IFB_6200_RBB1016_ATT_6_v1.docx
DOCX document 33 KB Posted
- Attached to
- Traffic Signal Cables
- Solicitation number
- IFB 6200 RBB1016
- Issued by
- Texas
About this file
This is a Key Personnel Designation submittal for a traffic signal cables procurement by the City of Austin, Texas. The document establishes the requirement that the Contractor maintain the same key personnel throughout the contract term, with any necessary replacements requiring individuals of equivalent experience and competence, subject to City approval that shall not be unreasonably withheld. The City has designated three key personnel: Andre Colbert as the City Contract Manager (512-974-9383, andre.colbert@austintexas.gov), Brian Craig as the City Project Manager (512-974-4061, brian.Craig@austintexas.gov), and Ryan Braziel as the City Contract Administrator and Procurement Specialist (512-978-2039, ryan.braziel@austintexas.gov). The Contractor is required to identify its Contract Manager as part of this submittal.
The document does not contain information regarding pricing terms, set-asides, funding sources, or other financial considerations. No specific renewal options, contract term duration, or performance metrics are detailed in this key personnel designation form. The submittal represents standard procurement requirements for maintaining continuity and accountability in contractor staffing for the traffic signal cables purchase contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_6200_RBB1016_ATT_5_v1.docx | DOCX document | |
| IFB_6200_RBB1016_ATT_4_v1.docx | DOCX document | |
| IFB_6200_RBB1016_ATT_3_v1.docx | DOCX document | |
| IFB_6200_RBB1016_MWDBE_PAC_v1.docx | DOCX document | |
| IFB_6200_RBB1016_ATT_1_v1.docx | DOCX document | |
| IFB_6200_RBB1016_ATT_2_v1.docx | DOCX document | |
| IFB_6200_RBB1016_0600_v1.xlsx | XLSX spreadsheet | |
| IFB_6200_RBB1016_PAC1_v1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL – Key Personnel
Designation of Key Personnel. The City and the Contractor resolve to keep the same key personnel assigned to this engagement throughout its term. In the event that it becomes necessary for the Contractor to replace any key personnel, the replacement will be an individual having equivalent experience and competence in executing projects such as the one described herein. Additionally, the Contractor shall promptly notify the City and obtain approval for the replacement. Such approval shall not be unreasonably withheld. The Contractor’s and City’s key personnel are identified as follows:
| Role |
| Name |
| Phone |
Contractor Contract Manager
| City Contract Manager |
| Andre Colbert |
| 512-974-9383 |
| andre.colbert@austintexas.gov |
| City Project Manager |
| Brian Craig |
| 512-974-4061 |
| brian.Craig@austintexas.gov |
| City Contract Administrator, Procurement Specialist |
| Ryan Braziel |
| 512-978-2039 |
| ryan.braziel@austintexas.gov |
| SUBMITTAL – Key Personnel |
| Pg. 1 |
image1.png