About this file

This document is an Attachment E - Cost Sheet for Intermediate Procurement W912JV24C3002 - Invasive Species Removal and Control at Camp Adair, issued by the Oregon Buys system under Bid # S-24800-00011406. The solicitation is requesting pricing for two bid items: 1) Cost per acre for woody species removal and control, and 2) Cost per acre for non-woody species herbaceous species removal and control. Proposers must provide unit costs for these items. Failure to provide the required information may result in the proposal being rejected as non-responsive.

The Cost Sheet does not provide details on the project overview, quantities, response dates, site visits, award information, or contract term. It focuses solely on the pricing requirements for the two specified bid items.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Intermediate Procurement W912JV24C3002 – Invasive Species Removal and Control at Camp Adair Att E OregonBuys Bid # S-24800-00011406

ATTACHMENT E — COST SHEET

COST SHEET INSTRUCTIONS:

Proposers must enter pricing and other required information for all Bid Items listed in this Cost Sheet. If this Cost Sheet is replaced by Addendum, Proposers must use the Addendum form to provide pricing and other required information. If the Cost Sheet is only modified by Addendum, Proposers must follow the instructions in the Addendum for making modifications to the Cost Sheet. Failure to supply the required information in the Cost Sheet or subsequent Addenda may result in Proposal rejection as non-responsive.

Number Item Description Unit of Measure Unit Cost

1. Cost per acre for woody species removal and control

Acre

2. Cost per acre for non-woody species herbaceous species removal and control

Acre

Authorized Signature Date