IFB_5000_ALD1020_ATT_4_v1.docx
DOCX document 30 KB Posted
- Solicitation number
- IFB 5000 ALD1020
- Issued by
- Texas
About this file
This is a Key Personnel Designation submittal for the City of Austin, Texas, related to Power and Pressure Washing and Parking Lot Cleaning Services. The document outlines the staffing requirements and approval procedures for personnel assigned to the contract. The City and Contractor commit to maintaining consistent key personnel throughout the contract term, with any necessary replacements requiring individuals possessing equivalent experience and competence. The Contractor must promptly notify the City and obtain approval before replacing any designated key personnel, with such approval not to be unreasonably withheld.
The identified key personnel include Al Drayton serving as both the City's Contract Manager and Contract Administrator/Procurement Specialist, with contact information of 512-974-2298 and alfonso.drayton@austintexas.gov. The Contractor is required to designate a Contract Manager, though the specific name and contact details are not provided in this submittal. The City Project Manager and additional Department Points of Contact will be designated at contract execution. This personnel structure ensures clear lines of communication and accountability between the City and Contractor throughout the engagement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_5000_ALD1020_ATT_6_v1.docx | DOCX document | |
| IFB_5000_ALD1020_ATT_9_v1.docx | DOCX document | |
| IFB_5000_ALD1020_ATT_3_v1.docx | DOCX document | |
| IFB_5000_ALD1020_PAC1_v1.pdf | ||
| IFB_5000_ALD1020_BID_DOC_v1.xlsx | XLSX spreadsheet | |
| IFB_5000_ALD1020_ATT_2_v1.docx | DOCX document | |
| IFB_5000_ALD1020_ATT_7_v1.docx | DOCX document | |
| IFB_5000_ALD1020_ATT_8_v1.docx | DOCX document | |
| IFB_5000_ALD1020_PAC1_v2.pdf | ||
| IFB_5000_ALD1020_ATT_11_v1.pdf | ||
| IFB_5000_ALD1020_ATT_10_v1.pdf | ||
| IFB_5000_ALD1020_ADD_1_v1.pdf | ||
| IFB_5000_ALD1020_ATT_5_v1.docx | DOCX document | |
| IFB_5000_ALD1020_ATT_1_v1.docx | DOCX document | |
| IFB_5000_ALD1020_ADD_2_v1.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL – Key Personnel
Designation of Key Personnel. The City and the Contractor resolve to keep the same key personnel assigned to this engagement throughout its term. In the event that it becomes necessary for the Contractor to replace any key personnel, the replacement will be an individual having equivalent experience and competence in executing projects such as the one described herein. Additionally, the Contractor shall promptly notify the City and obtain approval for the replacement. Such approval shall not be unreasonably withheld. The Contractor’s and City’s key personnel are identified as follows:
| Role |
| Name |
| Phone |
Contractor Contract Manager
| City Contract Manager |
| Al Drayton |
| 512-974-2298 |
| alfonso.drayton@austintexas.gov |
| City Project Manager |
| List of Department POC Provided at contract execution |
| City Contract Administrator, Procurement Specialist |
| Al Drayton |
| 512-974-2298 |
| alfonso.drayton@austintexas.gov |
| SUBMITTAL – Key Personnel |
| Pg. 1 |
image1.png
File details come from the government source that posted it. Updated .