The document is a comprehensive set of bidding and project plan drawings for the Leesburg International Airport Taxiway Reconstruction Project, prepared by AVCON, Inc. for the City of Leesburg, Florida. The project involves the reconstruction of Taxiways A1, A3, and D, and the relocation of Taxiway A2, with work to be completed in four distinct work areas (A, B, C, and D) over varying durations. Work Area A will last 28 calendar days, Work Area B 42 calendar days, Work Area C 12 calendar days, and Work Area D 33 consecutive calendar days, with working hours restricted to Monday through Friday, 7:00 AM to 7:00 PM.
The project includes extensive airfield electrical work, pavement reconstruction, drainage improvements, and ground improvements, with specific attention to maintaining airport operations during construction. The work will involve removing existing pavement, installing new pavement sections, upgrading electrical systems, replacing taxiway edge lights and signs, and implementing new drainage infrastructure. The project is funded through FAA Airport Improvement Program (AIP) funding and Florida Department of Transportation (FDOT) funding, with the project number 3-12-0042-032-2024. Additional project complexities include gopher tortoise surveys and relocation, strict safety and phasing requirements, and maintaining continuous airport functionality during construction phases.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEESBURG INTERNATIONAL AIRPORT
TAXIWAY A1, A3, & D RECONSTRUCTION AND
TAXIWAY A2 RELOCATION
NO. DATE DESCRIPTION
REVISIONS
DATE
FDOT PTGA NO.
FAA AIG NO.
AVCON PROJ NO.
JUNE 2024
XXXXX-X-XX-X
3-12-0042-032-2024 2024.236.03
VICINITY MAP
N.T.S.
LOCATION MAP
N
KEY WEST
FT.PIERCE
DAYTONA BEACH
TITUSVILLE
PANAMA CITY
PENSACOLA TALLAHASSEE
JACKSONVILLE
ORLANDO
TAMPA
ST.PETERSBURG
MIAMI
LOCATION OF PROJECT
N
N.T.S.
LEESBURG, FLORIDA.
GAINESVILLE
AVCON, INC.
ENGINEERS & PLANNERS
5555 MICHIGAN STREET, ORLANDO, FL. 32822
OFFICE: (407) 599-1122
www.avconinc.com
MELBOURNE
LEESBURG, FLORIDA
PROJECT
AREA
PROFESSIONAL SEAL
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
4\
.2
.0
- L
EE
Tw y D
, A 1, A 2, A 3\
.2
.0
- C
AD
D \2
2G
2.
dw g 6/
/2
5:
P M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
TAXIWAY A1, A3 & D
RECONSTRUCTION AND
TAXIWAY A2 RELOCATION
XR
EF
S:
x
3_
Ex Ba se m ap x
3_
St an da rd
_t b x2
_S he et La yo ut
2423603002G002
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT PTGA NO. XXXXXX-1
3-12-0042-032-2024
2024.236.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JUNE 2024
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
SHEET INDEXA1 ABBREVIATIONSA4
SEAL
SHEET INDEX,
GENERAL NOTES
AND
ABBREVIATIONS
G002
DJN
KNM
KNM
GENERAL NOTESA2
GENERAL NOTES
1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND
OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE
TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL FIELD LOCATE, VERIFY,
AND FURTHER IDENTIFY THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF ALL EXISTING
UTILITIES, STRUCTURES, AND OTHER FEATURES (IDENTIFIED ON THE PLANS OR NOT)
AFFECTING ANY COMPONENT OF WORK HEREIN PRIOR TO THE START OF ANY
CONSTRUCTION. DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY
CONSTRUCTION.
2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO
THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN WITH THOSE
EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE PLANS OR NOT) THAT
MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN COMPONENTS (I.E., AIRFIELD
ELECTRICAL, STORM SEWERS, SANITARY SEWERS, WATER MAINS, COMMUNICATION LINES,
HIGH POWER TRANSMISSION LINES, BUILDING FOUNDATIONS, ETC) AND ANY
DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY CONSTRUCTION. ANY COST
ASSOCIATED WITH THE LOCATION OF EXISTING UTILITIES AS OUTLINED ABOVE IS THE
RESPONSIBILITY OF THE CONTRACTOR.
3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR
OMISSION DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY THE
ENGINEER OF SUCH DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH CORRECTIONS
AND INTERPRETATIONS AS NECESSARY TO REFLECT THE ACTUAL SPIRIT AND INTENT OF
THE CONTRACT DOCUMENTS.
4. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND
SHALL PROVIDE AT LEAST 48-HOURS NOTICE TO THE UTILITY COMPANIES PRIOR TO
CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES.
5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE WORK PERFORMED BY
THE CONTRACTOR CALLED FOR IN THIS CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE
FOR PROTECTING ALL EXISTING SURVEY MONUMENTATION, AND ANY DISTURBED
MONUMENTATION SHALL BE RESTORED AT CONTRACTOR'S EXPENSE BY A SURVEYOR
SELECTED BY THE OWNER.
6. ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND PASS ALL TESTING OR INSPECTION
REQUIREMENTS PRIOR TO ROAD BASE AND/OR SURFACE IMPROVEMENT CONSTRUCTION.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMITS AND
INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AGENCIES AND
THE ENGINEER. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO
CONSTRUCTION, AND SCHEDULE INSPECTIONS AND TESTING ACCORDING TO AGENCY
REQUIREMENTS.
8. ALL WORK PERFORMED SHALL COMPLY WITH THE CODES, STANDARDS, REGULATIONS AND
REQUIREMENTS OF THE CITY OF LEESBURG LAND DEVELOPMENT CODE AND ENGINEERING
STANDARDS, PLUS THE CURRENT EDITION OF THE FDOT STANDARD SPECIFICATIONS FOR
ROAD, BRIDGE AND UTILITY CONSTRUCTION, PLUS THE CURRENT EDITION OF THE FAA
ADVISORY CIRCULARS, PLUS THE REGULATIONS AND ORDINANCES OF THE VARIOUS OTHER
GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK.
9. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL PRECAST AND MANUFACTURED
ITEMS TO THE ENGINEER FOR APPROVAL. FAILURE TO OBTAIN APPROVAL BEFORE
INSTALLATION COULD RESULT IN REMOVAL AND REPLACEMENT AT CONTRACTOR'S
EXPENSE. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS IS FOR CONFORMITY WITH
THE CONTRACT DOCUMENTS AND DOES NOT INCLUDE IN-DEPTH CHECK FOR THE ABILITY
OF THE CONTRACTOR TO PERFORM THE WORK IN A SAFE OR EFFICIENT MANNER. THE
ENGINEER'S REVIEW OF THE SHOP DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF
RESPONSIBILITY FOR DIMENSIONAL ACCURACY TO ENSURE FIELD FIT AND CONFORMITY OF
THE VARIOUS COMPONENTS AND DETAILS.
10. CONTRACTOR SHALL KEEP ENGINEER ADVISED OF CONSTRUCTION SCHEDULE CHANGES
SO THAT ENGINEER CAN PROVIDE CONSTRUCTION CERTIFICATIONS TO JURISDICTIONAL
AGENCIES.
11. SAFETY - DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL
SAFETY REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR THEIR
REPRESENTATIVE SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE
TRAVELING PUBLIC AND THE SAFETY OF HIS PERSONNEL. LABOR SAFETY REGULATIONS
SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA IN THE FEDERAL REGISTER OF
THE DEPARTMENT OF TRANSPORTATION.
12. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT NECESSARY FOR DEWATERING. DISCHARGE
WATER FROM DEWATERING SHALL BE CLEAR WITH NO VISIBLE SOIL PARTICLES.
DISCHARGE WATER FROM DEWATERING SHALL BE DISPOSED OF IN SUCH A MANNER THAT
IT WILL NOT INTERFERE WITH THE NORMAL DRAINAGE OF THE AREA IN WHICH THE WORK IS
BEING PERFORMED, OR CREATE PONDING. THE OPERATION SHALL NOT CAUSE ANY
DAMAGE TO ANY PORTION OF THE WORK COMPLETED, OR IN PROGRESS. THE DEWATERING
OPERATION SHALL COMPLY WITH THE REQUIREMENTS OF APPLICABLE REGULATORY
AGENCIES. A PRE-WORK MEETING WILL BE CONDUCTED WITH THE OWNER, THE
CONTRACTOR, AND THE ENGINEER PRIOR TO BEGINNING ANY SITE EXCAVATION.
13. "AS-BUILT" PLANS FOR THE PROPOSED CONSTRUCTION SHALL BE PROVIDED UPON
COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE OWNER'S
ENGINEER WITH COMPLETE "AS-BUILT" INFORMATION CERTIFIED BY A FLORIDA
REGISTERED PROFESSIONAL SURVEYOR.
14. PIPE LENGTHS SHOWN ARE APPROXIMATE AND SHOULD BE ORDERED FROM FIELD STAKED
QUANTITIES. PLAN PIPE LENGTHS ARE MEASURED FROM CONNECTION POINT TO END OF
THE LINES FOR WATER LINES.
15. THESE DRAWINGS HAVE BEEN PREPARED, IN PART, BASED UPON RECORD DRAWINGS
AND/OR CAD FILES FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE
RELIABLE, THOSE UTILIZING THE INFORMATION ON THESE DRAWINGS ARE ADVISED TO
OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE USING IT FOR ANY
PURPOSE.
16. ALL AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S STAGING AND CONSTRUCTION
OPERATIONS SHALL BE RESTORED EQUAL TO OR BETTER THAN ORIGINAL CONDITION AT
THE CONTRACTOR'S EXPENSE.
17. DURING THE WORK OF THIS CONTRACT, THE CONTRACTOR SHALL FURNISH, ERECT AND
MAINTAIN WHATEVER TEMPORARY LIGHTING MAY BE NECESSARY TO KEEP THE TAXIWAY IN
OPERATING CONDITION WHEN OPEN FOR AIRCRAFT.
18. ALL DIRT, DUST, STONES AND LOOSE DEBRIS SHALL BE CONTINUOUSLY REMOVED FROM
ALL PAVED SURFACES DURING THIS CONTRACT.
19. THE CONTRACTOR SHALL CONSTRUCT AND MAINTAIN PROPOSED ASPHALT MILLINGS
ACCESS ROADS AT THE APPROXIMATE LOCATION SHOWN. PROPOSED ACCESS ROAD
MATERIAL SHALL BE MADE OF ASPHALT MILLINGS OR AN APPROVED EQUIVALENT.
20. ALL OF THE CONTRACTOR'S OPERATIONS SHALL REMAIN ON AIRPORT PROPERTY AT ALL
TIMES. UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED ON ADJACENT
PROPERTY.
21. TO THE EXTENT THAT WETLAND AREAS ARE KNOWN, THEY HAVE BEEN DEPICTED ON THE
CONTRACT DRAWINGS.
22. IN WETLAND AREAS, NO EXCAVATION, VEHICLES OR OTHER SOIL DISTURBANCE WILL BE
ALLOWED. ANY CLEARING REQUIRED WILL BE PREFORMED WITH HAND HELD TOOLS AND
REMOVED BY HAND. NO GRUBBING WILL BE ALLOWED.
23. THE CONTRACT DOES NOT ALLOW FOR PRICE INCREASES DUE TO ESCALATION IN COST OF
UNIT BID ITEMS. THE CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION WHEN
PREPARING UNIT PRICES FOR BID.
24. THE CITY OF LEESBURG RESERVES THE RIGHT TO ELIMINATE ANY ITEMS OF THE CONTRACT
AND PERFORM THESE ITEMS WITH COUNTY SUPPLIED FORCES AND MATERIALS.
25. THE CONTRACTOR SHALL BE AWARE THAT OTHER CONCURRENT PROJECTS MAY BE UNDER
CONSTRUCTION ON THE AIRPORT. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE THEIR ACTIVITIES WITH THE OTHER CONTRACTORS ON THE AIRPORT. THIS
COORDINATION WILL NOT BE PAID SEPARATELY AND IS CONSIDERED A NECESSARY AND
INCIDENTAL PORTION OF THE WORK.
26. ALL ELEVATIONS REFERENCE NAVD 88 VERTICAL DATUM. COORDINATES REFERENCE NAD
83 HORIZONTAL DATUM.
27. THE TOPOGRAPHIC FEATURES SHOWN HEREON WERE COMPILED FROM FIELD SURVEY
PERFORMED BY GAI CONSULTANTS, INC. DATED 05-08-2023.
28. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL FAILED QUALITY
ASSURANCE TESTING.
GRADING NOTES
1. SELECTIVE GRADING SHALL BE REQUIRED AS DIRECTED BY THE ENGINEER.
2. THE QUANTITY OF UNCLASSIFIED EXCAVATION, ITEM P-152, INCLUDES 100 CY OF UNDERCUT
EXCAVATION WHICH WILL BE USED ONLY WHEN DIRECTED BY THE ENGINEER.
3. THE QUANTITY OF LIME ROCK BASE COURSE, ITEM P-211, INCLUDES 100 CY FOR
REPLACEMENT OF UNDERCUT EXCAVATION WHICH WILL BE USED ONLY WHEN DIRECTED
BY THE ENGINEER.
4. ALL SPOIL MATERIAL WHICH IS SUITABLE FOR EMBANKMENT AND EXCESS TOPSOIL SHALL
BE DISPOSED OF ON AIRPORT PROPERTY AS SHOWN ON THE CONTRACT DRAWINGS,
UNLESS OTHERWISE DIRECTED BY THE AIRPORT AUTHORITIES. SPOIL MATERIAL WHICH IS
NOT SUITABLE FOR EMBANKMENT SHALL BE DISPOSED OF OFF AIRPORT.
5. EMBANKMENTS SHALL BE CONSTRUCTED WITH SUITABLE ON-SITE MATERIAL UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
6. THE LIMITS FOR SODDING ARE THE LIMITS OF GRADING SHOWN ON THE GRADING PLANS.
ALL AREAS OUTSIDE OF THE GRADING LIMITS WHICH ARE DISTURBED SHALL BE RESTORED,
WITH SOD, BY THE CONTRACTOR AT THEIR EXPENSE.
7. THE COST OF MEASURES AND PRACTICES FOR COMPLIANCE WITH POLLUTION, EROSION,
AND SILTATION CONTROL SUCH AS AIR POLLUTION PREVENTION, WATER POLLUTION
PREVENTION, TEMPORARY SEEDING, TEMPORARY MULCHING, CONSTRUCTION ROAD
STABILIZATION, DUST CONTROL, PROTECTING VEGETATION, AND EROSION AND SILTATION
CONTROL PRACTICES DUE TO THE CONTRACTOR'S MEANS AND METHODS, SHALL BE
INCLUDED IN ITEM C-102 UNDER PAYMENT FOR "TEMPORARY AIR & WATER POLLUTION, SOIL
EROSION, AND SILTATION CONTROL"..
8. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE
PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED UNTIL THE
NEW SLOPES ARE STABILIZED WITH SODDING AND/OR SLOPE PROTECTION.
9. ALL GRADING AREAS SHALL BE RESTORED WITH SOD. ALL AREAS OF SODDING SHALL BE
SMOOTH AND FREE OF RUTTING AT THE COMPLETION OF THE PROJECT.
10. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ADEQUATE GROWTH OF
GRASS FOR ALL AREAS RESTORED WITH SOD. CONTRACTOR SHALL WATER AND MAINTAIN
THE SOD AS NECESSARY TO ENSURE CURRENT AND FUTURE GROWTH.
PAVING NOTES:
1. ALL AREAS TO BE PAVED SHALL BE PREPARED IN ACCORDANCE WITH ITEM P-101,
"PREPARATION/REMOVAL OF EXISTING PAVEMENTS".
2. EMULSIFIED ASPHALT TACK COAT, ITEM P-603, SHALL BE APPLIED PRIOR TO PLACING EACH
LIFT OF PAVEMENT, UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
3. IN CASES OTHER THAN CENTERLINE JOINTS, LONGITUDINAL PAVING JOINTS IN ONE LAYER
SHALL BE OFFSET FROM THAT IN THE PREVIOUS LAYER BY AT LEAST ONE FOOT. THE JOINT
AT THE CENTERLINE OF THE PAVEMENT SHALL LINE UP WITH PREVIOUS LAYER CENTERLINE
JOINTS.
STORMWATER SYSTEM NOTES:
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY INVERTS AND
LOCATIONS OF THE EXISTING STORM SEWER SYSTEM PRIOR TO SUBMITTAL OF SHOP
DRAWINGS AND CONSTRUCTION AND NOTIFY THE ENGINEER IF ANY DISCREPANCY IN
INVERTS AND LOCATIONS EXIST.
2. THE CONTRACTOR SHALL PROVIDE SHOP DRAWINGS, PRODUCT INFORMATION/CUT
SHEETS, AND/OR CERTIFICATIONS FOR ALL STORM WATER STRUCTURES, STORM SEWER
PIPES, AND CONCRETE DESIGN MIX.
3. THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS TO MAINTAIN EXISTING
STORM SEWER SYSTEM IN SERVICE.
4. SURFACE DRAINAGE SHALL BE DIVERTED FROM EXCAVATIONS, AND STOCKPILE AREAS
SUCH THAT PROPER SITE CONDITIONS ARE MAINTAINED AND EROSION DUE TO RAIN
RUN-OFF OR SEEPAGE IS PREVENTED OR MINIMIZED.
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE AND NATIONAL
ELECTRICAL CODES.
2. THE ELECTRICAL CHARACTERISTICS OF PROPOSED EQUIPMENT SHALL BE VERIFIED TO BE
COMPATIBLE WITH EXISTING EQUIPMENT MANUFACTURER PRIOR TO INSTALLATION.
3. ABANDONED CABLES MAY EXIST IN THE VICINITY OF THE PROPOSED WORK. IF
ENCOUNTERED, CONTRACTOR SHALL VERIFY THAT THEY ARE ABANDONED PRIOR TO
REMOVAL. IF THEY ARE NOT ABANDONED, CABLES SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
4. ITEMS OF SPECIFIC MANUFACTURE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH
MANUFACTURER'S PRINTED INSTRUCTIONS AND OR MANUFACTURER'S REPRESENTATIVE
DIRECTIONS.
5. ALL GROUND CONNECTIONS SHALL BE MADE USING EXOTHERMIC CONNECTIONS.
6. ALL CABLE CONNECTIONS SHALL BE MADE AT LIGHT UNITS OR AT ENDS OF DUCT BANKS
UNLESS DIRECTED OTHERWISE.
7. ALL ELECTRICAL EQUIPMENT REMOVED WHICH IS DESIRED BY THE OWNER TO BE
SALVAGED SHALL BE TURNED OVER TO THE OWNER. THE EQUIPMENT SHALL BE
STOCKPILED AT A LOCATION DESIGNATED BY THE OWNER IN PROPER WORKING
CONDITION. ALL OTHER MATERIALS SHALL BE SPOILED OFF AIRPORT PROPERTY AT A
PROPER DISPOSAL SITE AT THE CONTRACTOR'S EXPENSE.
8. PROVIDE WATERTIGHT TERMINATION FOR ALL BURIED CONDUIT ENDS.
9. ALL RUNWAY AND TAXIWAY EDGE LIGHTS SHALL BE LOCATED 5 FEET OFF THE DEFINED
PAVEMENT EDGE UNLESS OTHERWISE NOTED OR DIRECTED. THE CONTRACTOR SHALL
ALIGN ALL LIGHTS ON TANGENT SECTIONS SUCH THAT THEY FORM A STRAIGHT LINE.
ABAN. - ABANDONED
APPROX. - APPROXIMATE
ASPH. - ASPHALT
BL - BASELINE
BLDG. - BUILDING
BM - BENCHMARK
CL - CENTERLINE
CCR - CONSTANT CURRENT REGULATOR
CIP - CAST IRON PIPE
CMP - CORRUGATED METAL PIPE
CONC. - CONCRETE
CSP - CORRUGATED STEEL PIPE
D - DIAMETER
E - EASTING
ELL - ELBOW/ARM
ELEV, - ELEVATION
FND. - FOUNDATION
HP - HIGH POINT
INV. - INVERT
JCP - JUNCTION CAN PLAZA
LT - LEFT
LP - LOW POINT
MAX. - MAXIMUM
MES - MITERED END SECTION
M.E.G. - MEET EXISTING GRADE
MIN. - MINIMUM
N - NORTHING
NA - NOT ACCEPTABLE
NFPA - NATIONAL FIRE PROTECTION
ASSOCIATION
OFA - OBJECT FREE AREA
O.C - ON CENTER
PAV'T - PAVEMENT
PC - POINT OF CURVATURE
PCC - PORTLAND CEMENT CONCRETE
PAVEMENT
PI - POINT OF INTERSECTION
PL - PROPERTY LINE
PVI - POINT OF VERTICAL INTERSECTION
PVC - POLYVINYL CHLORIDE PIPE
PET - CROSSLINKED POLYETHYLENE
PRESSURE TUBING
PVT - POINT OF TANGENCY (VERTICAL
CURVE)
R - RADIUS
RCP - REINFORCED CONCRETE PIPE
RGS - RIGID GALVANIZED STEEL
ROFA - RUNWAY OBJECT FREE AREA
RSA - RUNWAY SAFETY AREA
ROW - RIGHT OF WAY
RPZ - RUNWAY PROTECTION ZONE
RT - RIGHT
RWY - RUNWAY
SHDR - SHOULDER
SICPP - SMOOTH INTERIOR CORRUGATED
POLYETHYLENE PIPE
STA - STATION
TLOFA - TAXILANE OBJECT FREE AREA
TOFA - TAXIWAY OBJECT FREE AREA
TSA - TAXIWAY SAFETY AREA
TWY - TAXIWAY
TYP - TYPICAL
UG - UNDERGROUND
TOFA TOFA
TOFA TOFA TOFA TOFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
R
SA
R
SA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
E
E
ROFZROFZROFZROFZROFZROFZROFZROFZROFZROFZ
R O
FZ
ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ ROFZ
A A
A
TOFA TOFA TOFA
TOFA TOFA TOFA
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
4\
.2
.0
- L
EE
Tw y D
, A 1, A 2, A 3\
.2
.0
- C
AD
D \2
4G
1.
dw g 6/
/2
5:
P M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
TAXIWAY A1, A3 & D
RECONSTRUCTION AND
TAXIWAY A2 RELOCATION
XR
EF
S:
x
3_
St an da rd
_t b x2
_E xB as em ap x
3_
G eo m et ry x
3_
M ar ki ng x
3_ C
SP
P x2
_D ra in ag e
2423603004G101
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT PTGA NO. XXXXXX-1
3-12-0042-032-2024
2024.236.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JUNE 2024
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
SEAL
GENERAL PLAN
G101
DJN
KNM
KNM
GRAPHIC SCALE (FT)
NORTH
80 160 320
GENERAL PLANB1
KEYED NOTESA1 #
2 3
U.S. HIGHWAY 441
U.S. HIGHWAY 441
AIRPORT
PROPERTY
LINE, (TYP.)
POND
EXISTING
TREELINE, (TYP.)
WILCO DRIVE
AIRPORT BLVD
EXISTING
FENCELINE, (TYP.)
AIRPORT
ADMIN
BUILDING
AIRPORT VIEW RD
RUNWAY 13-31 (6300' X 100')
TAXIWAY D
TAXIWAY A
TAXIWAY A1
EXISTING TAXIWAY A2
TAXIWAY A3
TAXIWAY A4
H
AN
G
AR
HANGAR
HANGAR
HANGAR HANGAR
HANGAR
HANGAR
HANGAR
HANGAR HANGAR HANGAR HANGAR HANGAR
H
AN
G
AR
H
AN
G
AR
HANGAR
HANGAR
H
AN
G
AR
HANGAR
HANGAR
FBO &
CUSTOMS
ATCT
NEW TAXIWAY A2
BLDG.
BLDG.
BLDG.
BLDG.
BLDG.
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR
HANGAR HANGAR
HANGAR
AIRCRAFT
PARKING
APRON
GOPHER TORTOISE SURVEY NOTESA2
1. THE CONTRACTOR SHALL COMPLETE A GOPHER TORTOISE SURVEY, PAID UNDER ITEM
"GOPHER TORTOISE SURVEY/PROTECTION." SURVEY RESULTS SHALL BE PROVIDED TO
THE ENGINEER ONCE COMPLETED.
2. CONTRACTOR SHALL PROTECT ALL DISCOVERED BURROWS IN ACCORDANCE WITH THE
FLORIDA FISH AND WILDLIFE REQUIREMENTS.
3. CONTRACTOR SHALL BE REQUIRED TO OBTAIN THE NECESSARY GOPHER TORTOISE
RELOCATION PERMITS. THIS WORK WILL BE PAID UNDER ITEM "GOPHER TORTOISE
PERMIT."
4. ALL COSTS FOR DIGGING, RELOCATION OF GOPHER TORTOISES, BACKFILLING, AND
PERMITS FOR THE RECIPIENT SITE SHALL BE PAID UNDER THE ALLOWANCE, ITEM,
"GOPHER TORTOISE BURROW EXCAVATION AND RELOCATION."
5. THE CONTRACTOR SHALL TRACK TIME AND MATERIALS FOR THE EFFORT NECESSARY
TO EXCAVATE ALL IDENTIFIED BURROWS.
6. THE GOPHER TORTOISE SURVEY SHALL BE COMPLETED AS SOON AS POSSIBLE.
EXCAVATION AND RELOCATIONS SHALL BE COMPLETED BEFORE THE START OF WORK
AREA A. GOPHER TORTOISE EXCAVATION AND RELOCATION WORK COMPLETED PRIOR
TO THE CONTRACT BEGINNING SHALL NOT COUNT AGAINST OVERALL CONTRACT TIME.
TOFA TOFA TOFA TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TO
FA
TO
FA
TO
FA
E
E
CB
INV: 73.50
LS
TOFA TOFA TOFA TOFA TOFA TOFA
TO
FA
TO
FA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
4\
.2
.0
- L
EE
Tw y D
, A 1, A 2, A 3\
.2
.0
- C
AD
D \2
5G
2.
dw g 6/
/2
5:
P M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
TAXIWAY A1, A3 & D
RECONSTRUCTION AND
TAXIWAY A2 RELOCATION
XR
EF
S:
x
3_
St an da rd
_t b x2
_C
SP
P
2423603005G102
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT PTGA NO. XXXXXX-1
3-12-0042-032-2024
2024.236.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JUNE 2024
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
SEAL
CONSTRUCTION
SAFETY AND
PHASING PLAN -
WORK AREA A
G102
DJN
KNM
KNM
GRAPHIC SCALE (FT)
NORTH
50 100 200
CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA AB1
KEYED NOTESA1 CONSTRUCTION SAFETY PHASING PLAN NOTES AND SHEET LEGENDA2
WILCO DRIVE
AIRPORT BLVD
RUNWAY 13-31 (6300' X 100')
TAXIWAY A
H
AN
G
AR
HANGAR
HANGAR HANGAR
HANGAR
HANGAR
HANGAR
HANGAR HANGAR HANGAR HANGAR HANGAR
HANGAR
HANG
AR
HANGAR
CONSTRUCTION SAFETY PHASING NOTES:
1. WORK AREA A SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN WORK AREA A,
INCLUDING, BUT NOT LIMITED TO, EXCAVATION/GRADING, AIRFIELD ELECTRICAL, PAVEMENT, AND
PAVEMENT MARKINGS.
2. WORK AREA A SHALL INCLUDE THE PARTIAL CLOSURE OF TAXIWAY A AND FULL CLOSURE OF
TAXIWAY A1. RUNWAY 13-31, THE REMAINING PORTION OF TAXIWAY A, TAXIWAY B, AND
AIRCRAFT PARKING APRON SHALL REMAIN OPEN AT ALL TIMES FOR THE DURATION OF THE
WORK AREA. THE TENANTS AND OWNER SHALL BE NOTIFIED TWO WEEKS IN ADVANCE OF THE
START OF WORK AREA A.
3. FOR WORK IN WORK AREA A, THE CONTRACTOR SHALL BE REQUIRED TO COMMUNICATE AND
REQUEST TRAVEL ACROSS MULTIPLE PORTIONS OF ACTIVE AIRFIELD PAVEMENT. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO EFFECTIVELY COMMUNICATE THIS TO THE ATCT.
CONTRACTOR MAY ALSO REQUEST TO USE MULTIPLE FLAGGERS TO ENSURE THE SAFE AND
EFFECTIVE TRAVEL TO THE DESIGNATED WORK AREA. ANY ADDITIONAL FLAGGERS SHALL BE
APPROVED BY THE RPR OR ENGINEER OF RECORD.
2. WORK AREA A SHALL BE LIMITED TO 28 CALENDAR DAYS. WORKING HOURS SHALL BE MONDAY
THROUGH FRIDAY, 7:00AM - 7:00PM.
3. HALF-RATE PAVEMENT MARKINGS SHALL BE IN PLACE PRIOR TO THE START OF WORK AREA B.
4. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT ALL TIMES.
5. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO AIRCRAFT TRAFFIC AT
ALL TIMES.
6. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR LEAVE THE MARKED WORK AREA WITHOUT
PRIOR APPROVAL OR PROPER COORDINATION WITH THE REQUIRED PARTIES. DOING SO MAY
RESULT IN THE PERMANENT EXPULSION OF THE CONTRACTOR FROM THE AIRPORT.
7. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT OWNED
FENCING THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY EXISTING AIRPORT
FENCE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL
COST TO THE OWNER.
8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE ENGINEER
AND/OR RPR REGARDING CONSTRUCTION SCHEDULE AND PLANNING. NOTAMS FOR LOCALIZED
CLOSURES SHALL BE PLANNED AND COORDINATED WITH THE OWNER AND ATCT PERSONNEL IN
ADVANCE OF THE START OF WORK. THE CONTRACTOR SHALL HAVE A QUALIFIED
REPRESENTATIVE CAPABLE OF COMMUNICATING WITH THE ATCT AND KNOWLEDGEABLE ABOUT
MOVEMENT ON ACTIVE AIRFIELD PAVEMENT AREAS. CONTRACTORS SHALL CLOSELY
COORDINATE ACCESS ON AND ACROSS OPEN AND ACTIVE AIRFIELD PAVEMENT WITH THE
AIRPORT, ATCT, AND THE RESIDENT ENGINEER.
9. CONTRACTOR PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY CIRCUMSTANCES,
OUTSIDE THE DESIGNATED STAGING, LAY-DOWN, PERSONAL VEHICLE PARKING AREA. ONLY
PROPERLY MARKED AND LIGHTED CONTRACTOR VEHICLES OR CONSTRUCTION VEHICLES SHALL
BE PERMITTED OUTSIDE THE STAGING AREA OR THE ACTIVE WORK AREA UNLESS OTHERWISE
APPROVED BY THE RPR.
10. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO THE ACTIVE WORK AREA SHALL BE CONTINUALLY
SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT ACTIVE AIRFIELD PAVEMENT
SURFACES ARE CLEAR AND FREE OF CONSTRUCTION DEBRIS, DUST, OR FOD. SELECTIVE
SWEEPING AND AIRFIELD PAVEMENT MAINTENANCE MAY BE DIRECTED BY THE RPR AND SHALL
BE INCIDENTAL TO SECTION 80, CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE.
11. PRIOR TO THE START OF WORK WITHIN WORK AREA A, THE CONTRACTOR SHALL ACTIVATE ANY
ELECTRICAL FIXTURES WITHIN THE INTENDED OVERALL PROEJCT WORK AREA AND TAKE NOTE
OF ITS EXISTING CONDITIONS. AFTER CONCLUDING WORK WITHIN WORK AREA A, THE
CONTRACTOR SHALL TAKE NOTE OF THE FINAL CONDITION OF ALL THE ELECTRICAL FIXTURES.
THE CONTRACTOR MAY BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY ELECTRICAL
FIXTURES THAT ARE DAMAGED OVER THE COURSE OF THE PROJECT OR THAT HAVE BEEN
NEGATIVELY IMPACTED AS A RESULT OF THE CONSTRUCTION OPERATIONS IN THE OPINION OF
THE ENGINEER.
12. CONTRACTOR SHALL BE REQUIRED TO IMPLEMENT FOD MANAGEMENT PRACTICES AT THE END
OF EACH DAY WHICH SHALL INCLUDE UTILIZATION OF THE FOD-RAZOR FRICTION MATT. THE
NUMBER OF PASSES AND AREAS TO BE MAINTAINED USING THE FOD-RAZOR FRICTION MAT SHALL
BE AT THE DISCRETION OF THE RPR. NO ADDITIONAL MEASUREMENT OR PAYMENT SHALL BE
MADE FOR USE OF THE FOD-RAZOR FRICTION MAT AND SHALL BE CONSIDERED INCIDENTAL TO
SECTION 80, CONSTRUCTION AND SAFETY PHASING PLAN COMPLIANCE.
SHEET LEGEND:
HANGAR TAXIW
AY B
WORK AREA A
EXISTING TREELINE, (TYP.)
EXISTING FENCELINE, (TYP.)
AIRPORT ADMIN BUILDING
TAXIWAY D
TAXIWAY A1
TAXIWAY A2
TAXIWAY A3
TAXIWAY A4
FBO & CUSTOMS
ATCT
EXISTING
AIRPORT
PROPERTY
LINE, (TYP.)
TAXI ROUTE FOR WORK AREA A
CONTRACTOR ACCESS ROUTE FOR WORK AREA A. SEE
SHEET G101 FOR ADDITIONAL INFORMATION.
FLAGGER FOR WORK AREA A, SEE SHEET
G101 FOR ADDITIONAL FLAGGER LOCATIONS
BARRICADES FOR WORK AREA A,
SEE DETAIL C4/G151.
EXISTING WINDCONE
AIRCRAFT PARKING APRON
AIRCRAFT PARKING APRON
TOFA TOFA TOFA TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA TOFA
TO
FA
TO
FA
TO
FA
E
E
A
TOFA TOFA TOFA TOFA TOFA TOFA
TO
FA
TO
FA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
4\
.2
.0
- L
EE
Tw y D
, A 1, A 2, A 3\
.2
.0
- C
AD
D \2
6G
3.
dw g 6/
/2
5:
P M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
TAXIWAY A1, A3 & D
RECONSTRUCTION AND
TAXIWAY A2 RELOCATION
XR
EF
S:
x
3_
St an da rd
_t b x2
_C
SP
P
2423603006G103
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT PTGA NO. XXXXXX-1
3-12-0042-032-2024
2024.236.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JUNE 2024
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
SEAL
CONSTRUCTION
SAFETY AND
PHASING PLAN -
WORK AREA B
G103
DJN
KNM
KNM
GRAPHIC SCALE (FT)
NORTH
20 40 80
CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA BB1
KEYED NOTESA1 CONSTRUCTION SAFETY PHASING PLAN NOTES AND SHEET LEGENDA2
CONSTRUCTION SAFETY PHASING NOTES:
1. WORK AREA B SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN WORK AREA B, INCLUDING, BUT NOT LIMITED TO, EXCAVATION/GRADING, AIRFIELD ELECTRICAL, PAVEMENT, AND PAVEMENT
MARKINGS.
2. WORK AREA B SHALL INCLUDE THE PARTIAL CLOSURE OF TAXIWAY, AND FULL CLOSURE OF
TAXIWAY D, A2, AND A3. RUNWAY 13-31, THE REMAINING PORTION OF TAXIWAY A, TAXIWAY B, AND AIRCRAFT PARKING APRON SHALL REMAIN OPEN AT ALL TIMES FOR THE DURATION OF THE WORK AREA. THE TENANTS AND OWNER SHALL BE NOTIFIED TWO WEEKS IN ADVANCE OF THE START OF
WORK AREA B.
3. FOR WORK IN WORK AREA B, THE CONTRACTOR SHALL BE REQUIRED TO COMMUNICATE AND
REQUEST TRAVEL ACROSS MULTIPLE PORTIONS OF ACTIVE AIRFIELD PAVEMENT. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO EFFECTIVELY COMMUNICATE THIS TO THE ATCT. CONTRACTOR MAY ALSO REQUEST TO USE MULTIPLE FLAGGERS TO ENSURE THE SAFE AND EFFECTIVE TRAVEL TO THE DESIGNATED WORK AREA. ANY ADDITIONAL FLAGGERS SHALL BE APPROVED BY THE RPR
OR ENGINEER OF RECORD.
2. WORK AREA B SHALL BE LIMITED TO 42 CALENDAR DAYS. WORKING HOURS SHALL BE MONDAY
THROUGH FRIDAY, 7:00AM - 7:00PM.
3. HALF-RATE PAVEMENT MARKINGS SHALL BE IN PLACE PRIOR TO THE START OF WORK AREA C.
4. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT ALL TIMES.
5. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO AIRCRAFT TRAFFIC AT
ALL TIMES.
6. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR LEAVE THE MARKED WORK AREA WITHOUT
PRIOR APPROVAL OR PROPER COORDINATION WITH THE REQUIRED PARTIES. DOING SO MAY
RESULT IN THE PERMANENT EXPULSION OF THE CONTRACTOR FROM THE AIRPORT.
7. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT OWNED FENCING THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY EXISTING AIRPORT FENCE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE ENGINEER
AND/OR RPR REGARDING CONSTRUCTION SCHEDULE AND PLANNING. NOTAMS FOR LOCALIZED
CLOSURES SHALL BE PLANNED AND COORDINATED WITH THE OWNER AND ATCT PERSONNEL IN
ADVANCE OF THE START OF WORK. THE CONTRACTOR SHALL HAVE A QUALIFIED REPRESENTATIVE
CAPABLE OF COMMUNICATING WITH THE ATCT AND KNOWLEDGEABLE ABOUT MOVEMENT ON
ACTIVE AIRFIELD PAVEMENT AREAS. CONTRACTORS SHALL CLOSELY COORDINATE ACCESS ON AND ACROSS OPEN AND ACTIVE AIRFIELD PAVEMENT WITH THE AIRPORT, ATCT, AND THE RESIDENT
ENGINEER.
9. CONTRACTOR PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY CIRCUMSTANCES,
OUTSIDE THE DESIGNATED STAGING, LAY-DOWN, PERSONAL VEHICLE PARKING AREA. ONLY
PROPERLY MARKED AND LIGHTED CONTRACTOR VEHICLES OR CONSTRUCTION VEHICLES SHALL BE
PERMITTED OUTSIDE THE STAGING AREA OR THE ACTIVE WORK AREA UNLESS OTHERWISE
APPROVED BY THE RPR.
10. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO THE ACTIVE WORK AREA SHALL BE CONTINUALLY
SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT ACTIVE AIRFIELD PAVEMENT
SURFACES ARE CLEAR AND FREE OF CONSTRUCTION DEBRIS, DUST, OR FOD. SELECTIVE SWEEPING AND AIRFIELD PAVEMENT MAINTENANCE MAY BE DIRECTED BY THE RPR AND SHALL BE INCIDENTAL
TO SECTION 80, CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE.
11. PRIOR TO THE START OF WORK WITHIN WORK AREA B, THE CONTRACTOR SHALL ACTIVATE ANY ELECTRICAL FIXTURES WITHIN THE INTENDED OVERALL PROEJCT WORK AREA AND TAKE NOTE OF ITS EXISTING CONDITIONS. AFTER CONCLUDING WORK WITHIN WORK AREA B, THE CONTRACTOR SHALL TAKE NOTE OF THE FINAL CONDITION OF ALL THE ELECTRICAL FIXTURES. THE CONTRACTOR
MAY BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY ELECTRICAL FIXTURES THAT ARE
DAMAGED OVER THE COURSE OF THE PROJECT OR THAT HAVE BEEN NEGATIVELY IMPACTED AS A
RESULT OF THE CONSTRUCTION OPERATIONS IN THE OPINION OF THE ENGINEER.
12. CONTRACTOR SHALL BE REQUIRED TO IMPLEMENT FOD MANAGEMENT PRACTICES AT THE END OF EACH DAY WHICH SHALL INCLUDE UTILIZATION OF THE FOD-RAZOR FRICTION MATT. THE NUMBER OF PASSES AND AREAS TO BE MAINTAINED USING THE FOD-RAZOR FRICTION MAT SHALL BE AT THE DISCRETION OF THE RPR. NO ADDITIONAL MEASUREMENT OR PAYMENT SHALL BE MADE FOR USE OF
THE FOD-RAZOR FRICTION MAT AND SHALL BE CONSIDERED INCIDENTAL TO SECTION 80,
CONSTRUCTION AND SAFETY PHASING PLAN COMPLIANCE.
SHEET LEGEND:
WORK AREA B
TAXI ROUTE FOR WORK AREA B
CONTRACTOR ACCESS ROUTE FOR WORK AREA B.
SEE SHEET G101 FOR ADDITIONAL INFORMATION.
BARRICADES FOR WORK AREA B,
SEE DETAIL C4/G151.
WILCO DRIVE
AIRPORT BLVD
RUNWAY 13-31 (6300' X 100')
TAXIWAY A
H
AN
G
AR
HANGAR
HANGAR HANGAR
HANGAR
HANGAR
HANGAR
HANGAR HANGAR HANGAR HANGAR HANGAR
HANGAR
HANG
AR
HANGAR HANGAR TAXIW
AY B
EXISTING TREELINE, (TYP.)
EXISTING FENCELINE, (TYP.)
AIRPORT ADMIN BUILDING
TAXIWAY D
TAXIWAY A1
TAXIWAY A2TAXIWAY A3TAXIWAY A4
FBO & CUSTOMS
ATCT
EXISTING
AIRPORT
PROPERTY
LINE, (TYP.)
EXISTING WINDCONE
AIRCRAFT PARKING APRON
AIRCRAFT PARKING APRON
TOFA TOFA TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA
E
E
W M W M
W M
TOFA
TOFA
TOFA TOFA TOFA TOFA TOFA TOFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
WILCO DRIVE
AIRPORT BLVD
RUNWAY 13-31 (6300' X 100')
TAXIWAY A
H
AN
G
AR
HANGAR
HANGAR HANGAR
HANGAR
HANGAR
HANGAR
HANGAR HANGAR HANGAR HANGAR HANGAR
HANGAR HANGAR
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
4\
.2
.0
- L
EE
Tw y D
, A 1, A 2, A 3\
.2
.0
- C
AD
D \2
7G
4.
dw g 6/
/2
5:
P M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
TAXIWAY A1, A3 & D
RECONSTRUCTION AND
TAXIWAY A2 RELOCATION
XR
EF
S:
x
3_
St an da rd
_t b x2
_C
SP
P
2423603007G104
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT PTGA NO. XXXXXX-1
3-12-0042-032-2024
2024.236.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JUNE 2024
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
SEAL
CONSTRUCTION
SAFETY AND
PHASING PLAN -
WORK AREA C
G104
DJN
KNM
KNM
GRAPHIC SCALE (FT)
NORTH
20 40 80
CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA CB1
KEYED NOTESA1 CONSTRUCTION SAFETY PHASING PLAN NOTES AND SHEET LEGENDA2
CONSTRUCTION SAFETY PHASING NOTES:
1. WORK AREA C SHALL CONSIST OF ALL PROJECT RELATED SCOPE WITHIN WORK AREA C,
INCLUDING, BUT NOT LIMITED TO, EXCAVATION/GRADING, AIRFIELD ELECTRICAL, PAVEMENT, AND
PAVEMENT MARKINGS.
2. WORK AREA C SHALL INCLUDE A FULL CLOSURE OF TAXIWAY D AND RUNWAY 13-31. TAXIWAY A, TAXIWAY B, TAXIWAY A1, TAXIWAY A2, TAXIWAY A3, TAXIWAY A4, AND AIRCRAFT PARKING
APRON SHALL REMAIN OPEN AT ALL TIMES FOR THE DURATION OF THE WORK AREA. THE
TENANTS AND OWNER SHALL BE NOTIFIED TWO WEEKS IN ADVANCE OF THE START OF WORK
AREA C.
3. FOR WORK IN WORK AREA C, THE CONTRACTOR SHALL BE REQUIRED TO COMMUNICATE AND
REQUEST TRAVEL ACROSS MULTIPLE PORTIONS OF ACTIVE AIRFIELD PAVEMENT. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO EFFECTIVELY COMMUNICATE THIS TO THE ATCT.
CONTRACTOR MAY ALSO REQUEST TO USE MULTIPLE FLAGGERS TO ENSURE THE SAFE AND
EFFECTIVE TRAVEL TO THE DESIGNATED WORK AREA. ANY ADDITIONAL FLAGGERS SHALL BE
APPROVED BY THE RPR OR ENGINEER OF RECORD.
2. WORK AREA C SHALL BE LIMITED TO 12 CALENDAR DAYS. WORKING HOURS SHALL BE MONDAY
THROUGH FRIDAY, 7:00AM - 7:00PM.
3. HALF-RATE PAVEMENT MARKINGS SHALL BE IN PLACE PRIOR TO THE START OF WORK AREA D.
4. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT ALL TIMES.
5. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO AIRCRAFT AT ALL
TIMES.
6. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR LEAVE THE MARKED WORK AREA WITHOUT
PRIOR APPROVAL OR PROPER COORDINATION WITH THE REQUIRED PARTIES. DOING SO MAY
RESULT IN THE PERMANENT EXPULSION OF THE CONTRACTOR FROM THE AIRPORT.
7. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT OWNED
FENCING THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY EXISTING AIRPORT
FENCE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL
COST TO THE OWNER.
8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE ENGINEER
AND/OR RPR REGARDING CONSTRUCTION SCHEDULE AND PLANNING. NOTAMS FOR LOCALIZED
CLOSURES SHALL BE PLANNED AND COORDINATED WITH THE OWNER AND ATCT PERSONNEL IN
ADVANCE OF THE START OF WORK. THE CONTRACTOR SHALL HAVE A QUALIFIED
REPRESENTATIVE CAPABLE OF COMMUNICATING WITH THE ATCT AND KNOWLEDGEABLE ABOUT
MOVEMENT ON ACTIVE AIRFIELD PAVEMENT AREAS. CONTRACTORS SHALL CLOSELY
COORDINATE ACCESS ON AND ACROSS OPEN AND ACTIVE AIRFIELD PAVEMENT WITH THE
AIRPORT, ATCT, AND THE RESIDENT ENGINEER.
9. CONTRACTOR PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY CIRCUMSTANCES,
OUTSIDE THE DESIGNATED STAGING, LAY-DOWN, PERSONAL VEHICLE PARKING AREA. ONLY
PROPERLY MARKED AND LIGHTED CONTRACTOR VEHICLES OR CONSTRUCTION VEHICLES SHALL
BE PERMITTED OUTSIDE THE STAGING AREA OR THE ACTIVE WORK AREA UNLESS OTHERWISE
APPROVED BY THE RPR.
10. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO THE ACTIVE WORK AREA SHALL BE CONTINUALLY
SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT ACTIVE AIRFIELD PAVEMENT
SURFACES ARE CLEAR AND FREE OF CONSTRUCTION DEBRIS, DUST, OR FOD. SELECTIVE
SWEEPING AND AIRFIELD PAVEMENT MAINTENANCE MAY BE DIRECTED BY THE RPR AND SHALL
BE INCIDENTAL TO SECTION 80, CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE.
11. PRIOR TO THE START OF WORK WITHIN WORK AREA C, THE CONTRACTOR SHALL ACTIVATE ANY
ELECTRICAL FIXTURES WITHIN THE INTENDED OVERALL PROEJCT WORK AREA AND TAKE NOTE
OF ITS EXISTING CONDITIONS. AFTER CONCLUDING WORK WITHIN WORK AREA C, THE
CONTRACTOR SHALL TAKE NOTE OF THE FINAL CONDITION OF ALL THE ELECTRICAL FIXTURES.
THE CONTRACTOR MAY BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY ELECTRICAL
FIXTURES THAT ARE DAMAGED OVER THE COURSE OF THE PROJECT OR THAT HAVE BEEN
NEGATIVELY IMPACTED AS A RESULT OF THE CONSTRUCTION OPERATIONS IN THE OPINION OF
THE ENGINEER.
12. CONTRACTOR SHALL BE REQUIRED TO IMPLEMENT FOD MANAGEMENT PRACTICES AT THE END
OF EACH DAY WHICH SHALL INCLUDE UTILIZATION OF THE FOD-RAZOR FRICTION MATT. THE
NUMBER OF PASSES AND AREAS TO BE MAINTAINED USING THE FOD-RAZOR FRICTION MAT SHALL
BE AT THE DISCRETION OF THE RPR. NO ADDITIONAL MEASUREMENT OR PAYMENT SHALL BE
MADE FOR USE OF THE FOD-RAZOR FRICTION MAT AND SHALL BE CONSIDERED INCIDENTAL TO
SECTION 80, CONSTRUCTION AND SAFETY PHASING PLAN COMPLIANCE.
WORK AREA C
TAXI ROUTE FOR WORK AREA C
CONTRACTOR ACCESS ROUTE FOR WORK AREA C. SEE
SHEET G101 FOR ADDITIONAL INFORMATION.
BARRICADES FOR WORK AREA C,
SEE DETAIL C4/G151.
KEYED NOTESA1 CONSTRUCTION SAFETY PHASING PLAN NOTES AND SHEET LEGENDA2
SHEET LEGEND:
EXISTING
TREELINE, (TYP.)
TAXIWAY D
TAXIWAY A1TAXIWAY A2
TAXIWAY A3TAXIWAY A4
FBO & CUSTOMS
EXISTING AIRPORT
PROPERTY LINE, (TYP.)
25 6
EXISTING WINDCONE
TOFA TOFA TOFA
TOFA TOFA TOFA TOFA TOFA TOFA
E
E
W M W M
W M
TOFA
TOFA
TOFA TOFA TOFA TOFA TOFA
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
WILCO DRIVE
AIRPORT BLVD
RUNWAY 13-31 (6300' X 100')
TAXIWAY A
H
AN
G
AR
HANGAR
HANGAR HANGAR
HANGAR
HANGAR
HANGAR
HANGAR HANGAR HANGAR HANGAR HANGAR
HANGAR HANGAR
TOFA TOFA
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
4\
.2
.0
- L
EE
Tw y D
, A 1, A 2, A 3\
.2
.0
- C
AD
D \2
8G
5.
dw g 6/
/2
5:
P M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
TAXIWAY A1, A3 & D
RECONSTRUCTION AND
TAXIWAY A2 RELOCATION
XR
EF
S:
x
3_
St an da rd
_t b x2
_C
SP
P x2
_M ar ki ng x
3_
G eo m et ry
2423603008G105
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT PTGA NO. XXXXXX-1
3-12-0042-032-2024
2024.236.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JUNE 2024
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
SEAL
CONSTRUCTION
SAFETY AND
PHASING PLAN -
WORK AREA D
G105
DJN
KNM
KNM
GRAPHIC SCALE (FT)
NORTH
20 40 80
CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA DB1
KEYED NOTESA1 CONSTRUCTION SAFETY PHASING PLAN NOTES AND SHEET LEGENDA2
CONSTRUCTION SAFETY PHASING NOTES:
1. WORK AREA D SHALL CONSIST ONLY OF FINAL PAVEMENT MARKINGS. THIS WORK AREA SHALL BE COMPLETED 30 DAYS AFTER ALL ASPHALT PAVING IS COMPLETED AND APPROVED BY THE ENGINEER.
ALL HALF-RATE MARKINGS HAVE BEEN APPLIED PREVIOUSLY IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS WITHIN THE SPECIFIED WORK AREA LIMITS.
2. WORK AREA D SHALL INCLUDE A FULL CLOSURE OF TAXIWAYS A1, A2, A3, D AND RUNWAY 13-31, AS
WELL AS A PARTIAL CLOSURE OF TAXIWAY A. THE REMAINING PORTION OF TAXIWAY A, AND
AIRCRAFT PARKING APRON SHALL REMAIN OPEN AT ALL TIMES FOR THE DURATION OF THE WORK AREA. THE TENANTS AND OWNER SHALL BE NOTIFIED TWO WEEKS IN ADVANCE OF THE START OF
WORK AREA D.
3. FOR WORK IN WORK AREA D, THE CONTRACTOR SHALL BE REQUIRED TO COMMUNICATE AND
REQUEST TRAVEL ACROSS MULTIPLE PORTIONS OF ACTIVE AIRFIELD PAVEMENT. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO EFFECTIVELY COMMUNICATE THIS TO THE ATCT. CONTRACTOR MAY ALSO REQUEST TO USE MULTIPLE FLAGGERS TO ENSURE THE SAFE AND EFFECTIVE TRAVEL TO THE DESIGNATED WORK AREA. ANY ADDITIONAL FLAGGERS SHALL BE APPROVED BY THE RPR
OR ENGINEER OF RECORD.
2. WORK AREA D SHALL BE LIMITED TO 33 CONSECUTIVE CALENDAR DAYS. WORKING HOURS SHALL BE
MONDAY THROUGH FRIDAY, 7:00AM - 7:00PM.
3. HALF-RATE PAVEMENT MARKINGS SHALL BE IN PLACE PRIOR TO THE END OF WORK AREA D.
4. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT ALL TIMES.
5. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO AIRCRAFT AT ALL TIMES.
6. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR LEAVE THE MARKED WORK AREA WITHOUT
PRIOR APPROVAL OR PROPER COORDINATION WITH THE REQUIRED PARTIES. DOING SO MAY RESULT
IN THE PERMANENT EXPULSION OF THE CONTRACTOR FROM THE AIRPORT.
7. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT OWNED FENCING THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY EXISTING AIRPORT FENCE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE ENGINEER
AND/OR RPR REGARDING CONSTRUCTION SCHEDULE AND PLANNING. NOTAMS FOR LOCALIZED
CLOSURES SHALL BE PLANNED AND COORDINATED WITH THE OWNER AND ATCT PERSONNEL IN
ADVANCE OF THE START OF WORK. THE CONTRACTOR SHALL HAVE A QUALIFIED REPRESENTATIVE CAPABLE OF COMMUNICATING WITH THE ATCT AND KNOWLEDGEABLE ABOUT MOVEMENT ON ACTIVE AIRFIELD PAVEMENT AREAS. CONTRACTORS SHALL CLOSELY COORDINATE ACCESS ON AND ACROSS OPEN AND ACTIVE AIRFIELD PAVEMENT WITH THE AIRPORT, ATCT, AND THE RESIDENT ENGINEER.
9. CONTRACTOR PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY CIRCUMSTANCES,
OUTSIDE THE DESIGNATED STAGING, LAY-DOWN, PERSONAL VEHICLE PARKING AREA. ONLY
PROPERLY MARKED AND LIGHTED CONTRACTOR VEHICLES OR CONSTRUCTION VEHICLES SHALL BE
PERMITTED OUTSIDE THE STAGING AREA OR THE ACTIVE WORK AREA UNLESS OTHERWISE
APPROVED BY THE RPR.
10. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO THE ACTIVE WORK AREA SHALL BE CONTINUALLY
SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT ACTIVE AIRFIELD PAVEMENT
SURFACES ARE CLEAR AND FREE OF CONSTRUCTION DEBRIS, DUST, OR FOD. SELECTIVE SWEEPING AND AIRFIELD PAVEMENT MAINTENANCE MAY BE DIRECTED BY THE RPR AND SHALL BE INCIDENTAL
TO SECTION 80, CONSTRUCTION SAFETY AND PHASING PLAN COMPLIANCE.
11. PRIOR TO THE START OF WORK WITHIN WORK AREA D, THE CONTRACTOR SHALL ACTIVATE ANY ELECTRICAL FIXTURES WITHIN THE INTENDED OVERALL PROEJCT WORK AREA AND TAKE NOTE OF ITS EXISTING CONDITIONS. AFTER CONCLUDING WORK WITHIN WORK AREA D, THE CONTRACTOR SHALL TAKE NOTE OF THE FINAL CONDITION OF ALL THE ELECTRICAL FIXTURES. THE CONTRACTOR
MAY BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY ELECTRICAL FIXTURES THAT ARE
DAMAGED OVER THE COURSE OF THE PROJECT OR THAT HAVE BEEN NEGATIVELY IMPACTED AS A
RESULT OF THE CONSTRUCTION OPERATIONS IN THE OPINION OF THE ENGINEER.
12. CONTRACTOR SHALL BE REQUIRED TO IMPLEMENT FOD MANAGEMENT PRACTICES AT THE END OF EACH DAY WHICH SHALL INCLUDE UTILIZATION OF THE FOD-RAZOR FRICTION MATT. THE NUMBER OF PASSES AND AREAS TO BE MAINTAINED USING THE FOD-RAZOR FRICTION MAT SHALL BE AT THE DISCRETION OF THE RPR. NO ADDITIONAL MEASUREMENT OR PAYMENT SHALL BE MADE FOR USE OF
THE FOD-RAZOR FRICTION MAT AND SHALL BE CONSIDERED INCIDENTAL TO SECTION 80,
CONSTRUCTION AND SAFETY PHASING PLAN COMPLIANCE.
WORK AREA D
TAXI ROUTE FOR WORK AREA D
CONTRACTOR ACCESS ROUTE FOR WORK AREA
D. SEE SHEET G101 FOR ADDITIONAL
INFORMATION.
BARRICADES FOR WORK AREA D,
SEE DETAIL C4/G151.
KEYED NOTESA1 CONSTRUCTION SAFETY PHASING PLAN NOTES AND SHEET LEGENDA2
SHEET LEGEND:
EXISTING
TREELINE, (TYP.)
TAXIWAY D
TAXIWAY A1TAXIWAY A2
TAXIWAY A3TAXIWAY A4
FBO & CUSTOMS
3 | 15
EXISTING AIRPORT
PROPERTY LINE, (TYP.)
25 6
EXISTING WINDCONE
AIRCRAFT PARKING APRON
28 28 28 28
ATTENTION:
THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY
INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,
FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.
WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY
DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN
WHOLE OR IN PART, IS STRICTLY PROHIBITED
V:
\2
4\
.2
.0
- L
EE
Tw y D
, A 1, A 2, A 3\
.2
.0
- C
AD
D \2
9G
1.
dw g 6/
/2
5:
P M
LEESBURG INTERNATIONAL
AIRPORT
LEESBURG, FLORIDA
TAXIWAY A1, A3 & D
RECONSTRUCTION AND
TAXIWAY A2 RELOCATION
XR
EF
S:
x
3_
Ex Ba se m ap x
3_
St an da rd
_t b x2
_L ig ht in g an d Si gn L ay ou t x
3_ G eo m et ry x
3_ Sh ee tL ay ou t
2423603009G151
PROFESSIONAL SEAL
CLIENT LOGO
B
ID
D O
C U
M
EN
TS
CADD:
AVCON PROJECT NO.
FAA AIP NO.
FDOT PTGA NO. XXXXXX-1
3-12-0042-032-2024
2024.236.03
DRAWING
DATE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
JUNE 2024
DJN
SCALE (US SVY FT): GRAPHIC
NO. DATE BY DESCRIPTION
REVISIONS:
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779
OFFICE: (407) 599-1122 - FAX: (407) 599-1133
CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057
www.avconinc.com
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
This item has been digitally signed and sealed by:
A
B
C
1 2 3 4
A
B
C
1 2 3 4
TH
IS
S H
EE
T
SH
A
LL
B
E
PR
IN
TE
D
IN
C O
LO
R
, S H
EE
TS
N O
T
PR
IN
TE
D
IN
C O
LO
R
A R
E
IN
VA
LI
D
SEAL
CONSTRUCTION
SAFETY AND
PHASING PLAN
NOTES AND
DETAILS
G151
DJN
KNM
KNM
CONSTRUCTION SAFETY PHASING PLAN NOTESA1
STABILIZED
CONSTRUCTION
ACCESS
ROADST
AB
IL
IZ
ED
AC
C
ES
S
R O
AD
EX
IS
TI
N
G P
AV
EM
EN
ET
RADIUS SHALL BE CONTRACTOR
DETERMINED AS REQUIRED FOR
CONSTRUCTION VEHICLES, AND SHALL
BE NOT LESS THAN 25', TYP. BOTH SIDES.
PLAN VIEW
20' MINIMUM
EXISTING
GRADE
" M
IN
IM
U M
ASPHALT MILLINGS OR A STABILIZED
MATERIAL APPROVED BY THE
ENGINEER.
SUITABLE FILL MATERIAL
EXISTING SUBGRADE SOILDS
SHALL BE COMPACTED TO 95% OF
THE STANDARD PROCTOR.
SECTION A-A
NOTE:
1. CONTRACTOR ACCESS ROAD SHALL NOT BLOCK
OR IMPEDE ANY EXISTING DRAINAGE LINES OR
PATHS PRESENT AT THE SITE. ADDITIONALLY,
CROSS SLOPE OF THE ROAD SHALL BE AS
REQUIRED TO PROVIDE ADEQUATE DRAINAGE
WITHOUT IMPEDING OR RESTRICTING EXISTING
FLOW LINES OR DRAINAGE PATHS.
2. CONTRACTOR ACCESS ROAD SHALL BE
MAINTAINED THROUGHOUT THE PROJECT, ITEM
GP-80, STABILIZED ACCESS ROAD. THE ACCESS
ROAD SHALL BE REMOVED AT THE COMPLETION OF
THE PROJECT AND THE AREA RESTORED TO
MATCH THE EXISTING CONDITION.
3. ANY DIRT OR SEDIMENT TRACKED ONTO EXISTING
PAVEMENTS SHALL BE SWEPT/CLEANED PRIOR TO
LEAVING THE SITE EACH DAY.
4. ALL MATERIALS REQUIRED FOR THIS ITEM SHALL
BE PAID FOR UNDER ITEM GP-80, STABILIZED
ACCESS ROAD.
STABILIZED ACCESS ROAD DETAILB3
NOTE:
1. CONTRACTOR SHALL PROVIDE THE REQUIRED AMOUNT OF L-893 LIGHTED VISUAL AIDS
TO INDICATE TEMPORARY RUNWAY CLOSURE AS MANUFACTURED BY HALI-BRITE, INC.,
SHERWIN INDUSTRIES, INC., OR APPROVED EQUAL. CONTRACTOR IS RESPONSIBLE
FOR FUELING AND MAINTAINING AS REQUIRED DURING CONSTRUCTION (INCLUDING
MAINTENANCE, BULB REPLACEMENT, PAVEMENT PROTECTION, AND ALL OTHER
INCIDENTS NECESSARY TO MAINTAIN THE LIGHTED X'S IN WORKING ORDER). COST
SHALL BE INCLUDED IN GP-80, CONSTRUCTION SAFETY AND PHASING PLAN.
2. ALL LIGHTED CLOSED RUNWAY MARKERS SHALL HAVE SPILL BLANKETS PLACED
UNDER THE GENERATOR/ENGINE AT ALL TIMES WHEN ON PAVED SURFACES. OIL,
DIESEL FUEL, OR GASOLINE SPILLED ON ASPHALT WILL BE RESOLVED BY MILLING A
MINIMUM OF 10'X10' AREA TO REMOVE DAMAGED SURFACES. NO PAYMENT SHALL BE
MADE FOR THE REPAIRS AS A RESULT OF LEAKING EQUIPMENT.
LIGHTED CLOSED RUNWAY SIGN DETAILC3 LOW PROFILE BARRICADE DETAILC4
CAUTION LIGHT
SECURED TO BARRIER
(TWO PER BARRIER)
COLOR: RED
REFLECTIVE MEDIA (ORANGE
AND WHITE STRIPES)
4' (TYP)
SEE NOTES
WATER-FILLED
BARRICADE
NOTES:
1. LOW PROFILE BARRICADES SHALL BE SUFFICIENTLY WEIGHTED TO
PRECLUDE MOVEMENT FROM PROP BLAST.
2. FLAT, DIRECTIONAL WARNING LIGHTS SHALL NOT BE ACCEPTABLE.
3. EXACT LOCATIONS SHALL BE DETERMINED DURING CONSTRUCTION
BY THE ENGINEER OR RPR.
4. BARRICADES SHALL BE WATER FILLED OR WEIGHED IN A WAY TO
PREVENT MOVEMENT DUE TO WIND, JET BLAST, OR PROP WASH.
5. PLACEMENT, MAINTENANCE, AND REMOVAL OF BARRICADES SHALL
NOT BE PAID SEPARATELY AND SHALL BE INCIDENTAL TO ITEM GP-80,
CONSTRUCTION SAFETY AND PHASING PLAN.
AVIATION ORANGE
AVIATION WHITE
3' MIN.
3' M
IN
NOTES:
1. THE CONTRACTOR SHALL PROMINENTLY DISPLAY
AVIATION SAFETY FLAGS ON ALL CONSTRUCTION
VEHICLES AND EQUIPMENT AT THE HIGHEST POINT
ON EACH PIECE OF CONSTRUCTION EQUIPMENT.
2. COST SHALL BE INCIDENTAL TO GP-80,
CONSTRUCTION SAFETY AND PHASING PLAN.
AVIATION FLAG DETAILA3
CONSTRUCTION SAFETY PHASING NOTES:
1. THE WORK AREAS A, B, C AND D SHALL CONSIST OF ALL PROJECT RELATED SCOPE
WITHIN THE WORK AREA LIMITS INCLUDING, BUT NOT LIMITED TO DRAINAGE
IMPROVEMENTS, EXCAVATION/GRADING, PAVING OPERATIONS, AND UTILITY WORK.
2. THE START DATE FOR PROPOSED WORK SHALL BE COORDINATED WITH THE OWNER
AND ENGINEER AT LEAST 72 HOURS IN ADVANCE. NOTAMS SHALL BE IN PLACE 72
HOURS IN ADVANCE PRIOR TO ANY TAXIWAY OR RUNWAY CLOSURES.
3. IN THE EVENT THAT THE CONTRACTOR'S ACCESS ROUTE IS UNAVAILABLE AT THE TIME
OF CONSTRUCTION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE
BEST WAY TO ACCESS THE CONTRACTOR'S STAGING, LAY-DOWN, STOCKPILE, AND
PERSONAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .