IFB #60-26-SKL Bunche Blvd Water and SewerFM Revised Final Plans_Part2.pdf
PDF 24 MB Posted
- Solicitation number
- IFB-122092
- Issued by
- Portsmouth City, Virginia
About this file
This document comprises revised final plan sheets for IFB #60-26-SKL, a water and sewer infrastructure improvement project issued by the City of Portsmouth, Virginia. The project scope encompasses the design and construction of water and sewer system upgrades along Bunche Boulevard, including installation of new water mains, sanitary sewer lines, and associated appurtenances such as service connections, cleanouts, and force main installations. The plans contain existing conditions surveys, demolition and abandonment plans, and detailed utility alignment drawings showing proposed gravity sewer installations, water main alignments, and sanitary sewer force main profiles across multiple segments of the project corridor. The project area spans from station 12+42 to approximately 46+58, with segments along Avondale Road, Beechdale Road, and connecting thoroughfares. The mandatory pre-bid conference is scheduled for June 23, 2026 at 3:00 p.m. EDT at the City of Portsmouth Public Utilities Operations Center, 430 Meander Road, with electronic bids due July 9, 2026 at 2:00 p.m. EDT. The contract period is 360 days, and contract award will be made to the lowest responsive and responsible bidder meeting all qualification criteria and technical specifications.
The plan sheets document existing utility infrastructure including sanitary sewer manhole locations with rim and invert elevations, water service connections, and relevant appurtenances. The existing conditions are illustrated with vegetation surveys, property line information, and current utility locations along the project corridor. Bidders must submit completed W-9 forms with their bid responses and provide evidence of financial capability and bonding. Virginia Contractor License Numbers and Federal ID Numbers are required submissions, as is DSBSD-certified Small Business designation if applicable. A virtual public bid opening will be conducted via Microsoft Teams on July 10, 2026 at 2:30 p.m. EDT, with prospective bidders required to register with Susan Kenney-Lambert at Lamberts@portsmouthva.gov. Addendum No. 1, issued June 11, 2026, modifies bid opening procedures and requires acknowledgment either prior to the bid due date or through attachment of signed acknowledgment to the bid submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICTORY BOULEVARD
OLD MAGAZINE ROAD
BI
R
D L
A N
E
VICTORY BOULEVARD
D E
E P C
R E
E K
B O
U L
E V
A R
D
D E
E P C
R E
E K
B O
U L
E V
A R
D
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
E08
EXISTING CONDITIONS
NORTH
M
AT
C H
L
IN
E (S
EE
S
H
EE
T E0
7)
M
ATC
H
LIN
E (SEE SH
EET E09)
MSCO #104RIM=10.38INV=6.81
24"CONC.INV=7.05
BI
R
D L
A N
E
SE
BA
G O
D R
IV
E
SE
M
IN
O
LE
D
R
IV
E
PU
EB
LO
D
R
IV
E
VICTORY BOULEVARD
VICTORY BOULEVARD
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
E09
EXISTING CONDITIONS
NORTH
M
AT
C H
L
IN
E (S
EE
S
H
EE
T E0
8)
M
ATC
H
LIN
E (SEE SH
EET E10)
MATCH LINE (SEE SHEET E12)INSET A
NORTH
2-
ST
OR
Y
BR
IC
K #7
2-
ST
OR
Y
BR
IC
K #8
PA
W
N
EE
D R
IV
E
(P R
IV
AT
E R
O
AD
IN
V= 8.5
MB
BOL.(2)
GM
BUSH
BUSHES
AP
PR
OX
. L
OC
AT
IO
N
OF
S
SM
H
(C oP
#1
MSCO NO#RIM=10.25INV=
MSCO #106RIM=10.40INV=7.05
TR
AV
#1
D
RI
LL
H
OL
E
N:
,45 6,0
.74
E:
,11
8,2
.26
EL
=1
0.2
TB
M
IS
C
HI
SE
LE
D
SQ
UA
RE
IN
C
ON
C.
A
T
DR
ILL
H
OL
E
EL
=1
0.2
PIN(F)
NOW OR FORMERLY10 HURON DRIVE, LLC(INST. 030058268)(M.B. 27, P. 74 - CHES.)T.M.P. 0452 0020
SSMH #108(CoP# 11512)RIM=13.01INV(SW)=7.42
PA
W
N
EE
D R
IV
E
H U
R O
N D
R
IV
E
VICTORY BOULEVARD
VICTORY BOULEVARD
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
E10
EXISTING CONDITIONS
NORTH
M
AT
C H
L
IN
E (S
EE
S
H
EE
T E0
9)
M
ATC
H
LIN
E (SEE SH
EET E12)
MATCH LINE (SEE SHEET E12)
CONC. MON(F)
V
IC
TO
R
Y
BO
U
LEV
A R
D
RE
DG
AT
E
DR
IV
E
RO
DG
ER
S
PL
AC
E
V
IC
TO
R
Y
BO
U
LEV
A R
D
GEORGE WASHINGTON HIGHWAY
GEORGE WASHINGTON HIGHWAY
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
E11
EXISTING CONDITIONS
N O
R
TH
MATCH LINE (SEE SHEET E10)
34"GUM
"G
UM
"G
UM
12"GUM
18"GUM(2)
"G
UM 24
"G
UM
12"PEAR
18"PEAR
5"PEAR
"G
UM 18"GUM(2)
8"
GU
M 6"
CH
ER
RY
8"
GU
M
12"GUM
12"GUM8"MAPLE
"B
IR
CH
12"CHERRY
8"BIRCH
13"GUM30"GUM30
"B
IR
CH
24"BIRCH
7"
GU
M
"G
UM
"G
UM
8"
CH
ER
RY
TEL. PED.
TE
L.
PE
D.
2-
ST
OR
Y
BR
IC
K #7
2-
ST
OR
Y
BR
IC
K #8
2-
ST
OR
Y
BR
IC
K #8
2-
ST
OR
Y
BR
IC
K #7
2-
ST
OR
Y
BR
IC
K #7
2-
ST
OR
Y
BR
IC
K #8
PU
EB
LO
D
R
IV
E (P
R
IV
AT
E
R O
AD
PA
W
N
EE
D R
IV
E
(P R
IV
AT
E R
O
AD
H U
R O
N D
R
IV
E (P
R
IV
AT
E
R O
AD
10"DEAD TREE
8"OAK48"CYPRESS
22"OAK 8"
OA
K
"C
YP
RE
SS
"C
YP
RE
SS
"O
AK
"M
UL
BE
RR
Y
24"MAPLE
"M
AP
LE
"D
EA
D
TR
EE
"G
UM
INV=8.78
INV=8.35
"P
VC
"C
LF
72"CLF W/ BW
72"MTL FENCE
72"CLF W/ BW
72"MTL
FENCE
CONC. WALK
CONC. WALK
CONC. WALK
UP#CC09
UP#BC90
IN
V=
8.5
INV=7.95
"C
LA
Y
APPROX. TOP OF BANK
APPROX. TOP OF BANK
APPROX. TOE OF SLOPE
APPROX. TOE OF SLOPE
BOL.
GMMB
MB
8"
MA
PL
E
4"
TW
-M
AP
LE
4"
GU
M
"G
UM
"M
UL
BE
RR
Y
5"
TW
-M
AP
LE
5"
CH
ER
RY
"G
UM
8"
GU
M
12"CHERRY30"OAK
10"CHERRY
18"CHERRY
4"
TW
-M
AP
LE
4"
TW
-B
IR
CH
"C
HE
RR
Y
"G
UM
"G
UM
"S
YC
AM
OR
E
6"
MU
LB
ER
RY
"G
UM
6"
GU
M
"G
UM
8"
GU
M
"G
UM
8"
MA
PL
E
"M
AP
LE
"T
W -G
UM
18"GUM(3)
36"GUM
12"BIRCH(2)
72"MTL FENCE72"MTL FENCE72"MTL FENCE
8"BIRCH
"M
AP
LE
"G
UM
6"
CH
ER
RY
22"GUM
8"
ST
UM
P
5"OAK
8"
MU
LB
ER
RY
8"CHERRY
8"TW-CHERRY
24"STUMP
24"MAPLE5"BIRCH
APPROX. TOP OF BANK
APPROX. TOE OF SLOPE
APPROX. TOE OF SLOPE
APPROX. TOP OF BANK
UP#BC02
UPL#BC12 UPL#BC41
MT
L S
TO
RA
GE
CO
NT
AI
NE
R
CONC. WALK
CONC. WALK
BOL.(2)
BOL.(2)
BOL.(2)
GM
GM
GM
GM
MB
BUSH
2-STORY FRAME
(LAUNDRY)
BUSHESBUSHES PET WASTE
STATION
"T
W -G
UM
WEEDS & BUSHES
TE
L.
PE
D.
GATE STOP
GW(2)
INV=8.67
IN
V=
7.7
GW(2)
UP
#B
B5
"C
ON
C.
IN
V=
6.6
BR. HW
CO
NC
. F
LU
ME
CO
NC
. F
LU
ME
CONC. FLUME
UP
-N
O#
CONC.
UP-NO#
UP#CB48
UP#CB47
UP#CC71
SSMH #101
(CoP# 10836)
RIM=10.53
INV(E)=4.82
INV(S)=4.72
INV(W)=4.83
INV(NW)=9.27
SSMH #102
RIM=11.05
INV(N)=4.45
INV(S)=4.43
SSMH #103
(CoP# 10840)
RIM=10.42
INV(N)=5.16
INV(E)=5.12
INV(W)=5.12 AP
PR
OX
. L
OC
AT
IO
N
OF
S
SM
H (C oP #1
SSMH #105
(CoP#10860)
RIM=10.60
INV(N)-8"=6.47
INV(N)-4"=7.47
INV(E)=6.48
INV(W)=6.47
MSCO #104
RIM=10.38
INV=6.81
MSCO #106
RIM=10.40
INV=7.05
DI #201
RIM=10.19
INV(N)=6.69
INV(S)=6.69
"P
VC
"C
ON
C.
6"PVC
INV=8.31
TR
AV
#1
D
RI
LL
H
OL
E
N:
,45 6,0
.74
E:
,11
8,2
.26
EL
=1
0.2
TR
AV
#1
D
RI
LL
H
OL
E
N:
3,4
,02 8.1
E:
,11
8,5
.97
EL
=1
0.3
TB
M
IS
C
HI
SE
LE
D
SQ
UA
RE
IN
C
ON
C.
A
T
DR
ILL
H
OL
E
EL
=1
0.3
TB
M
IS
C
HI
SE
LE
D
SQ
UA
RE
IN
C
ON
C.
A
T
DR
ILL
H
OL
E
EL
=1
0.2
TR
AV
#1
D
RI
LL
H
OL
E
N:
,45 6,1
.86
E:
,11
8,0
.96
EL
=1
0.2
TB
M
IS
C
HI
SE
LE
D
SQ
UA
RE
IN
C
ON
C.
A
T
DR
ILL
H
OL
E
EL
=1
0.2
CO
NC
. P
AV
ER
R
TW
72"CLF
W/ BW
PLYWOOD GATE
SI
GN
UPL#CC12
27"GUM
NOW OR FORMERLY
INDEPENDENCE SQUARE OWNERS, LLC, ET AL
(INST. 202104534)
T.M.P. 0452 0060
NOW OR FORMERLY
NORTHERN STAR CREDIT UNION, INC.
(D.B. 790, P. 256) (M.B. 12, P. 113) T.M.P. 0452 0030
NOW OR FORMERLY
10 HURON DRIVE, LLC
(INST. 030058268)
(M.B. 27, P. 74 - CHES.)
T.M.P. 0452 0020
NOW OR FORMERLY
10 HURON DRIVE, LLC
(INST. 030058268)
(M.B. 27, P. 74 - CHES.)
T.M.P. 0452 0020
NOW OR FORMERLY
INDEPENDENCE SQUARE OWNERS, LLC, ET AL
(INST. 202104534)
T.M.P. 0452 006072
"W F
"B
IR
CH
"T
W -G
UM
"O
AK24
"G
UM
15"MAPLE4"
BI
RC
H
6"
GU
M
"C
HE
RR
Y
"H
IC
KO
RY
10"MULBERRY
10"GUM(2)
18"MAPLE(2)
"B
IR
CH 5"
OA
KSNV
SNV
EPC IN CONC.
EL
.C
AB
METER VAULT HATCH
IN RAISED CONC.
GRAV.
AREA
PIN(F)
PU
E
B L
O D
R
IV
E
PA
W
N E
E D
R
IV
E
H U
R O
N D
R
IV
E
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
MATCH LINE (SEE SHEET E10)
E12
EXISTING CONDITIONS
MATCH LINE (SEE SHEET E11)
G
EO
RG
E
W
AS
H
IN
G
TO
N H
IG
H
W
AY
VICTORY BOULEVARD
AVONDALE RD
K E
N T
D R
IV
E
BEECHDALE RD
BEECHDALE RD
BU
N
C H
E
BL
V D
DEEP
CREEK B
LVD
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
NORTH
D00WATER AND FM
DEMOLITION AND
ABANDONMENT PLAN 26
BU
N
C H
E
BO
U
LE
V A
R D
AVONDALE ROAD
G
LE
N W
O O
D D
R
AVONDALE ROAD
AVONDALE ROAD
BEECHDALE ROAD
BEECHDALE ROAD
GUST LANE
GUST LANE
BE
EC
H
DA
LE
R
O
AD
D E
E P C
R E
E K
B O
U L
E V
A R
D
K E
N T
D R
IV
E
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
INSET W-A
INSET W-B
INSET W-C
INSET W-D
INSET FM-A INSET FM-B
INSET FM-C
D01DEMOLITION AND
ABANDONMENT PLAN AT
WATER AND FM TIE-INS 27
INSET W-E
EO
RG
W
AS
H
IN
G
TO
N
H
IG
H
W
AY
VICTORY BOULEVARD
TE
L.
PE
D.
8"
MA
PL
E
"M
AP
LE
"T
W -G
UM
18"GUM(3)
36"GUM
12"BIRCH(2)72"MTL FENCE
APPROX. TOE OF SLOPE
APPROX. TOP OF BANKUP#BC02
CONC. WALK
MB
GATE STOP
GW(2)
INV(NW)=9.27
SSMH #102RIM=11.05INV(N)=4.45INV(S)=4.43
6"PVC
INV=8.31
27"GUM
"W
F
"B
IR
CH
"T
W-G
UM
"O
AK24
"G
UM
15"MAPLE4"B
IR
CH
6"G
UM
"C
HE
RR
Y
"H
IC
KO
RY
10"MULBERRY
10"GUM(2)
18"MAPLE(2)
"B
IR
CH 5"O
AK
SNV
VENT
SNV
EPC IN CONC.
EL
.C
AB
METER VAULT HATCH
GRAV.AREA
CONC. MON(F)
VICTORY BOULEVARD
VICTORY BOULEVARD
G
EO
RG
E
W
AS
H
IN
G
TO
N H
IG
H
W
AY
34"GUM
"G
UM
"G
UM
12"GUM
18"GUM(2)
"G
UM 24
"G
UM
12"PEAR
18"PEAR
5"PEAR
"G
UM
18"GUM(2)
TEL. PED.
2-
ST
OR
Y
BR
IC
K #7
"C
YP
RE
SS
"C
YP
RE
SS
INV=8.78
INV=8.35
"P
VC
72"CLF W/ BW
72"MTL FENCE
72"CLF W/ BW
CONC. WALK
UP#CC09
APPROX. TOP OF BANKAPPROX. TOE OF SLOPE
"T
W -G
UM
UP#CB47
UP#CC71
SSMH #105(CoP#10860)RIM=10.60INV(N)-8"=6.47INV(N)-4"=7.47INV(E)=6.48INV(W)=6.47
TR
AV
#1
D
RI
LL
H
OL
N:
3,4
,02
8.1
E:
,11 8,5
.97
EL
=1 0.3
TB
M
IS
C
HI
SE
LE
D
SQ
UA
RE
IN
C
ON
C.
A T
DR
ILL
H
OL
E
EL
=1 0.3
NOW OR FORMERLY
NORTHERN STAR CREDIT UNION, INC.
(D.B. 790, P. 256)(M.B. 12, P. 113)
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
INSET FM-E
INSET FM-F
INSET FM-G
INSET FM-I
INSET FM-K
INSET FM-L
D02DEMOLITION AND
ABANDONMENT PLAN AT
WATER AND FM TIE-INS 28
NORTH
INSET FM-HINSET FM-D
DEEP
CREEK B
LVD
G
EO
RG
E
W
AS
H
IN
G
TO
N H
W Y
VICTORY BOULEVARD
DEEP
CREEK B
LVD
INSET FM-J
P01 P02
P03 P04
P05
P06
P07
P08 P09 P10
P12 P13
P14G
EO
RG
E
W
AS
H
IN
G
TO
N H
IG
H
W
AY
VICTORY BOULEVARD
BU
N
C H
E BO
U
LEV
A
R D
D
EE
P C
R
EE
K B
O U
LE
V
A R
D
P11
P15 P16
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P00
UTILITIES PLAN INDEX
AVONDALE ROAD
B U
N C
H E
B O
U L
E V
A R
D
AVONDALE ROAD
SFM ALIGNMENT
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P01UTILITIES PLAN AND
PROFILE STA 12+42 TO
15+91 30
NORTH
M
AT
C H
L
IN
E
ST
A
+9
(S
EE
S H
EE
T
P0 2)
PROPOSED SANITARY SEWER FORCE MAIN PROFILE
WM ALIGNMENT
GRAVSEWER1 WM ALIGNMENT 2
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P01A
UTILITIES PROFILES
PROPOSED GRAVITY SEWER PROFILE
PROPOSED WATER PROFILE
L
E N
W O
O D
D R
AVONDALE ROAD
AVONDALE ROAD
SFM ALIGNMENT WM ALIGNMENT - GLENWOOD
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P02UTILITIES PLAN AND
PROFILES
M
ATC
H
LIN
E STA 22+42
(SEE SH
EET P03)
M
AT
C H
L
IN
E
ST
A
+9
(S
EE
S H
EE
T
P0 1)
NORTH
PROPOSED FORCE MAIN PROFILE PROPOSED WATER PROFILE
GRAVSEWER2
WM ALIGNMENT
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P02A
UTILITIES PROFILES
PROPOSED GRAVITY SEWER PROFILE
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P02B
UTILITIES PROFILES
PROPOSED GRAVITY SEWER PROFILE PROPOSED GRAVITY SEWER PROFILE
AVONDALE ROAD
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P03UTILITIES PLAN AND
PROFILE STA 22+42 TO
28+53 35
M
AT
C H
L
IN
E
ST
A
+4
(S
EE
S H
EE
T
P0 2)
MATCH LINE STA 28+53
(SEE SHEET P04)
NORTH
PROPOSED FORCE MAIN PROFILE
GRAVSEWER2
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P03A
UTILITIES PROFILES
PROPOSED GRAVITY SEWER PROFILE
A V
O N
D A
L E
R O
A D
BEECHDALE ROAD
G U
ST
L
A N
E
BEECHDALE ROAD
G U
ST
L
A N
E
SFM ALIGNMENT
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P04UTILITIES PLAN AND
PROFILE STA 28+53 TO
34+50 37
MATCH LINE STA 28+53
(SEE SHEET P03)
M
AT
C H
L
IN
E
ST
A
+5
(S
EE
S H
EE
T
P0 5)
NORTH
PROPOSED FORCE MAIN PROFILE
GRAVSEWER2 WM ALIGNMENT - BEECHDALE WEST
WM ALIGNMENT - BEECHDALE EAST
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P04A
UTILITIES PROFILES
PROPOSED GRAVITY SEWER PROFILE
PROPOSED WATER PROFILE PROPOSED WATER PROFILE
BEECHDALE ROAD
BE
EC
H W
O O
D C
O U
R T
SFM ALIGNMENT
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P05UTILITIES PLAN AND
PROFILE STA 34+50 TO
40+52 39
M
ATC
H
LIN
E STA 34+50
(SEE SH
EET P04)
M
AT
CH
L
IN
E
ST
A
+5
(S
EE
S
HE
ET
P
PROPOSED SANITARY SEWER FORCE MAIN PROFILE
BEEC
H
D A
LE R
O
A D
SFM ALIGNMENT SFM - PS18 CONNECTION
117106239
BUNCHE BOULEVARD
WATER AND SEWER IMPROVEMENTS
P06UTILITIES PLAN AND
PROFILES
MATCH LINE STA 40+52
(SEE SHEET P05)
M
ATC
H
LIN
E STA 46+58
(SEE SH
EET P07)
NO
RTH
PROPOSED SANITARY SEWER FORCE MAIN PROFILE PROPOSED SANITARY SEWER FORCE MAIN PROFILE
| Sheets and Views |
| E08 EXISTING CONDITIONS |
| E09 EXISTING CONDITIONS |
| E10 EXISTING CONDITIONS |
| E11 EXISTING CONDITIONS |
| E12 EXISTING CONDITIONS |
| D00 WATER AND FM DEMOLITION AND ABANDONMENT PLAN |
| D01 DEMOLITION AND ABANDONMENT PLAN AT WATER AND FM TIE-INS |
| D02 DEMOLITION AND ABANDONMENT PLAN AT WATER AND FM TIE-INS |
| P00 UTILITIES PLAN INDEX |
| P01 UTILITIES PLAN AND PROFILE STA 12+42 TO 15+91 |
| P01A UTILITIES PROFILES |
| P02 UTILITIES PLAN AND PROFILES |
| P02A UTILITIES PROFILES |
| P02B UTILITIES PROFILES |
| P03 UTILITIES PLAN AND PROFILE STA 22+42 TO 28+53 |
| P03A UTILITIES PROFILES |
| P04 UTILITIES PLAN AND PROFILE STA 28+53 TO 34+50 |
| P04A UTILITIES PROFILES |
| P05 UTILITIES PLAN AND PROFILE STA 34+50 TO 40+52 |
| P06 UTILITIES PLAN AND PROFILES |
File details come from the government source that posted it. Updated .