17631 Bid Tab.pdf
PDF 132 KB Posted
- Solicitation number
- S-29100-00017631
- Issued by
- Union County, Oregon
About this file
This is a bid tabulation sheet for the Oregon Department of Corrections' kitchen floor replacement project at Two Rivers Correctional Institution in Umatilla, issued under ITB #S-29100-00017631. The project scope includes selective demolition of existing flooring systems, concrete substrate preparation, installation of 3/8-inch cementitious self-leveling underlayment, application of 3/8-inch red water-based polyurethane cement hybrid flooring with slip-resistant texture, metal fabrications, temporary non-structural metal framing partitions, and high-performance wall coatings. Bids were due November 10, 2026 at 2:00 p.m. (PST), with mandatory pre-bid conference attendance required on October 13, 2026 at 9:00 a.m. (PST). The project timeline allows 10 calendar days from Notice to Proceed to start, 250 calendar days to substantial completion, and 280 calendar days to final completion. Award will be made to the lowest responsive and responsible bidder.
Two contractors submitted bids for consideration: Copper Mechanical submitted a base bid of $1,906,000.00 and Jackson Commercial Construction submitted a base bid of $1,950,000.00. The estimated project cost range is $400,000 to $600,000. All work is subject to Oregon prevailing wage requirements under ORS 279C.800-279C.870 and apprenticeship requirements mandating that 12 percent of work hours performed by employees in apprenticeable occupations be performed by registered apprentices. Contractors must comply with ORS 279C.533 workforce diversity reporting, maintain a drug testing program, demonstrate Oregon tax compliance, and submit first-tier subcontractor disclosure within two working hours after bid closing for any subcontractor with a contract value of $350,000 or more or 5 percent of the project bid with a minimum of $15,000. Bid security of 10 percent of the bid amount and performance and payment bonds equal to 100 percent of the contract amount are required. Liquidated damages are $405.00 per calendar day for delays beyond substantial and final completion dates.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date/Time Contractor Name: BASE BID TOTAL BID
11/10/2026 Copper Mechanical $1,906,000.00 $1,906,000.00
11/11/2026 Jackson Commerical Construction $1,950,000.00 $1,950,000.00 of the bids submitted for consideration.
TRCI Kitchen Floor Replacement Date: 10-Nov-2026 at 2:00 PM (PST)
Oregon Department of Corrections
Bid tabulation sheet for ITB#: S-29100-00017631
Notice: This document is not an indicator of award. It is only a tabulation
File details come from the government source that posted it. Updated .