IFB #25001 Bass-Hoover ES - Chiller Replacement Construction Drawings 21320-37 2024-0.pdf
PDF 3 MB Posted
- Solicitation number
- 78275
- Issued by
- Fauquier County, Sugarland Run CDP, Virginia
About this file
This document is the Construction Drawings for IFB #25001 Bass-Hoover Elementary School (BHES) - Chiller Replacement, issued by Frederick County Public Schools. The project involves the replacement of the existing chiller at the BHES facility located at 471 Aylor Road, Stephens City, VA 22655. The project includes the demolition of the existing chiller, chilled water pumps, and related piping and accessories, and the installation of a new water-cooled chiller, new chilled water pumps, and new piping. There is also a bid alternate for the replacement of the condenser water pumps. The bid opening date is September 27, 2024.
The Construction Drawings provide detailed instructions for the demolition and new work, including equipment specifications, piping layouts, and installation requirements. Contractors must comply with local codes, NFPA standards, and utility regulations. The contractor is required to trend the chiller and pump operation for 30 days after project completion and provide the data to the owner. The project also includes the installation of a side-stream filter for the chilled water system, with a bid alternate for a side-stream filter for the cooling tower water system.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASS-HOOVER ELEMENTARY SCHOOL
(BHES) - CHILLER REPLACEMENT
FREDERICK COUNTY PUBLIC SCHOOLS
RRMM ARCHITECTS, PC
ARCHITECTURE / PLANNING / INTERIORS
VICINITY MAP CONSULTANTS OWNER LOCATION MAP
SITE
SITE
1317 Executive Boulevard, Suite 200 Chesapeake, VA 23320
(757) 622-2828
28 Church Avenue SW Roanoke, VA 24011
(540) 344-1212
1 Research Court, Suite 450 Rockville, MD 20850
(240) 403-4101
2900 South Quincy Street, Suite 710 Arlington, VA 22206
(703) 998-0101
115 South 15th Street, Suite 502 Richmond, VA 23219
(804) 277-8987
Lawrence Perry and Associates
MEP ENGINEERING
15 E. Salem Ave., Suite 101
Roanoke, VA 24011 Phone: 540-342-1816
Frederick County Public Schools
1415 Amherst Street
Winchester, VA 22601
Phone: 540-662-3888
IFB 25001
09/27/2024
RRMM
ARCHITECTS, PC
D A
T E
D R
A W
N
P R
O J E
C T
D E
S
IG
N E
D
C H
E C
K E
D
28 Church Ave SW Roanoke, Virginia 24011
(540)344-1212
M A
R K
R E
V
IS
IO
N
S
D A
T E
B Y
D E
S
0' 4' 8' 16'
3/32 = 1'-0" 0' 1" 2" 3"
6" = 1'-0"
0' 2" 4" 6"
3" = 1'-0"
5"3"1"0' 3" 6" 1'
1 1/2" = 1'-0"
9"0' 6" 1' 1.5'
1" = 1'-0"
3" 9"0' 1' 2'
3/4" = 1'-0"
6"0' 1' 2' 3'
1/2" = 1'-0"
6"0' 1' 2' 4'
3/8" = 1'-0"
3'0' 2' 4' 6'
1/4" = 1'-0"
0' 4' 8' 12'
1/8" = 1'-0"
0' 8' 16' 24'
1/16" = 1'-0"
4'0' 16' 32' 48'
1/32" = 1'-0"
SHEET
P R
O J E
C T
D R
A W
IN
G
1 2 3 4 5
C
B
A
D
1 2 3 4 5
C
B
A
D
P R
O J E
C T
D R
A W
IN
G
/2
/2
:1
:3
P
M A u to d e s k D o c s
/2
-3
F
C P
S B a s s H o o v e r E
S /2
-3 v
F C
P S
B a s s H o o v e r
E S
C h ill e r
A
R C
H .r v t
T
IT
L E
S H
E E
T
G-001
B H
E S
C
H
IL
L E
R R
E P
L A
C E
M E
N T
F R
E D
E R
IC
K
C O
U N
T Y
P U
B L
IC
S
C H
O O
L S
A
Y L O
R R
O A
D S
T E
P H
E N
S C
IT
Y
V
A
/2
/2
-3
D R
J
J P
P
D R
J
SHEET INDEX
Sheet Number Sheet Title DISCIPLINE
PROJECT TITLE SHEET
G-001 TITLE SHEET PROJECT TITLE SHEET
MECHANICAL
M-100 EXISTING FLOOR PLAN - MECH/ELEC MECHANICAL
CWS
G
G
C D
RC
D
S
HW
EXIST PANEL P1
ELEC. RM ALL
EQUIP IS EXIST
EXISTING BELOW-SLAB
CONDUIT
3P 400/NF
3" EXPOSED CONDUIT
EXIST. COOLING
TOWER
EXIST. CONTROLS AIR
COMPRESSOR
REFRIG. LEAK DETECTION
MONITOR/SENSOR
EXIST BAS PANEL
INCREASEREXIST CHILLED
WATER PUMP
EXIST PANEL L1
EXIST COND.
WATER PUMP
EXIST GAS-FIRED BOILER
EXIST
BOILER
HW
5"
REDUCER
6"
8"
5"
5"
CWR
CH-11
DEMOLITION NOTES:
1. THE CONTRACTOR SHALL REMOVE OR ALTER AS NECESSARY ALL
EXISTING PIPING, EQUIPMENT, EQUIPMENT FOUNDATIONS, AND
APPURTENANCES THAT ARE NOT REQUIRED FOR THE EXISTING
SYSTEMS TO REMAIN. CONTRACTOR SHALL VISIT THE SITE TO
DETERMINE THE SCOPE OF THIS WORK AND VERIFY EXISTING
CONDITIONS PRIOR TO SUBMITTING BIDS.
2. EXISTING EQUIPMENT SHALL BE TURNED OVER TO THE OWNER,
UNLESS DIRECTED OTHERWISE AND LOCATED AS DIRECTED BY THE
OWNER. ALL OTHER ITEMS TO BE REMOVED SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND REMOVED FROM THE
PREMISES.
3. INSULATION ON EXISTING PIPING THAT IS DAMAGED OR REMOVED
DUE TO THE DEMOLITION WORK SHALL BE REPLACED AND SEALED
AS REQUIRED.
GENERAL NOTES:
1. ALL DUCTWORK AND PIPES SHALL BE COORDINATED WITH (OTHER
NEW AND EXISTING DUCTS, PIPES,) LIGHTS, STRUCTURAL SYSTEM,
CEILING SUPPORTS AND FRAMING BEFORE INSTALLATION. MINOR
DUCT AND PIPE OFFSETS AND MINOR DUCT TRANSITIONS SHALL BE
PROVIDED AS REQUIRED. WHERE TRANSITIONS ARE REQUIRED,
CROSS SECTIONAL AREA OF DUCT SHALL NOT BE REDUCED.
MEASUREMENTS FOR VERTICAL CLEARANCES OF DUCTWORK SHALL
BE TAKEN AT THE JOB SITE BEFORE FABRICATION OF ANY
DUCTWORK.
2. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER'S PUBLISHED INSTRUCTIONS.
3. MATERIALS AND INSTALLATION SHALL COMPLY WITH LOCAL CODES,
APPLICABLE PROVISIONS OF LATEST EDITION OF NATIONAL FIRE
PROTECTION ASSOCIATION, LOCAL UTILITY REGULATIONS AND
GOVERNMENTAL DEPARTMENTS HAVING JURISDICTION.
4. CONTRACTOR SHALL SEAL AND FLASH ALL PENETRATIONS IN
EXISTING ROOF AND WALLS.
5. VERIFY ROOF AND WALL OPENINGS WITH STRUCTURE.
6. VERIFY THE LOCATION OF ALL THERMOSTATS, TEMPERATURE
SENSORS, PANELS AND CONTROL INSTRUMENTS WITH THE
ARCHITECT AND OWNER PRIOR TO ROUGH-IN.
7. VERIFY LOCATIONS OF NEW AND EXISTING EQUIPMENT.
8. ALL CUTTING AND PATCHING FOR THE INSTALLATION OF NEW WORK
IN EXISTING BUILDING SHALL BE DONE BY THE CONTRACTOR.
9. CONTRACTOR SHALL PROVIDE ALL SUPPORTS REQUIRED TO MOUNT
MECHANICAL EQUIPMENT, PIPING AND DUCTWORK.
10. WHERE PIPE AND DUCT CONNECTIONS ARE SHOWN CONNECTING TO
EXISTING, CONTRACTOR SHALL DETERMINE EXACT LOCATIONS AND
CONNECTION SIZES PRIOR TO INSTALLATION.
11. NEW PIPING AND PIPE INSULATION SHALL MATCH EXISTING.
INSULATION THAT IS DAMAGED OR REMOVED FOR NEW WORK SHALL
BE REPLACED, REPAIRED AND SEALED AS REQUIRED.
12. HEATING WATER PIPING SHALL BE TYPE L COPPER OR SCH 40 BLACK
STEEL. PIPE FITTINGS SHALL MATCH PIPING.
13. HEATING WATER LINES SHALL BE INSULATED WITH 2" THICK, 3-1/2 LB.
DENSITY FIBERGLASS FLAME-SAFE PIPE INSULATION WITH 1 MIL
FOIL-SCRIM-WHITE KRAFT PAPER JACKET. ALL JOINTS, VOIDS AND
PUNCTURES IN JACKET SHALL BE SEALED.
14. EXPOSED PIPING RUNOUTS SHALL BE INSTALLED IN PRACTICAL
ALIGNMENT WITH THE BUILDING AND SHALL BE ADEQUATELY
SECURED TO THE BUILDING STRUCTURE.
15. ALL REMOTE MOUNTED TEMPERATURE CONTROL DEVICES AND
TEMPERATURE CONTROL WIRING SHALL BE FURNISHED AND
INSTALLED BY THE MECHANICAL CONTRACTOR.
16. ALL EQUIPMENT SHALL BE SECURED TO CONCRETE HOUSEKEEPING
PADS WITH HOLD-DOWN BOLTS TO PREVENT MOVEMENT.
17. INSTRUCT THE OWNER IN THE PROPER OPERATION AND
MAINTENANCE OF THE MECHANICAL SYSTEMS UNTIL THE OWNER IS
FULLY PREPARED TO OPERATE AND MAINTAIN THE MECHANICAL
SYSTEM. HOWEVER, LENGTH OF INSTRUCTION TIME SHALL BE
LIMITED TO ONE-HALF DAY.
18. SYSTEMS SHALL OPERATE UNDER CONDITIONS OF LOAD WITHOUT
UNUSUAL OR EXCESSIVE NOISE OR VIBRATION. UNUSUAL OR
EXCESSIVE NOISE OR VIBRATION SHALL BE CORRECTED.
19. EQUIPMENT, MATERIALS AND LABOR REQUIRED BY THESE
CONTRACT DRAWINGS SHALL BE GUARANTEED TO BE FREE FROM
DEFECTIVE MATERIALS OR WORKMANSHIP FOR ONE YEAR AFTER
FINAL ACCEPTANCE OF THE PROJECT UNLESS SPECIFIED
OTHERWISE. DEFECTIVE MATERIALS OR WORKMANSHIP OCCURRING
DURING THIS PERIOD SHALL BE CORRECTED AT NO ADDITIONAL
COST.
20. ALL NEW EQUIPMENT SHALL BE CONNECTED TO AND CONTROLLED
BY THE EXISTING SIEMENS BUILDING AUTOMATION SYSTEM.
ABOVE ABV
ABOVE FINISHED FLOOR AFF
AIR SEPARATOR AS
BALANCING VALVE
BELOW BEL
BETWEEN BET
CAPACITY CAP
CHECK VALVE
CHILLED WATER PUMP CWP
CHILLED WATER RETURN PIPE CWRCWR
CHILLED WATER SUPPLY PIPE CWS CWS
CIRCUIT SETTER
CS(GPM)COMMON C
CONDENSER WATER PUMP CDP
CONDENSER WATER RETURN PIPE CDR CDR
CONDENSER WATER SUPPLY PIPE CDS CDS
DEGREES FAHRENHEIT °F
DIAMETER DIA
DIRECTION OF FLOW
DOMESTIC COLD WATER PIPE CW
DOWN DN
EACH EA
ENTERING WATER TEMPERATURE EWT
EXISTING, REMOVE FROM THIS POINT
EXPANSION TANK ET
FEET FT
FLOOR FL
FROM FRM
GALLONS GAL
GALLONS PER MINUTE GPM
HORSEPOWER HP
HOUR HR
INCH IN
KILOWATT KW
LEAVING WATER TEMPERATURE LWT
MANUAL AIR VENT
MAV
NEW CONNECTED TO EXISTING
PIPING INDICATION WITH RESPECT
BOTTOM TAKEOFF
SIDE CONNECTION
TOP TAKEOFF
TURN DOWN OR FROM BELOW
TURN UP OR DOWN
TURN UP OR FROM ABOVE
POUNDS LBS
POUNDS PER SQUARE INCH GAGE PSIG
PRESSURE DROP PD
PRESSURE GAUGE
PRESSURE REDUCING VALVE (FILL VALVE) PRV
REVOLUTIONS PER MINUTE RPM
SERVICE VALVE
STRAINER
THERMOMETER
THOUSAND BTU PER HOUR MBH
TWO-WAY CONTROL VALVE
UNION
HVAC LEGEND:
DEMOLITION PLAN NOTES:
1. REMOVE CHILLER, PIPING, CONTROLS, SUPPORTS AND
ACCESSORIES COMPLETE TO POINTS INDICATED.
2. RETAIN POWER CONDUIT AND WIRING FOR REUSE.
3. RETAIN VENT PIPING FOR REUSE.
4. REMOVE CWP, EXPANSION TANK, AIR SEPARATOR, PIPING,
SUPPORTS AND ACCESSORIES COMPLETE TO POINTS INDICATED.
5. BID ALTERNATE 1: REMOVE CDP, PIPING TO BY-PASS VALVE,
SUPPORTS AND ACCESSORIES COMPLETE TO POINTS INDICATED.
NEW WORK PLAN NOTES:
1. FURNISH AND INSTALL NEW WATER COOLED CHILLER ON EXISTING
HOUSEKEEPING PAD. EXTEND CONCRETE PAD IF NECESSARY TO
SUPPORT NEW CHILLER. CONNECT NEW CHILLER TO EXISTING
REFRIGERANT VENT PIPING, EXTEND PIPING AS NECESSARY TO NEW
POINTS OF CONNECTION ON CHILLER. CONNECT NEW CHILLER TO
EXISTING 400A 460V/3PH DISCONNECT, EXTEND CONDUIT AND
CONDUCTORS AS NECESSARY TO NEW POINT OF CONNECTION ON
CHILLER.
2. REMOVE AND REINSTALL DOOR HEADER AND WALL LOUVER FOR
INSTALLATION OF NEW CHILLER. HEADER AND LOUVER HAVE BEEN
MODIFIED FOR REMOVAL FROM PREVIOUS CHILLER REPLACEMENT.
3. FURNISH AND INSTALL NEW CWP (X2) AND PIPING COMPLETE.
EXTEND CONCRETE HOUSEKEEPING PAD TO SUPPORT BOTH PUMPS,
COORDINATE WITH EXISTING FLOOR DRAIN AND ROOM
ARRANGEMENT. UTILIZE EXISTING POWER CIRCUIT TO POWER BOTH
NEW DUTY/STANDBY PUMPS.
4. BID ALTERNATE 1: FURNISH AND INSTALL NEW CDP (X2) AND PIPING
COMPLETE TO NEW BY-PASS VALVE. EXTEND CONCRETE
HOUSEKEEPING PAD TO SUPPORT BOTH PUMPS, COORDINATE WITH
EXISTING FLOOR DRAIN AND ROOM ARRANGEMENT. UTILIZE
EXISTING POWER CIRCUIT TO POWER BOTH NEW DUTY/STANDBY
PUMPS.
5. FURNISH AND INSTALL NEW REFRIG. LEAK DETECTOR CALIBRATED
FOR R513A.
6. BALANCE EXISTING EXHAUST FAN TO 1850 CFM.
7. CONTRACTOR SHALL TREND VIA THE BAS CHILLER AND PUMP
OPERATION FOR 30 DAYS FOLLOWING PROJECT COMPLETION.
TREND DATA TO INCLUDE (BUT NOT LIMITED TO) EWT/LWT, WATER
FLOW, PUMP SPEED, CHILLER LOADING, ETC. FURNISH PRINTED
COPIES OF TRENDS TO THE OWNER.
8. NEW FLOOR MOUNTED SIDE STREAM FILTER, PROVIDE UNION AND
SERVICE VALVE ON INLET AND OUTLET TO FILTER UNIT, CONNECT
WITH 2" PIPING TO 6" MAIN PIPING DOWNSTREAM FROM PUMP
DISCHARGE, PROVIDE MIN 24" BETWEEN INLET AND OUTLET
CONNECTIONS TO MAIN.
X X
CHILLED WATER SIDE STREAM FILTER: SHELCO MODEL 4F0S2C-304-DOE-2MNPT-ML-B (OR EQUAL) WITH MB5-20 FILTER CARTRIDGES (X4).
COOLING TOWER WATER SIDE STREAM FILTER: (ADDITIVE BID ALTERNATE 2) SHELCO MODEL 4F0S2C-304-DOE-2MNPT-ML-B (OR EQUAL) WITH MB5-20 FILTER CARTRIDGES (X4).
CWS
G
G
HW
EXIST PANEL P1
ELEC. RM ALL
EQUIP IS EXIST
BOILER
ROOM
EXISTING BELOW-SLAB
CONDUIT
3P 400/NF
3" EXPOSED CONDUIT
EXIST. COOLING
TOWER
EXIST. CONTROLS AIR
COMPRESSOR
REFRIG. LEAK DETECTION
MONITOR/SENSOR
EXIST BAS PANEL
EXIST PANEL L1
EXIST GAS-FIRED BOILER
EXIST
BOILER
HW
8"
CDP-1
CDP-2
C D
S
C D
R
6"
CH-1
6"
AS-1
5"
5"
CWR
EX-1
3/4" CWP-1 CWP-2
PIPE SUPPORT
HANG THIS PIPE
FROM ABOVE SO
NO WEIGHT RESTS
ON PUMP CASING
FLEXIBLE PIPE
(TYPICAL)
1/4" COCK
3/4" HOSE-END
DRAIN VALVE
PUMP BASE + 6"
CONCRETE BASE
PUMP
LEVEL GROUT
SUCTION DISCHARGE
1/4" COCK
CS
FLOOR LINE 4"
SUCTION DIFFUSER
MOTOR
BASE MOUNTED PUMP DETAIL
NO SCALE
FEEDER BODY
NOTE:
SIZE FILTER FEEDER AS RECOMMENDED BY UNIT MANUFACTURER.
BYPASS CHEMICAL FEEDER
NO SCALE
LID
GLOBE VALVE
3/4" FROM PUMP
DISCHARGE
3/4"
REMOVABLE BASKET
AND FILTER
HOSE END
DRAIN VALVE
3/4" TO PUMP
INTAKE
CWR
C D
S
C D
R
C W
R
C W
S
R
FLEXIBLE PIPE
CONNECTORS (TYP.)
FLOW SWITCH
FLOW SWITCH
FLOOR
3/4" HOSE END
DRAIN VALVE (TYP.)
TO SYSTEM
RUBBER-IN-SHEAR (RIS)
VIBRATION ISOLATOR (TYP.)
4" HIGH CONCRETE
HOUSEKEEPING PAD
CHILLER
TO FLOOR
DRAIN
FROM CWP
CHILLER CONNECTION DETAIL
SCHEMATIC
PIPE SUPPORT DETAIL
NO SCALE
PIPE
VAPOR BARRIER
(WHERE REQUIRED)
12" LONG, HALF-SECTION OF
HYDROUS CALCIUM SILICATE
AT EACH HANGER SUPPORT
HEAVY DUTY
CLEVIS HANGER
HANGER ROD, SUPPORT
FROM BUILDING STRUCTURE
INSULATION
16 GAGE ZINC COATED
SHEET STEEL SADDLE
AT LEAST 12" LONG
NOTE:
SADDLE AND HALF-SECTION OF HYDROUS CALCIUM SILICATE
SHALL BE INSTALLED AT THE SAME TIME THAT THE PIPE AND
PIPE HANGERS ARE INSTALLED.
SEE SPECIFICATIONS FOR LOCATIONS WHERE HYDROUS
CALCIUM SILICATE SHALL BE REQUIRED.
0' 1" 2" 3"
6" = 1'-0"
0' 2" 4" 6"
3" = 1'-0"
5"3"1"0' 3" 6" 1'
1 1/2" = 1'-0"
9"0' 6" 1' 1.5'
1" = 1'-0"
3" 9"0' 1' 2'
3/4" = 1'-0"
6"0' 1' 2' 3'
1/2" = 1'-0"
6"0' 1' 2' 4'
3/8" = 1'-0"
3'0' 2' 4' 6'
1/4" = 1'-0"
0' 4' 8' 12'
1/8" = 1'-0"
0' 16' 32' 48'
1/32" = 1'-0"
0' 8' 16' 24'
1/16" = 1'-0"
4'0' 16' 32' 48'
1/32" = 1'-0"
G
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
H
SHEET
P R
O J E
C T
D R
A W
IN
G
D A
T E
D R
A W
N
P R
O J E
C T
D E
S
IG
N E
D
C H
E C
K E
D
M A
R K
R E
V
IS
IO
N
S
D A
T E
B Y
D E
S C
R
IP
T
IO
N
1 2 3 4 5 6 7 8 9 10
B H
E S
C
H
IL
L E
R R
E P
L A
C E
M E
N T
F R
E D
E R
IC
K
C O
U N
T Y
P U
B L
IC
S C
H O
O L S
A Y
L O
R R
O A
D
S T
E P
H E
N S
C
IT
Y V
A
/2
/2
-3
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
09/27/24
PARTIAL FLOOR PLAN - PHASE 2 - DEMOLITION - MECH
SCALE: 1/8" = 1'-0"
PARTIAL FLOOR PLAN - PHASE 2 - NEW WORK - MECH
SCALE: 1/8" = 1'-0"
M-100
E X
IS
T
IN
G
F L
O O
R P
L A
N
M E
C H
/E L E
C
R C
H
G N
H
R C
H
| Sheets |
| G-001 - TITLE SHEET |
File details come from the government source that posted it. Updated .