_43 AM.jpg | JPG image | |
| Scan from 2024-05-09 10_30_47 AM.jpg | JPG image | |
| Scan from 2024-05-09 09_56_41 AM.jpg | JPG image | |
| Figure Two A.pdf | ||
| ISO211-24.pdf | ||
| B-3173 Renovations-Combine CDRLS signed.pdf | ||
| Figure one.pdf | ||
| SHAR 10183 B3173 Demo New Construction Furniture and Layouts.pdf | ||
| Figure Two.pdf | ||
| Figure One A.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI #2- Armcorp Construction, Inc.
1) Will there be additional drawings posted? There are no lighting drawings. The specifications do not list specific fixtures. Just state they are to be LED. Please provide.
No additional drawings will be posted. During the mandatory site visit conducted on 9-May-24, the Contractors had the opportunity to see the workspace and confirm existing conditions including existing lighting. Please consider LED lights and fixtures similar to the existing.
2) There is no finish schedule. Please provide information/specs for flooring materials.
Please refer to UFGS 09 68 00 Carpeting and UFGS 09 65 00 Resilient Flooring.
3) The mechanical drawing included appears to be a poor photocopy. Cannot read anything on the drawing. Please provide scope of work for mechanical as well as a better quality version of this drawing.
During the site visit, it was observed an existing thermostat on the wall to be removed in Room 019/030. Existing thermostat needs to be relocated. HVAC drawings were included for information only. No additional HVAC works needed.
4) Confirm we will have access to facility restrooms.
The Contractor will have access to B-3173 restrooms on 1st and 2nd floors.
5) Is there sprinkler work on this project? Scope of work F)Sprinkler system calls out sprinkler work but at site visit it was discussed that no sprinkler work will be necessary. Please advise.
Please refer to the Statement of Work Section 4.1.1 F) Sprinkler System.
5) At site visit it was discussed that a full time on site superintendent as well as a full time on site project manager is required for this project. Would it be acceptable for one person to fulfill both roles with a full time off-site project manager also supporting the project.
It would be acceptable. The Contractor shall provide their key personnel required to fulfill all roles in order to comply with project requirements. CDRL A001 Contractor’s Personnel Roster.
6) Scope of work states new ceiling tiles and grid. However at site visit ceilings were not discussed at all. Confirm that ceilings will remain in entire space. If any rooms are to receive new ceilings please advise which rooms/spaces will receive new ceilings.
Please refer to the Statement of Work Section 4.1.1 G) Ceiling and Grid System.
7) Please clarify scope of work regarding Epoxy floor. Scope of work demolition states that epoxy floor in 048 corridor is to be removed and subfloor prepped for new carpet tiles. However, at the site visit it was discussed there is no epoxy floor removal. Our understanding is that the corridors in the space are epoxy to remain and to be protected during construction. Please advise.
Please refer to the Statement of Work Section 4.1.1 Demolition -Existing epoxy floor in 048 corridor shall be removed and subfloor prepared to receive new 24”x 24” tufted nylon carpet tiles to expand the area for Rooms 019 and 020B.
Epoxy floor sections to be removed in corridor 048 to expand Rooms 019 and 020B.