Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_26-B-30IF.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-B-30IF
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form (Exhibit B) for the Inlet Harbor ADA Parking Dune Walkover Beach Access project in Florida, submitted under Invitation to Bid (ITB) No. 26-B-30IF and Contract No. C-2064. The project encompasses replacement of an existing dune walkover with new infrastructure including a sidewalk, ADA parking space, timber dune walkover stairs, and ADA ramp to improve beach access. The scope requires demolition of the existing timber walkover, site regrading, concrete ADA parking space installation, and reinstallation of existing bench and bicycle rack fixtures. Bidders must complete and submit this form to be considered responsive; failure to do so may result in bid rejection.
The form requires bidders to identify all proposed subcontractors and their respective dollar values and percentage of work allocation across specified disciplines including surveys, demolition, hauling and disposal, excavation, grading, compaction, concrete, carpentry, painting, landscaping, signage, and testing. The prime contractor must clearly identify work performed in-house versus subcontracted work, with total bid pricing matching the amount listed on Exhibit G (Bid Price Sheet). The county reserves the right to seek clarification on subcontractor qualifications and compliance with licensing requirements but will not permit changes to total base bid pricing. The form also serves to determine local bid preference eligibility in accordance with Section 2.8, D of the solicitation documents.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2064 | ITB No. 26-B-30IF | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Exhibit G - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Surveys | $ - 0 | 0.00% | |
| Demolition | $ - 0 | 0.00% | |
| Hauling & Disposal | $ - 0 | 0.00% | |
| Excavation Grading and Compaction | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Carpentry | $ - 0 | 0.00% | |
| Painting | $ - 0 | 0.00% | |
| Landscaping | $ - 0 | 0.00% | |
| Signage | $ - 0 | 0.00% | |
| Testing | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .