This document is a detailed architectural drawing for a door replacement project at the Fermi National Accelerator Laboratory. The technical drawing includes two specific details: a door jamb detail and a door head detail, both drawn at a 3" = 1'-0" scale. The drawings specify critical installation requirements including:

Masonry and construction specifications involve using 12" CMU (concrete masonry unit) walls, filling door frames with mortar per NFPA-80 standards, installing masonry anchors (3 per jamb), and anchoring the door frame to the bond beam underside using Tapcons or masonry anchors. Additional architectural finishing requirements include applying sealant on both sides, replacing gypsum wallboard (GWB) as needed, providing corner and L-beads, and confirming the header is grouted solid. The project is associated with the United States Department of Energy and Fermi Research Alliance LLC, with a noted date of 08/21/25.

View the file

Other files

File Type Posted
c1fb5c05-26b0-4cf5-a477-34d86dbf9e01.pdf PDF
ISD-E_Section 08113 Hollow metal doors.pdf PDF
Amendment No. 2 Fermilab Cross Gallery Southwest Annex Refresh Project.pdf PDF
Questions for RFP ISD-371462-RO.pdf PDF
ISD-E_Section 087100 Door Hardware.pdf PDF
Amendment No. 1 Fermilab Cross Gallery Southwest Annex Refresh Project.pdf PDF
DOOR HARDWARE SCHEDULE- SINGLE DOOR-1 HOUR.pdf PDF
Exhibit B - 010010_General_Requirements.pdf PDF
Exhibit C - 013100_Environment Safety and Health Requirements.pdf PDF
Exhibit D - 014100_Quality_Requirements.pdf PDF
1.0 RFP ISD-366322-RO.pdf PDF
Exhibit G - Bond Bid FL-41.pdf PDF
Exhibit I - Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit M - Proposal Certifications Form PUR-466_FFDG.pdf PDF
Exhibit N - Sample Subcontract.pdf PDF
Exhibit O - Summary of Required RFP Submittal Documents.pdf PDF
Exhibit E - FFDG General Terms and Conditions for Construction (01.2025).pdf PDF
Exhibit A - SOW Cross Gallery Southwest Annex Refresh Project.pdf PDF
Exhibit F - 2025 Construction Insurance Requirements.pdf PDF
Exhibit P - Proposal Form ISD-371462-RO Cross Gallery Southwest Annex Refresh Project.pdf PDF
Exhibit A1 - SWA PES_RF site map.jpg JPG image
Exhibit H - Bond Payment FL-42.pdf PDF
Exhibit J - Construction Environmental Safety Health Certification (CESHC).pdf PDF
Exhibit K - Statement of Acknowledgment (SF-1413).pdf PDF
Exhibit L - SARC_Subcontractor Annual RepsCerts Rev 4_FFDG.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C M

U

2" SEE DOOR SCHEDULE

M.O.

MASONRY ANCHORS 3 PER JAMB

DOOR FRAME MUST BE FILLED WITH MORTAR AS PER NFPA-80

SEALANT BOTH SIDES ALL AROUND

PROVIDE GWB CORNER BEADREPLACE GWB AS NEEDED ALL AROUND

THRESHOLD

12" CMU

SEALANT ON BOTH

SIDES ALL AROUND

DOOR FRAME MUST BE

FILLED WITH MORTAR AS

PER NPFA-80. ANCHOR

FRAME TO UNDERSIDE OF

BOND BEAM WITH TAPCONS

OR MASONRY ANCHOR AS

PER MANUFACTURER

GUIDELINES

PROVIDE GWB

CORNER BEAD

REPLACE GWB AS NEEDED

ALL AROUND

CONFIRM HEADER IS GROUTED SOLID

PROVIDE GWB L-BEAD

FERMI NATIONAL ACCELERATOR

PROJECT

UNITED STATES DEPARTMENT OF

08/21/25

PROJECT NAMEDOOR DETAILS AND SCHEDULES

ISD-SK-01

3" = 1'-0"ISD-SK-01

1 DOOR JAMB DETAIL

3" = 1'-0"ISD-SK-01

2 DOOR HEAD DETAIL

SWA- DOOR REPLACEMENT

DOOR ELEVATION

Sheets
ISD-SK-01 - DOOR DETAILS AND SCHEDULES