INT RFP W912JV24C3002 AttE Final Revised 09122024.pdf
PDF 126 KB Posted
- Attached to
- W912JV24C3002: Invasive Species Removal and Control at Camp Adair, Benton County, Oregon
- Solicitation number
- S-24800-00011406
- Issued by
- Benton County, Oregon
About this file
The document provided is an Attachment E - Cost Sheet for a Request for Proposals (RFP) issued by the Oregon Military Department (OMD) for the removal and control of invasive plant species at the 527-acre Camp Adair training installation in Benton County, Oregon. The project area encompasses a priority area of approximately 70 acres with a maximum of 350 acres in need of treatment. The RFP requires proposers to provide pricing for treatment of blackberry, poison oak, and other invasive species such as knapweed and thistle, with pricing to be provided on a per-acre basis.
The RFP is identified as Intermediate Procurement W912JV24C3002, with the OregonBuys Bid # S-24800-00011406. Proposers must follow the instructions provided in the Cost Sheet and any subsequent addenda when submitting their pricing information, as failure to do so may result in the proposal being rejected as non-responsive.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Intermediate Procurement W912JV24C3002 – Invasive Species Removal and Control at Camp Adair Att E OregonBuys Bid # S-24800-00011406
ATTACHMENT E — COST SHEET
Revised September 12, 2024
COST SHEET INSTRUCTIONS:
Proposers must enter pricing and other required information for all Bid Items listed in this Cost Sheet. If this Cost Sheet is replaced by Addendum, Proposers must use the Addendum form to provide pricing and other required information. If the Cost Sheet is only modified by Addendum, Proposers must follow the instructions in the Addendum for making modifications to the Cost Sheet. Failure to supply the required information in the Cost Sheet or subsequent Addenda may result in Proposal rejection as non-responsive.
Number Item Description Unit of Measure Unit Cost
1. Cost per acre for blackberry treatment including mulching and/or removal off-site
Acre
2. Cost per acre for the treatment of poison oak and other invasive species such as knapweed, thistle, etc.
Acre
Authorized Signature Date
(Printed Name and Title)
File details come from the government source that posted it. Updated .