36C78623B0014 0001.docx
DOCX document 27 KB Posted
- Solicitation number
- 36C78623B0014
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78623B0014 0002.docx | DOCX document | |
| 36C78623B0014_1.docx | DOCX document | |
| FAR 52.219-28 Post-Award Small Business Program Rerepresentation (MAR 2023).docx | DOCX document | |
| Past Performance.pdf | ||
| RFI Form.docx | DOCX document | |
| Drawings Wood National Cemetery - Final Stamped Combined Drawings.pdf | ||
| Limitations on Subcontracting Certificate for 823MM23004 Replace Committal Shelter.docx | DOCX document | |
| Specs Wood National Cemetery - Final Stamped Specs.pdf | ||
| IFB Lump Sum Division Spreadsheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 7743-000016
823MM23004
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 To all Offerors/Bidders
36C78623B0014 06-02-2023
X X X
X
This amendment to solicitation number 36C78623B0014 for project number 823MM23004 Replace Committal Shelter at Wood National Cemetery is to publish responses to prebid Request for Information questions submitted by interested vendor.
Please refer to the continuation page for the response to the prebid RFI responses
The bid due date remains Monday, June 12, 2023, at 2:00 PM EST.
All amendments should be acknowledged.
Richard Adu Contracting Officer Response To Prebid RFIs for 823MM23004 Replace Committal Shelter at Wood National Cemetery RFI #1 – Bid Schedule Statement of Bid references Item I, General Construction, and Item II, Demolition. The IFB Lump Sum Division Spreadsheet refences CLIN1 and CLIN2. Is Item I the same as CLIN1? Is Item II the same as CLIN2?
Response:
Item I is the same as CLIN 1
Item II is the same as CLIN2
RFI #2 – Contractor Superintendence Is the contractor’s Superintendent required to be onsite at all times during construction?
Response:
Yes, when work is being completed
RFI #3– Site Safety and Health Officer Does this project require an SSHO? Is the SSHO required to be onsite at all times? Can the SSHO and superintendent be the same person?
Response:
Yes, a Safety officer must be on site when work is being completed.
Yes, they can be the same person.
RFI #4 – Liquidated Damages Confirming liquidated damages are a requirement on this project Response:
Yes, refer to FAR 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)
RFI #5– Ceiling Finishes Wall section 6/A3 notes a “2x6 T&G Wood Ceiling” at Storage Room 100. Corresponding detail 3/A3 references “2x6 Metal Soffit Panels” and “Pre-Finished Flush Seam Metal Ceiling”. Room Finish Schedule on sheet A-4 notes “MSP-1” at Storage Room 100. Please confirm ceiling finishes at Storage Room 100, Committal Shelter 200, and exterior roof overhangs.
Response:
Exterior roof overhang shall match the 2x6 Metal Soffit panels, Storage room Prefinished flush seams metal ceiling.
RFI #6 – Rammed Aggregate Piers Are RAPs required at the (4) concrete pier locations only?
Response:
Reference sheet S-4. Please reference page 5-12 of Geotechnical Engineering report.
Amendment 0001 to solicitation number 36C78623B0014 to publish responses to prebid Request for Information.
-End of Documents-