Bid_Tabulation.xlsx
XLSX spreadsheet 54 KB Posted
- Solicitation number
- 26-B-30IF
- Issued by
- Volusia County, Florida
About this file
This is a Bid Tabulation document for the Inlet Harbor Road Beach Access Replacement project in Florida, detailing the cost breakdown for construction services related to ADA accessibility improvements at a beach access point. The project encompasses thirteen line items covering mobilization and demobilization, construction and as-built survey, environmental compliance, temporary traffic control, demolition and hauling, clearing and grubbing, grading and compaction, concrete sidewalk installation (157 square yards), ADA parking space and van access aisle construction (52 square yards), timber railing installation (381 linear feet), timber pedestrian access structure with handrail (1,920 square feet), pavement striping with ADA signage and wheel stops, and bahia sod installation (455 square yards).
The bid tabulation presents all line items with unit prices and total amounts listed as zero dollars, indicating this document represents a template or blank bid form rather than a completed bid submission with actual pricing data. The document references payment and performance bond requirements and includes provisions for a subtotal and final total. Associated images are referenced within the file but not detailed in the tabulation itself. No specific pricing information, award details, or bidder information is provided in this tabulation format.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Inlet Harbor Road Beach Access Replacement
| Contractor's Cost | |||||
| UNIT | TOTAL | ||||
| ITEM NO. | DESCRIPTION | QUANTITY | UNIT | PRICE | AMOUNT |
| 1 | Mobilization and Demobilization | 1 | LS | $ - 0 | $ - 0 |
| 2 | Construction and As-Built Survey | 1 | LS | $ - 0 | $ - 0 |
| 3 | Environmental Compliance | 1 | LS | $ - 0 | $ - 0 |
| 4 | Temporary Traffic Control | 1 | LS | $ - 0 | $ - 0 |
| 5 | Demolition, Hauling, Disposal | 1 | LS | $ - 0 | $ - 0 |
| 6 | Clearing and Grubbing | 1 | LS | $ - 0 | $ - 0 |
| 7 | Grading and Compaction | 1 | LS | $ - 0 | $ - 0 |
| 8 | Concrete Sidewalk | 157 | SY | $ - 0 | $ - 0 |
| 9 | Concrete ADA Parking Space and Van Access Aisle | 52 | SY | $ - 0 | $ - 0 |
| 10 | Timber Railing Along Sidewalk | 381 | LF | $ - 0 | $ - 0 |
| 11 | Timber Pedestrian Access Structure with Handrail | 1,920 | SF | $ - 0 | $ - 0 |
| 12 | Pavement Striping, ADA Signage & Wheel Stop | 1 | LS | $ - 0 | $ - 0 |
| 13 | Bahia Sod | 455 | SY | $ - 0 | $ - 0 |
| Sub Total | $ - 0 | ||||
| Payment and Performance Bond | $ - 0 | ||||
| Total | $ - 0 |
LS=Lump Sum, SY= Square Yard, SF= Square Foot, LF = Linear Foot image1.jpeg image2.jpeg