This document is a detailed architectural drawing for a door replacement project at the Fermi National Accelerator Laboratory. The technical drawing includes two specific details: a door jamb detail and a door head detail, both drawn at a 3" = 1'-0" scale. The drawings specify critical installation requirements including:
Masonry and construction specifications involve using 12" CMU (concrete masonry unit) walls, filling door frames with mortar per NFPA-80 standards, installing masonry anchors (3 per jamb), and anchoring the door frame to the bond beam underside using Tapcons or masonry anchors. Additional architectural finishing requirements include applying sealant on both sides, replacing gypsum wallboard (GWB) as needed, providing corner and L-beads, and confirming the header is grouted solid. The project is associated with the United States Department of Energy and Fermi Research Alliance LLC, with a noted date of 08/21/25.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C M
U
2" SEE DOOR SCHEDULE
M.O.
MASONRY ANCHORS 3 PER JAMB
DOOR FRAME MUST BE FILLED WITH MORTAR AS PER NFPA-80
SEALANT BOTH SIDES ALL AROUND
PROVIDE GWB CORNER BEADREPLACE GWB AS NEEDED ALL AROUND
THRESHOLD
12" CMU
SEALANT ON BOTH
SIDES ALL AROUND
DOOR FRAME MUST BE
FILLED WITH MORTAR AS
PER NPFA-80. ANCHOR
FRAME TO UNDERSIDE OF
BOND BEAM WITH TAPCONS
OR MASONRY ANCHOR AS
PER MANUFACTURER
GUIDELINES
PROVIDE GWB
CORNER BEAD
REPLACE GWB AS NEEDED
ALL AROUND
CONFIRM HEADER IS GROUTED SOLID
PROVIDE GWB L-BEAD
FERMI NATIONAL ACCELERATOR
PROJECT
UNITED STATES DEPARTMENT OF
08/21/25
PROJECT NAMEDOOR DETAILS AND SCHEDULES
ISD-SK-01
3" = 1'-0"ISD-SK-01
1 DOOR JAMB DETAIL
3" = 1'-0"ISD-SK-01
2 DOOR HEAD DETAIL
SWA- DOOR REPLACEMENT
DOOR ELEVATION