IFB_2501801_Attachment_A_-_Rework_MR_Station_Diagram.pdf
PDF 480 KB Posted
- Solicitation number
- 2501801
- Issued by
- Lake County, Florida
About this file
The document is Attachment A, a metering and regulator station diagram for Invitation for Bid (IFB) 2501801, associated with the City of Leesburg, Florida's natural gas infrastructure project. The diagram depicts a prefabricated 16' 5" long by 50" wide natural gas metering and regulator station for the Reworld facility, which includes multiple key components: a Filterfab unit, FMG Meter, three Mooney Regulators, multiple Balon Valves, a Tee Strainer, and IMAC Insulators. The diagram provides a detailed schematic layout showing the precise positioning and interconnection of these gas infrastructure components.
The station design appears to be a standardized 4" x 2" x 4" ANSI 300 configuration, with city employees planned to handle the final installation at the Reworld site. The diagram serves as a technical specification for a qualified Florida-licensed fabrication contractor who must meet API 1104 standards for engineering and prefabrication. While specific pricing details are not visible in this technical diagram, the document represents a critical technical specification that would be part of a larger bid package for this municipal infrastructure project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reworld
Filterfab FMG Meter Mooney Regulator Mooney Regulator
Mooney RegulatorBalon Valve Balon Valve
Ba lo n Va lv e Balon
Valve
Tee Strainer
IM
AC
In su la to r IM AC Insulator
16’ 5”
50”
IFB 2501801 Natural Gas Prefabricated Metering & Regulator Station
Metering & Regulator Station Diagram
ATTACHMENT A
File details come from the government source that posted it. Updated .