Independent_Cost_Estimate_ICE_Form.pdf

PDF 58 KB Posted

Attached to
HVAC Preventative Maintenance
Solicitation number
2026-09
Issued by
Summit County, Akron City, Ohio

About this file

This is an Independent Cost Estimate (ICE) Form prepared for METRO Regional Transit Authority (RTA) in Ohio in support of an HVAC Preventative Maintenance contract procurement. The form serves as a template for documenting the methodology and calculation of estimated costs for goods and services, with sections designated for both standard items and services or non-standard items. The document provides space for the preparer to identify the method of obtaining the estimate, whether through published price lists, engineering or technical estimates, or independent third-party estimates, and includes detailed line items for products with unit costs, delivered costs, and freight considerations, as well as service-related items that account for materials, direct costs, labor rates and hours, labor classifications, allocated overhead, SG&A expenses, and profit margins.

The form itself contains no populated data fields; rather, it presents the structural framework that would be completed during the cost estimation process for the HVAC preventative maintenance services required across all RTA facilities. The completed ICE would be used to establish the government's baseline cost expectations and support the evaluation of contractor bids for the continuous, comprehensive HVAC maintenance service program. The form requires signature authorization from the cost estimate preparer and allows for attachment of detailed spreadsheets to support complex items or tasks, ensuring transparent documentation of how the total estimated cost for the procurement was determined.

View the file

Other files

File Type Posted
HVAC_Preventative_Maintenance.pdf PDF
Pricing_Results_3.pdf PDF
ICE.pdf PDF
Pricing_Results.pdf PDF
Pricing_Results_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEPENDENT COST ESTIMATE

Requisition Number: Date of Estimate:

Contract Type:

���� Material

���� Construction

���� Services

���� Other (Specify)

Description of Goods/Services:

Method of Obtaining the Estimate:

I have obtained the following estimate from:

���� Published Price List/Past pricing (Date)

���� Engineering or technical estimate

���� Independent Third Party estimate

���� Other (Specify)

Cost Estimate Details:

Through the method stated above it has been determined that the total cost of the goods/services is expected to be $ Details are shown below.

COST OF STANDARD ITEMS

PRODUCT

COST ($/EA)

DELIVERED

COST ($/EA)

NO FREIGHT NOTES / DATA SOURCE

A

COST OF SERVICES, REPAIRS, OR NON-STANDARD ITEMS

ITEM/TASK:

MATERIAL

OTHER

DIRECT

COSTS

LABOR

(RATE,HOURS)

LABOR

CLASS

ALLOCATED

OVERHEAD SG&A PROFIT TOTAL

B

Signature of Preparer The preceding cost estimate was obtained or prepared by:

(For complex items or tasks, attach detailed spreadsheet(s) explaining rationale.)

Requisition Number:
Date of Estimate:
Other (Specify):
Description of Goods/Services:
Published Price List/Past pricing (Date:
Other (Specify:
PRODUCT_Row_1:
COST ($/EA) DELIVERED_Row_1:
COST ($/EA) NO FREIGHT_Row_1:
NOTES / DATA SOURCE_Row_1:
PRODUCT_Row_2:
COST ($/EA) DELIVERED_Row_2:
COST ($/EA) NO FREIGHT_Row_2:
NOTES / DATA SOURCE_Row_2:
PRODUCT_Row_3:
COST ($/EA) DELIVERED_Row_3:
COST ($/EA) NO FREIGHT_Row_3:
NOTES / DATA SOURCE_Row_3:
PRODUCT_Row_4:
COST ($/EA) DELIVERED_Row_4:
COST ($/EA) NO FREIGHT_Row_4:
NOTES / DATA SOURCE_Row_4:
PRODUCT_Row_5:
COST ($/EA) DELIVERED_Row_5:
COST ($/EA) NO FREIGHT_Row_5:
NOTES / DATA SOURCE_Row_5:
PRODUCT_Row_6:
COST ($/EA) DELIVERED_Row_6:
COST ($/EA) NO FREIGHT_Row_6:
NOTES / DATA SOURCE_Row_6:
MATERIAL_Row_1:
OTHER DIRECT COSTS_Row_1:
LABOR (RATE,HOURS)_Row_1:
LABOR CLASS_Row_1:
ALLOCATED OVERHEAD_Row_1:
SG&A_Row_1:
PROFIT_Row_1:
TOTAL_Row_1:
MATERIAL_Row_2:
OTHER DIRECT COSTS_Row_2:
LABOR (RATE,HOURS)_Row_2:
LABOR CLASS_Row_2:
ALLOCATED OVERHEAD_Row_2:
SG&A_Row_2:
PROFIT_Row_2:
TOTAL_Row_2:
MATERIAL_Row_3:
OTHER DIRECT COSTS_Row_3:
LABOR (RATE,HOURS)_Row_3:
LABOR CLASS_Row_3:
ALLOCATED OVERHEAD_Row_3:
SG&A_Row_3:
PROFIT_Row_3:
TOTAL_Row_3:
MATERIAL_Row_4:
OTHER DIRECT COSTS_Row_4:
LABOR (RATE,HOURS)_Row_4:
LABOR CLASS_Row_4:
ALLOCATED OVERHEAD_Row_4:
SG&A_Row_4:
PROFIT_Row_4:
TOTAL_Row_4:
MATERIAL_Row_5:
OTHER DIRECT COSTS_Row_5:
LABOR (RATE,HOURS)_Row_5:
LABOR CLASS_Row_5:
ALLOCATED OVERHEAD_Row_5:
SG&A_Row_5:
PROFIT_Row_5:
TOTAL_Row_5:
MATERIAL_Row_6:
OTHER DIRECT COSTS_Row_6:
LABOR (RATE,HOURS)_Row_6:
LABOR CLASS_Row_6:
ALLOCATED OVERHEAD_Row_6:
SG&A_Row_6:
PROFIT_Row_6:
TOTAL_Row_6:
The preceding cost estimate was obtained or prepared by:
PrintButton1:
NumericField1:
:

File details come from the government source that posted it. Updated .