Intent to Award~16.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- S-C05004-00002810
- Issued by
- Coos County, Oregon
About this file
This is an Intent to Award document issued by the Oregon Department of Transportation (ODOT) for ITB No. S-73000-00002812 on May 14, 2022, for pavement repair services at various locations on US Route 26. The project scope includes mobilization, temporary work zone traffic control, pollution control planning, cold plane pavement removal (65,032 square yards at 2 inches deep), installation of Level 3 PG 64-22 dense asphalt concrete pavement (7,316 tons), methyl methacrylate surface application (78,144 linear feet), and centerline rumble strip installation (4 miles). The bid closing date was May 10, 2022, with ODOT issuing notice of intent to award the contract to Granite Construction Company dba Knife River Materials. Aggrieved bidders have 5 calendar days from the issued date to protest the award decision.
The winning bid from Granite Construction Company totaled $1,331,118.66, with significant line items including mobilization at $133,111.86, temporary traffic control at $74,000.00, asphalt paving at $910,842.00, and methyl methacrylate surface treatment at $121,123.20. The competing bid tabulation shows comparative pricing with unit rates and extended totals for all items, demonstrating competitive bidding practices. The document does not specify set-aside designations, incumbent vendors, or explicit funding sources, though ODOT's capital improvement funding structure typically supports such pavement rehabilitation projects. The contract represents a standard state transportation infrastructure improvement with work scheduled for completion at various US 26 locations throughout Oregon.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Report Meissner CCE BMC 200015 SRT.pdf | ||
| Columbia911 ITB Meissner.docx | DOCX document | |
| RFP Evaluation Form Meisner 3.docx | DOCX document | |
| Report Meissner CCE BMC 200015 GEO.pdf | ||
| Meissner Pricing Schedule 2.xlsx | XLSX spreadsheet | |
| Columbia 911 Agreement Final 04_2022.docx | DOCX document | |
| 4. Meissner Final Construction Drawings 4-7-2021.pdf | ||
| Pumpkin Center Building Drawing~1.pdf | ||
| Meissner SA 6 22 21.pdf | ||
| Wireless Construction SOW Meissner 04_2022.docx | DOCX document | |
| Pumpkin Center Building Drawing~2.pdf | ||
| Special Inspection Short form 2016 Signed.PDF | ||
| Meisner R 1 For Construction.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 5/14/22 | |||
| ITB No. | S-73000-00002812 | BIDDER | ||
| NAME: | Granite Construction Company | LTM, Incorporated dba Knife River Materials | ||
| Bid Closing: | May 10, 2022 | CITY/STATE: | ||
| Description: | US26 Various Locations Pavement Repair | CCB#: | ||
| This bid tabulation shall serve as ODOT's notice of intent to award a contract to Granite Construction Company. Aggrieved Bidders have 5 calendar days from the issued date shown above to protest the intent to award. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 73,741.00 | $ 73,741.00 | $ 133,111.86 | $ 133,111.86 |
| 2 | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 85,000.00 | $ 85,000.00 | $ 74,000.00 | $ 74,000.00 |
| 3 | Pollution Control Plan | 1 | LS | $ 500.00 | $ 500.00 | $ 100.00 | $ 100.00 |
| 4 | Cold Plane Pavement Removal, 2 inches deep | 65,032 | SQYD | $ 1.25 | $ 81,290.00 | $ 1.30 | $ 84,541.60 |
| 5 | Level 3, PG 64-22, 1/2 Inch Dense ACP | 7,316 | Ton | $ 125.00 | $ 914,500.00 | $ 124.50 | $ 910,842.00 |
| 6 | Methyl Metharcylate, Extruded, Surface, Profiled | 78,144 | Lin Foot | $ 2.00 | $ 156,288.00 | $ 1.55 | $ 121,123.20 |
| 7 | Rumble Strips, Centerline 12" | 4 | Mile | $ 2,000.00 | $ 8,000.00 | $ 1,850.00 | $ 7,400.00 |
| TOTAL | $ 1,319,319.00 | $ 1,331,118.66 |
File details come from the government source that posted it. Updated .