Inlet Harbor Beach Access Replacement Project – Construction Drawings
This is a comprehensive 100% construction drawings document prepared by Dredging & Marine Consultants for Volusia County, Florida, detailing the Inlet Harbor Beach Access Replacement project located at 4801 South Atlantic Avenue, Ponce Inlet, Florida 32127. The project scope includes demolition of an existing 300-linear-foot timber boardwalk and replacement with new ADA-compliant infrastructure consisting of 194 linear feet of concrete sidewalk, 128 linear feet of timber boardwalk, timber dune walkover stairs (17 steps), an ADA-compliant ramp with maximum 1:12 slope, one concrete ADA parking space with loading zone, and timber railings throughout. The drawings package comprises 18 sheets including site plans, demolition plans, grading plans, detailed cross-sections, stair and ramp profiles, observation deck framing plans, and ADA parking specifications. The project requires careful removal and storage of existing site furnishings (bench, bicycle rack, and signage) for reinstallation on the new structure. All work must comply with Florida Building Code accessibility standards, ASCE 7-22 design specifications, and federal FEMA compliance requirements. The construction contract is estimated at $408,325.00 with substantial completion required within 120 days and final completion within 150 days of the Notice to Proceed, subject to liquidated damages of $500 per day for delays.
The project specifications mandate comprehensive material testing and quality assurance, including soil compaction verification to 98% Modified Proctor density, concrete strength certification of 4,500 PSI minimum, and timber grading compliance with marine-grade Southern Yellow Pine standards. All fasteners, bolts, and hardware must be Grade 316 stainless steel to withstand coastal marine environments. The contractor must provide post-driving logs documenting blow counts and jetting operations, obtain all necessary local building permits, implement erosion and turbidity control measures, and coordinate utility protection with affected entities. Environmental compliance requires adherence to coastal construction restrictions, including prohibition on soil movement seaward of the Coastal Construction Control Line and restriction of construction activities during marine turtle nesting season (May 1–October 31). The contractor is responsible for site surveying stakeout, temporary traffic control planning, shipping and stockpile area coordination, site safety planning, and final as-built survey preparation by a licensed Florida Professional Surveyor referenced to NAVD 88. All submittals, including shop drawings, material certifications, and schedule of completion, require Engineer of Record approval prior to ordering or installation.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUSIA
COUNTY
CVR
C-01 C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-09 C-10 C-11 C-12 C-13 C-14 C-15 C-16 C-17 C-18
INDEX & LOCATION MAP
EXISTING CONDITIONS
AERIAL
DEMOLITION PLAN
GRADING PLAN
SITE PLAN
SITE PLAN
BEACH ACCESS DETAILS
SIDEWALK PLAN & PROFILE
BOARDWALK PLAN & PROFILE
CORNER PLAN & CROSS SECTION
OBSERVATION DECK PLAN
STAIRS PROFILE & CROSS-SECTION
ADA PARKING PLAN
ADA PARKING DETAILS
GENERAL NOTES
GENERAL NOTES
GENERAL NOTES
ENVIRONMENTAL NOTES
SURVEY
SURVEY
SURVEY
SURVEY
PROJECT ADDRESS: 4801 SOUTH ATLANTIC AVENUE, PONCE INLET, FL 32127
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : C
O
VE
R
/1 6/
INDEX
SHEET DESCRIPTION
FLORIDA
COUNTY COUNCIL
PROJECT LOCATION MAP
VOLUSIA COUNTY
BEACH ACCESS REPLACEMENT
JULY 16, 2025
CONSTRUCTION DRAWINGS
Port Orange, FL 32129 Unit 302 4643 S. Clyde Morris BlvdDredging & Marine Consultants
ENGINEERS SCIENTISTS
Phone:(386) 304-6505 Fax:(386) 304-6506 www.dmces.com
CURTIS N. TODD, P.E.
FLORIDA LICENSE No. 37136
ENGINEER CERTIFICATION:
I HEREBY CERTIFY THAT I AM A REGISTERED PROFESSIONAL ENGINEER IN THE
STATE OF FLORIDA PRACTICING WITH DMC, DREDGING & MARINE
CONSULTANTS LLC, A CORPORATION, AUTHORIZED TO OPERATE AS AN
ENGINEERING BUSINESS, CERTIFICATE OF AUTHORIZATION # 9410, BY THE
STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL
REGULATION, AND THAT I, OR OTHERS UNDER MY DIRECT SUPERVISION, HAVE
PREPARED OR APPROVED THE EVALUATIONS, FINDINGS, OPINIONS,
CALCULATIONS, CONCLUSIONS OR TECHNICAL ADVICE HEREBY REPRESENTED
BY THESE DRAWINGS.
NOTE TO CONTRACTOR:
THESE DRAWINGS AND THE PROJECT SPECIFICATIONS ARE COMPLEMENTARY,
AND ANY REQUIREMENT OF ONE SHALL BE A REQUIREMENT OF THE OTHER. IT
IS THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE THE DRAWINGS AND
SPECIFICATIONS AND TO COMPARE THE REQUIREMENTS OF EACH DIVISION
AND ENSURE THAT EACH TRADE OR SUBCONTRACTOR IS MAKING THE
ALLOWANCES NECESSARY TO PROVIDE THE OWNER A COMPLETE FACILITY,
OPERATIONAL IN ALL RESPECTS, UNLESS OTHERWISE SPECIFICALLY STATED
IN THE DRAWINGS OR PROJECT MANUAL.
IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE ENGINEER OF
ANY DEFICIENCIES OR DISCREPANCIES AMONG THE DIVISIONS OF THE
DRAWING AND SPECIFICATIONS PRIOR TO THE DEADLINE FOR BID SUBMITTAL.
NEITHER THE OWNER OR ENGINEER WILL BE RESPONSIBLE FOR ANY
DEFICIENCIES OR DISCREPANCIES RAISED AFTER THE BID OPENING.
ACCORDINGLY, IN LIGHT OF THESE OBLIGATIONS, THE ENGINEER IS
OBLIGATED TO INTERPRET THE DRAWINGS SPECIFICATIONS IN A MANNER
THAT WILL PROVIDE THE OWNER WITH A COMPLETE, FUNCTIONING FACILITY
FOR THE BID PRICE.
REPRODUCTION SCALE:
THESE PLANS SHALL BE PRINTED IN COLOR AND
ARE SCALED TO ACCURATELY BE REPRODUCED ON
11X17 SIZED SHEETS. ALL OTHER SHEET SIZES ARE
NOT TO SCALE.
JEFF BROWER COUNTY CHAIR
JAKE JOHANSSON AT-LARGE REPRESENTATIVE
DON DEMPSEY DISTRICT 1
MATT REINHART VICE CHAIR, DISTRICT 2
DANNY ROBINS DISTRICT 3
TROY KENT DISTRICT 4
DAVID SANTIAGO DISTRICT 5
GEORGE RECKTENWALD COUNTY MANAGER
INLET HARBOR ROAD
SECTION 19, TOWNSHIP 16S, RANGE 34E
100% PLANS
PROJECT
LOCATION
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
C -0
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : E
XI
ST
IN
G
C O
N D
IT
IO
N S
(1
7/
/2
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
EE
RS
SC
IE
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
EXISTING BEACH ACCESS, FACING WEST DMC, 12-11-2023 EXISTING BEACH ACCESS RAMP, FACING WEST
EXISTING BEACH ACCESS, FACING NORTHEASTEXISTING BEACH ACCESS RAMP, FACING SOUTHEAST
DMC, 12-11-2023
DMC, 12-11-2023DMC, 12-11-2023
AE
R
IA
L
C -0
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : A
ER
IA
L (2
7/
/2
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
AERIAL
1" = 30'
COASTAL CONSTRUCTION
CONTROL LINE (CCCL)
PROPOSED CONCRETE
ADA PARKING PAD
EXISTING
VEGETATION LINE
LABINS, 2021
Feet 0 30 60
PROPOSED TIMBER BOARDWALK
268'± TO CCCL
274'± TO CCCL
PROPOSED
BEACH
ACCESS
STAIRS &
RAMP
SOUTH ATLANTIC AVENUE (A1A)
PROPOSED CONCRETE SIDEWALK WITH TIMBER RAILING
BENCHMARK
N: 1728832.572 E: 678688.330
EL.=(+)14.85 NAVD 88
BENCHMARK
N: 1728844.778
E: 678477.790
EL.=(+)15.70 NAVD 88
D
EM
O
LI
TI
O
N P
LA
N C
-0
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : D
EM
O
(3
7/
/2
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
DEMOLITION PLAN
1" = 30'
COASTAL CONSTRUCTION
CONTROL LINE (CCCL)
EXISTING
VEGETATION LINE
TO REMAIN
LABINS, 2021
300± LINEAR FOOT EXISTING BOARDWALK TO BE REMOVED AND REPLACED
EXISTING TREES
TO BE TRIMMED
AS NEEDED (TYP.)
EXISTING SIGN TO
BE REMOVED,
STORED ON SITE,
AND REINSTALLEDEXISTING TRASH CAN TO
BE REMOVED, STORED ON
SITE, AND REINSTALLED
EXISTING BENCH AND BIKE
RACK TO BE REMOVED, STORED
ON SITE, AND REINSTALLED
OVERHEAD UTILITIES
TO REMAIN (TYP.)
EXISTING GUY
ANCHOR TO REMAIN
EXISTING WOOD FENCE
TO REMAIN. ADJUST
NORTH END AS NEEDED
FOR PROPOSED RAMP
Feet 0 30 60
EXISTING MOUND TO
BE EXCAVATED AND
RE-GRADED. SEE
GRADING PLAN,
SHEET C-04
SOUTH ATLANTIC AVENUE (A1A)
EXISTING SIDEWALK
TO REMAIN
EXISTING VEGETATION TO BE TRIMMED AS
NEEDED TO CONSTRUCT PROPOSED STRUCTURE
NOTE:
· DE-WATER SITE AS NEEDED.
· ANY EXISTING SIGNAGE SHALL BE REMOVED AS NEEDED
AND STORED ON SITE FOR REINSTALL.
G R
AD
IN
G P
LA
N
C -0
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : G
R
AD
IN
G
(4
7/
/2
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
GRADING PLAN
N.T.S.
131415
EXISTING SAND
PARKING LOT
CONCRETE
APRON
GRADE AS NEEDED FOR
PROPOSED CONCRETE SIDEWALK
LEGEND:
EXISTING CONTOUR
PROPOSED CONTOUR
EXISTING MOUND TO BE
REMOVED / RE-GRADED
SOUTH ATLANTIC AVENUE (A1A)
PROPERTY LINE
OVERHEAD UTILITIES
TO REMAIN (TYP.)
EXISTING GUY
ANCHOR TO REMAIN
EXISTING SIDEWALK
TO REMAIN
SI
TE
P
LA
N
C -0
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : S
P
(5
7/
/2
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
SITE PLAN
1" = 8'
EL.=(+)15.75±
(MATCH EXISTING)
EXISTING
CONCRETE
SIDEWALK
6'-0"
(TYP.)
LEGEND:
CONTRACTION JOINT
EXPANSION JOINT
PROPOSED ADA PARKING
SPACE, SEE SHEET C-13
EL.=(+)14.00
EL.=(+)13.80±
(MATCH EXISTING)
6'-6"
(TYP.) 19'-71
4"
7'-3" (TYP.)
SITE PLAN
1" = 8'
EXISTING
ASPHALT
MATCHLINE A
MATCHLINE A
MATCHLINE B
6'-0" C.C.
POSTS (TYP.)
5'-0" C.C.
POSTS (TYP.)
6'-0"
(TYP.)7'-3" (TYP.)
6'-0" C.C.
POSTS (TYP.)
EXISTING OVERHEAD
UTILITIES
PROPOSED 194 LF
CONCRETE SIDEWALK
PROPOSED 194 LF
CONCRETE SIDEWALK
PROPERTY LINE
PROPERTY LINE
6" X 6" RAILING POSTS,
S.Y.P. No.1 GRADE (TYP.)
6" X 6" RAILING POSTS,
S.Y.P. No.1 GRADE (TYP.)
30'-0" (TYP.)16'-101
2" 30'-0" (TYP.)
30'-0" (TYP.)30'-0" (TYP.)
SI
TE
P
LA
N
C -0
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : S
P
(6
7/
/2
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
SITE PLAN
1" = 8'
SITE PLAN
1" = 8'
MATCHLINE B
EL.=(+)14.75
56'-0" 10'-0" C.C.
POSTS (TYP.)
LEGEND:
MAIN POST
MID-POST
54'-0"
14'-0"
14'-0"
7'-0"
6'-0"
(TYP.)
10'-0" C.C.
MID-POSTS
(TYP.) BIKE
RACK
BENCH
MATCHLINE C
MATCHLINE C
EL.=(+)5.75
6'-0"
(TYP.)
VEGETATION
LINE
6'-0"
LANDING
EL.=(+)14.75
30'-0" RAMP 25'-0" RAMP6'-0"
LANDING
EL.=(+)12.25
EL.=(+)10.25
6'-0"
LANDING
12'-0"
6'-0"
(TYP.)
6'-0"
(TYP.)
30'-0" RAMP
EL.=(+)8.25
EL.=(+)14.00
11EL.=(+)14.75
15'-10"
(17± STEPS)
125°
5'-10"
7'-4"
EL.=(+)4.83
6'-0"
1'-91 2"
6'-0"
LANDING
LAND SIDE
WATER SIDE
PROPOSED 128 LF
TIMBER BOARDWALK
PROPOSED 128 LF
TIMBER BOARDWALK
CORNER-POST FOR
TIMBER RAILING
CONNECTION (TYP.)
SEE OBSERVATION DECK
FRAMING PLAN, SHEET C-11
5'-0" C.C. POSTS
10'-0" C.C.
MAIN POSTS
10''-0" C.C.
MID-POSTS
10'-0"
SEE CORNER FRAMING
PLAN, SHEET C-10
NOTE:
CONTRACTOR TO COORDINATE WITH
COUNTY AND ENGINEER ON FINAL
PLACEMENT OF BIKE RACK AND BENCH
C -0
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : X
-S (7
7/
/2
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
BE
AC
H A
C C
ES
S
D
ET
AI
LS
BEACH ACCESS CROSS-SECTION AT MAIN POSTS
1" = 2'
BEACH ACCESS CROSS-SECTION AT MID-POSTS
1" = 2'
42" 36"
(3) 2" X 8" VERTICAL RAILINGS, S.Y.P.
No.1 PRIME GRADE. ATTACH WITH (2)
8" DIA. S.S. CARRIAGE BOLTS (TYP.)
2" X 6" VERTICAL RAILING, S.Y.P. No.1
PRIME GRADE. ATTACH WITH (1) 3 8"
DIA. S.S. CARRIAGE BOLT (TYP.)
2" X 8" COMPOSITE HORIZONTAL
RAILING CAP. ATTACH WITH (2) #10 X 3"
LONG S.S. FLATHEAD SCREWS,
EQUALLY SPACED AT POSTS (TYP.)
3" X 8" STRINGERS, S.Y.P.
No.2 GRADE, SPACED
EQUALLY AS SHOWN (TYP.)
8" CLEAR
(TYP.)
8" CLEAR
(TYP.)
(2) 5 8" DIA. S.S.
THREADED RODS, NUTS
AND WASHERS (TYP.)
3" OVERHANG (TYP.)
6" X 6" MID-POSTS,
S.Y.P. No.1 GRADE
(TYP.)
3" X 8" SPACER BOARD
(CUT TO FIT) S.Y.P. No.2
GRADE (TYP.)
6" X 6" POSTS, S.Y.P.
No.1 GRADE, MIN. 10'-0"
EMBEDMENT BELOW
GROUNDLINE (TYP.)
3" X 8" CAP
BOARDS, S.Y.P.
No.2 GRADE (TYP.)
SPLICE BLOCK
BOLTING
POST
BOLTING
(2) 5 8" DIA. S.S.
THREADED RODS, NUTS
AND WASHERS (TYP.)
3" X 8" SPLICE BLOCK,
S.Y.P. No.2 GRADE, LENGTH = 18"
3" X 8" STRINGERS, S.Y.P.
No.2 GRADE, SPACED
EQUALLY AS SHOWN (TYP.)
S.S. HURRICANE
STRAPS WITH S.S.
SCREWS (TYP.)
2" X 8" DECK BOARDS, S.Y.P. No.1 PRIME
GRADE, LENGTH = 6'-0". ATTACH WITH (3)
#10 X 3" LONG S.S. FLATHEAD SCREWS AT
EACH STRINGER CONNECTION (TYP.)
6'-0" C.C. POSTS (TYP.)
6" X 6" POSTS, S.Y.P. No.1
GRADE, MIN. 10'-0" EMBEDMENT
BELOW GROUNDLINE (TYP.) 3" X 8" CAP BOARDS,
S.Y.P. No.2 GRADE (TYP.)
6" X 6" MID-POSTS, S.Y.P.
No.1 GRADE (TYP.) 3" X 8" STRINGERS, S.Y.P.
No.2 GRADE (TYP.)
2" X 8" DECK BOARDS, S.Y.P.
No.1 PRIME GRADE. ATTACH
WITH (3) #10 X 3" LONG S.S.
FLATHEAD SCREWS AT EACH
STRINGER CONNECTION (TYP.)
ALUMINUM
ADA HANDRAIL
2" X 8" COMPOSITE HORIZONTAL RAILING CAP.
ATTACH WITH (2) #10 X 3" LONG S.S. FLATHEAD
SCREWS, EQUALLY SPACED AT POSTS (TYP.)
(3) 2" X 8" VERTICAL RAILINGS, S.Y.P.
No.1 PRIME GRADE. ATTACH WITH (2)
8" DIA. S.S. CARRIAGE BOLTS (TYP.)
2" X 6" VERTICAL RAILING, S.Y.P. No.1
PRIME GRADE. ATTACH WITH (1) 3 8"
DIA. S.S. CARRIAGE BOLT (TYP.)
TOP RAILING DETAIL
1" = 1'
TOP RAILING 90° CORNER DETAIL
1" = 2'
2" X 8" VERTICAL RAILING,
S.Y.P. No.1 PRIME GRADE
(4) #10 X 3" LONG S.S. FLAT-HEAD SCREWS
AT EACH HORIZONTAL RAIL JOINT
CONNECTION, SPACED EQUALLY (TYP.)
45° JOINT AT 6" X 6" POSTS,
S.Y.P. No.1 GRADE (TYP.)
90°
45° HORIZONTAL RAIL
JOINT AT CORNER POSTS
2" X 8" COMPOSITE
HORIZONTAL RAILING CAP
6" X 6" POST, S.Y.P.
No.1 GRADE (TYP.)
2" X 8" VERTICAL RAILING,
S.Y.P. No.1 PRIME GRADE
3 8" DIA. S.S. CARRIAGE
BOLTS (TYP.)
(2) #10 X 3" LONG S.S. FLAT-HEAD SCREWS
AT EACH HORIZONTAL RAIL CONNECTION,
SPACED EQUALLY (TYP.)
6" X 6" MID-POST, S.Y.P.
No.1 GRADE (TYP.)
2" X 8" COMPOSITE
HORIZONTAL RAILING CAP
(2) 5 8" DIA. S.S.
THREADED RODS, NUTS
AND WASHERS (TYP.)
BEACH ACCESS CROSS-SECTION AT CORNER
1" = 2'
CONCRETE SIDEWALK & TIMBER RAILING CROSS-SECTION
1" = 2'
ALUMINUM ADA
HANDRAIL (TYP.)
42" 36"
8" CLEAR
(TYP.)
8" CLEAR
(TYP.)
6" X 6" POSTS,
S.Y.P. No.1
GRADE (TYP.)
6" THICK CONCRETE
SIDEWALK WITH 12"
THICKENED EDGE
SIMPSON STRONG TIE (CB66)
STAINLESS STEEL COLUMN BASE
OR APPROVED EQUAL SHALL BE
SET INTO PLACE DURING
CONCRETE POUR. ATTACH TO 6"x6"
POST WITH (2) 5 8" DIA. S.S.
CARRIAGE BOLTS, NUTS AND
WASHERS
6'-0" C.C. POSTS
7'-3" CONCRETE SIDEWALK
8" CLOSED-CELL NEOPRENE,
FULL CROSS-SECTIONAL
AREA OF 6"x6" POST.
12"
12"
6"
6"
ALUMINUM ADA
HANDRAIL (TYP.)
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : S
ID
EW
AL
K
(8
7/
/2
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
SI
D
EW
AL
K
PL
AN
PR
O
FI
LE
SIDEWALK PLAN
1" = 2'
SIDEWALK PROFILE
1" = 2'
6'-0" C.C.
POSTS (TYP.)
7'-3" CONCRETE
SIDEWALK
8" CLOSED-CELL NEOPRENE
EXPANSION JOINT, SPACED 30' MAX.
6'-0" C.C. MAIN POSTS (TYP.)
CONTRACTION
JOINT (TYP.)
6" X 6" POSTS, S.Y.P.
No.1 GRADE (TYP.)71
2" (TYP.)
42" (TYP.)36" (TYP.)
6" X 6" POSTS, S.Y.P.
No.1 GRADE (TYP.)
(3) 2" X 8" VERTICAL RAILINGS,
S.Y.P. No.1 PRIME GRADE.
ATTACH WITH (2) 3 8" DIA. S.S.
CARRIAGE BOLTS (TYP.)
2" X 6" VERTICAL RAILING, S.Y.P. No.1
PRIME GRADE. ATTACH WITH (1) 3 8"
DIA. S.S. CARRIAGE BOLT (TYP.)
8" CLEAR (TYP.)
8" CLEAR (TYP.)
ALUMINUM ADA
HANDRAIL
2" X 8" COMPOSITE HORIZONTAL RAILING CAP.
ATTACH WITH (2) #10 X 3" LONG S.S. FLATHEAD
SCREWS, EQUALLY SPACED AT POSTS (TYP.)
6'-0" C.C. MAIN POSTS (TYP.)
6" THICK CONCRETE
SIDEWALK WITH 12"
THICKENED EDGE
(BOTH SIDES)
SIMPSON STRONG TIE (CB66)
STAINLESS STEEL COLUMN
BASE OR APPROVED EQUAL
SHALL BE SET INTO PLACE
DURING CONCRETE POUR.
ATTACH TO 6"x6" POST WITH
(2) 5 8" DIA. S.S. CARRIAGE
BOLTS, NUTS AND WASHERS
COMPACT SOILS UNDER AREA
WHERE CONCRETE WILL BE
PLACED MODIFIED PROCTOR
VALUE PER AASHTO T-180.
45° JOINT (TYP.)
6'-0" (TYP.)
8" CLOSED-CELL NEOPRENE
EXPANSION JOINT
CONTRACTION
JOINT (TYP.)
2" X 8" HORIZONTAL
RAILING CAP, S.Y.P. No.1
PRIME GRADE (TYP.)
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : P
LA
N
P
R O
FI
LE
(9
7/
/2
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
BO
AR
D W
AL
K
PL
AN
P
R O
FI
LE
(2) 5 8" DIA. S.S. THREADED RODS,
NUTS AND WASHERS (TYP.)
BEACH ACCESS PLAN
1" = 2'
BEACH ACCESS RAMP PROFILE
1" = 2'
6'-0" C.C. LANDING POSTS (TYP.) 10'-0" C.C. RAMP POSTS 1:12 MAX. SLOPE (8.33%) (TYP.)
42" (TYP.)36" (TYP.)
S.S. HURRICANE
STRAPS WITH S.S.
SCREWS (TYP.)
(2) 5 8" DIA. S.S. THREADED RODS,
NUTS AND WASHERS (TYP.)
6'-0" C.C. LANDING POSTS (TYP.) 10'-0" C.C. RAMP POSTS (TYP.)
6'-0" C.C.
POSTS (TYP.)
3" OVERHANG (TYP.)
(BOTH SIDES)
NOTE:
HANDRAILS NOT SHOWN FOR CLARITY.
3" X 8" STRINGERS, S.Y.P.
No.2 GRADE, SPACED
EQUALLY AS SHOWN (TYP.)
3" X 8" SPLICE BLOCK, S.Y.P. No.2 GRADE, LENGTH = 18". ATTACH WITH (2) 5 8" DIA. S.S.
THREADED RODS, NUTS, AND WASHERS (TYP.)
6" X 6" POSTS, S.Y.P.
No.1 GRADE (TYP.)5'-0" C.C. (TYP.)
6" X 6" MID-POSTS, S.Y.P.
No.1 GRADE (TYP.)
2" X 8" DECK BOARDS, S.Y.P. No.1 PRIME
GRADE, LENGTH = 6'-0". ATTACH WITH (3)
#10 X 3" LONG S.S. FLATHEAD SCREWS
AT EACH STRINGER CONNECTION (TYP.)
3" X 8" CAP BOARDS,
S.Y.P. No.2 GRADE (TYP.)
3" X 8" SPACER BOARD (CUT TO FIT) S.Y.P.
No.2 GRADE WITH (2) 3 12" LONG S.S. POCKET
SCREWS AT EACH CONNECTION (TYP.)
3" X 8" STRINGERS, S.Y.P.
No.2 GRADE, SPACED
EQUALLY AS SHOWN (TYP.)
3" X 8" CAP BOARDS,
S.Y.P. No.2 GRADE (TYP.)
6" X 6" POSTS, S.Y.P. No.1
GRADE, MIN. 10'-0" EMBEDMENT
BELOW GROUNDLINE (TYP.)
2" X 8" DECK BOARDS,
S.Y.P. No.1 PRIME GRADE, LENGTH = 6'-0". ATTACH
WITH (3) #10 X 3" LONG S.S.
FLATHEAD SCREWS AT
EACH STRINGER
CONNECTION (TYP.)
(3) 2" X 8" VERTICAL RAILINGS, S.Y.P.
No.1 PRIME GRADE. ATTACH WITH (2)
8" DIA. S.S. CARRIAGE BOLTS (TYP.)
2" X 6" VERTICAL RAILING, S.Y.P. No.1
PRIME GRADE. ATTACH WITH (1) 3 8"
DIA. S.S. CARRIAGE BOLT (TYP.)
8" CLEAR (TYP.)
8" CLEAR (TYP.)
ALUMINUM ADA
HANDRAIL 6" X 6" MID-POSTS, S.Y.P.
No.1 GRADE (TYP.)
5'-0" C.C. (TYP.)
2" X 8" COMPOSITE HORIZONTAL RAILING CAP.
ATTACH WITH (2) #10 X 3" LONG S.S. FLATHEAD
SCREWS, EQUALLY SPACED AT POSTS (TYP.)
M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : E
N D
C O
R N
ER
P
R O
FI
LE
(1 0)
/1
6/
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
42"
36"
(3) 2" X 8" VERTICAL
RAILINGS, S.Y.P. No.1
PRIME GRADE. ATTACH
WITH (2) 3 8" DIA. S.S.
CARRIAGE BOLTS (TYP.)
2" X 6" VERTICAL RAILING,
S.Y.P. No.1 PRIME GRADE.
ATTACH WITH (1) 3 8" DIA.
S.S. CARRIAGE BOLT (TYP.)
2" X 8" COMPOSITE
HORIZONTAL RAILING
CAP. ATTACH WITH (2) #10
X 3" LONG S.S. FLATHEAD
SCREWS, EQUALLY
SPACED AT POSTS (TYP.)
(2) 5 8" DIA. S.S.
THREADED RODS, NUTS
AND WASHERS (TYP.)
3" OVERHANG (TYP.)
ALUMINUM ADA
HANDRAIL (TYP.)
8" CLEAR
8" CLEAR
(TYP.)
(2) 3" X 8" CAP BOARDS,
S.Y.P. No.2 GRADE (TYP.)
3" X 8" STRINGER, S.Y.P.
No.2 GRADE (TYP.)
3" X 8" STRINGER, S.Y.P.
No.2 GRADE (TYP.)
(2) 3" X 8" CAP
BOARDS, S.Y.P.
No.2 GRADE (TYP.)
6" X 6" MID-POSTS, S.Y.P.
No.1 GRADE (TYP.)
6" X 6" POSTS, S.Y.P.
No.1 GRADE, MIN. 10'-0"
EMBEDMENT BELOW
GROUNDLINE (TYP.)
6" X 6" POSTS, S.Y.P. No.1 GRADE, MIN. 10'-0" EMBEDMENT BELOW
GROUNDLINE (TYP.)
3" X 8" CAP BOARDS,
S.Y.P. No.2 GRADE (TYP.)
CORNER FRAMING PLAN
1" = 2'
CROSS-SECTION A-A
1" = 1'
A
A
C -1
C O
R N
ER
P
LA
N
C
R O
SS
-S
EC
TI
O N
CONTRACTOR TO ADD 3" X 8" SPACER BOARD (CUT TO
FIT) AS NEEDED TO PLACE DECK BOARDS. BOARDS
SHALL BE S.Y.P. No.2 GRADE WITH (2) 3 12" LONG S.S.
POCKET SCREWS AT EACH CONNECTION (TYP.)
S.S. HURRICANE
STRAPS WITH S.S.
SCREWS (TYP.)
3" X 8" STRINGERS, S.Y.P.
No.2 GRADE, SPACED
EQUALLY AS SHOWN (TYP.)
CUT POST FLUSH WITH
BOTTOM OF STRINGER
M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : D
EC
K
PL
AN
(1 1)
/1
6/
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
OBSERVATION DECK
FRAMING PLAN
1" = 3'
C -1
O
BS
ER
VA
TI
O
N D
EC
K
FR
AM
IN
G
P
LA
N
2" X 8" DECK BOARDS S.Y.P. No.1 PRIME
GRADE. (3) #10 X 3" LONG S.S. FLAT-HEAD
SCREWS AT EACH STRINGER CONNECTION.
STAGGERED DECK BOARDS, AS SHOWN.
MAXIMUM LENGTH = 20'-0" (TYP.)
S.S. HURRICANE STRAPS
WITH S.S. SCREWS (TYP.)
3" X 8" STRINGERS, S.Y.P.
No.2 GRADE, SPACED
EQUALLY AS SHOWN (TYP.)
3" X 8" SPLICE BLOCK, S.Y.P. No.2 GRADE, LENGTH = 18". ATTACH WITH (2) 5 8" DIA. S.S.
THREADED RODS, NUTS, AND WASHERS (TYP.)
6" X 6" POSTS, S.Y.P.
No.1 GRADE (TYP.)
1'-7" C.C. (TYP.)
1'-7" C.C. (TYP.)
7'-0" C.C.
MINIMUM 24" OVERLAP
OF CAP BOARDS AT
POST LOCATIONS (TYP.)
7'-0" C.C.
(2) 5 8" DIA. S.S. THREADED
RODS, NUTS AND
WASHERS CONNECTING
CAP BOARDS (TYP.)
3" X 8" CAP BOARDS,
S.Y.P. No.2 GRADE (TYP.)
2" X 8" DECK BOARDS, S.Y.P. No.1 PRIME
GRADE, LENGTH = 6'-0". ATTACH WITH (3)
#10 X 3" LONG S.S. FLATHEAD SCREWS
AT EACH STRINGER CONNECTION (TYP.)
6'-0"
(2) 5 8" DIA. S.S. THREADED RODS,
NUTS AND WASHERS (TYP.)
7'-0" C.C.
3" X 10" CAP BOARDS,
S.Y.P. No.2 GRADE AT
OBSERVATION DECK (TYP.)
7'-0" C.C.
14'-0"
14'-0"
6" X 6" MID-POSTS, S.Y.P.
No.1 GRADE (TYP.)
-1
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : S
TA
IR
S (1
2)
/1 6/
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
STAIR CROSS-SECTION
1" = 2'
ALUMINUM ADA
HANDRAIL
(2) 5 8" DIA. S.S.
THREADED RODS, NUTS
AND WASHERS (TYP.)
ST
AI
R P
R O
FI
LE
C
R O
SS
-S
EC
TI
O N
STAIR PROFILE
1" = 2'
11" MIN.
7" MAX.
2" X 12" STAIR TREADS, S.Y.P. No.1 GRADE.
ATTACH WITH (4) #10 X 3" LONG S.S.
SCREWS (TYP.)
2" X 8" STAIR RISERS (CUT TO FIT),
S.Y.P. No.1 GRADE. ATTACH WITH
(2) #10 X 3" LONG S.S. SCREWS AT
EACH STRINGER (TYP.)
42" 36"
4"
8"
2"
4"
8"
4"
8"
2"
8"
6'-0" C.C. POSTS (TYP.)
42" 36"
NOTE:
· STAIRWAY SHALL COMPLY WITH FBCA 504 AND FBCB 1009
AND SHALL HAVE HANDRAILS COMPLYING WITH FBCA 505.
· STAIRWAY RISER = 7" MAX., TREAD = 11" MIN.
· ALL POSTS MUST HAVE 10' MINIMUM EMBEDMENT
· ADA HANDRAIL MUST BE INSTALLED AT ALL STAIRWAY AND
RAMP LOCATIONS AND SHALL HAVE 12" OF HORIZONTAL
HANDRAIL AT TOP OF FLIGHT PER FBCA 505.
· ALL STAIR RISERS AND TREADS NOT SHOWN FOR CLARITY.
EL.= (+)14.75
3" X 8" CAP BOARDS,
S.Y.P. No.2 GRADE (TYP.)
3" X 14" STAIRS STRINGERS,
S.Y.P. No.2 GRADE (TYP.)
6" X 6" POSTS, S.Y.P. No.1 GRADE, MIN. 10'-0" EMBEDMENT BELOW
GROUNDLINE (TYP.)
(3) 2" X 8" VERTICAL RAILINGS, S.Y.P. No.1
PRIME GRADE. ATTACH WITH (2) 3 8" DIA.
S.S. CARRIAGE BOLTS (TYP.)
8" CLEAR (TYP.)
8" CLEAR (TYP.)
EL.=(+)4.83±
11" MIN. HANDRAIL
EXTENSION
12" MIN. HANDRAIL
EXTENSION
END STAIRS AT
APPROXIMATE
2'-0" EMBEDMENT
17± STEPS TO APPROXIMATE 2'-0" EMBEDMENT
3" X 14" STAIRS STRINGERS,
S.Y.P. No.2 GRADE, SPACED
EQUALLY AS SHOWN (TYP.)
2" X 12" STAIR TREADS, S.Y.P. No.1
GRADE. ATTACH WITH (4) #10 X 3"
LONG S.S. SCREWS (TYP.)
2" X 8" STAIR RISERS (CUT TO FIT),
S.Y.P. No.1 GRADE. ATTACH WITH
(2) #10 X 3" LONG S.S. SCREWS AT
EACH STRINGER (TYP.)
(3) 2" X 8" VERTICAL RAILINGS, S.Y.P. No.1
PRIME GRADE. ATTACH WITH (2) 3 8" DIA.
S.S. CARRIAGE BOLTS (TYP.)
6" X 6" POSTS, S.Y.P. No.1 GRADE, MIN. 10'-0" EMBEDMENT BELOW
GROUNDLINE (TYP.)
2" X 6" VERTICAL RAILING, S.Y.P. No.1
PRIME GRADE. ATTACH WITH (1) 3 8"
DIA. S.S. CARRIAGE BOLT (TYP.)
ALUMINUM ADA
HANDRAIL (TYP.)
EL.=(+)14.75
2" X 8" COMPOSITE HORIZONTAL RAILING CAP.
ATTACH WITH (2) #10 X 3" LONG S.S. FLATHEAD
SCREWS, EQUALLY SPACED AT POSTS (TYP.)
2" X 8" COMPOSITE HORIZONTAL RAILING CAP.
ATTACH WITH (2) #10 X 3" LONG S.S. FLATHEAD
SCREWS, EQUALLY SPACED AT POSTS (TYP.)
C -1
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : A
D A
(1 3)
/1
6/
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
AD
A
PA
R
KI
N
G P
LA
N
12'-0" 5'-0" 8'-3"
20'-0"
20'-0"
WHEEL STOP
ADA PARKING SIGN
EXISTING TIMBER
FENCING SHIFTED FOR
ADA PARKING SPOT
5'-0" C.C.
19'-71 4"
6'-0" C.C.
MATCH EXISTING
EL.=(+)13.80±
MATCH EXISTING
EL.=(+)13.80±
MATCH EXISTING
EL.=(+)13.50±
27'-3"
EXISTING SAND
PARKING
ADA PARKING PLAN
1" = 5'
CONCRETE PARKING PAD & CONCRETE SIDEWALK NOTES NOTES:
1. THE BEARING SUBSURFACE SHALL HAVE ALL ORGANIC, LOOSE, AND DELETERIOUS MATERIAL REMOVED AND THE REMAINING CLEAN SOIL SHALL BE
SMOOTH, SOUND AND SOLID. COMPACT TO 98% PER AASHTO T-180. ANY FILL MATERIAL SHALL BE COMPACTED WITH A VIBRATORY OR IMPACT COMPACTION MACHINE IN MAXIMUM 12 INCHES LIFTS OR COMPACTED WITH A HAND TAMPER IN MAXIMUM 4 INCH LIFTS TO 98% PER AASHTO T-180.
2. CONCRETE PARKING PAD SHALL BE REINFORCED WITH 6X6 10-10 WELDED WIRE MESH, 3" MINIMUM COVER ON ALL SIDES.
3. STRENGTH OF 4,500 PSI AT 28 DAYS
4. LARGE AND SMALL ANGULAR AGGREGATE. NO PEA GRAVEL.
5. REINFORCED WITH 1.5 LBS. PER CUBIC YARD. FIBERMESH 150 VIRGIN HOMOPOLYMER POLYPROPYLENE MULTIFILAMENT FIBERS CONTAINING NO OLEFIN
MATERIALS.
6. 11
2" DEEP CONTRACTION JOINTS SPACED EQUALLY AS-SHOWN FOR CONCRETE PARKING.
7. FINAL CONCRETE SURFACE SHALL BE A LIGHT BROOM FINISH.
CONCRETE SIDEWALK
WITH TIMBER RAILING
TIMBER BOARDWALK
WITH TIMBER RAILING
EL.=(+)14.00
NOTES:
1. CONCRETE WHEEL STOP TO BE PRE-MANUFACTURED
REINFORCED 4,000 PSI TYPE II CEMENT.
2. #4 ANCHOR REBAR ENDS TO BE INSTALLED FLUSH WITH TOP
OF WHEEL STOP.
3. SHOP DRAWINGS TO BE SUBMITTED TO ENGINEER FOR
APPROVAL PRIOR TO ORDER.
LEGEND:
CONTRACTION JOINT
EXPANSION JOINT
CONTRACTION JOINT
EXPANSION JOINT
8"
6" MIN.6" MIN.
PARKING SLAB DETAILS
1" = 1'
PROFILE CROSS-SECTION
2" MIN.1
4" MAX.
8" CLOSED-CELL
NEOPRENE (FULL W X H)
WHEEL STOP DETAILS
1" = 2'
6'-0" 1'-0" 1'-0"
5" 3"5
8" OR 3 4"
ANCHOR
HOLE (TYP.)
2'-0" MIN.
ANCHOR TO
SURFACE w/ (2)
30-INCH LONG
#4 REBARS
2"
(2) #4 REBARS
ADA COMPLIANT HANDRAIL
N.T.S.
6061-T6 ALUMINUM ADA HANDRAIL
PER FBCA 405.8, ATTACH ALONG
CENTERLINE OF TIMBER POSTS WITH
S.S. FASTENERS 36" ABOVE WALKING
SURFACE. CONTRACTOR SHALL
SUBMIT SHOP DRAWINGS PRIOR TO
ORDERING AND INSTALLING.
2"Ø HANDRAIL 21
2"
10-32 TYPE "F" UNDERCUT
S.S. THREAD CUTTING
FHMS (PHILLIPS DRIVE) #21
PILOT HOLE REQUIRED IN
TUBING PRIOR TO
INSTALLING SCREWS
ARHB1 SERIESX ALUMINUM
HANDRAIL BRACKET, OR
APPROVED EQUAL AT EVERY
POST/MID-POST
#14 X 3" PAN HEAD
S.S. SCREW
2" X 37
8" BLOCKING
FIXED BETWEEN
VERTICAL RAILING.
ATTACH TO 6" X 6"
POSTS WITH (2) #10 X 3"
LONG S.S. FLATHEAD
SCREWS
EL.=(+)13.80±
EL.=(+)14.00
9'-31 4"
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : A
D A
(1 4)
/1
6/
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
AD
A
PA
R
KI
N
G D
ET
AI
LS
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : G
N (1
5)
/1 6/
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
G
EN
ER
AL
N O
TE
S
IMPORTANT NOTES TO BIDDERS:
1. The Contractor shall keep a post driving log as specified in the plans and may not cut off posts until the Engineer has given approval to do so. The Contractor must provide advanced notification of a request to cut off posts so that the Engineer may make field observations, if necessary. The Engineer will not make a structure certification if the Contractor does not comply with this requirement. If a vibratory hammer, auger or jetting equipment is used to install posts, the time needed to hammer and/or jet and/or auger each post shall be recorded.
2. The Contractor shall retain all material delivery tickets, material testing reports and cut-sheets/shop drawings for manufactured products for the project and provide copies to the Engineer on a weekly basis. The Engineer will not make a structure certification if the Contractor does not comply with this requirement.
3. The Engineer must be given advanced notice of the critical stages of construction such as initial construction stakeout, post driving, timber framing, concrete forming prior to placing concrete, etc. The Engineer will not make a structure certification if the Contractor does not comply with this requirement.
4. The location of existing utilities, utility services, facilities, and structural features shown on these plans has been determined from the information available at the time of the preparation of these plans, but do not purport to be absolutely correct and are provided for only the convenience of the Contractor. Any inaccuracy or omission in such information shall not relieve the Contractor of its responsibility to protect the existing features from damage and unscheduled interruption of service or from the responsibility to relocate utilities are required. Should a discrepancy arise between these plans and actual field conditions which would appreciably affect the execution of the plans the Contractor shall stop construction and notify the County and utility or facility owner immediately. The Contractor shall verify, prior to construction, the exact location, elevation, dimensions of all existing utilities, facilities, structures, and other features (whether or not shown in the plans). The Contractor shall be solely responsible for coordination of any utilities to be adjusted by others for the construction of this project and shall coordinate with other utilities and entitles as required to ensure the successful implementation of this project.
5. A pre-construction meeting must be scheduled before start of construction and all parties are to attend including: Owner or Owner's Representative, Engineer, Prime Contractor, Subcontractor(s), Surveyor, Applicable Tradesmen, etc. The Engineer will lead the meeting and provide a list of critical items to discuss.
6. Bidders are advised that overnight parking of equipment or storage of materials on the beach is forbidden at all times. The bid price shall include all costs associated with obtaining and securing temporary material stockpile areas and equipment lay down areas.
GENERAL:
1. Owner hereinafter refers to Owner's Representative, City, County, Town, Developer or
Private Entity.
2. All elevations in the project plans are referenced to feet N.A.V.D. 88.
3. The project shall be straight, plumbed, level, and elevations are correct as shown in plans.
4. Any deviation from these plans, notes or specifications must be approved in writing by the Owner or Engineer, or else the deviation will be considered construction non-compliant with the plans and specifications.
5. Any discrepancies amongst the plans, notes, specifications and other bid documents must be resolved in writing by the Owner or Engineer prior to continuing the work in question.
6. These plans, notes and specifications, along with the other components of the project bidding documents, constitute the only instructions to bidders/contractors, unless written addenda are issued.
7. All construction, manufacturing, fabrication and testing of materials shall be performed under the guidelines set forth in applicable local, state and federal codes, and/or under recommendations provided in technical publications of respected professional or industry organizations. Material testing programs, where applicable, shall be presented to the Engineer for review and approval prior to construction.
8. All products constructed or manufactured/supplied for the project shall be accompanied by industry acceptable warranties or guarantees.
9. For the purpose of these specifications. "Project Completion" is defined as completion of an agreed upon list of punchlist items compiled in a planned project walkthrough held at a time the Contractor considers the project to be "Substantially Complete". The Contractor shall notify the Owner and Engineer at least 120 hours in advance of substantial completion and schedule a mutually agreeable walkthrough.
10. A portion of the site lies within flood zones “VE" with a base flood elevation of 10.0 as indicated on Federal Emergency Management Agency Flood Insurance Rate Map Community Panel No.12127C0533J dated September 29, 2017.
11. Any materials interfering with construction, and all abandoned utility lines, pipes, structures and other subterranean objects to be removed, shall be disposed of as directed by the Owner. All materials not claimed by the Owner shall be disposed of at the Contractor's expense in areas provided by the Contractor.
12. All materials to be removed from the existing structures per the construction plans.
13. The Contractor shall endeavor to protect private property. Any damage caused by the Contractor in the performance of his work shall be corrected to the satisfaction of the Engineer at the Contractor's expense. Payment shall not be made for this work.
14. Any damage to state, county, or local roads caused by the Contractor's hauling or excavation equipment shall be repaired by the Contractor to the satisfaction of the Engineer. Payment shall not be made for this work.
15. The construction lengths indicated in these plans are approximate. Actual limits may be set in the fields as directed by the Engineer.
16. During land alteration and construction activities, it shall be unlawful to remove vegetation by grubbing, or to place soil deposits, debris, solvents, construction material, machinery or other equipment of any kind within the dripline of a tree to remain on site unless approved by the Engineer.
17. All trimming undertaken on a tree protected by provisions of the land development code shall be pruned in accordance with the National Arborist Association (NAA) Pruning Standards.
18. The Owner and the Engineer reserve the right to perform quality assurance testing on all materials delivered to project and to reject all materials not meeting acceptable standards.
19. The Contractor shall be responsible for the complete stake-out of the project, i.e., line, grade, slope stake, utility relocations or any other stake-out that may be required to complete the project in accordance with the plans and specifications. Any and all expenses incurred for this work shall be included in the unit price bid for other items. No additional payment shall be made for this work. Contractor shall also be required to provide a certified as-built survey of the grading, drainage and earthwork improvements and meet any minimum requirements of Owner.
20. Overall cleanup shall be accomplished by the Contractor in accordance with Owner standards or as directed by the Engineer. Any and all expenses incurred for this work shall be included in the unit price bid for other items.
21. If, during construction activities, any evidence of historic resources including, but not limited to, aboriginal or historic pottery, prehistoric stone tools, bone or shell tools, historic trash pits, or historic building foundations are discovered, work shall come to an immediate stop and the client and the Florida Division of Historical Resources shall be notified within two working days.
22. All materials and construction shall be in accordance with the more stringent of the current FDOT Standards and Specifications or Volusia County Standards and Specifications.
23. Contractor shall be responsible for independently calculating all quantities for the project including earthwork. It is the Contractors responsibility to verify the Engineers estimated quantities included on the bid schedule.
24. The Contractor shall provide pumping equipment and devices to properly remove and dispose of water during construction, if needed.
25. Refer to construction pollution prevention plan for erosion control notes.
SURVEY INFORMATION:
Topographic information shown hereon from survey performed by Arc Surveying & Mapping, Inc. October 22, 2024. Referenced on the North American Vertical Datum of 1988 (N.A.V.D.
88).
ENVIRONMENTAL AND PERMITS:
1. The U.S. Army Corps of Engineers (USACE), Florida Department of Environmental
Protection (FDEP) and the local city or county may exert jurisdiction over construction of the project. The Contractor shall be responsible to understand and comply with all applicable permit conditions imposed by the jurisdictional agencies, if permits are necessary. If not, the Contractor must at least comply with general state water quality standards for siltation and guidelines for encounters with threatened and endangered species.
2. All building and construction-related permits from the local (city or county) or state authorities are the responsibility of the Contractor.
3. The Contractor shall be responsible for penalties and/or fines levied due to work that is not in accordance with permit conditions.
4. The project includes earthwork activities located seaward of the Coastal Construction Control Line (CCCL). The Contractor is absolutely forbidden from moving nation soils located on the seaward of the CCCL to any location on the landward side of the CCCL.
The Contractor shall abide by all state regulations and permit requirements regarding the placement of imported fill seaward of the CCCL.
SUBMITTALS:
All submittals shall be made to the Engineer of Record for review and approval, in writing, prior to ordering and before construction. Submittals also include but are not limited to, shop drawings, mark-up drawings, sketches, cut-sheets, product literature, additional specifications, photographs and letters.
Submittals list:
1. Schedule for completion of work with tasks and durations defined.
2. Shipping, Stockpile and Site Administration Plan (SSSAP).
3. Temporary Traffic Control plan (TTC) for vehicles and pedestrians, including material deliveries, stockpile area(s), worker's parking and construction equipment.
4. Site-Specific Safety Plan shall be distributed and reviewed with all site workers prior to said workers commencing work on the project site. See "Site Safety" heading.
5. Complete list of required shop drawing submittals shall be provided by the Engineer at the preconstruction meeting.
6. Changes, alternates or other methods different from project plans must be approved, in writing, via submittals required by the Engineer and/or Owner.
7. After completing the punchlist in the field, the Contractor must submit a itemized punchlist, as-built survey and record drawings for final changes and the Engineer of Record approving in writing.
8. The Contractor shall be responsible for keeping a log of change orders, RFI's and shop drawings. The log shall be updated and available upon request.
INSPECTION COORDINATION:
1. The Engineer will be conducting routine observations and observations at critical stages of construction. A minimum of 120 hours notice shall be given to the Engineer prior to commencing the critical stages of construction. In general, critical stages are the initial work on the major structure components. Examples of critical stages of construction include: initial construction stakeout, demolition, post driving, timber framing, concrete forming prior to placing concrete, etc.The local city or county may perform their own construction observations in addition to the Engineer. No observers other than the Engineer or his/her designated representative shall have the authority to determine compliance with plans and specifications.
2. Other observers may relay information to the Engineer, but it will be the Contractor's ultimate responsibility to maintain contact and resolve disputes, questions, field changes, payment requests, etc. directly with the Owner or Engineer.
CONSTRUCTION SURVEYING:
1. Stake-out survey of the project is the responsibility of the Contractor. Beginning and end points will be provided by the Owner or Engineer in the project drawings.
2. The staked project must be approved by the Engineer prior to commencing construction.
The Engineer reserves the right to make alignment changes based on conditions portrayed by the initial stakeout.
3. Methods and frequency of continuing stake-out during construction shall be submitted to the Engineer for approval prior to beginning construction.
4. The Contractor must perform an independent construction record survey (as-built survey) as a check for compliance at the end of the project. The record survey must be signed and sealed by a State of Florida Licensed Professional Surveyor. The record survey must be referenced to feet N.A.V.D. 88.
5. The Prime Contractor is advised that certification of the project elevations and alignment is required by the Engineer for final acceptance of work.
SITE SAFETY:
The Contractor shall prepare and adhere to a Site-Specific Safety Plan. The contents of the plan are:
1. Identification of potential hazards and injuries pertaining to the specific site and project.
2. Location of nearest hospital.
3. Assure availability of at least one working cell phone and one vehicle on site at all times.
4. Emergency contacts within the Subcontractor's organization and at the Prime
Contractor's organization.
5. All field personnel shall wear appropriate safety attire and utilize appropriate personal protection equipment for a given task/operation such as safety glasses/goggles, masks, shields, gloves, harnesses, hard hats, steel-toed boots,etc.
6. Safety kit shall be available onsite at all times with appropriate materials for potential hazards and injuries.
7. The Site-Specific Safety Plan shall be distributed and reviewed with all site workers prior to said workers commencing work on the project site.
8. The Contractor shall follow all applicable local, state, and federal codes regarding site safety.
9. The Contractor shall adjust the means and methods of this plan as appropriate for maintaining site and operational safety.
SITE MAINTENANCE:
1. The Contractor shall maintain a clean and neat site, void of loose debris, trash, remnant parts or materials.
2. Trash receptacles and removal service shall be maintained by the Contractor specifically for this project. Pre-existing trash/debris facilities shall not be used to maintain the project.
3. Temporary debris piles shall be limited in number as much as practical and contained in designated areas until removal. Debris and trash shall not be scattered in areas outside the limited designated areas at any time.
4. Removal of trash/debris shall be scheduled as appropriate to not allow piles to reach five-feet in height or greater than ten-feet in diameter. Debris individually larger than these dimensions shall be removed from the site within five working days. Receptacles shall not overflow at any time.
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\D M
C -U se r\D re dg in g
M ar in e C on su lta nt s\ D
M C
D oc um en ts
\D M
C P ro je ct s\
- V ol us ia
C ou nt y\
-0
-4
In le t H ar bo r R oa d\ D ra w in gs
\In le t H ar bo r 1
C op y.
dw g
B y:
D M
C -U se r T ab : G
N (1
6)
/1 6/
-1
6-
C 3D
AS
S
H O
W N
BL -
-0
-4
VO
LU
SI
A
C O
U N
TY
BE
AC
H A
C C
ES
S
R
EP
LA
C
EM
EN
T Po rt Or an ge
, F L 3
Un it 3
S
. C lyd e M or ris B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
IS
TS
FL
O
R
ID
A
LI
C
EN
SE
N o.
C U
R
TI
S N
. T O
D D
, P .E
IN
LE
T H
AR
BO
R R
O
AD
G
EN
ER
AL
N O
TE
S
5. Where necessary, the Contractor shall employ a Temporary Traffic Control plan (TTC) for vehicles and pedestrians, including material deliveries, stockpile area(s), worker parking and construction equipment. The plan must be in writing, including sketches or drawings, and must be submitted to the Owner or Engineer for review and approval before commencement of any work.
6. The Contractor shall follow all applicable local, state and federal codes regarding site maintenance.
MOBILIZATION AND DEMOBILIZATION:
1. Access to near water construction areas is required for material storing, hauling, erection and construction. All facilities, public or private, used for such purposes shall be repaired to their original condition following "Completion" of the project, including grade and topping (sod, tree/vegetation cover, established road, etc.)
2. The Contractor shall present a Shipping, Stockpile and Site Administration Plan (SSSAP) to the Owner or Engineer for approval. The plan shall be specific to the project requirements for the particular materials to be delivered to the site, describing delivery points, stockpile areas, temporary debris/trash storage areas, temporary field office (including utilities maintained there), fencing, security and a statement of commitment and details for maintaining safety on the site.
3. The Owner or Engineer shall have the right to exercise reasonable alterations or additions to the SSSAP.
4. It is the Contractor's responsibility to coordinate, and pay for, necessary utilities to occupy the site and perform the work.
5. The Contractor shall not demobilize until project completion, and all parties have agreed and signed off in writing.
TECHNICAL SPECIFICATIONS FOR SITE PLAN TESTING:
1. MATERIAL
The inspection and testing of materials and finished articles to be incorporated in the work shall be made by bureaus, laboratories, or agencies approved by the Engineer of Record.
The Contractor shall submit such samples, or such special or test pieces of materials as the Engineer of Record may require. The Contractor shall not incorporate any material or finished article into the work until the results of the inspections or tests are known and the Contractor has been notified by the Engineer of Record that the material or finished article is accepted. All materials must be of the specified quality and be equal to the approved sample if a sample has been submitted. Certified copies of all tests made shall be submitted to the Engineer of Record as well as to the Owner's designated site inspector.
The Owner's designated site inspector must receive copies of all testing reports and certificates prior to the Engineer of Record requesting a final project inspection from the Owner.
2. LABORATORY CONTROL AND CERTIFICATES SPECIFICATIONS:
Sampling, testing, and laboratory methods shall be in accordance with the standard specifications of the AASHTO or ASTM. Where AASHTO or ASTM specifications are used, the reference shall be construed to be the most recent standard specifications or tentative specifications of the AASHTO or ASTM in force on the date of the test.
TEST AND CERTIFICATES:
The Contractor shall engage an approved testing laboratory to provide the following tests and certifications signed by a registered Engineer of the State of Florida. All technicians performing the tests shall be state certified for the testing performed. Additional tests that may be required by either the Engineer of Record or the Owner shall also be provided by the Contractor, and the following shall not be taken as a complete and exhaustive list of the Contractor's testing responsibilities.
a. Soil analysis for structural fill material prior to installation.
b. Proctor densities, moisture content, compacted field densities and Atterberg limits.
FILL MATERIAL AND SURFACE TREATMENT:
1. The Contractor shall provide fill material meeting the specifications and criteria of
Subsection 62B-33.005(7) of the Florida Administrative Code; the relevant portion of this subsection is given below. Only beach compatible fill shall be placed on the beach or in any associated dune system. All fill material placed seaward of the CCCL shall be sand which is similar to that already existing in the same fixed coastal cell in coloration, grain size, and composition. Beach compatible fill is material that maintains the general character and functionality of the material occurring on the beach and in the adjacent dune and coastal system. Such material shall be predominately of carbonate, quartz or similar material with a particle size distribution ranging between 0.062mm (4.0) and 4.76mm (-2.25) (classified as sand by either the Unified Soils or the Wentworth classification), shall be similar in color and grain size distribution (sand grain frequency, mean and median grain size and sorting coefficient) to the material in the existing coastal system at the placement area and shall not contain: Greater than 5 percent, by weight, silt, clay or colloids passing the #230 sieve (4.0); Greater than 5 percent, by weight, fine gravel retained on the #4 sieve (-2.25); Coarse gravel, cobbles or material retained on the 3/4 inch sieve in a percentage or size greater than found at the placement area;
Construction debris, clay balls or…