Bunche Boulevard Water and Sewer Improvements - Revised Final Plans

This file contains revised final utility plans and profiles for the City of Portsmouth, Virginia's Bunche Boulevard Water and Sewer Improvements project (IFB #60-26-SKL). The document presents detailed engineering plans depicting the installation of water and sewer infrastructure improvements along Bunche Boulevard, including proposed sanitary sewer force mains, water profiles, and related appurtenances across multiple stations ranging from STA 10+00 to STA 95+60. The plans document existing utilities, site features including trees and vegetation, property boundaries, and utility tie-in points with specific rim elevations and invert elevations for sanitary sewer manholes (SSMH #101 through #108), catch basins, and drill holes. The plans also include traffic control sequences, detour routes, and typical construction sections necessary for project execution. Electronic bids for this project were due July 9, 2026 at 2:00 p.m. EDT, with a mandatory pre-bid conference scheduled for June 23, 2026 at 3:00 p.m. EDT at the City of Portsmouth Public Utilities Operations Center, 430 Meander Road. A virtual public bid opening was conducted via Microsoft Teams on July 10, 2026 at 2:30 p.m. EDT. The initial contract period is 360 days.

Bidders were required to submit completed W-9 forms, demonstrate financial capability, provide bonding documentation, and include their Virginia Contractor License Number and Federal ID Number with their bid responses. DSBSD-certified Small Business designations were to be noted if applicable. Contract award was made to the lowest responsive and responsible bidder meeting all qualification criteria and technical specifications. Addendum No. 1, issued June 11, 2026, modified bid opening procedures and required acknowledgment either prior to the bid due date or through signed acknowledgment attached to the bid submission. Prospective bidders were required to register for the virtual bid opening by contacting Susan Kenney-Lambert at Lamberts@portsmouthva.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KENT DRIVE

VICTO

RY BO

ULEVARD

BEECHDALE ROAD

SFM ALIGNMENT

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P07UTILITIES PLAN AND

PROFILE STA 46+58 TO

52+99 41

M

AT

C H

L

IN

E

ST

A

+5

(S

EE

S H

EE

T

P0 6)

MATCH LINE STA 52+99

(SEE SHEET P08)

NO

RTH

PROPOSED SANITARY SEWER FORCE MAIN PROFILE

KENT DRIVE

VICTO

RY BO

ULEVARD

BEECHDALE ROAD

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P07AUTILITIES PLAN AND

PROFILE STA 1100+00 TO

1100+59 42

M

AT

C H

L

IN

E

ST

A

+5

(S

EE

S H

EE

T

P0 6)

MATCH LINE STA 52+99

(SEE SHEET P08)

NO

RTH

PROPOSED WATER PROFILE

VICTORY BOULEVARD

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P08UTILITIES PLAN AND

PROFILES 52+99 TO

59+48 43

M

AT

C H

L

IN

E

ST

A

+9

(S

EE

S H

EE

T

P0 7)

M

AT

C H

L

IN

E

SA

T

+4

(S

EE

S H

EE

T

P0 9)

NORTH

VICTORY BOULEVARD

LO

X

LEY

R

O A

D

SFM ALIGNMENT

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P09UTILITIES PLAN AND

PROFILE STA 59+48 TO

66+00 44

M

AT

C H

L

IN

E

ST

A

+4

(S

EE

S H

EE

T

P0 8)

M

AT

C H

L

IN

E

ST

A

+0

(S

EE

S H

EE

T

P1 0)

OLD MAGAZINE ROAD

D E

E P C

R E

E K

B O

U L

E V

A R

D D

E E

P C R

E E

K B

O U

L E

V A

R D

SFM ALIGNMENT

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P10UTILITIES PLAN AND

PROFILE STA 66+00 TO

72+50 45

NORTH

M

ATC

H

LIN

E STA 66+00

(SEE SH

EET P09)

M

AT

C H

L

IN

E

ST

A

+5

(S

EE

S H

EE

T

P1 1)

OLD MAGAZINE ROAD

D E

E P C

R E

E K

B O

U L

E V

A R

D D

E E

P C R

E E

K B

O U

L E

V A

R D

SFM TRUNK 1

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P10AUTILITIES PLAN AND

PROFILE STA 599+50 TO

601+70 46

NORTH

M

ATC

H

LIN

E STA 66+00

(SEE SH

EET P09)

M

AT

C H

L

IN

E

ST

A

+5

(S

EE

S H

EE

T

P1 1)

SFM ALIGNMENT

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P11UTILITIES PLAN AND

PROFILE STA 72+50 TO

79+00 47

M

AT

C H

L

IN

E

ST

A

+5

(S

EE

S H

EE

T

P1 0)

M

AT

C H

L

IN

E

ST

A

+0

(S

EE

S H

EE

T

P1 2)

VICTORY BOULEVARDVICTORY BOULEVARD

24"CONC.

INV=7.05

SFM ALIGNMENT SFM TIE-IN - PS 62

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P12UTILITIES PLAN AND

PROFILE STA 79+00 TO

85+50 48

M

AT

C H

L

IN

E

ST

A

+0

(S

EE

S H

EE

T

P1 1)

M

AT

C H

L

IN

E

ST

A

+5

(S

EE

S H

EE

T

P1 3)

G

EO

R G

E W

A

SH

IN

G

TO

N

H

IG

H W

A Y

CONC. MON(F)

PIN(F)

SFM ALIGNMENT

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P13UTILITIES PLAN AND

PROFILE STA 85+50 TO

90+44 49

M

AT

C H

L

IN

E

ST

A

+5

(S

EE

S H

EE

T

P1 2)

MATCH LINE STA 90+44

(SEE SHEET P14)

R E

D G

A T

E D

R

IV

E

R O

D G

E R

S

PL

A C

E

GEORGE WASHINGTON HIGHWAY

R E

D G

A T

E D

R

IV

E

R O

D G

E R

S

PL

A C

E

SFM ALIGNMENT

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P14UTILITIES PLAN AND

PROFILE STA 90+44 TO

95+60 50

NO

RTH

M

AT

C H

L

IN

E

ST

A:

0+

(S

EE

S H

EE

T

P1 3)

34"GUM

"G

UM

"G

UM

12"GUM

18"GUM(2)

"G

UM 24

"G

UM

12"PEAR

18"PEAR

5"PEAR18

"G

UM 18"GUM(2)

8"

GU

M 6"

CH

ER

RY

8"

GU

M

12"GUM

12"GUM8"MAPLE

"B

IR

CH

12"CHERRY

8"BIRCH

13"GUM30"GUM30

"B

IR

CH

24"BIRCH

7"

GU

M

"G

UM

"G

UM

8"

CH

ER

RY

TEL. PED.TE

L.

PE

D.

2-

ST

OR

Y

BR

IC

K #7

2-

ST

OR

Y

BR

IC

K #8

2-

ST

OR

Y

BR

IC

K #8

2-

ST

OR

Y

BR

IC

K #7

2-

ST

OR

Y

BR

IC

K #7

2-

ST

OR

Y

BR

IC

K #8

PU

EB

LO

D

R

IV

E (P

R

IV

AT

E

R O

AD

PA

W

N

EE

D R

IV

E

(P R

IV

AT

E R

O

AD

H U

R O

N D

R

IV

E (P

R

IV

AT

E

R O

AD

10"DEAD TREE

8"OAK48"CYPRESS

22"OAK 8"

OA

K

"C

YP

RE

SS

"C

YP

RE

SS

"O

AK

"M

UL

BE

RR

Y

24"MAPLE

"M

AP

LE

"D

EA

D

TR

EE

"G

UM

INV=8.78

INV=8.35

"P

VC

"C

LF

72"CLF W/ BW

72"MTL FENCE

72"CLF W/ BW

72"MTL

FENCE

CONC. WALK CONC. WALKCONC. WALK

UP#CC09

UP#BC90

IN

V=

8.5

INV=7.95

"C

LA

Y

APPROX. TOP OF BANK

APPROX. TOP OF BANK

APPROX. TOE OF SLOPE

APPROX. TOE OF SLOPE

BOL.

GM

MB MB

8"

MA

PL

E

4"

TW

-M

AP

LE

4"

GU

M

"G

UM

"M

UL

BE

RR

Y

5"

TW

-M

AP

LE

5"

CH

ER

RY

"G

UM

8"

GU

M

12"CHERRY30"OAK

10"CHERRY

18"CHERRY

4"

TW

-M

AP

LE

4"

TW

-B

IR

CH

"C

HE

RR

Y

"G

UM

"G

UM

"S

YC

AM

OR

E

6"

MU

LB

ER

RY

"G

UM

6"

GU

M

"G

UM

8"

GU

M

"G

UM

8"

MA

PL

E

"M

AP

LE

"T

W -G

UM

18"GUM(3)

36"GUM

12"BIRCH(2)

72"MTL FENCE72"MTL FENCE72"MTL FENCE

8"BIRCH

"M

AP

LE

"G

UM

6"

CH

ER

RY

22"GUM

8"

ST

UM

P

5"OAK

8"

MU

LB

ER

RY

8"CHERRY

8"TW-CHERRY

24"STUMP

24"MAPLE5"BIRCH

APPROX. TOP OF BANK

APPROX. TOE OF SLOPEAPPROX. TOE OF SLOPE

APPROX. TOP OF BANK

UP#BC02

UPL#BC03

UPL#BC12 UPL#BC41

MT

L S

TO

RA

GE

CO

NT

AI

NE

R

CONC. WALKCONC. WALK

BOL.(2)

BOL.(2)

BOL.(2)

GM

GM

GMGM MB

BUSH

2-STORY FRAME

(LAUNDRY)

BUSHES

BUSHES PET WASTE

STATION

"T

W -G

UM

WEEDS & BUSHES

TE

L.

PE

D.GATE STOP

GW(2)

INV=8.67

IN

V=

7.7

GW(2)

UP

#B

B5

"C

ON

C.

IN

V=

6.6

BR. HW

CO

NC

. F

LU

ME

CO

NC

. F

LU

ME

CONC. FLUME

UP

-N

O#

CONC.

UP-NO# UP#CB48

UP#CB47

UP#CC71

SSMH #101

(CoP# 10836)

RIM=10.53

INV(E)=4.82

INV(S)=4.72

INV(W)=4.83

INV(NW)=9.27

SSMH #102

RIM=11.05

INV(N)=4.45

INV(S)=4.43

SSMH #103

(CoP# 10840)

RIM=10.42

INV(N)=5.16

INV(E)=5.12

INV(W)=5.12

AP

PR

OX

. L

OC

AT

IO

N

OF

S

SM

H

(C oP

#1

SSMH #105

(CoP#10860)

RIM=10.60

INV(N)-8"=6.47

INV(N)-4"=7.47

INV(E)=6.48

INV(W)=6.47

DI #201

RIM=10.19

INV(N)=6.69

INV(S)=6.69

"P

VC

"C

ON

C.

6"PVC

INV=8.31

TR

AV

#1

D

RI

LL

H

OL

E

N:

,45 6,0

.74

E:

,11

8,2

.26

EL

=1

0.2

TR

AV

#1

D

RI

LL

H

OL

E

N:

3,4

,02 8.1

E:

,11

8,5

.97

EL

=1

0.3

TB

M

IS

C

HI

SE

LE

D

SQ

UA

RE

IN

C

ON

C.

A

T

DR

ILL

H

OL

E

EL

=1

0.3

TB

M

IS

C

HI

SE

LE

D

SQ

UA

RE

IN

C

ON

C.

A

T

DR

ILL

H

OL

E

EL

=1

0.2

TR

AV

#1

D

RI

LL

H

OL

E

N:

,45 6,1

.86

E:

,11

8,0

.96

EL

=1

0.2

TB

M

IS

C

HI

SE

LE

D

SQ

UA

RE

IN

C

ON

C.

A

T

DR

ILL

H

OL

E

EL

=1

0.2

CO

NC

. P

AV

ER

R

TW

72"CLF

W/ BW

PLYWOOD GATE

SI

GNUPL#CC12

27"GUM

NOW OR FORMERLY

INDEPENDENCE SQUARE OWNERS, LLC, ET AL

(INST. 202104534)

T.M.P. 0452 0060

NOW OR FORMERLY

NORTHERN STAR CREDIT UNION, INC.

(D.B. 790, P. 256) (M.B. 12, P. 113) T.M.P. 0452 0030

NOW OR FORMERLY

10 HURON DRIVE, LLC

(INST. 030058268)

(M.B. 27, P. 74 - CHES.)

T.M.P. 0452 0020

NOW OR FORMERLY

10 HURON DRIVE, LLC

(INST. 030058268)

(M.B. 27, P. 74 - CHES.)

T.M.P. 0452 0020

NOW OR FORMERLY

INDEPENDENCE SQUARE OWNERS, LLC, ET AL

(INST. 202104534)

T.M.P. 0452 0060

"W

F

"B

IR

CH

"T

W -G

UM

"O

AK24

"G

UM

15"MAPLE

4"

BI

RC

H

6"

GU

M

"C

HE

RR

Y

"H

IC

KO

RY

10"MULBERRY

10"GUM(2)

18"MAPLE(2)

"B

IR

CH 5"

OA

KSNV

VENT

SNV

EPC IN CONC.

ANTENNA ON

RAISED CONC.

EL

.C

AB

WET WELL

RIM=11.08

METER VAULT HATCH

IN RAISED CONC.

RIM=11.27

VENT

CO

NC

. S

UR

FA

CE

GRAV.

AREA

TEL. PED.

PIN(F)

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P15UTILITIES PLAN AND

PROFILE STA 10+00 TO

16+92 51

M

AT

C H

L

IN

E (S

EE

S

H

EE

T P1

6)

NORTH

Scott.Funk Cloud

V

IC

T O

R Y

B O

U L

E V

A R

D

GEORGE WASHINGTON HIGHWAY

GEORGE WASHINGTON HIGHWAY

TRAV #105 DRILL HOLE

N: 3,455,964.939 E: 12,118,828.308

EL=12.53

GV

W M

UP#CB89

UP-NO#

W

P-GAS

(FLUSH SITE)

SSMH #107

(CoP# 11514)

RIM=13.46

INV(NE)=6.96

INV(E)=.7.74

INV(SW

)=7.71

INV(W

)=6.92

15"CONC.

15"CONC.

CONC.

SURFACE

15"CONC.

15"CONC.CB #204RIM=12.33INV(NE)=8.58

CB #203RIM=12.37INV(N)=8.67INV(NE)=8.22INV(SW)=8.30

CB #202RIM=12.52INV=9.12

SDMH #205RIM=12.72INV(SW)=7.97

15"CONC.

WM(2)

UPL#CB87

UP#CB27

TBM IS CHISELED SQUARE

IN CONC. AT DRILL HOLE

EL=12.53

1-STORY BRICK#5100

ASPH. SURFACE

ASPH. SURFACE

ASPH. SURFACE

CONC.

SURFACE

CONC.

SURFACE

BOL.

BOL.

SCO

BOL.

SSMH(2)

(GREASE SEPARATOR)

SCO

BOL.

BOL.

RAISED CONC.

SCO

72"CLF

W

/ BW

PLYW

OOD GATE

1-STORY STUCCO

#5004

KFC / TACO BELL

1-STORY MTL

(STORAGE)

INTERCOM POST

HEDGEROWBUSH

GM

6" CONC. CURB

CONC. WALK

CONC. WALK

GRASS

24" CONC. C&G

ASPH. SURFACE

ASPH. SURFACE 30"CONC. C&G

CONC. APRON

LM ON CONC. BASE

GW

LM ON CONC. BASE

CONC. PAVER RTW

L.A. W

/ BUSHES

CONC. PAVER

RTW

UNDER CURB

CONC. MON(F)

N O

W O

R

FO

R M

ER

LY

FR

EED

O M

G W

LLC

(IN

ST. 202404574)

(D

.B. 895, P. 96-PLAT)

N O

R

TH

ER

N

STAR

C

R

ED

IT U

N

IO

N

, IN

C

T.M .P. 0452 0012

T.M .P. 0452 0010

SSMH #108

(CoP# 11512)

RIM=13.01

INV(SW

)=7.42

SCO

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

P16

UTILITIES PLAN

MATCH LINE

(SEE SHEET P15)

N O

R

TH

Scott.Funk Cloud

CLAREMONT DR

D

EE

P C

R

EE

K

BL

VD

GE

OR

GE

W

AS

HI

NG

TO

N

HW

Y

SMITHFIELD RD

VICTORY BLVD

KE

N

T D

R

GUST LN

BU

N

C H

E

BL

VD

AVONDALE RD

BEECHDALE RD

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

T00TRAFFIC CONTROL INDEX

AND NARRATIVE

A

B C D

E

F

G H

I

J

NORTH

NOTES

LEGEND

DETOUR

DETOUR

DETOUR

AHEAD

DETOUR

ROAD

CLOSED

BEECHDALE ROAD

DETOUR

DETOUR

ROAD CLOSED

THRU TRAFFIC

TO

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

T01TRAFFIC CONTROL

NOTES

TEMPORARY TRAFFIC CONTROL/SEQUENCE OF CONSTRUCTION NOTES

PUBLIC COMMUNICATION PLAN

TRANSPORTATION OPERATIONS PLANNOTES

TRANSPORTATION MANAGEMENT PLAN

SUGGESTED MAINTENANCE OF TRAFFIC CONCEPTTEMPORARY TRAFFIC CONTROL/SEQUENCE OF CONSTRUCTION

NOTES CONT'D.

DETOUR PLAN LEGEND

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

TTC DETAILS

T02

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

TTC DETAILS

T03

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

TYPICAL SECTION

T04

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

TYPICAL SECTION

T05

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

TYPICAL SECTION

T06

GUST LN

AVONDALE RD

BEECHDALE RD

BU

N

C H

E BLVD

CLAREMONT DR

D

EE

P C

R

EE

K R

D D

EE

P

C R

EE

K

R D

VICTORY BLVD

SMITHFIELD RD

KENT D

R

CHATHAM RD

LOXLEY RD

FR

AN

CI

S

ST

BEECHDALE RD

GUST LN

ROAD CLOSED

THRU TRAFFIC

TO

ROAD CLOSED

THRU TRAFFIC

TO

DE

TO

UR

BEE

CH

DA

LE

RO

AD

DETOUR

BEECHDALE ROAD

DETOUR

BEECHDALE ROAD

DETOUR

BEECHDALE ROAD

DET

OUR

BEE

CHDALE

ROAD

DETOUR

BEECHDALE ROAD

ST

R

AT

FO

R D

S T

DWIGHT DR

DETOUR

AHEAD BEECHDALE ROAD

DETOURBEECHDALE ROADTAFT DR

DE

TO

UR

AH

EA

D

BEE

CHD

ALE

RO

ADG

U

ST LN

DETOUR

AH

EAD

END

DETOUR

DETOUR PLAN

BEECHDALE RD.

T07

117106239

BUNCHE BOULEVARD

WATER AND SEWER IMPROVEMENTS

Sheets and Views
P07 UTILITIES PLAN AND PROFILE STA 46+58 TO 52+99
P07A UTILITIES PLAN AND PROFILE STA 1100+00 TO 1100+59
P08 UTILITIES PLAN AND PROFILES 52+99 TO 59+48
P09 UTILITIES PLAN AND PROFILE STA 59+48 TO 66+00
P10 UTILITIES PLAN AND PROFILE STA 66+00 TO 72+50
P10A UTILITIES PLAN AND PROFILE STA 599+50 TO 601+70
P11 UTILITIES PLAN AND PROFILE STA 72+50 TO 79+00
P12 UTILITIES PLAN AND PROFILE STA 79+00 TO 85+50
P13 UTILITIES PLAN AND PROFILE STA 85+50 TO 90+44
P14 UTILITIES PLAN AND PROFILE STA 90+44 TO 95+60
P15 UTILITIES PLAN AND PROFILE STA 10+00 TO 16+92
P16 UTILITIES PLAN
T00 TRAFFIC CONTROL INDEX AND NARRATIVE
T01 TRAFFIC CONTROL NOTES
T02 TTC DETAILS
T03 TTC DETAILS
T04 TYPICAL SECTION
T05 TYPICAL SECTION
T06 TYPICAL SECTION
T07 DETOUR PLAN