Questions for RFP ISD-371462-RO.pdf

PDF 216 KB Posted

Attached to
Cross Gallery Southwest Annex Refresh Project
Solicitation number
ISD-371462-RO
Issued by

About this file

This document is a Questions and Answers (Q&A) document for Request for Proposal (RFP) ISD-371462-RO for a renovation project at Fermilab. The project involves a 90-day renovation of specific rooms (SW-204, SW-206) with scope including painting, removing paneling, addressing specific door and wall conditions, priming and painting ductwork, and replacing vinyl base. The anticipated Notice to Proceed (NTP) is tentatively set for mid-September 2025, with work to be conducted during normal lab hours (7am-3:30pm).

Key details include: replacing existing vinyl base, removing paneling in SW-206 and patching walls, painting interior window frames Benjamin Moore NAL Blue in satin, painting 4 additional doors and frames, priming and painting exposed ductwork in parchment color, and painting fixed shelving. The area will be completely vacant during construction, with Fermilab responsible for furniture relocation. Parking is available for 2-3 contractor vehicles in the courtyard area, with additional spaces potentially available in the horseshoe parking. A 10-yard roll-off will be provided by Fermilab in the courtyard area for debris removal.

View the file

Other files

File Type Posted
c1fb5c05-26b0-4cf5-a477-34d86dbf9e01.pdf PDF
DOOR HARDWARE SCHEDULE- SINGLE DOOR-1 HOUR.pdf PDF
ISD-E_Section 08113 Hollow metal doors.pdf PDF
Amendment No. 2 Fermilab Cross Gallery Southwest Annex Refresh Project.pdf PDF
ISD-SK01_SWA DOOR REPLACEMENT_250821.pdf PDF
ISD-E_Section 087100 Door Hardware.pdf PDF
Amendment No. 1 Fermilab Cross Gallery Southwest Annex Refresh Project.pdf PDF
Exhibit B - 010010_General_Requirements.pdf PDF
Exhibit C - 013100_Environment Safety and Health Requirements.pdf PDF
Exhibit D - 014100_Quality_Requirements.pdf PDF
Exhibit A1 - SWA PES_RF site map.jpg JPG image
Exhibit H - Bond Payment FL-42.pdf PDF
Exhibit J - Construction Environmental Safety Health Certification (CESHC).pdf PDF
Exhibit K - Statement of Acknowledgment (SF-1413).pdf PDF
Exhibit L - SARC_Subcontractor Annual RepsCerts Rev 4_FFDG.pdf PDF
1.0 RFP ISD-366322-RO.pdf PDF
Exhibit G - Bond Bid FL-41.pdf PDF
Exhibit I - Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit M - Proposal Certifications Form PUR-466_FFDG.pdf PDF
Exhibit N - Sample Subcontract.pdf PDF
Exhibit O - Summary of Required RFP Submittal Documents.pdf PDF
Exhibit E - FFDG General Terms and Conditions for Construction (01.2025).pdf PDF
Exhibit A - SOW Cross Gallery Southwest Annex Refresh Project.pdf PDF
Exhibit F - 2025 Construction Insurance Requirements.pdf PDF
Exhibit P - Proposal Form ISD-371462-RO Cross Gallery Southwest Annex Refresh Project.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for RFP ISD-371462-RO

1) Has the proposal submittal deadline changed vs 8/22/25? A new proposal date will accompany the amendment answering the questions submitted

2) Anticipated NTP—mid-Sept ’25? Tentative, but correct

3) Drawings for the area of work—available? Will Provide what is available

4) Please clarify vinyl base scope, replace existing or throughout – Replace existing only.

5) Room SW-206

a. Paneling— painted vs remove / dw? Remove all paneling. Patch/paint walls underneath the same color and finish as the rest of the space.

6) Structural steel and metal decking not to be painted- remain as is? Correct. Not in scope

7) Furniture can remain wherever it lands during the completion of the work— Fermilab to relocate in final position? Correct.

8) Start date mid / end Sept pending completion of the acm carpet. Correct. The lab is still working on a new contractor

9) Ductwork prime / paint part of project scope? Yes. In scope of work, under “Patch and Paint”, see bullet point 4, sub-bullet point #2. Prime and paint exposed ductwork, including supply vents. Color Parchment, finish in satin.

10) Fixed shelfing to be painted to match wall color? Correct

11) It was advised that SW Annex Refresh work would start in Room SW-210 while the ACM work was being done in Room SW-204, will we be able to get the contact info for the ACM company to coordinate activities? Yes, once a contractor has been selected.

12) Who is responsible for trash containers and removal ISD/Fermilab will be responsible for the roll off drop off and pick up. Dumpster will be in proximity to work site in the courtyard area.

a. Does Fermilab have a disposal company they work with / prefer? NA. See above

b. Is so, who is to be responsible for their services during the SW Annex

Refresh? ISD/Fermilab

13) Further to ‘Color Benjamin Moore NAL Blue, Finish in Satin, 12 interior window frames’, we understand the exterior door / frame is to be painted (both side), but other interior HM doors are not to be repainted? There are 4 additional doors and frames that will be painted on both sides. The door at the top of the interior stairs, the entrance to SW-206, the entrance to SW204 and the door to office

SW202.

14) Room SW-204

a. Exh A notes flashing scope at the door, but the damage appears from water infiltration to be in the wall overhead, will someone be addressing the infiltration before the door work is to be done or would you want this part of the scope? A roof leak repair was done just above the door. The masonry work noted in the scope of work should include addressing the wall above the door. The scope does not intend for the contractor to address issues along the entire length and breadth of that exterior wall.

15) Room SW-206

a. The stained / damaged pipe insulation noted in the scope document appears to be damages from a leak in a pipe or joint

i. Who is to address this? Contractor is not responsible for any leaks identified. To our knowledge, there is no active leak.

16) Please clarify dimensions of exterior door SW204. Single Door – 3’-0” x 7’-0” x 1- 3/4”. See additional door and hardware specifications for details

17) What are the dimensions of the new 90-minute fire rated door? See 16 above

18) Is there a designated space for the furniture that needs to be cover/moved? No.

Contractor can move furniture as needed to accommodate work. All furniture should be covered to protect from incidental dust/paint/debris.

19) Is the area going to be completely vacant during the 90 days period of construction? Yes. No personnel should be actively working in the space during construction.

20) It is possible to work during regular working hours (6 am – 3 pm)? Normal Lab hours are 7am – 3:30pm. Schedule changes will need to be discussed with the Task Manager.

21) Is there a designated parking area for contractors? Yes. There is space for 2 or 3 vehicles along the berm in the courtyard area. Additional spaces may be made available in the horseshoe parking if needed. A short-term loading/unloading zone is also available in the courtyard area. Map available.