About this file
This is Addendum No. 1 to a Request for Proposals issued by Universal EV LLC for NEVI EVSE (Electric Vehicle Supply Equipment) installation at 1312 Carolyn Dr, Minonk, IL 61760 in Woodford County. The addendum, issued on June 11, 2026, clarifies equipment specifications for the original RFP dated June 8, 2026, and does not change the proposal deadline of June 26, 2026. The project requires the supply and installation of DC fast charging infrastructure, originally specified as 4 x Tritium PKM150 CS DC Fast Chargers (150kW each) and 2 x Tritium PKM150 RU DC Rectification Units. Universal EV LLC has clarified that while these Tritium specifications represent the minimum performance standard and design basis, they are not mandatory requirements. Proposers are encouraged to submit alternative EVSE hardware that meets specified minimum requirements and will be evaluated on equal footing with Tritium equipment proposals.
Alternative EVSE equipment must satisfy comprehensive minimum requirements including NEVI Technical Compliance per 23 CFR Part 680 (minimum 150kW DC output per port, dual-port dispenser with CCS1 and NACS connectors, open access payment with credit/debit card and contactless RFID, QR code payment, OCPP 2.0.1 compatibility, 97% uptime capability, real-time data reporting to FHWA, UL certifications, NEMA Type 3R enclosure, ADA compliance, and cord length not exceeding 25 feet); Build America Buy America Act compliance with United States manufacturing and certification; technical compatibility with the existing approved engineering design; and Owner approval. Proposers submitting alternative equipment must include complete equipment specifications, applicable certifications, BABA compliance certification, OCPP 2.0.1 documentation, descriptions of any required design modifications with associated costs, and evidence of 97% uptime performance. All proposers must acknowledge receipt of Addendum No. 1 in their proposal submission. Questions regarding the addendum must be submitted in writing by June 18, 2026, to proposal@universalgreengroup.com.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CE Stamped _ Modern Stay 39 Lakeview _ UNE2506R15.pdf | ||
| Universal_EV_NEVI_RFP_IL002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Universal EV LLC | RFP Addendum No. 1 | NEVI EVSE Installation – Minonk, IL
Addendum No. 1 | All other RFP terms remain unchanged | Proposal Deadline: June 26, 2026
ADDENDUM NO. 1
Request for Proposals — NEVI EVSE Installation — 1312 Carolyn Dr, Minonk, IL 61760
Issued By: Universal EV LLC
Addendum Date: 06/11/2026
Original RFP Date: June 8, 2026
Proposal Deadline: June 26, 2026 — UNCHANGED
Project: NEVI EVSE Installation — 1312 Carolyn Dr, Minonk, IL 61760
Submitted To: All Prospective Bidders
IMPORTANT: This Addendum No. 1 forms part of the RFP and must be acknowledged in your proposal submission. All prospective bidders who received the original RFP — including those who have indicated they will not submit a proposal — are required to receive this addendum per federal procurement requirements (2 CFR Part 200). This addendum may affect your decision to submit a proposal.
1. PURPOSE OF THIS ADDENDUM
Universal EV LLC issues this Addendum No. 1 to clarify the EVSE equipment specifications contained in the original RFP dated June 8, 2026. This addendum supersedes any conflicting language in the original RFP regarding EVSE equipment requirements.
2. CLARIFICATION — EVSE EQUIPMENT SPECIFICATIONS
The original RFP references the following as specified equipment:
Specified Equipment (Original RFP): 4 x Tritium PKM150 CS DC Fast Chargers (150kW) and 2 x Tritium PKM150 RU DC Rectification Units
Universal EV LLC hereby clarifies that the Tritium PKM150 specification represents the minimum performance standard and design basis only. It is NOT a mandatory equipment requirement.
Proposers are permitted and encouraged to propose alternative EVSE hardware, provided all requirements in Section 3 below are fully met. Proposals offering alternative compliant equipment will be evaluated on equal footing with proposals offering Tritium equipment.
3. MINIMUM REQUIREMENTS FOR ALTERNATIVE EVSE EQUIPMENT
Any alternative EVSE equipment proposed must meet ALL of the following requirements.
Failure to meet any single requirement will result in the proposal being deemed non-responsive for equipment compliance.
3a. NEVI Technical Compliance — 23 CFR Part 680
• Minimum 150kW DC output per charging port
• Dual port dispenser — both CCS1 (SAE J1772 Type 1 DC) and NACS (SAE J3400) connectors required per port
• Open access payment — credit/debit card with contactless RFID support required (no app or membership required)
• QR code payment option required
• Pricing clearly displayed at charger prior to session initiation
• OCPP 2.0.1 network protocol compatibility required
• Minimum 97% uptime capability per port per calendar month
• Real-time or near real-time data reporting capability to FHWA EV data portal
• UL 2202 (DC Charging Equipment) or equivalent certification required
• UL 2231-1 and UL 2231-2 (Personnel Protection Systems) certification required
• NEMA Type 3R (Rainproof) enclosure minimum
• ADA accessibility compliance per 2010 ADA Standards for Accessible Design
• Cord length must not exceed 25 feet per NEC 625.17
3b. Build America Buy America Act (BABA) Compliance
• All proposed EVSE equipment — including charger dispensers, rectification units, and associated hardware — must be manufactured in the United States per Section 70914 of the Infrastructure Investment and Jobs Act (Pub. L. 117-58)
• Proposer must submit BABA compliance certification for all proposed equipment with their proposal
• If a BABA waiver has been approved for the proposed equipment, documentation of the approved waiver must be included
• Unsubstantiated BABA compliance claims will result in the proposal being deemed non-responsive
3c. Technical Compatibility
• Proposed equipment must be compatible with the existing approved engineering design (Nordic Asia Solutions, Project ID UNE-25-06/15)
• If alternative equipment requires design modifications, the proposer must identify and include the cost of all required redesign in their proposal price
• All proposed equipment must be compatible with Owner-provided network services
(OCPP 2.0.1)
3d. Owner Approval
• Final approval of any alternative equipment rests with Universal EV LLC
• Approval will not be unreasonably withheld for equipment that meets all requirements above
• Owner reserves the right to request additional technical documentation to verify compliance
4. PROPOSAL SUBMISSION REQUIREMENTS FOR ALTERNATIVE EQUIPMENT
Proposers offering alternative EVSE equipment must include the following in their proposal:
1. Complete equipment specifications including model number, output ratings, connector types, certifications, dimensions, and operating temperature range
2. Copies of all applicable certifications (UL 2202, UL 2231-1, UL 2231-2, NEMA rating)
3. BABA compliance certification signed by an authorized representative of the equipment manufacturer
4. OCPP 2.0.1 compatibility documentation or certification
5. Description of any required design modifications and associated costs
6. Evidence of minimum 97% uptime performance (e.g., network performance data, manufacturer specifications, or reference site data)
5. NO OTHER CHANGES
All other terms, conditions, scope requirements, qualifications, evaluation criteria, and deadlines contained in the original RFP dated June 8, 2026 remain in full force and effect. The proposal submission deadline of June 26, 2026 is UNCHANGED.
6. ACKNOWLEDGMENT REQUIRED
All proposers must acknowledge receipt of this Addendum No. 1 in their proposal submission by including the following statement on the proposal cover page or in a cover letter:
"The undersigned acknowledges receipt of Addendum No. 1 dated [INSERT DATE] and confirms that this proposal has been prepared in accordance with the original RFP and Addendum No. 1."
Failure to acknowledge this addendum may result in the proposal being deemed non-responsive.
7. QUESTIONS
Questions regarding this addendum must be submitted in writing to:
Email: proposal@universalgreengroup.com Subject Line: "Addendum No. 1 Question — NEVI EVSE Minonk IL" Deadline: June 18, 2026
Responses will be distributed in writing to all registered bidders. No oral interpretations will be made.
Issued by:
Shwet Shah
Project Manager, Universal EV LLC proposal@universalgreengroup.com | (214) 989-4173
Date: 06/11/2026
This Addendum No. 1 has been posted on universalevcharging.com/rfp and ConstructionBidSource.com and distributed to all prospective bidders who received the original RFP.