This is a Prime/Subcontractor Form (Contract No. C-2014, ITB No. 25-B-##XX) for a Florida county construction project involving the replacement of a dune walkover with ADA-compliant parking and beach access improvements. The project, titled "Inlet Harbor ADA Parking Dune Walkover Beach Access," requires demolition of the existing timber walkover, site regrading, installation of a new sidewalk, ADA parking space, timber dune walkover stairs, and ADA ramp. The scope includes careful removal and reinstallation of existing bench and bicycle rack facilities. Bidders must complete and return this form as part of their bid submission or risk being deemed non-responsive.
The form requires prime contractors to identify all proposed subcontractors and allocate work by discipline and dollar value, with anticipated subcontractor categories including surveys, demolition, hauling and disposal, excavation and grading, concrete, carpentry, painting, landscaping, signage, and testing. The prime contractor must submit a total bid price that matches the bid form, with all work percentages totaling 100 percent. The county reserves the right to seek clarification on subcontractors but will not permit changes to the total base bid pricing. Prime contractors are responsible for ensuring all subcontractors hold appropriate licenses, and any subcontractor changes during project completion require prior approval from the county project manager. The form will also be used to determine local preference eligibility in accordance with county solicitation requirements.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Surveys | $ - 0 | 0.00% | |
| Demolition | $ - 0 | 0.00% | |
| Hauling & Disposal | $ - 0 | 0.00% | |
| Excavation Grading and Compaction | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Carpentry | $ - 0 | 0.00% | |
| Painting | $ - 0 | 0.00% | |
| Landscaping | $ - 0 | 0.00% | |
| Signage | $ - 0 | 0.00% | |
| Testing | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .