This document appears to be a floorplan for the second floor of Building 3173 at Naval Support Activity Crane in Crane, Indiana. The related federal contract opportunity is for the renovation of the first and second floors of Building 3173, which includes removal and disposal of existing flooring, walls, doors, and fixtures; construction of new walls and a communication closet; installation of new flooring, doors, data/phone/electrical cabling, power outlets, lighting, and ceiling tiles. The solicitation number is ISO211-024, and the contracting agency is the Department of Justice Bureau of Prisons Correctional Facilities. The scope of work requires the contractor to provide all management, labor, materials, equipment, and quality controls necessary to complete the renovation project.

View the file

Other files

File Type Posted
B-3173- Existing HVAC.pdf PDF
W-9_2024.pdf PDF
B-3173 Renovations on 1st and 2nd Floors (SOW final)- Rev 13-May-24.docx DOCX document
RFI 2.docx DOCX document
AMD02 ISO211-24.pdf PDF
RFI 3.pdf PDF
ST-105_2024.pdf PDF
RFI 4.pdf PDF
RFI 1.docx DOCX document
Scan from 2024-05-09 09_57_17 AM.jpg JPG image
Scan from 2024-05-09 10_40_56 AM.jpg JPG image
Scan from 2024-05-09 10_16_43 AM.jpg JPG image
Scan from 2024-05-09 10_30_47 AM.jpg JPG image
Scan from 2024-05-09 09_56_41 AM.jpg JPG image
Figure Two A.pdf PDF
ISO211-24.pdf PDF
B-3173 Renovations-Combine CDRLS signed.pdf PDF
Figure one.pdf PDF
SHAR 10183 B3173 Demo New Construction Furniture and Layouts.pdf PDF
Figure One A.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 3 4 5 6 7 8

6 5 4 3 2

6 5 4 3 2 1

9 10 11 12 13 14

151617181920

21 22 23 24 25 26

DN.

9'-0"

DN.

8'-0" 8'-0" 8'-0"8'-0"

8'-0"8'-0" 8'-0" 8'-0"

9'-0"

SECOND FLOOR PLAN

BUILDING NO. 3173

DATA PROCESSING

VEST.

OPEN OFFICE AREA

OFFICE

OPEN OFFICE AREA

OFFICE

OFFICE

OFFICE015

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BREAK ROOM

EQUIPMENT ROOM

CORRIDOR

EQUIP.

MENS

WOMENS

VEST.

JANITORIAL

BREAK ROOM

STAIRS

ELEVATOR

STAIRS

BUILDING OUTLINE

29 39

13957

OFFICE

CONFERENCE

CONFERENCE

CONFERENCE

7A

8A

1A

DRAWN BY:

DATE:

NO.

FACILITIES BRANCH (1021)

SCALE: REVISION DATE

BUILDING 3173

SECOND FLOOR

WITH CUBICLES & OFFICES

NOT TO SCALE

J. WIMMENAUER

9/ 1/

:2

9:

P M

Figure #2 - B-3173 2nd Floor Room0s0 3, 004, CR 004, 009, 010, 012, 013, 014, 015, 016, 017, CR 017, 021, 022, CR 022, 025, 026, 027, 028, 030, 031, 032, 033, 034 and 002 corridor