About this file
This file contains architectural drawings and specifications for window replacement at the FAA's Salt Lake Air Route Traffic Center Interim Service Building (ISB). The drawings show detailed building elevations for all four sides (north, south, east, west) with window dimensions and types marked, including 3x3, 4x6, and 4x10 window units along with metal siding, downspouts, and concrete foundation elements.
The specifications detail requirements for vinyl-framed windows (Section 085313) including performance standards, testing, warranties, and installation procedures. Key requirements include WDMA certification, minimum CW performance class, SHGC ratings of 0.40-0.27, and sound transmission ratings of 26-30 STC/OITC. Approved manufacturers include Jeldwen, Plygem, BPI, Milgard, and Amsco. The windows must be impact-resistant UV-stabilized PVC with integral black finish, dual glazing system, and full perimeter weather stripping. A 10-year warranty is required. The specifications also include detailed closeout procedures (Section 017700) covering substantial completion, final completion, warranties, cleaning, and project record documentation requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Response - ZLC Windows.pdf | ||
| Sol_6973GH-25-R-00113_Amd_0001.pdf | ||
| 6973GH-25-R-00113.pdf | ||
| ISB Window Replacement SOW.pdf | ||
| USDoL Wage Determination.pdf | ||
| Past Performance Questionnaire (PPQ).pdf | ||
| 6973GH-25-R-00113.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Benjamin D-CTR Jacob Text Box ISB and AAS Building Window Replacement Project
Not in
S co pe
Benjamin D-CTR Jacob Text Box
NORTH ELEVATION
NOT TO SCALE
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
4X10 WINDOW
4X10 WINDOW
Benjamin D-CTR Jacob
4X10 WINDOW
4X10 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob Text Box ISB and AAS Building Drawing is to be used for reference only.
SOUTH ELEVATION
NOT TO SCALE
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob 3x6 WINDOW
3X6 WINDOW
Benjamin D-CTR Jacob Text Box
EAST ELEVATION
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob Text Box
WEST ELEVATION
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
3X3 WINDOW
3X3 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X6 WINDOW
4X6 WINDOW
Benjamin D-CTR Jacob
4X3 WINDOW
4X3 WINDOW
Benjamin D-CTR Jacob Text Box
AS-BUILT WINDOW DETAILS
TO BE USED FOR REFERENCE ONLY.
DISREGARD REMAINDER OF DRAWING INFORMATION
Benjamin D-CTR Jacob Polygon
Benjamin D-CTR Jacob
AS-BUILT WINDOW DETAILS
TO BE USED FOR REFERENCE ONLY.
DISREGARD REMAINDER OF DRAWING INFORMATION
Benjamin D-CTR Jacob Polygon
Benjamin D-CTR Jacob
VINYL WINDOWS 085313 - 1
SECTION 085313 - VINYL WINDOWS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes vinyl-framed windows.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
2. Review, discuss, and coordinate the interrelationship of vinyl windows with other exterior wall components. Include provisions for anchoring, flashing, weeping, sealing perimeters, and protecting finishes.
3. Review and discuss the sequence of work required to construct a watertight and weathertight exterior building envelope.
4. Inspect and discuss the condition of substrate and other preparatory work performed by other trades.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include construction details, material descriptions, glazing and fabrication methods, dimensions of individual components and profiles, hardware, and finishes for vinyl windows.
B. Shop Drawings: For vinyl windows.
1. Include plans, elevations, sections, hardware, accessories, insect screens, operational clearances, and details of installation, including anchor, flashing, and sealant installation.
C. Samples for Initial Selection: For units with factory-applied finishes.
1. Include Samples of hardware and accessories involving color selection.
D. Samples for Verification: For vinyl windows and components required, prepared on Samples of size indicated below:
1. Exposed Finishes: 2 by 4 inches .
2. Exposed Hardware: Full-size units.
VINYL WINDOWS 085313 - 2
1.4 INFORMATIONAL SUBMITTALS
A. Qualification Data: For manufacturer and Installer.
B. Product Test Reports: For each type of vinyl window, for tests performed by a qualified testing agency.
C. Field quality-control reports.
D. Sample Warranties: For manufacturer's warranties.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: A manufacturer capable of fabricating vinyl windows that meet or exceed performance requirements indicated and of documenting this performance by test reports and calculations.
B. Installer Qualifications: An installer acceptable to vinyl window manufacturer for installation of units required for this Project.
1.6 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace vinyl windows that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Failure to meet performance requirements.
b. Structural failures including excessive deflection, water leakage, and air infiltration.
c. Faulty operation of movable sash and hardware.
d. Deterioration of materials and finishes beyond normal weathering.
e. Failure of insulating glass.
2. Warranty Period:
a. Window: 10 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Source Limitations: Obtain vinyl windows from single source from single manufacturer.
VINYL WINDOWS 085313 - 3
2.2 WINDOW PERFORMANCE REQUIREMENTS
A. Product Standard: Comply with AAMA/WDMA/CSA 101/I.S.2/A440 for definitions and minimum standards of performance, materials, components, accessories, and fabrication unless more stringent requirements are indicated.
1. Window Certification: WDMA certified with label attached to each window.
B. Performance Class and Grade: AAMA/WDMA/CSA 101/I.S.2/A440 as follows:
1. Minimum Performance Class: CW
C. Solar Heat-Gain Coefficient (SHGC): NFRC 200 maximum whole-window SHGC of 0.40, 0.30, or 0.27.
D. Sound Transmission Class (STC): Rated for not less than 26 or 30STC when tested for laboratory sound transmission loss according to ASTM E 90 and determined by ASTM E 413.
E. Outside-Inside Transmission Class (OITC): Rated for not less than 22 ,26, or 30 OITC when tested for laboratory sound transmission loss according to ASTM E 90 and determined by
ASTM E 1332.
F. Windborne-Debris-Impact Resistance: Capable of resisting impact from windborne debris based on testing glazed windows identical to those specified, according to ASTM E 1886 and testing information in ASTM E 1996 and requirements of authorities having jurisdiction.
2.3 VINYL WINDOWS
A. List of manufacturers
1. Jeldwen
2. Plygem
3. BPI
4. Milgard
5. Amsco
6. Other manufactures and products may be submitted.
B. Operating Types: Provide the following operating types in locations indicated on Drawings:
1. Horizontal sliding.
2. Fixed.
C. Frames and Sashes: Impact-resistant, UV-stabilized PVC complying with
AAMA/WDMA/CSA 101/I.S.2/A440.
1. Finish: Integral color, black.
2. Gypsum Board Returns: Provide at interior face of frame.
D. Glass: Clear annealed glass, ASTM C 1036, Type 1, Class 1, q3.
E. Glazing System: Manufacturer's standard factory-glazing system that produces weathertight seal.
VINYL WINDOWS 085313 - 4
1. Dual Glazing System:
a. Interior Lite: Glass
b. Exterior Lite: Glass
F. Hardware, General: Provide manufacturer's standard hardware fabricated from aluminum, stainless steel, carbon steel complying with AAMA 907, or other corrosion-resistant material compatible with adjacent materials; designed to smoothly operate, tightly close, and securely lock windows, and sized to accommodate sash weight and dimensions.
G. Horizontal-Sliding Window Hardware:
1. Sill Cap/Track:Rigid PVC or other weather-resistant plastic track with manufacturer's standard integral color of dimensions and profile indicated; designed to comply with performance requirements indicated and to drain to the exterior.
2. Locks and Latches: Allow unobstructed movement of the sash across adjacent sash in direction indicated and operated from the inside only.
3. Roller Assemblies: Low-friction design.
H. Weather Stripping: Provide full-perimeter weather stripping for each operable sash unless otherwise indicated.
I. Fasteners: Noncorrosive and compatible with window members, trim, hardware, anchors, and other components.
1. Exposed Fasteners: Do not use exposed fasteners to greatest extent possible. For application of hardware, use fasteners that match finish hardware being fastened.
2.4 INSECT SCREENS
A. General: Fabricate insect screens to integrate with window frame. Provide screen for each operable exterior sash. Screen wickets are not permitted.
1. Type and Location: Full, outside for sliding sashes.
B. Aluminum Frames: Manufacturer's standard aluminum alloy complying with SMA 1004 or SMA 1201. Fabricate frames with mitered or coped joints or corner extrusions, concealed fasteners, and removable PVC spline/anchor concealing edge of frame.
1. Tubular Framing Sections and Cross Braces: Roll formed from aluminum sheet.
2. Finish for Interior Screens: Baked-on organic coating in Black.
3. Finish for Exterior Screens: Matching color and finish of cladding.
C. Aluminum Wire Fabric: 18-by-16 (1.1-by-1.3-mm) mesh of 0.011-inch- (0.28-mm-) diameter, coated aluminum wire.
1. Wire-Fabric Finish: Black
VINYL WINDOWS 085313 - 5
2.5 FABRICATION
A. Fabricate vinyl windows in sizes indicated. Include a complete system for installing and anchoring windows.
B. Glaze vinyl windows in the factory.
C. Weather strip each operable sash to provide weathertight installation.
D. Mullions: Provide mullions and cover plates, compatible with window units, complete with anchors for support to structure and installation of window units. Allow for erection tolerances and provide for movement of window units due to thermal expansion and building deflections.
Provide mullions and cover plates capable of withstanding design wind loads of window units.
Provide manufacturer's standard finish to match window units.
E. Hardware: Mount hardware through double walls of vinyl extrusions or provide corrosion-resistant reinforcement.
F. Complete fabrication, assembly, finishing, hardware application, and other work in the factory to greatest extent possible. Disassemble components only as necessary for shipment and installation. Allow for scribing, trimming, and fitting at Project site.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine openings, substrates, structural support, anchorage, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Verify rough opening dimensions, levelness of sill plate, and operational clearances.
C. Examine wall flashings, vapor retarders, water and weather barriers, and other built-in components to ensure weathertight window installation.
D. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Comply with manufacturer's written instructions for installing windows, hardware, accessories, and other components. For installation procedures and requirements not addressed in manufacturer's written instructions, comply with installation requirements in ASTM E 2112.
B. Install windows level, plumb, square, true to line, without distortion, anchored securely in place to structural support, and in proper relation to wall flashing and other adjacent construction to produce weathertight construction.
VINYL WINDOWS 085313 - 6
3.3 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections.
B. Windows will be considered defective if they do not pass tests and inspections.
C. Prepare test and inspection reports.
3.4 ADJUSTING, CLEANING, AND PROTECTION
A. Adjust operating sashes and hardware for a tight fit at contact points and weather stripping for smooth operation and weathertight closure.
B. Clean exposed surfaces immediately after installing windows. Remove excess sealants, glazing materials, dirt, and other substances.
1. Keep protective films and coverings in place until final cleaning.
C. Remove and replace sashes if glass has been broken, chipped, cracked, abraded, or damaged during construction period.
D. Protect window surfaces from contact with contaminating substances resulting from construction operations. If contaminating substances do contact window surfaces, remove contaminants immediately according to manufacturer's written instructions.
END OF SECTION 085313
PROJECT RECORD DOCUMENTS 017839 - 1
SECTION 017839 - PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for project record documents, including the following:
1. Record Drawings.
2. Record Specifications.
3. Record Product Data.
4. Miscellaneous record submittals.
B. Related Requirements:
1. Section 017700 "Closeout Procedures" for general closeout procedures.
1.2 CLOSEOUT SUBMITTALS
A. Record Drawings: Comply with the following:
1. Number of Copies: Submit three set(s) of marked-up record prints.
2. Number of Copies: Submit copies of record Drawings as follows:
a. Initial Submittal:
1) Submit record digital data files of marked-up record prints.
2) FAA will indicate whether general scope of changes, additional information recorded, and quality of drafting are acceptable.
b. Final Submittal:
1) Submit PDF electronic files of scanned record prints and three set(s) of prints.
B. Record Specifications: Submit annotated PDF electronic files of Project's Specifications, including addenda and contract modifications.
C. Record Product Data: Submit annotated PDF electronic files and directories of each submittal.
D. Miscellaneous Record Submittals: See other Specification Sections for miscellaneous record-keeping requirements and submittals in connection with various construction activities. Submit annotated PDF electronic files and directories of each submittal.
1.3 RECORD DRAWINGS
A. Record Prints: Maintain one set of marked-up paper copies of the Contract Drawings and Shop Drawings, incorporating new and revised drawings as modifications are issued.
PROJECT RECORD DOCUMENTS 017839 - 2
1. Preparation: Mark record prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to provide information for preparation of corresponding marked-up record prints.
a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later.
b. Accurately record information in an acceptable drawing technique.
c. Record data as soon as possible after obtaining it.
d. Record and check the markup before enclosing concealed installations.
e. Cross-reference record prints to corresponding photographic documentation.
2. Content: Types of items requiring marking include, but are not limited to, the following:
a. Dimensional changes to Drawings.
b. Revisions to details shown on Drawings.
c. Depths of foundations.
d. Locations and depths of underground utilities.
e. Revisions to routing of piping and conduits.
f. Revisions to electrical circuitry.
g. Actual equipment locations.
h. Duct size and routing.
i. Locations of concealed internal utilities.
j. Changes made by Change Order or Change Directive.
k. Changes made following Architect's written orders.
l. Details not on the original Contract Drawings.
m. Field records for variable and concealed conditions.
n. Record information on the Work that is shown only schematically.
3. Mark the Contract Drawings and Shop Drawings completely and accurately. Use personnel proficient at recording graphic information in production of marked-up record prints.
4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.
5. Mark important additional information that was either shown schematically or omitted from original Drawings.
6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable.
B. Format: Identify and date each record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location.
1. Record Prints: Organize record prints into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets.
2. Format: Annotated PDF electronic file with comment function enabled.
3. Record Digital Data Files: Organize digital data information into separate electronic files that correspond to each sheet of the Contract Drawings. Name each file with the sheet identification. Include identification in each digital data file.
4. Identification: As follows:
a. Project name.
PROJECT RECORD DOCUMENTS 017839 - 3
b. Date.
c. Designation "PROJECT RECORD DRAWINGS."
d. Name of Contractor.
1.4 RECORD SPECIFICATIONS
A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications.
1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.
2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected.
3. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made.
4. For each principal product, indicate whether record Product Data has been submitted in operation and maintenance manuals instead of submitted as record Product Data.
5. Note related Change Orders record Product Data, and record Drawings where applicable.
B. Format: Submit record Specifications as annotated PDF electronic file.
1.5 RECORD PRODUCT DATA
A. Recording: Maintain one copy of each submittal during the construction period for project record document purposes. Post changes and revisions to project record documents as they occur; do not wait until end of Project.
B. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal.
1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.
2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation.
3. Note related Change Orders, record Specifications, and record Drawings where applicable.
C. Format: Submit record Product Data as annotated PDF electronic file.
1. Include record Product Data directory organized by Specification Section number and title, electronically linked to each item of record Product Data.
1.6 MISCELLANEOUS RECORD SUBMITTALS
A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference.
B. Format: Submit miscellaneous record submittals as PDF electronic file.
PROJECT RECORD DOCUMENTS 017839 - 4
1. Include miscellaneous record submittals directory organized by Specification Section number and title, electronically linked to each item of miscellaneous record submittals.
1.7 MAINTENANCE OF RECORD DOCUMENTS
A. Maintenance of Record Documents: Store record documents in the field office apart from the Contract Documents used for construction. Do not use project record documents for construction purposes. Maintain record documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to project record documents for FAA reference during normal working hours.
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION 017839
CLOSEOUT PROCEDURES 017700 - 1
SECTION 017700 - CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:
1. Substantial Completion procedures.
2. Final completion procedures.
3. Warranties.
4. Final cleaning.
5. Repair of the Work.
B. Related Requirements:
1. Section 017839 "Project Record Documents" for submitting Record Drawings, Record
Specifications, and Record Product Data.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of cleaning agent.
B. Contractor's List of Incomplete Items: Initial submittal at Substantial Completion.
C. Certified List of Incomplete Items: Final submittal at final completion.
1.3 CLOSEOUT SUBMITTALS
A. Certificates of Release: From authorities having jurisdiction.
B. Certificate of Insurance: For continuing coverage.
C. Field Report: For pest control inspection.
1.4 MAINTENANCE MATERIAL SUBMITTALS
A. Schedule of Maintenance Material Items: For maintenance material submittal items specified in other Sections.
1.5 SUBSTANTIAL COMPLETION PROCEDURES
A. Contractor's List of Incomplete Items: Prepare and submit a list of items to be completed and corrected (Contractor's punch list), indicating the value of each item on the list and reasons why the Work is incomplete.
CLOSEOUT PROCEDURES 017700 - 2
B. Submittals Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request.
1. Certificates of Release: Obtain and submit releases from authorities having jurisdiction permitting Owner unrestricted use of the Work and access to services and utilities.
Include occupancy permits, operating certificates, and similar releases.
2. Submit closeout submittals specified in other Division 01 Sections, including project record documents, operation and maintenance manuals, damage or settlement surveys, property surveys, and similar final record information.
3. Submit closeout submittals specified in individual Sections, including specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.
4. Submit maintenance material submittals specified in individual Sections, including tools, spare parts, extra materials, and similar items, and deliver to location designated by the FAA. Label with manufacturer's name and model number.
a. Schedule of Maintenance Material Items: Prepare and submit schedule of maintenance material submittal items, including name and quantity of each item and name and number of related Specification Section. Obtain Owner's signature for receipt of submittals.
5. Submit sustainable design submittals not previously submitted.
6. Submit changeover information related to Owner's occupancy, use, operation, and maintenance.
C. Procedures Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request.
1. Advise Owner of pending insurance changeover requirements.
2. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and systems.
3. Complete final cleaning requirements.
4. Touch up paint and otherwise repair and restore marred exposed finishes to eliminate visual defects.
D. Inspection: Submit a written request for inspection to determine Substantial Completion a minimum of 10days prior to date the Work will be completed and ready for final inspection and tests. On receipt of request, FAA will either proceed with inspection or notify Contractor of unfulfilled requirements. FAA will notify Contractor of items, either on Contractor's list or additional items identified, that must be completed or corrected.
1. Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for final completion.
1.6 FINAL COMPLETION PROCEDURES
A. Submittals Prior to Final Completion: Before requesting final inspection for determining final completion, complete the following:
CLOSEOUT PROCEDURES 017700 - 3
1. Certified List of Incomplete Items: Submit list of items to be completed or corrected (punch list), endorsed and dated by FAA. Certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
2. Certificate of Insurance: Submit evidence of final, continuing insurance coverage complying with insurance requirements.
B. Inspection: Submit a written request for final inspection to determine acceptance a minimum of 10 days prior to date the work will be completed and ready for final inspection and tests. On receipt of request, FAA will either proceed with inspection or notify Contractor of unfulfilled requirements.
1. Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
1.7 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Organization of List: Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
1. Organize list of spaces in sequential order.
2. Organize items applying to each space by major element.
3. Include the following information at the top of each page:
a. Project name.
b. Date.
c. Name of Contractor.
d. Page number.
4. Submit list of incomplete items in the following format:
a. MS Excel electronic file. FAA will return annotated file.
1.8 SUBMITTAL OF PROJECT WARRANTIES
A. Time of Submittal: Submit written warranties on request of FAA for designated portions of the Work where warranties are indicated to commence on dates other than date of Substantial Completion, or when delay in submittal of warranties might limit Owner's rights under warranty.
B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of designated portions of the Work that are completed and occupied or used by Owner during construction period by separate agreement with Contractor.
C. Organize warranty documents into an orderly sequence based on the table of contents of Project Manual.
CLOSEOUT PROCEDURES 017700 - 4
D. Warranty Electronic File: Provide warranties and bonds in PDF format. Assemble complete warranty and bond submittal package into a single electronic PDF file with bookmarks enabling navigation to each item. Provide bookmarked table of contents at beginning of document.
1. Submit by email to FAA.
E. Warranties in Paper Form:
1. Bind warranties and bonds in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch (215-by-280-mm) paper.
2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.
3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.
F. Provide additional copies of each warranty to include in operation and maintenance manuals.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
1. Use cleaning products that comply with Green Seal's GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels.
PART 3 - EXECUTION
3.1 FINAL CLEANING
A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.
1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a designated portion of Project:
CLOSEOUT PROCEDURES 017700 - 5
a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.
c. Rake grounds that are not planted, mulched, or paved to a smooth, even-textured surface.
d. Remove tools, construction equipment, machinery, and surplus material from Project site.
e. Remove snow and ice to provide safe access to building.
f. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.
g. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.
h. Sweep concrete floors broom clean in unoccupied spaces.
i. Vacuum carpet and similar soft surfaces, removing debris and excess nap; clean according to manufacturer's recommendations if visible soil or stains remain.
j. Clean transparent materials, including mirrors and glass in doors and windows.
Remove glazing compounds and other noticeable, vision-obscuring materials.
Polish mirrors and glass, taking care not to scratch surfaces.
k. Remove labels that are not permanent.
l. Wipe surfaces of mechanical and electrical equipment[, elevator equipment,] and similar equipment. Remove excess lubrication, paint and mortar droppings, and other foreign substances.
m. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water exposure.
n. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.
o. Clean ducts, blowers, and coils if units were operated without filters during construction or that display contamination with particulate matter on inspection.
p. Leave Project clean and ready for occupancy.
C. Construction Waste Disposal: Comply with waste disposal requirements a directed by FAA.
3.2 REPAIR OF THE WORK
A. Complete repair and restoration operations before requesting inspection for determination of Substantial Completion.
B. Repair, or remove and replace, defective construction. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. Where damaged or worn items cannot be repaired or restored, provide replacements. Remove and replace operating components that cannot be repaired.
Restore damaged construction and permanent facilities used during construction to specified condition.
1. Remove and replace chipped, scratched, and broken glass, reflective surfaces, and other damaged transparent materials.
CLOSEOUT PROCEDURES 017700 - 6
2. Touch up and otherwise repair and restore marred or exposed finishes and surfaces.
Replace finishes and surfaces that that already show evidence of repair or restoration.
a. Do not paint over "UL" and other required labels and identification, including mechanical and electrical nameplates. Remove paint applied to required labels and identification.
3. Replace parts subject to operating conditions during construction that may impede operation or reduce longevity.
4. Replace burned-out bulbs, bulbs noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.
END OF SECTION 017700
| PROJECT NAME |
| NORTH ELEVATION |
| SOUTH ELEVATION |
| EAST ELEVATION |
| WEST ELEVATION |
| WINDOW DETAILS PAGE 1 |
| WINDOW DETAILS PAGE 2 |
| VINYL WINDOW SPECIFICATION |
| CLOSEOUT PROCEDURES SPECIFICATION |
| PROJECT RECORD DOCUMENTS SPECIFICATION |