IFB Lump Sum Division Spreadsheet.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C78623B0014
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78623B0014 0002.docx | DOCX document | |
| 36C78623B0014 0001.docx | DOCX document | |
| 36C78623B0014_1.docx | DOCX document | |
| FAR 52.219-28 Post-Award Small Business Program Rerepresentation (MAR 2023).docx | DOCX document | |
| Past Performance.pdf | ||
| RFI Form.docx | DOCX document | |
| Drawings Wood National Cemetery - Final Stamped Combined Drawings.pdf | ||
| Limitations on Subcontracting Certificate for 823MM23004 Replace Committal Shelter.docx | DOCX document | |
| Specs Wood National Cemetery - Final Stamped Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| Solicitation Number | 36C78623B0014 |
| Project Number | 823MM23004 |
| Project Name | Replace Committal Shelter at Wood National Cemetery |
| Division | CLIN1 | CLIN 2 | TOTAL CLIN 0001 & 0002 |
| Division 0 | |||
| Special Sections | $ | $ | $ |
| Division 1 | |||
| General Requirements | $ | $ | $ |
| Division 2 | |||
| Existing Conditions | $ | $ | $ |
| Division 3 | |||
| Concrete | $ | $ | $ |
| Division 4 | |||
| Masonry | $ | $ | $ |
| Division 5 | |||
| Metals | $ | $ | $ |
| Division 6 | |||
| Wood and Plastic | $ | $ | $ |
| Division 7 | |||
| Thermal and Moisture | $ | $ | $ |
| Division 8 | |||
| Doors and Windows | $ | $ | $ |
| Division 9 | |||
| Finishes | $ | $ | $ |
| Division 10 | |||
| Specialties | $ | $ | $ |
| Division 11 | |||
| Equipment | $ | $ | $ |
| Division 12 | |||
| Furnishings | $ | $ | $ |
| Division 13 | |||
| Special Construction | $ | $ | $ |
| Division 22 | |||
| Plumbing | $ | $ | $ |
| Division 23 | |||
| Heat, Ventilating, and Air Conditioning | $ | $ | $ |
| Division 25 | |||
| Integrated Automation | $ | $ | $ |
| Division 26 | |||
| Electrical | $ | $ | $ |
| Division 27 | |||
| Communications | $ | $ | $ |
| Division 28 | |||
| Electronic Safety and Security | $ | $ | $ |
| Division 31 | |||
| Earthwork | $ | $ | $ |
| Division 32 | |||
| Exterior Improvements | $ | $ | $ |
| Division 33 | |||
| Utilities | $ | $ | $ |
| Bonds | |||
| $ | $ | $ | |
| TOTAL PRICE | CLIN1 | CLIN 2 | TOTAL CLIN 0001 & 0002 |
| $ | $ | $ |
TOTAL CONTRACT PRICE (CLINS 0001 & 0002 & TOTAL)
File details come from the government source that posted it. Updated .