IP for CM - Full Set of Drawings.pdf

PDF 17 MB Posted

Attached to
Z2DA--642-17-100 | Renovate Inpatient Pharmacy for Chemo I. V. Mixing
Solicitation number
36C24421R0046
Issued by

About this file

This document provides details on a federal solicitation to renovate inpatient pharmacy spaces at a Department of Veterans Affairs medical center. The solicitation seeks general construction and alterations to renovate existing compounding, office, files, and mechanical equipment rooms into new chemo mixing labs, a hazardous chemical room, office space, and a relocated dry drug storage area. A mandatory site visit will be held on March 23, 2021 for up to two representatives from each firm, who must confirm attendance by contacting the contracting officer by the specified date and time due to social distancing requirements. The work is to be completed at the Veterans Affairs Medical Center in Philadelphia, Pennsylvania under Solicitation Number 36C24421R0046 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4.

View the file

Other files

File Type Posted
36C24421R0046 0003.docx DOCX document
Revised Dwg AE 111.pdf PDF
Revised Dwg ES101.pdf PDF
Addnl Dwg AE 111.1.pdf PDF
Revised Dwg S301.pdf PDF
Camera Spec.pdf PDF
36C24421R0046 0002.docx DOCX document
36C24421R0046 0001.docx DOCX document
IP for CM - Full Set of Specifications.pdf PDF
36C24421R0046.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAMC

PHILADELPHIA

NORTH

A R C H I T E C T S E N G I N E E R S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F ile

P a th

/1

/2

:3

:0

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ENGINEER

SCALE:

H.F. LENZ COMPANY

1407 Scalp Avenue Johnstown, PA 15904

Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants

1/8" = 1'-0"

Philadelphia VA Medical Center 3900 Woodland Ave., Philadelphia, PA 19104

08/27/2020

642-17-100

DRKBJ

Renovate Inpatient Pharmacy for Chemotherapy I.V. Mixing

BID SETCOVER SHEET

GI101

Department of Veterans Affairs

A/E RENOVATE INPATIENT PHARMACY

FOR CHEMOTHERAPY I.V. MIXING

CORPORAL MICHAEL J. CRESCENZ VA MEDICAL CENTER

3900 WOODLAND AVENUE, PHILADELPHIA, PA 19104

LOCATION MAP DRAWING LIST

APPLICABLE CODES PROJECT CONTACT DIRECTORY

Approved by Medical Center Director Approved by Project Section Supervisor

Approved by Project CORApproved by Medical Center Assistant Director

Approved by Infection Control Nurse

Approved by Chief Engineer

Approved by Safety Officer

Approved by Bio-Med Engineer

CONTRACTING OFFICER REPRESENTATIVE (COR)

ARCHITECT

MEP/FP ENGINEER

FREDERICK SCHULTZ

PHILADELPHIA VAMC

3900 WOODLAND AVENUE, BUILDING 5

PHONE: (215) 823-5800 x5771 Frederick.Schultz@va.gov

CB DESIGN GROUP, INC

KEN JONES

11720 BELTSVILLE DRIVE, SUITE 350

CALVERTON, MARYLAND 20705

CELL: (443) 388-7351

kjones@cbdg-ae.com

H.F. LENZ COMPANY

BRIAN RAGER

1407 SCALP AVENUE

JOHNSTOWN, PA 15904

PHONE: (814) 269-9312

brager@hflenz.com

GENERAL INFORMATION

ARCHITECTURAL

PLUMBING

MECHANICAL

ELECTRICAL

GI101 COVER SHEET

GI102 SYMBOLS, ABBREVIATIONS AND NOTES

GI103 LIFE SAFETY PLAN

GI104 DOOR SCHEDULE AND DETAILS

AE101 PHASES 2A & 2B

AE102 PHASES 2C & 3A

AE103 PHASES 3B & 3C

AE104 FINISH PLAN, EQUIPMENT PLAN & PARTITION TYPES

AE105 INTERIOR ELEVATIONS

AE106 REFLECTED CEILING PLANS - DEMOLITION AND NEW WORK

AE107 MISCELLANEOUS DETAILS

AE111 EXTERIOR ELEVATIONS AND DETAILS

AE112 EXTERIOR ELEVATIONS AND DETAILS

P001 PLUMBING NOTES, SYMBOLS, ABBREVIATIONS & SCHEDULE

PD101 PLUMBING SECOND FLOOR DEMOLITION

P101 PLUMBING SECOND FLOOR NEW WORK

M001 MECHANICAL NOTES, SYMBOLS, & ABBREVIATIONS

MD101 MECHANICAL SECOND FLOOR DEMO WORK DUCTWORK & PIPING

MD401 MECHANICAL ROOM PLAN 3D100C - DEMOLITION WORK

MH101 MECHANICAL SECOND FLOOR NEW WORK - DUCTWORK AND PIPING

MH102 MECHANICAL ROOF PLAN - PENTHOUSE 3D100C & NINTH FLOOR

MH301 MECHANICAL SECTIONS

MH302 MECHANICAL SECTIONS

MH401 MECHANICAL EQUIPMENT ROOM PLAN 3D100C - NEW WORK

MH402 MECHANICAL THIRD FLOOR PLAN TEMPORARY AC-14

MH901 MECHANICAL 3D ISOMETRIC

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M601 MECHANICAL SCHEDULES

MI701 MECHANICAL CONTROLS

MI702 MECHANICAL CONTROLS - 1-3NE-AC-14

MI703 MECHANICAL CONTROLS - 1-3NE-PHARM-AC-1

E001 ELECTRICAL NOTES, SYMBOLS, & ABBREVIATIONS

ED101 ELECTRICAL PLANS - SECOND & THIRD FLOORS - DEMOLITION

EL101 ELECTRICAL SECOND FLOOR LIGHTING NEW WORK

EP101 ELECTRICAL FLOOR PLANS - POWER NEW WORK

EP102 OVERALL THIRD FLOOR ELECTRICAL PLAN

ES101 ELECTRICAL FLOOR PLANS - SIGNAL NEW WORK

E501 ELECTRICAL DETAILS

E502 ELECTRICAL DETAILS

E601 ELECTRICAL SCHEDULES

MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1)

LIFE SAFETY CODE NFPA 101 - 2018

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

VA DESIGN MANUALS:

FIRE PROTECTION, SEVENTH EDITION - DECEMBER 2015

INTERIOR DESIGN MANUAL, MAY 2008

VA BARRIER FREE DESIGN STANDARD (PG-18-13), REV

11/1/18

USP CHAPTER 797, PHARMACEUTICAL COMPOUNDING - STERILE

PREPARATIONS, 2019

USP CHAPTER 800, HAZARDOUS DRUGS - HANDLING IN

HEALTHCARE, 2019FIRE PROTECTION

FP101 FIRE PROTECTION SECOND FLOOR NEW WORK

FP102 FIRE PROTECTION THIRD FLOOR NEW WORK

STRUCTURAL

S001 STRUCTURAL GENERAL NOTES

S101 STRUCTURAL FRAMING PLANS

S102 STRUCTURAL FRAMING PLAN AND SECTIONS @ LOUVERS

S301 SECTIONS AND DETAILS

S302 SECTIONS AND DETAILS

S900 3D RENDERING

Approved by Chief of Police

& AND

@ AT

C CENTERLINE

# NUMBER

AB ANCHOR BOLT

ABV ABOVE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH

DISABILITIES ACT

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALUM ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AUTO AUTOMATIC

AVG AVERAGE

BD BOARD

BLDG BUILDING

BLK BLOCK

BM BEAM

BOT BOTTOM

BRG BEARING

BEL BELOW

BR BUMPER RAIL

BRK BRICK

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CCT CUBICLE CURTAIN TRACK

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CT CERAMIC TILE

CLG CEILING

CL CLOSET

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CU CUBIC

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DOOR OPENING

DOZ DOZEN

DP DAMPPROOFING

DR DOOR

DWG DRAWING

DWGS DRAWINGS

DWR DRAWER

E EAST

EA EXHAUST AIR, EACH

EL ELEVATION

ELEV ELEVATION

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EP ELECTRICAL PANELBOARD

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXP EXPANSION

EJ EXPANSION JOINT

EXIST EXISTING

EXT EXTERIOR

FA FIRE ALARM

FB FACE BRICK

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISH FACE

FHC FIRE HOSE CABINET

FIN FINISH

FLR FLOOR

FLUOR FLUORESCENT

FO __ FACE OF __

FOC FACE OF CONCRETE

FOS FACE OF STUD

FOW FACE OF WALL

FPRF FIREPROOF(ING)

FR FIRE RATING, FRAME

FRMG FRAMING

FS FULL SIZE

FT FOOT OR FEET

FTG FOOTING

FUR FURRING

FUT FUTURE

GC GENERAL CONTRACTOR

GA GAUGE

GAL GALLON

GALV GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GL GLASS

GND GROUND

GR GRADE

GWB GYPSUM WALLBOARD

GYP BD GYPSUM WALLBOARD

HB HOSE BIBB

HC HOLLOW CORE

HD HEAD

HDWR HARDWARE

HDWD HARDWOOD

HT HEIGHT

HNDRL HANDRAIL

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMF HOLLOW METAL FRAME

HR HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HVAC HEATING, VENTILATION, AIR

CONDITIONING

IBC INTERNATIONAL BUILDING

CODE

ID IDENTIFICATION, INSIDE

DIAMETER / DIMENSION

IN INCH

INCL INDLUDE(D)

INSUL INSULATION

INT INTERIOR

INV INVERT

JAN JANITOR

JST JOIST

JT JOINT

KP KICK PLATE

KO KNOCKOUT

L LENGTH

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUND

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LH LEFT HAND

LIN LINEAR

LIQ LIQUID

LKR LOCKER

LG LONG

LL LEAD LINED

LLV LONG LEG VERTICAL

LP LOW POINT

LRG LARGE

LT LIGHT

LT WT LIGHTWEIGHT

LVR LOUVER

MATL MATERIAL

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MTL METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MP MOP PLATE

MTD MOUNTED

N NORTH

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER /

DIMENSION

OFF OFFICE

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OH OVERHEAD

OZ OUNCE

PAV PAVING

PC PRECAST CONCRETE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PLBG PLUMBING

PMF PREMOLDED FILLER

PR PAIR

PT POINT

PTN PARTITION

QT QUARRY TILE

R RADIUS, RISER

RA RETURN AIR

RAD RADIUS

RB RESILIENT BASE, RUBBER

BASE

RD ROOF DRAIN

RL ROOF LEADER

REF REFERENCE

REFR REFRIGERATOR

REQ'D REQUIRED

REV REVISION

RFI REQUEST FOR

INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

S SOUTH

SA SUPPLY AIR

SC SOLID CORE

SCHED SCHEDULE

SECT SECTION

SH SPRINKLER HEAD

SHT SHEET

SIM SIMILAR

SAN SANITARY

SPEC SPECIFICATION

SPKR SPEAKER

SQ SQUARE

STA STATION

STD STANDARD

STO STORAGE

STL STEEL

SS STAINLESS STEEL

STOR STEERAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TEL TELEPHONE

TEMP TEMPERED

T&G TONGUE AND GROOVE

THK THICK

TOC TOP OF CONCRETE

TOP TOP OF PAVEMENT

TOS TOP OF STEEL

TOW TOP OF WALL

TV TELEVISION

TYP TYPICAL

UNFIN UNFINISHED

UON UNLESS OTHERWISE

NOTED

VB BAPOR BARRIER

VERT VERTICAL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VTR VET THRU ROOF

W WEST

W/ WITH

WD WOOD

W/O WITHOUT

WP WATERPROOF

WT WEIGHT

WWF WELDED WIRE FRAME

ARCHITECTURAL ABBREVIATIONS

NOTE: ALL ABBREVIATIONS SHOWN MAY

NOT BE USED ON THIS PROJECT. CERTAIN

COMMON ABBREVIATIONS MAY NOT BE

SHOWN.

NORTH

NORTH ARROW

Room name

101ROOM TAG

EQUIPMENT TAG

COLUMN GRID TAG 0

A101

BUILDING SECTION

PARTITION TAG

NEW DOOR

CENTERLINE

REVISION CLOUD

BREAK LINE

SPOT ELEVATION

A101

ENLARGED PLAN / DETAIL REFERENCE

x'-

BUILDING ELEVATION

A101

REVISION

INTERIOR ELEVATION

GLAZING TYPE TAG

1tTOILET ACCESSORY TAG

EXISTING COLUMN

GRID TAG

FLOOR LINES IN

EXTERIOR ELEVATION; CENTER

PROPERTY LINE,

BOUNDARY LINES

MATCH LINE

A701

A1

A

SYMBOL LEGEND

EXISTING DOOR

1i

WOOD

WOOD FINISH

ALUMINUM

STEEL

EARTH

GYPSUM - PLASTER

MASONRY -

CONCRETE BLOCK

RIGID INSULATION

BATT INSULATION

PLYWOOD

CONCRETE

MATERIAL SCHEDULE

GENERAL CONDITION NOTES - ARCHITECTURAL

1. PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF

ALTERATIONS WILL BE VACATED. ALL CONTRACTOR WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS BETWEEN 7:00 AM - 3:30 PM UNLESS ADJACENT VA EMPLOYEES ARE DISTURBED BY A PARTICULAR WORK TASK, THEN THAT WORK SHALL BE PREFORMED BETWEEN 4:00 PM - 11:00 PM

2. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET- UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO

CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND RESIDENCE.

3. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION.

4. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES/ SEQUENCING AND TO ENSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION. CONTRACTOR SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS, AND REMOVE SHORING AND BRACING

UPON COMPLETION OF THE PROJECT.

5. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD

CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.

6. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING

SUBSURFACE TO RECEIVE NEW FINISHES DESIGNATED.

7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK.

8. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND

SHEEN.

9. IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHED TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE.

10. WHERE CODED NOTE DESIGNATIONS ARE SHOWN AS "TYP" OR "TYPICAL" IT IS INTENDED THAT THE NOTE

GENERALLY REFERS TO ALL SIMILAR ITEMS OR SURFACES.

11. A HAZARDOUS MATERIALS SURVEY WAS NOT CONDUCTED. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE PROTECTIVE MEASURES FOR ITS WORKERS PRIOR TO THE BEGINNING OF ANY RENOVATION OR

DEMOLITION WORK.

12. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE VA COR FOR REVIEW OF

EXISTING CONDITIONS.

13. PATCH AND FIRE STOP ALL ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS, WALLS, AND

ROOF DECK.

GENERAL ICRA NOTES

NOTE:

CONTRACTOR MUST PROTECT DEMOLITION AND CONSTRUCTION ACTIVITIES IN ACCORDANCE

WITH THE FOLLOWING PROVISIONS:

TYPE OF CONSTRUCTION ACTIVITY: CLASS IV, TYPE D

DURING CONSTRUCTION OF PROJECT:

1. CONTRACTOR SHALL FOLLOW VA/ICRA REGULATIONS IN PERFORMING ALL WORK.

2. CONTRACTOR SHALL COORDINATE WITH THE VA FOR OFF-HOURS ACCESS TO THE FLOORS

ABOVE AND BELOW THE WORK NEEDED FOR MECHANICAL TIE-INS. TEMPORARY ICRA

BARRIERS ARE TO BE INSTALLED AROUND ALL WORK AREAS PRIOR TO CONSTRUCTION.

3. CONTRACTOR SHALL FOLLOW ALL FIRE SAFETY CODES DURING CONSTRUCTION.

4. CONTRACTOR SHALL PROVIDE THE VA TWO (2) WEEKS (14 CALENDAR DAYS) NOTICE PRIOR

TO ANY SYSTEM SHUTDOWN WORK VIA A SHUTDOWN FORM, (FORM TO BE PROVIDED BY

THE VA).

5. BEFORE COMMENCEMENT OF CONSTRUCTION, COORDINATE THE ICRA PROCEDURE WITH

THE FACILITY INFECTION CONTROL DEPARTMENT. CONTRACTOR MUST ACQUIRE AN ICRA

PERMIT FROM INFECTION CONTROL DEPARTMENT PRIOR TO THE START OF CRITICAL

BARRIER AND ICRA BARRIER CONSTRUCTION.

6. COORDINATE WITH THE VA COR FOR ANY PHASING PLAN REQUIREMENTS TO SCHEDULE

SHUTDOWNS, TEMPORARY RELOCATION OR CLOSED DOWN AREAS THAT MAY BE AFFECTED

DUE TO THE RENOVATION OF THE SCHEDULED PROJECT.

7. ALL CRITICAL BARRIER AND ICRA BARRIER WORK TO BE COMPLETED ON SECOND SHIFT

FROM 4:00 PM - 11:00 PM MONDAY - FRIDAY OR ON SATURDAYS AND SUNDAYS. (SEE

CRITICAL BARRIER DETAIL 1/GI102.)

8. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM, PRIOR TO ANY PHASE WORK COMMENCEMENT. HVAC

SYSTEM ISOLATION MATERIALS TO BE REMOVED IN THEIR ENTIRETY, PRIOR TO TURNING

THE SPACE OVER TO THE VA FACILITY AFTER EACH PHASE'S COMPLETION OF WORK.

9. COMPLETE ALL CRITICAL BARRIERS TO 1-HOUR FIRE-RATING I.E. GYP BOARD, PLYWOOD.

PLASTIC, TO SEAL AREA FROM NON-WORK AREA, BEFORE CONSTRUCTION BEGINS.

CRITICAL BARRIERS ARE THE EXTENSION OF EXISTING WALLS TO THE UNDERSIDE OF THE

DECK ABOVE AND ARE TO SEALED WITH FIRE CAULK AT THE DECK/ TOP OF WALL

INTERSECTION AND AROUND ALL GAPS FROM WALL PENETRATIONS OF EXISTING ITEMS

(PIPES CONDUIT, DUCTWORK, ETC.) THAT THE CRITICAL BARRIERS MUST BE BUILT AROUND.

10. WHEN CONSTRUCTING ICRA ANTE-ROOMS, REMOVE AND SECURELY STORE ALL

INTERFERING WALL APPURTENANCES, INCLUDING BUT NOT LIMITED TO HANDRAILS AND

ELECTRICAL DEVICES. ALL ITEMS TO BE SECURELY STORED FOR REINSTALLATION BY THE

CONTRACTOR.

11. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS, CONTRACTORS SHALL MAINTAIN 0.001" NEGATIVE PRESSURE. PROVIDE

DIGITALLY RECORDING GAUGE MOUNTED ON THE OUTSIDE OF THE PERIMETER WALL OF

THE PROJECTS WORKSPACE.

12. SEAL ALL HOLES, PIPES, CONDUITS, AND PENETRATIONS IN THE WALLS ABOVE THE CEILING.

13. REPORT TOTAL WEIGHT OF CONSTRUCTION WASTE DISPOSED OF TO THE COR AND

CONTRACTING OFFICER ON THE LAST DAY OF EACH MONTH.

14. CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF SMOKE COMPARTMENTS WITHIN AREA OF

CONSTRUCTION DURING THE ENTIRE PROJECT.

15. COORDINATE A DISCHARGE PLAN FOR EACH PHASE WITH THE VA PRIOR TO COMMENCING

WORK ON THE NEXT PHASE.

16. WHERE THE HEPA FILTER UNIT DISCHARGE DUCT LEAVES THE ICRA CONTAINMENT AREA TO

BE DISCHARGED TO THE OUTSIDE. THE DUCT SHALL BE SHEET METAL WHEN CROSSING

THE ICRA BARRIER TO THE POINT OF DISCHARGE. FLEX DUCT IS PERMITTED INSIDE THE

ICRA BARRIER AND OTHER LOCATIONS AS APPROVED BY THE VA. CONNECTIONS TO THE

OUTSIDE DISCHARGE POINT (I.E. WINDOW) SHALL BE MADE WITH SHEET METAL AND SHALL

BE SECURE. CONNECTIONS SHALL NOT BE MADE WITH DUCT TAPE.

17. ANY MEP WORK OUTSIDE THE ICRA BARRIER MAY NOT REQUIRE FULL BARRIER WALL

PROTECTION. LESS STRINGENT MEASURES SUCH AS PLASTIC SHEETING SHALL BE

PERMITTED, AS APPROVED, BY VA COR FOR AREAS WITH SHORT TERM WORK. THE WORK

IN THESE AREAS IS EXPECTED TO BE COMPLETE OR DONE IN SECTIONS THAT COMPLETE

WORK AND RESTORE THE SPACE IN A ONE DAY WORK SHIFT.

18. CONTRACTOR SHALL COORDINATE FINAL ICRA WALLS WITH VA COR AND PROTECT EXISTING

WALL MOUNTED EQUIPMENT IDENTIFIED TO REMAIN.

19. RELOCATE EXISTING "EXIT" SIGNS TO LOCATIONS AS SHOWN ON ELECTRICAL DRAWING

E301 TO PROVIDE CLEAR PATH EGRESS DIRECTIONS DURING CONSTRUCTION.

20. PROTECT ALL EXISTING FINISHES THAT ARE TO REMAIN.

UPON COMPLETION OF EACH PHASE

1. DO NOT REMOVE ICRA/ ANTE ROOM BARRIERS FROM WORK AREA UNTIL THE PHASE WORK

IS INSPECTED AND APPROVED, IN WRITING, BY VA COR.

2. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION. UTILIZE POLYURETHANE PLASTIC SHEETING DURING

INSTALLATION AND DEMOLITION OF ICRA BARRIERS TO CONTAIN DUST AND DEBRIS.

3. CONTRACTOR'S FINAL CLEANUP THROUGHOUT PHASE WORK AREA, SHALL UTILIZE HEPA

FILTERED VACUUMS. PHASE WORK AREA SHALL NOT BE TURNED OVER TO THE VA FOR USE

UNTIL IT IS THOROUGHLY CLEANED BY THE VA'S ENVIRONMENTAL SERVICES (EMS).

PROVIDE THE VA COR WITH (1) WEEK NOTIFICATION PRIOR TO THE EMS CLEANING, TO

ALLOW FOR SCHEDULING OF EMS.

INFECTIOUS CONTROL PROCEDURES (ICRA)

SEAL W/ FIRE CAULK, CONT.

EXISTING STRUCTURAL DECK

EXISTING WALL FRAMING

2 LAYERS 5/8" TYPE X GYP BOARD

2ND LAYER OF GYP BOARD TO

OVERLAP EXISTING FINISHED WALL

EXISTING SPACE NEW WORK SIDE

SEAL W/ FIRE CAULK, CONT.

NEW ACOUSTIC CEILING TILE

EXISTING FINISHED WALL

EXISTING ACOUSTIC

CEILING TILE

NOTE:

CRITICAL BARRIERS ARE THE EXTENSION OF EXISTING WALLS UP

TO THE EXISTING DECK ABOVE. THE PERIMETER WALLS OF EACH

PHASE MUST EXTEND UP TO THE EXISTING DECK, ABOVE. IF THEY

DO NOT, THE CONTRACTOR IS EXTENDED THE WALLS UP TO THE

EXISTING DECK.

A R C H I T E C T S E N G I N E E R S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F ile

P a th

/1

/2

:3

:0

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ENGINEER

SCALE:

H.F. LENZ COMPANY

1407 Scalp Avenue Johnstown, PA 15904

Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants

As indicated

Philadelphia VA Medical Center 3900 Woodland Ave., Philadelphia, PA 19104

08/27/2020

642-17-100

DRKBJ

Renovate Inpatient Pharmacy for Chemotherapy I.V. Mixing

BID SETSYMBOLS, ABBREVIATIONS AND

NOTES

GI102

3/4" = 1'-0"

CRITICAL BARRIER - (TYP. ABOVE CEILING WALL INFILL

DETAIL)

OFFICE

2D135r

OFFICE

2D135t

HD STORAGE

2D135u

2D135s

STERILE HD

COMPOUNDING

2D135w STERILE

COMPOUNDING

2D135x

ANTE-ROOM

2D135v

ORDER ENTRY

2D135q

ANTE-ROOM

2D135n

IV CLEAN ROOM

2D135m

FILES

2D135j

2D135h

2D135r

2D135t

HD STORAGE

PASSAGE

2D135w

2D135x

2D135q

2D135n

FILES

VAULT

2D135h

TRAVEL DISTANCE TO EXIT

146'

SHADED AREAS

DEPICTS PROJECT

SCOPE

T R

A V

E L

D

IS

T A

N C

E T

O E

X

IT

2ND FLOOR KEY PLAN

AREAS OF WORK

FIRE RATING LEGEND

SYMBOL

(NUMBER SHOWS OPENING PARTITION OPENING RATING

CORRIDOR POSITIVE LATCH

(NON-

20 MIN.

20 MIN.

45 MIN.

60 MIN.

90 MIN.

3 HR.

3 HR.

ONE HOUR

ONE HOUR

ONE HOUR

ONE HOUR

TWO HOUR

THREE HOUR

FOUR HOUR

EXISTING EXISTING

NOTE: FOR SCHEDULED OPENINGS WHERE SMOKE AND FIRE SEPARATIONS

COINCIDE,THE MORE STRINGENT

FIRE RATING SHALL APPLY. REFER TO THE 'GX.XX' SERIES FOR FIRE RESISTIVE

REFERENCES.

SMOKE

20 20 20

20 20 20

45 45 45

45 45 45

60 60 60

60 60 60

90 90 90

90 90 90

20 20 20

20 20 20 45 45 45 90 90 90

GENERAL NOTES

A. REFER TO THE PROJECT MANUAL FOR FRAMED OPENING SCHEDULE

AND HARDWARE SCHEDULE.

B. PARTITIONS SHALL BE TYPE D13A UNLESS NOTED OTHERWISE

C. REFER TO SHEET A604 FOR PARTITION TYPES.

D. PARTITIONS ARE DIMENSIONED TO FINISH FACE OF GYPSUM

BOARD UNLESS NOTED OTHERWISE.

E. REFER TO SHEET AE-04 FOR TYPICAL INTERIOR PARTITION

DETAILS.

LIFE SAFETY CODE ANALYSIS

NFPA 101 LIFE SAFETY CODE 2018 INPATIENT PHARMACY

TOTAL PROJECT AREA 1,200 SF

TOTAL FLOOR AREA GROSS FLOOR AREA (100% ALL SPACES): 17,110 SF

OCCUPANCY COUNT HEALTH CARE USE, SLEEPING DEPARTMENTS:

17,110 SF / 120 SF PER

OCCUPANT LOAD = 143 OCCUPANTS

EGRESS CAPACITY PROVIDED STAIR DOORS: 42" DOOR 42/.3 = 140 OCCUPANTS MAX.

TOTAL EGRESS CAPACITY 5 STAIRWELLS * (140) 700

CORRIDOR MINIMUM 72" ALLOWED BY VA STANDARDS 96" EXISTING EXIT

CORRIDORS

7.1.10 MEANS OF EGRESS RELIABILITY

7.1.10.1 MEANS OF EGRESS SHALL BE CONTINUOUSLY MAINTAINED FREE OF ALL OBSTRUCTIONS OR

IMPEDIMENTS TO FULL INSTANT USE IN THE CASE OF FIRE OR OTHER EMERGENCY.

9.2.1 AIR CONDITIONING, HEATING, VENTILATION DUCTWORK, AND RELATED EQUIPMENT. AIR CONDITIONING, HEATING, VENTILATION DUCTWORK, AND RELATED EQUIPMENT SHALL BE IN ACCORDANCE WITH

NFPA 90A.

18.1.1.1.1 ALTERATION OF EXISTING HEALTH CARE OCCUPANCIES

18.1.1.4.3 REHABILITATION

18.1.1.4.3 (2) MINOR RENOVATION: RENOVATION IS LESS THAN 50% AND NOT MORE THAN 4500 SF OF

THE AREA OF A SMOKE COMPARTMENT

18.2.2.2 DOORS

18.2.2.2.4 DOORS WITHIN A REQUIRED MEANS OF EGRESS SHALL NOT BE EQUIPPED WITH A LATCH OR LOCK

THAT REQUIRES THE USE OF A TOOL OR KEY FROM THE EGRESS SIDE, UNLESS OTHERWISE PERMITTED BY ONE OF

THE FOLLOWING:

EXCEPTION NO. 1: KEY-LOCKING DEVICES THAT RESTRICT ACCESS TO THE ROOM FROM THE CORRIDOR AND THAT ARE OPERABLE ONLY BY STAFF FROM THE CORRIDOR SIDE SHALL BE PERMITTED. SUCH DEVICES

SHALL NOT RESTRICT EGRESS FROM THE ROOM.

18.2.3.1 THE CAPACITY OF MEANS OF EGRESS SHALL BE IN ACCORDANCE WITH SECTION 7.3

7.3 / TABLE 7.3.3.1 THE CAPACITY OF MEANS OF EGRESS PROVIDING TRAVEL BY MEANS OF STAIRS SHALL BE

0.3 IN. PER PERSON, AND THE CAPACITY OF MEANS OF EGRESS PROVIDING HORIZONTAL TRAVEL (WITHOUT STAIRS) BY MEANS SUCH AS DOORS, RAMPS, OR HORIZONTAL EXITS SHALL BE 0.2 IN. PER PERSON.

18.2.3.4 AISLES, CORRIDORS, AND RAMPS REQUIRED FOR EXIT ACCESS IN A HOSPITAL OR NURSING HOME SHALL

BE NOT LESS THAN 8 FT IN CLEAR AND UNOBSTRUCTED WIDTH.

18.2.5 ARRANGEMENT OF MEANS OF EGRESS

18.2.5.2 DEAD-END CORRIDORS. DEAD-END CORRIDORS SHALL NOT EXCEED 30 FT

18.2.5.6.1 EVERY HABITABLE ROOM SHALL HAVE AN EXIT ACCESS DOOR LEADING DIRECTLY TO AN EXIT

ACCESS CORRIDOR

18.2.6 TRAVEL DISTANCE TO EXITS

18.2.6.2.1 THE TRAVEL DISTANCE BETWEEN ANY POINT IN A ROOM AND AN EXIT SHALL NOT EXCEED 200 FT.

18.3 PROTECTION.

18.3.4.1 GENERAL. HEALTH CARE OCCUPANCIES SHALL BE PROVIDED WITH A FIRE ALARM SYSTEM IN

ACCORDANCE WITH SECTION 9.6.

18.3.4.3.1 OCCUPANT NOTIFICATION. OCCUPANT NOTIFICATION SHALL BE ACCOMPLISHED AUTOMATICALLY IN

ACCORDANCE WITH 9.6.3.

18.3.4.5 DETECTION

18.3.4.5.1 GENERAL. DETECTION SYSTEMS, WHERE REQUIRED, SHALL BE IN ACCORDANCE WITH SECTION 9.6.

18.3.5.1 BUILDINGS CONTAINING HEALTH CARE FACILITIES SHALL BE PROTECTED THROUGHOUT BY AN

APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 9.7.

18.3.5.6 PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN ALL HEALTH CARE OCCUPANCIES IN

ACCORDANCE WITH 9.7.4.1.

18.3.6 CORRIDORS

18.3.6.1 CORRIDORS SHALL BE SEPARATED FROM ALL OTHER AREAS BY PARTITIONS.

18.3.6.2 CONSTRUCTION OF CORRIDOR WALLS SHALL FORM A BARRIER TO LIMIT THE TRANSFER OF SMOKE.

SUCH WALLS SHALL BE PERMITTED TO TERMINATE AT THE CEILING WHERE THE CEILING IS CONSTRUCTED TO LIMIT THE TRANSFER OF SMOKE. NO FIRE RESISTANCE RATING REQUIRED FOR CORRIDOR WALLS..

18.3.6.3 CORRIDOR DOORS

18.3.6.3.1 CONSTRUCTED TO RESIST THE PASSAGE OF SMOKE.

18.3.6.3.2 PROVIDED WITH POSITIVE LATCHING.

18.3.6.3.11 DOOR-CLOSING DEVICES SHALL NOT BE REQUIRED ON DOORS IN CORRIDOR WALL OPENINGS OTHER THAN THOSE SERVING REQUIRED EXITS, SMOKE BARRIERS, OR ENCLOSURES OF VERTICAL OPENINGS

AND HAZARDOUS AREAS

18.3.7.1 (4) TO LIMIT THE TRAVEL DISTANCE FROM ANY POINT TO REACH A DOOR IN THE REQUIRED SMOKE

BARRIER TO A DISTANCE NOT EXCEEDING 200 FEET.

A R C H I T E C T S E N G I N E E R S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F ile

P a th

/1

/2

:3

:0

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ENGINEER

SCALE:

H.F. LENZ COMPANY

1407 Scalp Avenue Johnstown, PA 15904

Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants

As indicated

Philadelphia VA Medical Center 3900 Woodland Ave., Philadelphia, PA 19104

08/27/2020

642-17-100

DRKBJ

Renovate Inpatient Pharmacy for Chemotherapy I.V. Mixing

BID SETLIFE SAFETY PLAN

GI103

1/8" = 1'-0"

LIFE SAFETY PLAN

DOOR TYPES

SCALE: 1/4" = 1'-0"

TEMPERED

GLASS

FLUSH, WOOD PRE-HUNG; AUTOMATIC SINGLE

SWING, 36"Wx81"H, 304 STAINLESS

STEEL FRAME, FULL VIEW (BASED ON

TERRA UNIVERSAL 1998-87-L OR R)

FLUSH, HOLLOW

METAL, 1HR RATED

TYPICAL INTERIOR DOOR FRAMES

SCALE: NTS

1 15/16" VARIES VARIES

STANDARD DOOR FRAMEFRAMES IN METAL STUD PARTITIONS

(DOOR SIDE)

/8

1/2" 1/2"

GAGE AS

SPECIFIED

ADD RETURN ON

FRAME WHERE

DRYWALL FINISH IS

REQUIRED

STANDARD FRAME

FOR DRYWALL

CAULK ALL AROUND

BOTH SIDES

WIDTH

METAL STUD

DRYWALL, THICKNESS

SINGLE OR DOUBLE AS

REQUIRED

DOUBLE STUDS BACK

TO BACK

JAMB ANCHORS

J1 H1

THROAT OPENING = PARTITION WIDTH + 1/8" MIN

VERTICAL STUDS @ 1'-4" MAX W/ GYPSUM

WALLBOARD. 1'-4" W/ GYPSUM LATH &

PLASTER DOUBLE STUDS FOR

SUPPORTING CONCRETE BACKER BOARD.

PROVIDE CONTINUOUS BRACING

WHEN STUDS EXCEED 10'-0" & ARE

FINISHED BOTH SIDES.

DETAIL D: JAMB ANCHOR CLIPS (3) PER

SIDE - COORDINATE W/ HINGE

REINFORCEMENT.

NOTE 1: OMIT BRACE WHEN "D" DIMENSION

IS LESS THAN 2'-0" FOR GYPSUM WALLBOARD

OR 16" FOR PLASTER PARTITION.

SEC. B 1/2"

CONSTRUCTION

JOINT

SEE

NOTE 1

RUNNER

BETWEEN

STUDS

HM DOOR

FRAME

DETAIL C

E Q

U A

L E

Q U

A L

E Q

U A

L E

Q U

A L

D

V A

R

IE

S

/2

CRIPPLE STUD, DO

NOT ANCHOR TO

BEARING STUD

GYPSUM

WALLBOARD

PANELS

CONTROL JOINT

1/2" MIN

PROVIDE SOUND

DEADENING WHERE

REQUIRED

ISOMETRIC OF CONSTRUCTION JOINT SECTION B

SECTION CSECTION A

JAMB ANCHORS

(FURNISHED WITH FRAME)

DETAIL D

DOUBLE STUDS

HM FRAME

INTERIOR

PARTITION, SEE

FLOOR PLAN

JAMB

ANCHOR

/4

M

IN

1/2"M

IN

5/8" M

AX

STUD OF INTERIOR

PARTITION, SEE FLOOR

PLAN

TOP TRACK

SANITARY STOP

HM DOOR

FRAME

SHIM AS

REQUIRED

METAL ANCHOR

CLIP

FR

AME FA

CE

MIN

US 3/16"

FR

AME FA

CE

MIN

US 3/16"

/4

M

IN

JAMB DEPTH

STUDWIDTH

STUDWIDTH

/4

M

IN

SEE DOOR SCHEDULE

VARIES

PARTITION FRAMING FOR DOORS

SCALE: NTS

FRONT APPROACH, PULL SIDE HINGE APPROACH, PULL SIDE HINGE APPROACH, PULL SIDE LATCH APPROACH, PULL SIDE

FRONT APPROACH, PUSH SIDE HINGE APPROACH, PUSH SIDE LATCH APPROACH, PUSH SIDE

ADA MANEUVERING CLEARANCES AT MANUAL SWINGING DOORS

1'-6" MIN

'-0

M

IN

'-0

M

IN

3'-0" MIN 3'-6" MIN

'-4

M

IN

2'-0" MIN

'-0

M

IN

1'-0" MIN*

'-0

M

IN

1'-0" MIN*

2'-0" MIN*

'-6

M

IN

'-6

M

IN

*4'-4" MIN IF CLOSER IS PROVIDED

*IF BOTH CLOSER AND LATCH ARE

PROVIDED

*IF BOTH CLOSER AND LATCH ARE PROVIDED

** 4'-0" MIN IF BOTH CLOSER AND LATCH ARE

PROVIDED

*4'-4" MIN IF CLOSER IS PROVIDED

FRAME TYPES

SCALE: 1/4" = 1'-0"

HOLLOW METAL

2"

DOOR WIDTH

2"

D O

O R

H E

IG

H

T

STAINLESS STEEL FRAME,

PRE-HUNG DOOR AND

FRAME SYSTEM

D O

O R

H E

IG

H

T

2"

DOOR WIDTH

2"

ROOM

135q

WIDTH HEIGHT

DOOR SCHEDULE

DOOR NOTES:

1. ALL DOORS SHALL BE FLUSH - 1 3/4" (44mm) THICK

UNLESS NOTED OTHERWISE.

2. TOP & SIDE RAILS SHALL BE 9" (229mm) MIN. UNO.

BOTTOM RAILS SHALL BE 12" (305mm) MIN. UNO.

PAIR MATERIAL FINISH TYPE

DOOR SIGN

TYPE MATERIAL FINISH TYPE

FRAME FIRE

RATING

HDW

SET

REMARKS

DOOR

NO.

ORDER ENTRY 2D135q, FILES 2D135j - 3'-0" 7'-0" HM PTD 3 A HM PTD 1 - 1 TEMPORARY DOOR - PHASE 2A

135p PASSAGE 2D135s - 3'-0" 7'-0" HM PTD 3 A HM PTD 1 - 1

135t OFFICE 2D135t - 3'-0" 7'-0" HM PTD 3 A HM PTD 1 - 1 -

135u HD STORAGE 2D135u - 3'-0" 6'-8" SS - 2 A SS - 2 - 1 PROVIDE TEMPERED GLASS

135v ANTE-ROOM 2D135v - 3'-0" SS - A - - 2

135w STERILE HD COMPOUNDING 2D135w - 3'-0" SS - A - - 2A

135x STERILE COMPOUNDING 2D135x - 3'-0" SS - A - - 2A

6'-8"

6'-8"

6'-8"

SS

SS

SS

PROVIDE TEMPERED GLASS

PROVIDE TEMPERED GLASS

PROVIDE TEMPERED GLASS

TEMPORARY DOOR - PHASE 3A

EX01 FILES 2D135p PAIR 6'-0" 6'-8"

EX02 FILES 2D135j PAIR 6'-0" 6'-8" TEMPORARY CONTRACTOR ACCESS

TEMPORARY CONTRACTOR ACCESS10A

10A

HM

HM

MULTI-LAYERED FIRE RETARDANT

THERMOPLASTIC SHEET WITH

SPECTRIM #13 MAPLE FINISH

(MAGNETICALLY REMOVABLE)

1/8" ANODIZED ALUMINUM DIVIDER BAR

MAGNETICALLY REMOVABLE F-UNIT

1" TEXT, ALL CAPS

AERIAL REGULAR

PHOTOPOLYMER / BRAILLE

3 PLY NON-GLARE ACRYLIC CONSTRUCTION

SUBSURFACE UV VARIABLE DOT DIGITALLY

PRINTED BACKGROUND COLOR WHITE

5 3/16 x 9" CLEAR ACETATE - 1/16" THICK

CLEAR ACRYLIC BACKER WITH FUTURA MED TEXT

SATIN ANODIZED ALUMINUM FRAME

2D-135t

OFFICE

DIMENSION OF INSERT

9"

INSIDE DIMENSION OF FRAME

9 1/8"

F -U

N

IT

6"

IN

S

E R

T

3"

F R

A M

E

1/

8"

F R

A M

E

1/

8"

SIGN SYSTEM MECHANICALLY ATTACHES TO WALL

AND FEATURES INTERCHANGEABLE COMPONENTS

TOP OF SIGN TO BE

MOUNTED AT +5'-0" AFFTYPE A - SLIDER

9"

5'

1. ALL SIGNS SHALL BE ADA/ABA COMPLIANT

2. MOUNT SIGNS WITH TOP OF SIGN AT +5'-0" ABOVE FINISHED FLOOR, UNLESS OTHERWISE

NOTED. SEE DETAIL 2 ON THIS SHEET.

4. SIGN TYPE REQUIREMENTS ARE SHOWN ON DOOR SCHEDULE - SEE GI104.

5. VERIFY ALL FINAL TEXT AND ROOM NUMBERS WITH COR PRIOR TO FABRICATION.

6. ALL SIGNAGE TO MATCH EXISTING FACILITY SIGNAGE. BASIS OF DESIGN FOR SIGNS IS CREATIVE

SIGNAGE. CONTACT PAUL MOSKIOS, 301-345-3700.

SIGNAGE NOTES

A R C H I T E C T S E N G I N E E R S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F ile

P a th

/1

/2

:3

:0

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ENGINEER

SCALE:

H.F. LENZ COMPANY

1407 Scalp Avenue Johnstown, PA 15904

Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants

As indicated

Philadelphia VA Medical Center 3900 Woodland Ave., Philadelphia, PA 19104

08/27/2020

642-17-100

DRKBJ

Renovate Inpatient Pharmacy for Chemotherapy I.V. Mixing

BID SETDOOR SCHEDULE AND DETAILS

GI104

3" = 1'-0"

SIGN TYPE A

1/2" = 1'-0"

DOOR SIGN MOUNTING HEIGHT

2ND FLOOR KEY PLAN

AREAS OF WORK

2A01

2A02

2A03

2A04

REMOVABLE

GUARDRAIL

SECTION

TC

SCAFFOLD SECTION WITH STAIR

7' - 0"7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0"

REMOVABLE

GUARDRAIL

SECTION

EXIST. CONC.

CURB BELOW

OFFICE

2D135r

FILES

2D135p

ORDER ENTRY

2D135q

ANTE-ROOM

2D135n

IV CLEAN ROOM

2D135m

OFFICE

2D135k

VAULT

2D135h

COMPOUNDING

ROOM

2D135j

THIS DOOR IS FOR

ISOLATING CONSTRUCTION

AREA AND EMERGENCY

USE ONLY. IT IS NOT FOR

DAILY USE.135q

EX02

2B05

2B05

2B05

2B03

2B03

2B02

2B01

2B04

2B04

2B04

OFFICE

2D135r

FILES

2D135p

ORDER ENTRY

2D135q

ANTE-ROOM

2D135n

IV CLEAN ROOM

2D135m

OFFICE

2D135k

VAULT

2D135h

COMPOUNDING

ROOM

2D135j

135q

EX02

GENERAL DEMOLITION NOTES (ALL PHASES)

1. SCOPE OF DEMOLITION WORK IS NOT LIMITED TO WORK SHOWN ON

DEMOLITION DRAWINGS. CONTRACTOR TO COORDINATE DEMOLITION WITH NEW

WORK AND PATCH EXISTING TO RECEIVE NEW FINISHES.

2. REFER TO MECHANICAL, ELECTRICAL & PLUMBING DRAWINGS FOR

DEMOLITION WORK. WHERE SUCH WORK OCCURS, ARCHITECTURAL ITEMS OR

FINISHES SHALL BE REMOVED ONLY TO THE EXTENT REQUIRED & PATCHED TO

MATCH EXISTING ADJACENT CONSTRUCTION AND FINISHES.

3. REMOVE ALL INTERIOR DOORS, FRAMES AND HARDWARE INDICATED AS

DASHED LINES.

4. REMOVE EXISTING CEILING IN ALL AREAS TO RECEIVE A NEW CEILING.

5. REMOVE EXISTING FLOOR FINISH, BASE AND ADHESIVE IN ALL AREAS WHICH ARE

TO RECEIVE NEW FLOOR FINISHES. SEE FINISHES PLAN, DRAWING AE104.

6. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN

AREAS OF DEMOLITION WORK.

7. REMOVE PARTITIONS SHOWN DASHED.

8. SEE DOOR SCHEDULE ON SHEET GI104 FOR DOOR SIZES.

9. VERIFY EXISTING FIRE PROTECTION ON ALL STRUCTURAL ELEMENTS IN AREA OF

WORK PRIOR TO INSTALLING NEW WORK. PATCH AND REPAIR AS NECESSARY TO

MAINTAIN REQUIRED RATING.

10. REFER TO SHEET GI104 FOR TEMPORARY CONSTRUCTION BARRIER DOORS.

11. AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH ALL EXISTING SURFACES

EFFECTED BY CONSTRUCTION AND MATCH EXISTING FINISHES.

12. INSTALL A TEMPORARY ILLUMINATED EXIT SIGN AT THE EXIT DOORS EX01 AND

EX02 DURING THE WHOLE TIME THEY ARE IN USE.

PHASE 2B: KEY NOTES

2B01 REMOVE EXISTING DOOR, HM FRAME, AND HARDWARE.

2B02 REMOVE EXISTING PLUMBING FIXTURE. SEE PLUMBING DRAWINGS.

2B03 REMOVE EXISTING BASE CABINETS, WALL CABINETS AND

COUNTERTOP. PATCH WALLS AS REQUIRED FOR NEW FINISHES.

2B04 REMOVE EXISTING FLOOR FINISH, WALL BASE AND ADHESIVES. PREP

FLOOR AND WALLS FOR NEW FINISHES.

2B05 REMOVE EXISTING INTERIOR PARTITION SHOWN DASHED IN ITS

ENTIRETY. PATCH AND PREP FLOOR AND WALLS FOR NEW FINISHES.

DEMOLITION SYMBOL LEGEND

REMOVE EXISTING PARTITION SHOWN DASHED IN ITS

ENTIRETY.

REMOVE EXISTING DOOR AND HARDWARE. FRAME TO

REMAIN.

REMOVE EXISTING BASE CABINET, COUNTERTOP AND

WALL CABINETS SHOWN DASHED IN THEIR ENTIRETY.

VERIFY EXISTING CONDITIONS.

DETAIL A DETAIL B

A

TYPICAL FLOOR PENETRATION DETAIL

SCALE: 1" = 1'-0"

TEMPORARY HEPA

EXHAUST FAN

VENTILATION DUCT

SEAL AS REQUIRED

EXISTING FLOOR SLAB

CORE DRILL EXISTING

FLOOR SLAB AS REQUIRED

FOR TEMPORARY HEPA

EXHAUST DUCT

INFILL FLOOR PENETRATION

FLUSH WITH CONCRETE TO

MATCH EXISTING

EXISTING FLOOR SLAB

CONSTRUCTION

PATCH UNDERSIDE OF TEMPORARY

PENETRATION WITH METAL DECK

TO MATCH EXISTING, ATTACH AS

REQUIRED.

INFECTION CONTROL RISK

ASSESSMENT (ICRA) POLICY

PRECAUTIONS DURING CONSTRUCTION (ALL PHASES)

1. UTILIZE 6-MIL FIRE-RATED POLY PLASTIC SHEET WITH EXPANDABLE POLES TO

ISOLATE AREA DURING CONSTRUCTION OF ICRA PARTITION WITH SECURITY

DOOR. SEE NOTE 2A01

2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM

CONSTRUCTION OPERATIONS.

3. ANY CEILING TILES DISPLACED FOR VISUAL INSPECTION MUST BE REMOVED

CAREFULLY AND IMMEDIATELY REPLACED. INSTALL NEW CEILING TILE IN ITS

PLACE IF IT IS DAMAGED IN THE PROCESS.

4. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING

INTO ATMOSPHERE.

5. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL

FOR BARRIERS.

6. BLOCK OFF AND SEAL AIR VENTS IN THE CONSTRUCTION AREA.

7. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE

TO PREVENT CONTAMINATION OF DUCT SYSTEM.

8. REMOVE CONSTRUCTION WASTE DAILY.

9. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA

FILTER EQUIPPED AIR FILTRATION UNITS. COORDINATE LOCATION OF ABOVE

FLOOR PENETRATION WITH THE VA COR. PATCH FLOOR PENETRATION AFTER

CONSTRUCTION AS REQUIRED TO MATCH EXISTING.

10. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL

AS REQUIRED.

11. COORDINATE ALL INFECTION CONTROL RISK ASSESSMENT (ICRA)

REQUIREMENTS WITH THE VA INFECTION CONTROL OFFICER AND VA COR.

PHASE 2A: KEY NOTES

2A01 ICRA PARTITION WITH SECURITY DOOR SYSTEM. ALL CONTRACTOR CONSTRUCTION SITE

ACCESS WILL BE THROUGH THE TEMPORARY HM DOOR. SEE NOTE 2A03

WALL CONSTRUCTION: ONE (1) HOUR FIRE RATED SYSTEM

3 5/8" METAL STUDS.

5/8" GWB BOTH SIDES.

EXTEND PARTITION FROM FLOOR TO UNDERSIDE OF DECK ABOVE.

PROVIDE AND INSTALL PERIMETER FIRE CAULK.

DOOR SYSTEM: ONE (1) HOUR RATED HM DOOR AND HM FRAME.

3'-0" WIDE X 7'-0" DOOR.

PANIC BAR WITH ALARM.

2A02 TEMPORARY STAIR AND PLATFORM ACCESS SYSTEM.

STAIR: TEMPORARY STEEL SCAFFOLD SECTION WITH STAIRS TO MEET OSHA

STANDARDS.

WALKWAY: TEMPORARY WALKWAY WITH GUARDRAILS. PROVIDE TEMPORARY

STRUCTURAL SYSTEM TO MEET OSHA STANDARDS.

REMOVABLE GUARDRAIL: PROVIDE A REMOVABLE GUARDRAIL FOR ACCESS THROUGH 2ND

FLOOR WINDOWS.

2A03 REMOVE EXISTING WINDOW. INSTALL A TEMPORARY HM DOOR FRAME, WEATHER SEALED HM

DOUBLE DOOR AND ENTRANCE LOCK SET. EXTERIOR WALL TO BE WEATHER TIGHT.

2A04 HEPA FILTERED EXHAUST FAN SYSTEM. SEE DETAIL A/AE101. COORDINATE WITH VA COR.

NO ARCHITECTURAL WORK

UNLESS NOTED OTHERWISE

AREA OF ARCHITECTURAL WORK

UNLESS NOTED OTHERWISE

AREA OF WORK LEGEND

A R C H I T E C T S E N G I N E E R S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F ile

P a th

/1

/2

:3

:0

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ENGINEER

SCALE:

H.F. LENZ COMPANY

1407 Scalp Avenue Johnstown, PA 15904

Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants

As indicated

Philadelphia VA Medical Center 3900 Woodland Ave., Philadelphia, PA 19104

08/27/2020

642-17-100

DRKBJ

Renovate Inpatient Pharmacy for Chemotherapy I.V. Mixing

BID SETPHASING PLAN - PHASES 2A & 2B

AE101

1/4" = 1'-0"

PHASE 2A - ICRA CONSTRUCTION 1/4" = 1'-0"

PHASE 2B - DEMOLITION

2C01

2C02

2C02

OFFICE

2D135r

FILES

2D135p

ORDER ENTRY

2D135q

ANTE-ROOM

2D135n

IV CLEAN ROOM

2D135m

FILES

2D135j

VAULT

2D135h

EX01 EX02

135q

3A04

3A013A03

TC

OFFICE

2D135r

ORDER ENTRY

2D135q

ANTE-ROOM

2D135n

IV CLEAN ROOM

2D135m

FILES

2D135j

VAULT

2D135h

FILES

2D135p

3A05

3A02

AE105

135p

EX01 EX02

135q

3A06

2ND FLOOR KEY PLAN

AREAS OF WORK

PHASE 2C: KEY NOTES

2C01 ICRA PARTITION WITH SECURITY DOOR SYSTEM. ALL CONTRACTOR CONSTRUCTION SITE

ACCESS WILL BE THROUGH THIS TEMPORARY HM DOOR.

DOOR SYSTEM: ONE (1) HOUR RATED HM DOOR AND HM FRAME.

DOOR SIZED TO FIT EXISTING EXTERIOR OPENING.

PROVIDE PANIC BAR WITH ALARM.

2C02 RELOCATE EXISTING FILE SYSTEM, SHOWN DASHED, TO FILES 2D135J. MODIFY TRACK AS

REQUIRED. INSTALL NEW FIRE RETARDANT TREATED 3/4" PLYWOOD ON THE FLOOR BELOW THE

FILES. SEE DETAIL H/AE107.

PHASE 3A: KEY NOTES

3A01 REMOVE ICRA BARRIER AND DOOR AND FRAME. PORTION OF ICRA PARTITION TO REMAIN TO

CREATE A SOFFIT AT 7'-0". PATCH FLOOR AND WALL AND PREP FOR FINISHES.

3A02 REMOVE TEMPORARY DOOR AND FRAME. RE-INSTALL EXISTING WINDOW TO MATCH EXISTING.

SEAL PERIMETER OF WINDOW.

3A03 ICRA PARTITION WITH SECURITY DOOR SYSTEM. ALL CONTRACTOR CONSTRUCTION SITE ACCESS

WILL BE THROUGH THE TEMPORARY HM DOOR EX01. REMOVE EXISTING LIGHT FIXTURE.

REPLACE LIGHT FIXTURE AFTER ICRA PARTITION IS REMOVED.

WALL CONSTRUCTION: ONE (1) HOUR FIRE RATED SYSTEM

3 5/8" METAL STUDS.

5/8" GWB BOTH SIDES.

EXTEND PARTITION FROM FLOOR TO UNDERSIDE OF DECK ABOVE.

FIRE CAULK.

DOOR SYSTEM: ONE (1) HOUR RATED HM DOOR AND HM FRAME.

3'-0" WIDE X 7'-0" DOOR.

PANIC BAR WITH ALARM TIED TO SECURITY OFFICE.

3A04 HEPA FILTERED EXHAUST FAN SYSTEM. SEE DETAIL A/GC101. COORDINATE WITH VA COR.

3A05 REMOVE EXISTING INTERIOR PARTITION SHOWN AS DASHED IN ITS ENTIRETY.

3A06 SECURE THIS EXISTING DOOR TO RESTRICT ACCESS DURING CONSTRUCTION.

NO ARCHITECTURAL WORK

UNLESS NOTED OTHERWISE

AREA OF ARCHITECTURAL WORK

UNLESS NOTED OTHERWISE

AREA OF WORK LEGEND

A R C H I T E C T S E N G I N E E R S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F ile

P a th

/1

/2

:3

:0

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ENGINEER

SCALE:

H.F. LENZ COMPANY

1407 Scalp Avenue Johnstown, PA 15904

Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants

As indicated

Philadelphia VA Medical Center 3900 Woodland Ave., Philadelphia, PA 19104

08/27/2020

642-17-100

DRKBJ

Renovate Inpatient Pharmacy for Chemotherapy I.V. Mixing

BID SETPHASING PLAN - PHASES 2C & 3A

AE102

1/4" = 1'-0"

PHASE 2C - SHELVING RELOCATION

1/4" = 1'-0"

PHASE 3A - ICRA CONSTRUCTION / ICRA

REMOVAL/DEMOLITION

3C05 3C04

3C03

OFFICE

2D135r

OFFICE

2D135t

HD STORAGE

2D135u

PASSAGE

2D135s

STERILE HD

COMPOUNDING

2D135w

STERILE

COMPOUNDING

2D135x

ANTE-ROOM

2D135v

ORDER ENTRY

2D135q

ANTE-ROOM

2D135n

IV CLEAN ROOM

2D135m

FILES

2D135j

VAULT

2D135h

OFFICE

2D135r

OFFICE

2D135t

HD STORAGE

2D135u

PASSAGE

2D135s

STERILE HD

COMPOUNDING

2D135w

STERILE

COMPOUNDING

2D135x

ANTE-ROOM

2D135v

ORDER ENTRY

2D135q

ANTE-ROOM

2D135n

IV CLEAN ROOM

2D135m

FILES

2D135j

VAULT

2D135h

3C02

3C01

B

SIM

135x

135w

135u

135t

135v

2ND FLOOR KEY PLAN

AREAS OF WORK

PHASE 3B: KEY NOTES

3B01 INSTALL WINDOW BLACKOUT FILM AND GWB PARTITION TO

CLOSE OFF WINDOW VIEW. ALIGN FINISHES WITH EXISTING

WALL SURFACES.

3B02 ALIGN PARTITION WITH EXISTING WALL.

3B03 PASS-THRU. SEE EQUIPMENT PLAN ON DRAWING AE104

3B04 SCRUB SINK WITH EYEWASH. SEE EQUIPMENT PLAN ON

DRAWING AE104.

3B05 REMOVE HEPA FILTERED EXHAUST FAN SYSTEM. COORDINATE

WITH VA COR.

3B06 NOT USED

3B07 DEMARCATION LINE TO DELINEATE BETWEEN "CLEAN" AND

"DIRTY" AREAS.

3B08 REMOVE DOOR USAGE RESTRICTION TO ALLOW OFFICE 2D135r

USE AFTER WALL IS FINISHED AND PAINTED.

NOTE: NEW INTERIOR PARTITIONS NOT LABELED

IN FLOOR PLAN SHALL BE PARTITION TYPE A

PHASE 3C: KEY NOTES

3C01 REMOVE HEPA FILTERED EXHAUST FAN SYSTEM

3C02 INSTALL PARTITION WALL. UTILIZE TEMPORARY FIRE-RATED PLASTIC

BARRIER DURING CONSTRUCTION

3C03 REMOVE ICRA BARRIER AND DOOR AND FRAME. PATCH CEILING AS

REQUIRED. PATCH FLOOR AND WALL AND PREP FOR FINISHES.

3C04 REMOVE TEMPORARY DOOR AND FRAME. RE-INSTALL EXISTING WINDOW

TO MATCH EXISTING. INSTALL BLACKOUT FILM ON INSIDE OF WINDOW.

SEAL PERIMETER OF WINDOW.

3C05 REMOVE TEMPORARY STAIR AND ACCESS PLATFORM. PATCH AND REPAIR

EXISTING EXTERIOR WALL AND SIDEWALKS TO MATCH EXISTING.

NO ARCHITECTURAL WORK

UNLESS NOTED OTHERWISE

AREA OF ARCHITECTURAL WORK

UNLESS NOTED OTHERWISE

AREA OF WORK LEGEND

NEW WORK SYMBOL LEGEND

EXISTING PARTITION. PATCH WALL ON SITE OF

CONSTRUCTION AS REQUIRED FOR NEW FINISHES.

NEW DOOR AND HARDWARE. SEE DOOR SCHEDULE.

NEW INTERIOR PARTITION. SEE PARTITION SCHEDULE. INTERIOR

PARTITIONS NOT KEYED TO BE INTERIOR PARTITION A

X

3B02

3B02

3B04

3B04

/4

3B05

B

SIM

B

A

B

B

B

B

OFFICE

2D135r

OFFICE

2D135t

HD STORAGE

2D135u

PASSAGE

2D135s

STERILE HD

COMPOUNDING

2D135w

STERILE

COMPOUNDING

2D135x

ANTE-ROOM

2D135v

ORDER ENTRY

2D135q

ANTE-ROOM

2D135n

IV CLEAN ROOM

2D135m

FILES

2D135j

VAULT

2D135h

A

4' - 1 1/2" 4' - 2 1/2" 3' - 8"

/4

11' - 0 5/8"

/8

'-6

M

A X

/8

/2

A

A

C

B B

1' - 3 5/8" 4' - 0"

A

A

A

6' - 4 1/4" 3 5/8" 5' - 9"

B

B

A

A

A

A

A.1

3B03

BENCH

D E

M A

R C

A T

IO

N3B03

1' - 4"

1' - 3"

E

AE107

3B01

3B07

135p

135u

135v

135t

135w

135x

B

3B08

A R C H I T E C T S E N G I N E E R S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F ile

P a th

/1

/2

:3

:0

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ENGINEER

SCALE:

H.F. LENZ COMPANY

1407 Scalp Avenue Johnstown, PA 15904

Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants

As indicated

Philadelphia VA Medical Center 3900 Woodland Ave., Philadelphia, PA 19104

08/27/2020

642-17-100

DRKBJ

Renovate Inpatient Pharmacy for Chemotherapy I.V. Mixing

BID SETPHASES 3B & 3C

AE103

1/4" = 1'-0"

PHASE 3C - ICRA REMOVAL1/4" = 1'-0"

PHASE 3B - FLOOR PLAN

M

S H

E

LV

IN

G

UPE01,

BENCH

30" WIDE

P3000, SCRUB SINK

WITH EYEWASH

U1200, PASS-

THRU

R6060, LAB REF

M1801, COMPUTER

STATION

U3501, HOOD TYPE

A2 (SG304)

L2280, LAMINAR

FLOW HOOD

(EG6252)

U3500, HOOD

TYPE B2

(BCG601)

M

S H

E

LV

IN

G

M1801, COMPUTER

STATION

U1200, PASS-

THRU

R6060, LAB REF

M2080, SHELVING

M1801, COMPUTER

STATION

P3000, SCRUB

SINK WITH

EYEWASH

A

5, H

O O

K S

3)

M

S H

E

LV

IN

G

WORK COUNTER W/

STORAGE ABOVE

REF. BELOW

OMNICELL ABOVE

M2080, SHELVING

OFFICE

2D135t

HD STORAGE

2D135u

PASSAGE

2D135s

STERILE HD

COMPOUNDING

2D135w STERILE

COMPOUNDING

2D135x

ANTE-ROOM

2D135v

M2080, SHELVINGREFRIGERATOR

PASS-THRU

SHARPS, CONTAINER

COMPUTER, WALL MOUNTED

HOOD, LAMINAR FLOW

HOOD, BIOLOGICAL SAFETY CABINET TYPE B2

R6060

U1200

U3501

M1801

L2280

U3500

BENCH, STAINLESS STEEL WALL MOUNTEDUPE01

HOOK, GARMENT, DOUBLE, SS, SURFACE MOUNTEDA5145

HOOD, BIOLOGICAL SAFETY CABINET TYPE A2 U3501

GC

GC

VA

GC

GC

VA

GC

GC

GC

GC

VA

GC

VA

GC

GC

GC

GC

GC

GC

GC

GC

GC

GC

GC

GC

GC

GC

BAKER

BAKER

BAKER SG304, SterilGARD e3 Class II Type A2, Biological Safety Cabinet

EDGEGARD EG6252: CASTER FOR 36" WORK SURFACE

HEIGHT, IV BAR, 30 AMP POWER CORD w/ TWIST PLUG

BCG601, BioChemGard e3 Class II, Type B2

TERRA UNIVERSAL

#2634-80A-220: GENERAL-USE PASS-THROUGH WITH RECIRCULATING

HEPA FILTRATION, 304 SS, 18"x18"x18" 240V, ELECTRONIC INTERLOCK

LAB COMPANION

AAHE1143U: CLG-1400g LAB REFRIGERATOR 1395L, (GLASS, DOUBLE DOOR) 120V, 60Hz, 13A

SHELVING, STORAGEM2080

SS SCRUB SINK, SENSOR ACTIVATED, EYEWASHP3000

KEY

NOTE ITEM

PURCHASED

BY

INSTALLED

BY

GC

VA VA

GC

SUPPORT *

GC

*CONTRACTOR TO PROVIDE MEP SUPPORT REQUIREMENTS AS INDICATED IN THE CONTRACT DRAWINGS AND SPECIFICATIONS. SUPPORT REQUIREMENTS INCLUDE BUT ARE NOT LIMITED TO OUTLETS, SUPPORT BLOCKING, SA/RA/EXHAUST DUCTS, DATA LINES, ELECTRIC, PLUMBING, ETC.

CONTRACTOR IS RESPONSIBLE FOR ALL EQUIPMENT COORDINATION.

MANUFACTURER MODEL / ACCESSORIES

SEE PLUMBING DRAWINGS

SEE DETAIL G/AE107

EQUIPMENT SCHEDULE

2ND FLOOR KEY PLAN

AREAS OF WORK

TC B

LINE OF ROOF OR FLOOR DECK

SECTION

PLAN

/8

3 5/8" METAL STUDS @ 16" OC, TYP

5/8" GYPSUM BOARD, BOTH SIDES, SEE ROOM FINISH

SCHEDULE FOR FINISHES

CONTINUOUS METAL STUD TOP TRACK. PROVIDE

DEFLECTION TRACK AT ROOM

CONTINUOUS METAL STUD BOTTOM TRACK

LINE OF FINISHED FLOOR, SEE ROOM FINISH

SCHEDULE FOR FLOOR & BASE TYPE

LINE OF CEILING SYSTEM, SEE ROOM FINISH

SCHEDULE FOR TYPE & HEIGHT

CONTINUOUS 3 1/2" SOUND ATTENUATION BATTS,

TYP.

CONTINUOUS METAL HORIZONTAL BRIDGING

CHANNEL @ MID HEIGHT, TYP.

FIRE-RATED SEALANT, BOTH SIDES

3 5/8" METAL STUDS @ 16" OC, 25-GAGE, TYPICAL

5/8" TYPE "X" GYPSUM BOARD, BOTH SIDES,

STAGGER JOINTS ON OPPOSITE SIDES OF ROOM

SEE ROOM FINISH SCHEDULE FOR FINISHES

FIRE-RATED SEALANT, BOTH SIDES

CONTINUOUS METAL STUD TOP TRACK. PROVIDE

DEFLECTION TRACK AT ROOF

CONTINUOUS METAL STUD BOTTOM TRACK

LINE OF FINISHED FLOOR, SEE ROOM FINISH SCHEDULE

FOR FLOOR & BASE TYPE

LINE OF ROOF OR FLOOR DECK

LINE OF CEILING SYSTEM, SEE ROOM FINISH

SCHEDULE FOR TYPE & HEIGHT

3 5/8" METAL STUDS @ 16" OC, TYP

5/8" GYPSUM BOARD, BOTH SIDES, SEE ROOM FINISH

SCHEDULE FOR FINISHES

CONTINUOUS METAL HORIZONTAL BRIDGING

CHANNEL @ MID HEIGHT, TYP.

3 5/8" METAL STUDS @ 16" OC, TYP.

5/8" GYPSUM BOARD, SEE ROOM FINISH SCHEDULE FOR

FINISHES. CONTINUE GWB TO UNDERSIDE OF DECK.

SECTION

PLAN

1-HR RATED PARTITION - U465

TEMPORARY CONSTRUCTION BARRIER

NON-RATED PARTITION

SINGLE SIDED PARTITION

CONTINUOUS METAL STUD BOTTOM TRACK

LINE OF FINISHED FLOOR, SEE ROOM FINISH SCHEDULE

FOR FLOOR & BASE TYPE

LINE OF ROOF OR FLOOR DECK

LINE OF CEILING SYSTEM, SEE ROOM FINISH

SCHEDULE FOR TYPE & HEIGHT

3 5/8" METAL STUDS @ 16" OC, TYP

5/8" GYPSUM BOARD, BOTH SIDES, SEE

ROOM FINISH SCHEDULE FOR FINISHES

SECTION

CONTINUOUS METAL HORIZONTAL BRIDGING

CHANNEL @ MID HEIGHT, TYP.

PLAN

A.1

/8

3/8" ACOUSTICAL SEALANT, BOTH SIDES

5/8" GYPSUM BOARD, BOTH SIDES, SEE ROOM FINISH

SCHEDULE FOR FINISHES

3/8" ACOUSTICAL SEALANT, BOTH SIDES

NON-RATED PARTITION

CONTINUOUS METAL STUD TOP TRACK. PROVIDE

DEFLECTION TRACK AT ROOF

C

CONTINUOUS METAL STUD BOTTOM TRACK

LINE OF FINISHED FLOOR, SEE ROOM FINISH SCHEDULE

FOR FLOOR & BASE TYPE

LINE OF ROOF OR FLOOR DECK

LINE OF CEILING SYSTEM, SEE ROOM FINISH

SCHEDULE FOR TYPE & HEIGHT

6" METAL STUDS @ 16" OC, TYP

5/8" GYPSUM BOARD, BOTH SIDES, SEE ROOM FINISH

SCHEDULE FOR FINISHES

SECTION

CONTINUOUS METAL HORIZONTAL BRIDGING

CHANNEL @ MID HEIGHT, TYP.

PLAN

3/8" ACOUSTICAL SEALANT, BOTH SIDES

6" METAL STUDS @ 16" OC, TYP.

5/8" GYPSUM BOARD, BOTH SIDES, SEE ROOM FINISH

SCHEDULE FOR FINISHES

3/8" ACOUSTICAL SEALANT, BOTH SIDES

NON-RATED PARTITION

CONTINUOUS METAL STUD TOP TRACK. PROVIDE

DEFLECTION TRACK AT ROOF

/4

/4

3 5/8" METAL STUDS @ 16" OC, 25-GAGE, TYPICAL

PARTITION TYPE A.1: CONTINUOUS 3 1/2" SOUND

ATTENUATION BATT INSULATION, TYP.

A

PARTITION TYPE A: SOUND ATTENUATION BATT

INSULATION NOT REQUIRED

PORTION OF PARTITION

TO REMAIN AS SOFFIT

BULKHEAD

PORTION OF

TEMPORARY PARTITION

TO BE REMOVED.

FINISH BOTTOM OF

SOFFIT BULKHEAD WITH

GWB.

OFFICE

2D135r

OFFICE

2D135t

HD STORAGE

2D135u

PASSAGE

2D135s

STERILE HD

COMPOUNDING

2D135w

STERILE

COMPOUNDING

2D135x

ANTE-ROOM

2D135v

ORDER ENTRY

2D135q

ANTE-ROOM

2D135n

IV CLEAN ROOM

2D135m

FILES

2D135j

VAULT

2D135h

135t

135u

135v

135w

135x

2D135a - PASSAGE VSF-1 VSF-1

FINISH SCHEDULE

ROOM

2D135r - OFFICE

2D135t - OFFICE

2D135u - HD STORAGE

2D135v - ANTE-ROOM

2D135w - STERILE HD COMPOUNDING

2D135x - STERILE COMPOUNDING

FLOOR BASE

PT-1 ACT-1

PAINT CEILING

2D135j - FILES VSF-1 VSF-1 PT-1 ACT-1

VSF-1 VSF-1 PT-2 ACT-1

VSF-1 VSF-1 PT-2 ACT-1

VSF-1 VSF-1 PT-1* GWB

VSF-1 VSF-1 PT-1* GWB

VSF-1 VSF-1 PT-1* GWB

VSF-1 VSF-1 PT-1* GWB

REMARKS

DOOR FRAME: P-3 (BOTH SIDES)

* WALLS & CEILINGS

MATERIAL ABBREVIATIONS

VSF-1 VINYL SHEET FLOORING

VSF-1: ARMSTRONG; MEDITONE; GRAYED BLUE LIGHT / H5328

PT PAINT

PT-1: SHERWIN WILLIAMS; WESTHIGHLAND WHITE / SW7566

PT-2: SHERWIN WILLIAMS; WESTHIGHLAND WHITE / SW7566

PT-3: SHERWIN WILLIAMS; SOFT FAWN / SW9097

ACT-1 ACOUSTIC CEILING TILE

SEE SPECIFICATIONS

GWB GYPSUM BOARD CEILING, PATINTED

SEE SPECIFICATIONS

FINISH SCHEDULE NOTES:

1. PROVIDE INTEGRAL VSF BASE WITH HEAT WELDED SEAMS AT VSF FLOORING. SEE DETAIL D/AE107.

2. HEAT WELD ALL JOINTS IN VINYL SHEET FLOORING (VSF).

3. PLASTIC LAMINATE (PLAM-1) TO BE WILSONART; WINDSWEPT BRONZE; MATTE / 4794-60

4. SOLID SURFACE (SS-1) TO BE MEGANITE; WHITE MOSALE GRANITE / 775

REFERENCE SPEC SECTION 09 06 00 FOR FINISHES

DOOR FRAME: P-3 (BOTH SIDES)

* WALLS & CEILINGS

* WALLS & CEILINGS

* WALLS & CEILINGS

A R C H I T E C T S E N G I N E E R S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F ile

P a th

/1

/2

:3

:0

P

M

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMP

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

ENGINEER

SCALE:

H.F. LENZ COMPANY

1407 Scalp Avenue Johnstown, PA 15904

Phone: 814-269-9300 FAX: 814-269-9301 cadd@hflenz.com www.hflenz.com Engineers - Planners - Surveyors - Energy Consultants

As indicated

Philadelphia VA Medical Center 3900 Woodland Ave., Philadelphia, PA 19104

08/27/2020

642-17-100

DRKBJ

Renovate Inpatient Pharmacy for Chemotherapy I.V. Mixing

BID SETFINISH PLAN, EQUIPMENT PLAN &

PARTITION TYPES

AE104

3/8" = 1'-0"

EQUIPMENT PLAN

1/4" = 1'-0"

FINISH PLAN

D E

M A

R C

A T

IO

N

L

IN

E

01AE10502

OFFICE

2D135r

OFFICE

2D135t

HD STORAGE

PASSAGE

2D135s

STERILE HD

COMPOUNDING

2D135w

STERILE

COMPOUNDING

2D135x

ANTE-ROOM

2D135v

2D135u

05AE10503

07AE10509

18AE10516

13AE10511

AE105

AE105

6" INTEGRATED BASE

MODIFY EXISTING

CEILING

NEW SOFFIT

EXISTING GWB WALL,

PREP FOR NEW

FINISHES, PAINT

FINISHED CEILING

SYSTEM

EXISTING FINISHED

FLOOR, PREP FOR

NEW FINISHES

6" INTEGRATED BASE

MODIFY EXISTING

CEILING

NEW SOFFITFINISHED CEILING

SYSTEM

EXISTING FINISHED

FLOOR, PREP FOR

NEW FINISHES

SOLID SURFACE

COUNTERTOP W/ 4"

BACKSPLASH

6" INTEGRATED BASE

FINISHED CEILING

SYSTEM

EXISTING FINISHED

FLOOR, PREP FOR

NEW FINISHES

FINISHED END

PANEL

GWB PAINTED

PASS-THRU

6" INTEGRATED BASE

EXISTING FINISHED

FLOOR, PREP FOR

NEW FINISHES

GWB PAINTED

FINISHED CEILING SYSTEM

6" INTEGRATED BASE

WALL MTD. MONITOR STATION

GWB PAINTED

FINISHED CEILING

SYSTEM

EXISTING FINISHED

FLOOR, PREP FOR

NEW FINISHES

6" INTEGRATED BASE

PASS THRU

GWB PAINTED

FINISHE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .