IFB 2023-3-B Fire Alarm System Upgrades Building Code Study.pdf

PDF 3 MB Posted

Attached to
Fire Alarm System Upgrades
Solicitation number
2023-3-B
Issued by
Chaves County, New Mexico

About this file

This document is a comprehensive Building Code Analysis prepared for Clovis Community College located in Clovis, New Mexico, covering fire alarm and sprinkler system upgrades across multiple campus buildings. The analysis examines seven different campus structures - the Main Building (Phases 1-6), Skills Development Center, Cosmetology Classroom, Welding Building, Storage Building, Grounds Maintenance Building, and Petty Arts Center - using the 2015 International Building Code and related standards. The document systematically evaluates each building's occupancy classifications, construction types, allowable floor areas, height and story limitations, occupant load counts, toilet fixture requirements, travel distances, and code compliance issues.

The code study reveals several significant findings, including multiple buildings that do not fully comply with current building codes and fire safety standards. Key compliance issues include insufficient toilet facilities, inadequate fire separations, travel distance limitations, and the potential need for fire sprinkler systems in certain occupancies. For example, the Main Building's Phases 1 and 2 do not meet allowable area requirements, and the Theater requires full fire sprinkler coverage due to its occupant load exceeding 300. The analysis provides detailed recommendations for each building, such as adding fire walls, verifying wall assemblies, completing fire-rated construction, and ensuring proper opening protections and fire penetration seals. The document serves as a critical technical assessment to guide potential fire alarm and sprinkler system upgrades across the Clovis Community College campus.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Applicable Codes:

2015 International Building Code (IBC) 2015 International Existing Building Code (IEBC) 2015 International Mechanical Code (IMC) 2015 International Fuel Gas Code (IFGC) 2015 International Plumbing Code (IPC) 2015 International Fire Code (IFC) ICC A117.1-2009 Accessibility Standards (I/A)

A) Occupancy Classification: B* (Classrooms/Educational Labs) A-3 (Museum, Student Serv) (Accessory Use)**

*Note: B/F-1/S-1/M need A-1 (Theater) *** not be separated per F-1* (Wood Shop) IBC Table 508.4 M* (Book Store)

S-1* (Auto Shop and Misc. Storage Rooms) **Note that Accessory Use areas that are less than 10% of the floor area in aggregate in any building are not required to be separated per IBC 508.2.

***A 1 hour Fire Barrier is required around the Theater as a Separated Use per IBC 508.4.

B) Type of Construction: II-B Fire and Non Fire-Sprinkled (NFPA 13)

The Theater is required to be Fully Fire Sprinklered in that it’s occupant load exceeds 300 per IBC 903.2.1.1.

C) Location on Property:

Each building, i.e. areas separated by Fire Walls, has yards of varying depth, but limited such that Allowable Area Increases would be limited.

D) Allowable Floor Area: II-B

Phases 1 and 2 Allowable Area (First Floor Only, assumes fully fire sprinklered), 69,000(basic) + 14,260 (frontage increase) = 83,260 < 87,218 Does not comply* Skills Development Center Allowable Area (Non-Fire Sprinklered), 23,000(basic) > 14,656 sf Complies Phase 4 Allowable Area (Non-Fire Sprinklered) 23,000(basic) > 22,723 sf Complies Phase 5 Allowable Area (Non-Fire Sprinklered) 23,000(basic) > 20,663 sf Complies Phase 6 East Allowable Area (Assumes A-3 occupancy Fully Fire Sprinklered) 38,000 (basic) > 28,456 sf Complies Phases 3 and 6 West Allowable Area (First Floor Only, assumes non-fire sprinklered), 23,000(basic) < 34,321 sf Does not comply**

*Calculation is shown for B occ only and does not include the mixed-use calculation to address the Assembly occupancy. This calculation will only show a further lack of compliance. The only remedy for this is to provide an additional Fire Wall, such as between Phases 1 and 2, see plan for potential locations. Unsprinklered portions of this building will need to be fire sprinklered.

**Allowable Area is exceeded for a non-fire sprinklered building. Fire Sprinkler required.

E) Height & No. of Stories:

Height < 55’ OK No. of Stories = 2 < 3 OK

F) Occupant Load Count:

Room Name Area(sf) Occupant Load Factor Occupant Load Count

Phase 1 & 2 1st Flr Business 44,434 100 445 Classrooms 5,774 20 289 Labs 15,281 50 306 Theater Fixed Seats Seats 222 Theater Stage 2480 15 166 Museum 6,570 30 219 Student Services 4,592 15 307 Storage 1,052 300 4 Mechanical 780 300 3 Book Store 2,106 60 36 Wood Shop 3,287 50 66 Kitchen 1,440 200 8

Total 2,071

Phase 1 & 2 2nd Flr Business 7,843 100 79 Classrooms 5,818 20 291 Labs 5,462 50 110 Mechanical 8,228 300 28

Total 508

Skills Dev Center Business 6,801 100 68 Classroom 4,031 20 202 Student Success 3,451 50 69 Mechanical 373 300 2

Total 341

Phases 3 & 6 West Business 8,698 100 87 Classrooms 1,355 20 68 Labs 1,682 50 34 Racquetball/Lockers 13,320 50 267 Gym (no seating) 8,064 50 162 Observation 816 20 41 Mechanical 386 300 2

Total 661

Phase 3 2nd Floor Labs 2,294 50 46 Mechanical 2,190 300 8 Business 1,297 100 13

Total 67

Phase 4 Business 10,855 100 109 Classrooms 8,316 20 416 Labs 2,155 50 44 Storage 1,397 300 5

Total 574

Phase 5 Business 8,603 100 86 Classrooms 5,033 20 252 Labs 7,027 50 141

Total 479

Phase 5 2nd Floor Mechanical 1,130 300 4

Total 4

Phase 6 East Business 9,203 100 93 Classrooms 1,494 20 75 Labs 8,836 50 177 Gym/Locker 3,600 50 72 Pool 5,023 50 101 Mechanical 300 300 1

Total 519

G) Toilet Fixture Count: (Based on Educational Occupancy)

Phases 1 & 2 2,579 occupants >> 1290 male, 1290 female

Male Female

Fixture Required Provided Required Provided Water Closets 26 14 26 22 Urinals 20 Lavatories 26 14 26 14 Drinking Fountain 26 14 Service Sink 1

Skills Dev Center 341 occupants >> 171 male, 171 female

Male Female

Fixture Required Provided Required Provided Water Closets 3 2 3 4 Urinals 3 Lavatories 3 3 3 3 Drinking Fountain 4 Service Sink 1

Phases 3 & 6 W 728 occupants >> 364 male, 364 female

Male Female

Fixture Required Provided Required Provided Water Closets 8 7 8 16 Urinals 12 Lavatories 8 12 8 16 Drinking Fountain 8 Service Sink 1

Phase 4 574 occupants >> 287 male, 287 female

Male Female

Fixture Required Provided Required Provided Water Closets 6 2 6 3 Urinals 2 Lavatories 6 2 6 2 Drinking Fountain 6 Service Sink 1 1

Phases 5 483 occupants >> 242 male, 242 female

Male Female

Fixture Required Provided Required Provided Water Closets 5 2 5 4 Urinals 3 Lavatories 5 2 5 2 Drinking Fountain 5 Service Sink 2 1

Phase 6 East 519 occupants >> 260 male, 260 female

Male Female

Fixture Required Provided Required Provided Water Closets 6 Incl Ph 6 W 6 Incl Ph 6 W Urinals Lavatories 6 6 Drinking Fountain 6 Service Sink 1

Main Classroom Building All Phases Total

Male Female

Fixture Required Provided Required Provided Water Closets 54 25 54 49 Urinals 40 Lavatories 54 33+ 54 37+ Drinking Fountain 3+ 54 Service Sink 5 1

+ Plumbing fixtures have been calculated conservatively, including floor area of the corridor systems and toilet rooms themselves which is not required by code. We believe that the water closet and urinals are likely adequate considering this conservatism, however lavatories and drinking fountains appear inadequate.

H) Travel Distance Occupancy Max Allowable Travel Distance Max Noted Phases 1 & 2

B (FS) 300’ 272’

A (NS) 200’ 97’

A (FS) 250’ 175’

Skills Dev Center

B (NS) 200’ 173’

Phase 4

B (NS) 200’ 197’

Phase 5

B (NS) 200’ 147’

Phase 6 East

B (FS) 300’ 161’

A (FS) 250’ 211’

Phase 3 & 6 West

B (NS) 200’ 197’

A (NS) 200’ 171’

GJN

JPH/AJL/ELR

Current Issue:

S B

G P

R O

J E

C T

S \9

.2

C

L O

V

IS

C O

M M

U N

IT

Y

C O

L L E

G E

D E

S

IG

N O

F F

IR

E

A L A

R M

A N

D S

P R

IN

K

L E

R U

P G

R A

D E

S \C

A D

\B G

C E

C A

D \9

.2

C

.0

.D W

G

A L B

U Q

U E

R Q

U E

A

V O

N |D

E N

V E

R F

O R

T C

O L L

IN

S

.2

.3 w w w ˛b g b u ild in g w o rk s ˛c o m

F

IR

E A

L A

R M

A N

D S

P R

IN

K

L E

R S

Y S

T E

M U

P G

R A

D E

S S

C H

E P

P S

B L V

D

C L O

V

IS

N

E W

M E

X

IC

O

C L

O V

IS

C

O M

M U

N

IT

Y C

O L

L E

G E

Designed:

Reviewed:

Project No:

SEAL

Issued:

Scale: As Shown

Sheet Title:

Sheet No:

Date:

© 2020 BG BUILDINGWORKS INC.

P R O G

R E S S

P R

IN

T N O T F

O R

C O N S

TR

U C

TIO

N

PROGRESS SET

A0.0

JPH21146

COVER SHEET &

MAIN BLDG CODE

STUDY

02/02/22

02/02/22

ARCHITECTURAL ABBREVIATIONS

VICINITY MAP

CLOVIS CC ASSESSMENT

417 SCHEPPS BLVD,

CLOVIS, NM 88101

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VOL VOLUME

VWC VINYL WALL COVERING

W

W/ WITH

W/O WITHOUT

WC

WALL COVERING or WATER CLOSETWD WOOD or WOOD DOOR

WP WORKING POINT

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

I

IBC INTERNATIONAL BUILDING CODE

ID IINSIDE DIAMETER

INCL INCLUDED

INSUL INSULATED or INSULATION

INT INTERIOR

J

JAN JANITOR

JT JOINT

K

KD KNOCKED DOWN

L

L ANGLE

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LF LINEAR FEET

LIB LIBRARY

LR LIVING ROOM

M

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MEP MECHANICAL, ELECTRICAL and PLUMBING

MEZZ MEZZANINE

MFR MANUFACTURER

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MTD MOUNTED

MTL METAL

N

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O

OA OVERALL

OC ON-CENTER

OD OUTSIDE DIAMETER or OVERFLOW DRAIN

OH DR OVERHEAD DOOR

OPNG OPENING

OPP OPPOSITE

P

PERF PERFORATED

PL PLATE or PROPERTY LINE

PLAM PLASTIC LAMINATE

PLYWD PLYWOOD

PNTD PAINTED

PREFAB PREFABRICATED

PROJ PROJECT

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT(ED) or PRESSURE TREATED

PWR POWER

Q

QA QUALITY ASSURANCE

QT QUARRIED TILE

QTY QUANTITY

R

R RADIUS, RISER or THERMAL RESISTANCE

RA RETURN AIR

RB RESILIENT BASE or RUBBER BASE

RCP REFLECTED CEILING PLAN

RCP REFLECTED CEILING PLAN

RD ROAD or ROOF DRAIN

RE REFER TO or REFERENCE

REF REFRIGERATOR or REFRIGERATED

REINF REINFORCED

REQD REQUIRED

RESIL RESILIENT

REV REVISE, REVISED or REVISION

RF RESILIENT FLOORING

RM ROOM

RO ROUGH OPENING

ROW RIGHT-OF-WAY

RTU ROOFTOP UNIT

S

SA SUPPLY AIR

SAN SANITARY

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT (FEET)

SHT SHEET

SHWR SHOWER

SIM SIMILAR

SPEC SPECIFICATION(S)

SQ SQUARE

SST STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURE or STRUCTURAL

SUSP SUSPEND(ED)

SYMM SYMMETRICAL

SYS SYSTEM

T

T TREAD

T&G TONGUE AND GROOVE

TEL TELEPHONE

TEMP TEMPORARY

TO TOP OF

TOC TOP OF CONCRETE

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TYP TYPICAL

U

A

ABV ABOVE

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE(LY)

ARCH ARCHITECT or ARCHITECTURAL

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO/VISUAL

B

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BOT BOTTOM

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C

CATV COMMUNITY ANTENNA (cable) TELEVISION

CCTV CLOSED CIRCUIT TELEVISION

CD CONSTRUCTION DOCUMENTS or CONTRACT

DOCUMENTS

CG CORNER GUARD

CIP CAST-IN-PLACE

CJ CONSTRUCTION JOINT or CONTROL JOINT

CL CENTERLINE

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONST

CONST

CONSTRUCTION

CONT CONTINUE, CONTINUOUS or CONTROLLER

CORR CORRIDOR

CPT CARPET

CT CERAMIC TILE or COUNT

D

DBL DOUBLE

DEG DEGREE(S)

DEMO DEMOLISH or DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION or DIMENSIONAL

DN DOWN

DOC DOCUMENT

DR DINING ROOM, DOOR, DRAIN or DRIVE

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

E

E EAST

EA EACH

EF EXHAUST FAN

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

ENCL ENCLOSURE

ENGR ENGINEER

EPDM ETHYLENE PROPYLENE DIENE MONOMER (roofing)

EPS EXPANDED POLYSTYRENE (insulation board)

EQ EQUAL

EQUIP EQUIPMENT

ETC ET CETERA (and so forth)

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPAND, EXPANDED or EXPANSION

EXT EXTERIOR or EXTINGUISHER

F

F/F FACE TO FACE

FACP FIRE ALARM CONTROL PANEL

FBO FURNITURE BY OWNER or FURNISHED BY OWNER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FFE FURNITURE, FIXTURES AND EQUIPMENT

FHC FIRE HOSE CABINET

FIN FINISH(ED)

FIXT FIXTURE

FLR FLOOR

FLUOR FLUORESCENT

FR FIRE RATING, FIRE RESISTIVE, FIRE RESISTANT

or FRAME

FRG FIBER REINFORCED GYPSUM

FRMG FRAMING

FRP FIBER-REINFORCED POLYESTER or

FIBERGLASS - REINFORCED PLASTIC

FT FEET, FOOT or FIRE TREATED

FTG FOOTING

G

GA GAUGE

GALV GLAVANIZED

GB GRAB BAR

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTER or PLASTIC

GL GLASS or GLAZING

GYP GYPSUM

GYP BD GYPSUM BOARD

H

HB HOSE BIBB

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HORIZ HORIZONTAL

HT HEIGHT

HVAC HEATING, VENTILATION and AIR CONDITIONING

CNTLN CENTERLINE

MAIN BUILDING CODE STUDY

PROJECT TEAM

ARCHITECT & STRUCT ENGINEER:

AEC-WEST CONSULTANTS, INC.

4506 QUEBEC STREET/SUITE B8

DENVER, CO 80216

PHONE: 303-377-6963

JAMES P. HORNE, PE, SE

JAMES@AEC-WEST.COM

GARY J. NICKERSON, RA

GARY@AEC-WEST.COM

CONTRACTOR: ELECTRICAL: MECHANICAL/PLUMBING:

SHEET LIST

SEE A0.1, A0.2 AND A0.3 FOR

MAIN BUILDING CODE PLANS

ART LAB

155A

ORCH PIT

270 SF

CORRIDOR

1,971 SF

HALL

OFF

201 SF

STU GOV

CAREER SVC OFF

ADVISE OFF

138A

OFF

138B

OFF

136E

RECORDS

138F

OFF

138D

OFF

138C

OFF

137B

CONF

137A

DEAN OFF

OFFICE

VEST

BOOKSTORE

CLASSROOM

695 SF

OFF

400B

FREEZER

400A

REFIG

400C

STO

KITCHEN PREP

VEST

118D

OFF

118E

CONFERENCE

118G

IT OFFICE

118F

SERVER ROOM

112C

OFF

112E

HUMAN RESOURCES SERVICE

112A

OFF

OFF

109C

OFF

VEST

STO

PRES OFF

MAINT

128A

MECH

128B

BOILER

127B

STO

127A

CONFERENCE

MARKETING OFF

LAVLAV

WOMENMEN HALL

SEC / RECEP

134D

STO

134B

OFF

134A

OFF

134C

OFF

136C

OFF

136D

OFF

136B

OFF

136A

OFF

CORRIDOR

STAIR

SEC / RECP

138E

FILE

DR. H. A. MILLER STUDENT SERVICES CENTER

138G

STORAGE/ELEC

138I

STO

STO

STAIR

MEN WOMEN

142A

STO

TRIO

STAIR

COMMONS

138L

INFO

138J

ADMISSIONS

138K

RECORDS

CORRIDOR

HALL HALL

141I

OFF

141H

OFF

141G

OFF

141F

OFF

141E

WK RM

141D

OFF

141C

OFF

141B

OFF

141A

OFF

FACULTY OFFICE

VEST

CORRIDOR

CLASSROOM

101A

STO

102A

STO

CLASSROOM

104A

STO

103A

STO

103B

STO

UPWARD BOUND

VEST

JAN

LAV

WOMEN

LAVMEN

TESTING LAB

108B

OFF

108A

STO

116B

STO

109B

OFF

109A

OFF 112F

STO

TESTING LAB

110A

MACHINE RM

SECURITY

DR. JAMES H. TURNER BUSINESS SERVICE CENTER

MAINT.

112B

OFF

112D

STO

116A

OFF

WOMENMEN

LAVLAV

HALL

CORRIDOR

STAIR

SNACK BAR

125A

STO

TOILET

HALL

STO

BANNER ROOM

OFFICE

HALL

118A

OFF

118B

OFF

118C

OFF

INFORMATION TECHNOLOGY

STO

CLASSROOM

562 SF

CLASSROOM

564 SF

CLASSROOM

554 SF

171I

CONFERENCE

168 SF

171K

CLASSROOM

378 SF

171J

CLASSROOM

379 SF

CENTER FOR STUDENT SUCCESS/ COMPUTER LAB

3,445 SF

171A

TUTOR

378 SF

171B

TESTING

379 SF

171C

WKRM

357 SF

MAINT.

373 SF

170A

STO

104 SF

VEST

83 SF

171H

OFF

108 SF

171G

OFF

104 SF

171F

CONTROL

254 SF

171E

OFF

104 SF

171D

OFF

108 SF

JAN

87 SF

MEN

131 SF

WOMEN

172 SF

LAV

86 SF

LAV

92 SF

LOBBY

1,156 SF

146A

OFF

EULA MAE EDWARDS MUSEUM

146B

STO

SEMINAR

SEMINAR

CLASSROOM

CLASSROOM

VEST

340 SF

VEST

201 SF

151A

EDUCATIONAL SERVICES

151E

OFFICE

151C

CONF

152A

OPEN OFFICE

CORR

1,437 SF

VEST

363 SF

155B

DRESS

171 SF

155A

DRESS

221 SF

STAGE

2,264 SF

DR. JAY GURLEY TOWN HALL

2,759 SF

VEST

308 SF

CLASSROOM

552 SF

164C

TOOLS

98 SF

TOOLS

98 SF

157A

OFF

98 SF

157B

STO

132 SF

157C

MAINT. OFFICE

166 SF

PLANT MAINT

2,533 SF

COATS

135 SF

JAN

71 SF

GREEN RM

250 SF

CLASSROOM

552 SF

164A

OFF

98 SF

164B

STO

392 SF

CORR

550 SF

CORR

784 SF

CORR

451 SF

MEN

168 SF

WOMEN

188 SF

LAV

LAV

MEN

WOMEN

BLDG CONSTRUCTION

3,071 SF

WOMEN

72 SF

MEN

100 SF

STO

172 SF

HALL

164 SF

CLASSROOM

554 SF

167A

OFF

99 SF

167B

STO

444 SF

AUTOMOTIVE TECHNOLOGY

6,498 SF

LOCKERS

LOCKERS

OFF

PATIO

152B

OFFICE

152C

OFFICE

151B

OFFICE

151C

OFFICE

151D

OFFICE

EQPT PLATFORM

MEZZ PLATFORM

OPEN TO BELOW

UPPER BOOKSTORE

(OPEN TO BELOW)

MEZZ PLATFORM

MEZZ PLATFORM

UPPER LRC

(OPEN TO BELOW)

UPPER COMMONS

(OPEN TO BELOW)

ART LAB

309A

ELEC

42 SF

155A

ORCH PIT

270 SF

CORRIDOR

654 SF

HALL

OFF

201 SF

STU GOV

CAREER SVC OFF

ADVISE OFF

138A

OFF

138B

OFF

136E

RECORDS

138F

OFF

138D

OFF

138C

OFF

137B

CONF

137A

DEAN OFF

OFFICE

VEST

BOOKSTORE

VEST

176 SF

VEST

170 SF

CLASSROOM

695 SF

OFF

400B

FREEZER

400A

REFIG

400C

STO

KITCHEN PREP

VEST

118D

OFF

118E

CONFERENCE

118G

IT OFFICE

118F

SERVER ROOM

112C

OFF

112E

HUMAN RESOURCES SERVICE

112A

OFF

OFF

109C

OFF

314A

WEIGHT RM

922 SF

314B

OBSERVATION

1,226 SF

RAQUETBALL - COURT F

810 SF

RAQUETBALL - COURT E

810 SF321

RAQUETBALL - COURT D

840 SF

MEN

259 SF

CORRIDOR

483 SF

JAN

128 SF

320C

STO

24 SF

320B

EQUIP

87 SF

320A

SHOWERS

367 SF

MEN'S LOCKER

666 SF

305C

STO

23 SF

305B

EQUIP

87 SF

305A

SHOWERS

369 SF

WOMEN'S LOCKER

672 SF

WOMEN

263 SF

COURT A

803 SF

803 SF

813 SF

WEIGHT RM

1,265 SF

OFF

211 SF

CLASSROOM

598 SF

OFF

159 SF

MECH

342 SF

STORAGE

228 SF

OFF

111 SF

OFF

111 SF

VEST

229 SF

322B

STAIR

132 SFCORRIDOR

2,315 SF

CHECK IN

570 SF

GYMNASIUM / HEALTH AND FITNESS CENTER

7,981 SF

AEROBIC STUDIO

1,675 SF

VEST

102 SF

CLASSROOM

757 SF

CLASSROOM

776 SF

CORRIDOR

2,163 SF

STO

226 SF

460B

STORAGE

461A

OPEN OFFICE

462B

OFFICE

463A

RECEPTION

CLASSROOM

772 SF

OFFICE

244 SF

LAB

856 SFCORR

180 SF

CORRIDOR

755 SF

CORR

197 SF

ITV LAB

722 SF

INTER ACTIVE LAB

999 SF

CONTROL

410 SF

MULTI-MEDIA LAB

899 SF

MAINT

207 SF

AEROBIC LAB

682 SF

CORRIDOR

CLASSROOM

VEST

166 SF

CORRIDOR

647 SF

FLIGHT TRAINING

CHECK-IN

244 SF

CORRIDOR

540 SF

364C

STAIR

171 SF

STO

128 SF

JAN

98 SF

CORRIDOR

498 SF

OFFICE

499 SF

367D

SHOWER

101 SF

367C

DRYING

103 SF

367B

LOCKERS

210 SF

MEN

63 SF367

MEN'S LOCKER

337 SF

VEST

94 SF

VEST

94 SF

VEST

89 SF

VEST

87 SF

368A

WOMEN

59 SF

WOMEN'S LOCKER

323 SF

368C

SHOWERS

211 SF368B

LOCKERS

220 SF

WOMEN

471 SF

VEST

25 SF

VEST

28 SF

MEN

327 SF

POOL EQ

325 SF

369A

MECH

14 SF

369B

MECH

15 SF

POOL

5,023 SF

VEST

STO

PRES OFF

MAINT

128A

MECH

128B

BOILER

127B

STO

127A

CONFERENCE

MARKETING OFF

LAVLAV

WOMENMEN HALL

SEC / RECEP

134D

STO

134B

OFF

134A

OFF

134C

OFF

136C

OFF

136D

OFF

136B

OFF

136A

OFF

CORRIDOR

STAIR

SEC / RECP

138E

FILE

DR. H. A. MILLER STUDENT SERVICES CENTER

138G

STORAGE/ELEC

138I

STO

STO STAIR

MEN WOMEN

142A

STO

TRIO

STAIR

COMMONS

138L

INFO

138J

ADMISSIONS

138K

RECORDS

CORRIDOR

HALL HALL

141I

OFF

141H

OFF

141G

OFF

141F

OFF

141E

WK RM

141D

OFF

141C

OFF

141B

OFF

141A

OFF

FACULTY OFFICE

VEST

CORRIDOR

CLASSROOM

101A

STO

102A

STO

CLASSROOM

104A

STO

103A

STO

103B

STO

UPWARD BOUND

VEST

JAN

LAV

WOMEN

LAVMEN

TESTING LAB

108B

OFF

108A

STO

116B

STO

109B

OFF

109A

OFF 112F

STO

TESTING LAB

110A

MACHINE RM

SECURITY

DR. JAMES H. TURNER BUSINESS SERVICE CENTER

MAINT.

112B

OFF

112D

STO

116A

OFF

WOMENMEN

LAVLAV

HALL

CORRIDOR

STAIR

SNACK BAR

125A

STO

TOILET

HALL

STO

BANNER ROOM

OFFICE

HALL

118A

OFF

118B

OFF

118C

OFF

INFORMATION TECHNOLOGY

CLASSROOM

1,019 SF

CLASSROOM

1,056 SF

ELEC

65 SF

410B

STO

410A

OFF

INDUSTRIAL TECHNOLOGY

1,750 SF

CORRIDOR

1,959 SF

CORRIDOR

325 SF

STO

CORRIDOR

SHIPPING & RECEIVING

403H

WK RM

141 SF

403G

OFF

100 SF

403F

OFF

101 SF403E

OFF

113 SF

403D

OFF

100 SF

403C

OFF

112 SF

403B

OFF

100 SF

403A

OFF

99 SF

FACULTY OFFICE

244 SF

CORRIDOR

435 SF

VEST

76 SF

MAINT.

289 SF

CONF

375 SF

406A

LAV

62 SF

407A

LAV

62 SF

MEN'S TOILETS

140 SF

WOMEN'S TOILETS

100 SF

409B

GRAPHICS / PRINTING

409A

STO

178 SF

411A

STO

126 SF

DRAFTING

1,145 SF

CLASSROOM

1,019 SF

VEST

105 SF

CORRIDOR

902 SF

415B

OFF

100 SF

EQUIP

59 SF

415A

OFF

100 SF

415C

STO

205 SF

415D

EQUIP

89 SF

415E

STO

100 SF

415A

TUTORING CENTER

4,464 SF

CORRIDOR

1,251 SF

CORR

327 SF

FACULTY OFFICE

546 SF

509E

OFF

127 SF

509D

OFF

146 SF

509C

OFF

131 SF

509B

OFF

135 SF

509A

OFF

134 SF

509H

OFF

136 SF

509G

OFF

132 SF

509F

OFF

147 SF

512A

PROJECTION

64 SF

BOARD RM

1,215 SF

VEST

86 SF

TV PROD

391 SF

CLASSROOM

965 SF

CLASSROOM

968 SF

JAN

STO

181 SF

PHOTO LAB

875 SF

WKRM

368 SF

540D

LIGHT LOCK

148 SF

540C

STO

28 SF

540B

FILMLOAD

28 SF

531A

STO

119 SF

CLASSROOM

969 SF

CLASSROOM

873 SF

CORR

1,029 SF

LOBBY

1,156 SF

146A

OFF

EULA MAE EDWARDS MUSEUM

146B

STO

SEMINAR

SEMINAR

CLASSROOM

CLASSROOM

VEST

340 SF

VEST

201 SF

151A

EDUCATIONAL SERVICES

151E

OFFICE

151C

CONF

152A

OPEN OFFICE

CORR

1,437 SF

VEST

363 SF

155B

DRESS

171 SF

155A

DRESS

221 SF

STAGE

2,264 SF

DR. JAY GURLEY TOWN HALL

2,759 SF

VEST

308 SF

CLASSROOM

552 SF

164C

TOOLS

98 SF

TOOLS

98 SF

157A

OFF

98 SF

157B

STO

132 SF

157C

MAINT. OFFICE

166 SF

PLANT MAINT

2,533 SF

COATS

135 SF

JAN

71 SF

GREEN RM

250 SF

CLASSROOM

552 SF

164A

OFF

98 SF

164B

STO

392 SF

CORR

550 SF

CORR

784 SF

CORR

451 SF

MEN

168 SF

WOMEN

188 SF

LAV

LAV

MEN

WOMEN

BLDG CONSTRUCTION

3,071 SF

WOMEN

72 SF

MEN

100 SF

STO

172 SF

HALL

164 SF

CLASSROOM

554 SF

167A

OFF

99 SF

167B

STO

444 SF

AUTOMOTIVE TECHNOLOGY

6,498 SF

DRAWING LAB

1,231 SF

STO

73 SF

STO

73 SF

WORK ROOM

542 SF

PAINTING LAB

1,249 SF

CORRIDOR

590 SF

WINDOWS GALLERY

1,493 SF

VEST

98 SF

STO

180 SF

517A

STO

149 SF

LAV

167 SF

MEN

134 SF

WOMEN

134 SF

CERAMIC LAB

1,652 SF

517B

KILN

419 SF

LOCKERS

LOCKERS

OFF

409A

GRAPHICS / PRINTING

"MILLENNIUM" COURTYARD

COURT B

COURT C

415B

MATH EMPORIUM

PATIO

STORAGE

460A

OPEN OFFICE

461B

OPEN OFFICE

462A

STORAGE

463B

OFFICE

463C

OFFICE

463D

OFFICE

463E

OFFICE

410C

OFF

152B

OFFICE

152C

OFFICE

151B

OFFICE

151C

OFFICE

151D

OFFICE

603C

OFFICE

603D

OFFICE

RECEPTION

CLASSROOM

603B

OFFICE

603A

OFFICE

CONFERENCE ROOM

PTA LAB

604A

SIM ROOM

604B

WORKROOM

604C

WORKROOM

E QP T P LA TFORM

ME ZZ P LA TFORM

OP E N TO B E LOW

UP P ER B OOK S TORE

(OP E N TO B E LOW )

ME ZZ P LA TFORM

ME ZZ P LA TFORM

UP P ER LRC

(OP E N TO B E LOW )

UP P E R COMMONS

(OP E N TO B E LOW )

UP P ER COURT

(OP E N TO B E LOW )

JA NITOR

UP P ER COURT

(OP E N TO B E LOW )

UP P ER COURT

(OP E N TO B E LOW )

CUT LINE

CUT LINE

CUT LINE

(E) FLUME HOOD

(E) PROPANE

TANK

LAB

1130 SF

BUSINESS, B

44,434 SF

ASSEMBLY, A-1

6570 SF

CLASSROOM

3507 SF

CLASSROOM

1120 SF

CLASSROOM

1700 SF

CLASSROOM

805 SF

CLASSROOM

763 SF

CLASSROOM

1117 SF

CLASSROOM

763 SF

MECHANICAL

373 SF

LAB. S-1

8217 SF

WOODSHOP, F-1

3287 SF

MECHANICAL

780 SF

KITCHEN

1440 SF

BOOKSTORE, M

2106 SF

STORAGE, S-1

922 SF

STUDENT SERVICES CENTER, A-3

4952 SF,

ACCESSORY USE

STORAGE, S-1

130 SF

MUSEUM, A-3

1542 SF

222 FIXED

SEATS

STUDENT SUCCESS, B

3451 SF

LAB

2647 SF

BUSINESS

6801 SF

161'-9"

103'-5"

147'-8"

175'-4"

180'-2"

157'-7"

POTENTIAL FIRE

WALL OPTION 1 HOUR FIRE BARRIER REQUIRED

VERIFY WALL ASSEMBLY, OPENING

PROTECTION, AND FIRE PENETRATION

2 HOUR FIRE WALL (EXISTING) VERIFY

WALL ASSEMBLY, OPENING

PROTECTION, AND FIRE PENETRATIONS

108'-1"

108'-4"

121'-0"

30 Occupants

220 Capacity

30 Occupants

220 Capacity

200 Occupants

440 Capacity

11 Occupants

220 Capacity

200 Occupants

440 Capacity 200 Occupants

110 Capacity

200 Occupants

440 Capacity

400 Occupants

880 Capacity

175'-6"

200 Occupants

330 Capacity

102'-3"

200 Occupants

440 Capacity

200 Occupants

440 Capacity

200 Occupants

440 Capacity

PHASE 4

PHASE 5

PHASE 6

PHASE 3

PHASE 1

PHASE 2

SKILLS

DVLP. CNTR.

CUT LINE

CUT LINE

CUT LINE

RAQUETBALL ADDITION

PHASE 4

PHASES 1 & 2: SUMMARY OF TOTAL AREAS ON FIRST FLOOR

BUSINESS, B = 44,434 SF

CLASSROOM, B = 5,774 SF

LAB, B = 3,777 SF

ASSEMBLY A-1 = 6,570 SF (1 hour Separated Use) MUSEUM, A-3 = 1,542 SF (Accessory Use) STUDENT SERVICES CENTER, A-3 = 4,952 SF (Accessory Use)

STORAGE, S-1 = 1052 SF

AUTOMOTIVE, S-1 = 8,217 SF

MECHANICAL = 780 SF

BOOK STORE, M = 2,106 SF

WOOD SHOP, F-1 = 3,287 SF

KITCHEN, B = 1440 SF

TOTALS: 87,218 SF

SKILLS DEVELOPMENT CENTER: SUMMARY OF TOTAL AREAS

BUSINESS, B = 6,801 SF

CLASSROOM, B = 4,031 SF

STUDENT SUCCESS, B = 3,451 SF

MECHANICAL, B = 373 SF

TOTALS: 14,656 SF

EXISTING AUTOMATIC SPRINKLER SYSTEM

PROVIDED IN THIS AREA

INTENDED TO BE 2-HR FIRE SEPARATION WALL, PER

PHASE 6 DRAWINGS, SHEET G-5

EXTENT OF 1-HOUR CORRIDOR SYSTEM REQUIRED

IN NON-FIRE SPRINKLED BUILDING. VERIFY WALL

ASSEMBLY, COMPLETENESS OF WALL AND CEILING

RATED CONSTRUCTION, OPENING PROTECTION,

DOORS AND SEALS, FIRE DAMPERS THROUGH

WALLS AND FIRE PENETRATIONS

TRAVEL DISTANCE MEASUREMENT

CLASSROOMS > 950 SF HAVE AN OCCUPANT LOAD

OF 50+ WHICH REQUIRES TWO SEPARATED EXIT

ACCESS DOORS WITH PANIC HARDWARE.

LEGEND

29'-3"

Current Issue:

S B

G P

R O

J E

C T

S \9

.2

C

L O

V

IS

C O

M M

U N

IT

Y

C O

L L E

G E

D E

S

IG

N O

F F

IR

E

A L A

R M

A N

D S

P R

IN

K

L E

R U

P G

R A

D E

S \C

A D

\B G

C E

C A

D \9

.2

C

.0

.D W

G

A L B

U Q

U E

R Q

U E

A

V O

N |D

E N

V E

R F

O R

T C

O L L

IN

S

.2

.3 w w w ˛b g b u ild in g w o rk s ˛c o m

F

IR

E A

L A

R M

A N

D S

P R

IN

K

L E

R S

Y S

T E

M U

P G

R A

D E

S S

C H

E P

P S

B L V

D

C L O

V

IS

N

E W

M E

X

IC

O

C L

O V

IS

C

O M

M U

N

IT

Y C

O L

L E

G E

Designed:

Reviewed:

Project No:

SEAL

Issued:

Scale: As Shown

Sheet Title:

Sheet No:

Date:

© 2020 BG BUILDINGWORKS INC.

P R O G

R E S S

P R

IN

T N O T F

O R

C O N S

TR

U C

TIO

N

KEY PLAN

GJN

JPH/AJL/ELR

PROGRESS SET

A0.1

CODE

PLAN-MAIN

BUILDING WEST

02/02/22

JPH21146

02/02/22

1/16" = 1'-0"1

CODE PLAN LEVEL ONE WEST

SEE A0.0 FOR

MAIN BUILDING

CODE STUDY

C EDBA

309A

ELEC

42 SF

CORRIDOR

654 SF

VEST

176 SF

VEST

170 SF

314A

WEIGHT RM

922 SF

314B

OBSERVATION

1,226 SF

RAQUETBALL - COURT F

810 SF

RAQUETBALL - COURT E

810 SF

RAQUETBALL - COURT D

840 SF

MEN

259 SF

CORRIDOR

483 SF

JAN

128 SF

320C

STO

24 SF

320B

EQUIP

87 SF

320A

SHOWERS

367 SF

MEN'S LOCKER

666 SF

305C

STO

23 SF

305B

EQUIP

87 SF

305A

SHOWERS

369 SF

WOMEN'S LOCKER

672 SF

WOMEN

263 SF

COURT A

803 SF

803 SF

813 SF

WEIGHT RM

1,265 SF

OFF

211 SF

CLASSROOM

598 SF

OFF

159 SF

MECH

342 SF

STORAGE

228 SF

OFF

111 SF

OFF

111 SF

VEST

229 SF

322B

STAIR

132 SFCORRIDOR

2,315 SF

CHECK IN

570 SF

GYMNASIUM / HEALTH AND FITNESS CENTER

7,981 SF

AEROBIC STUDIO

1,675 SF

VEST

102 SF

CLASSROOM

757 SF

CLASSROOM

776 SF

CORRIDOR

2,163 SF

STO

226 SF

460B

STORAGE

461A

OPEN OFFICE

462B

OFFICE

463A

RECEPTION

CLASSROOM

772 SF

OFFICE

244 SF

LAB

856 SFCORR

180 SF

CORRIDOR

755 SF

CORR

197 SF

ITV LAB

722 SF

INTER ACTIVE LAB

999 SF

CONTROL

410 SF

MULTI-MEDIA LAB

899 SF

MAINT

207 SF

AEROBIC LAB

682 SF

CORRIDOR

CLASSROOM

VEST

166 SF

CORRIDOR

647 SF

FLIGHT TRAINING

CHECK-IN

244 SF

CORRIDOR

540 SF

364C

STAIR

171 SF

STO

128 SF

JAN

98 SF

CORRIDOR

498 SF

OFFICE

499 SF

367D

SHOWER

101 SF

367C

DRYING

103 SF

367B

LOCKERS

210 SF

MEN

63 SF367

MEN'S LOCKER

337 SF

VEST

94 SF

VEST

94 SF

VEST

89 SF

VEST

87 SF

368A

WOMEN

59 SF

WOMEN'S LOCKER

323 SF

368C

SHOWERS

211 SF368B

LOCKERS

220 SF

WOMEN

471 SF

VEST

25 SF

VEST

28 SF

MEN

327 SF

POOL EQ

325 SF

369A

MECH

14 SF

369B

MECH

15 SF

POOL

5,023 SF

CLASSROOM

1,019 SF

CLASSROOM

1,056 SF

ELEC

65 SF

410B

STO

410A

OFF

INDUSTRIAL TECHNOLOGY

1,750 SF

CORRIDOR

1,959 SF

CORRIDOR

325 SF

CORRIDOR

SHIPPING & RECEIVING

403H

WK RM

141 SF

403G

OFF

100 SF

403F

OFF

101 SF403E

OFF

113 SF

403D

OFF

100 SF

403C

OFF

112 SF

403B

OFF

100 SF

403A

OFF

99 SF

FACULTY OFFICE

244 SF

CORRIDOR

435 SF

VEST

76 SF

MAINT.

289 SF

CONF

375 SF

406A

LAV

62 SF

407A

LAV

62 SF

MEN'S TOILETS

140 SF

WOMEN'S TOILETS

100 SF

409B

GRAPHICS / PRINTING

409A

STO

178 SF

411A

STO

126 SF

DRAFTING

1,145 SF

CLASSROOM

1,019 SF

VEST

105 SF

CORRIDOR

902 SF

415B

OFF

100 SF

EQUIP

59 SF

415A

OFF

100 SF

415C

STO

205 SF

415D

EQUIP

89 SF

415E

STO

100 SF

415A

TUTORING CENTER

4,464 SF

CORRIDOR

1,251 SF

CORR

327 SF

FACULTY OFFICE

546 SF

509E

OFF

127 SF

509D

OFF

146 SF

509C

OFF

131 SF

509B

OFF

135 SF

509A

OFF

134 SF

509H

OFF

136 SF

509G

OFF

132 SF

509F

OFF

147 SF

512A

PROJECTION

64 SF

BOARD RM

1,215 SF

VEST

86 SF

TV PROD

391 SF

CLASSROOM

965 SF

CLASSROOM

968 SF

JAN

STO

181 SF

PHOTO LAB

875 SF

WKRM

368 SF

540D

LIGHT LOCK

148 SF

540C

STO

28 SF

540B

FILMLOAD

28 SF

531A

STO

119 SF

CLASSROOM

969 SF

CLASSROOM

873 SF

CORR

1,029 SF

DRAWING LAB

1,231 SF

STO

73 SF

STO

73 SF

WORK ROOM

542 SF

PAINTING LAB

1,249 SF

CORRIDOR

590 SF

WINDOWS GALLERY

1,493 SF

VEST

98 SF

STO

180 SF

517A

STO

149 SF

LAV

167 SF

MEN

134 SF

WOMEN

134 SF

CERAMIC LAB

1,652 SF

517B

KILN

419 SF

409A

GRAPHICS / PRINTING

"MILLENNIUM" COURTYARD

COURT B

COURT C

415B

MATH EMPORIUM

STORAGE

460A

OPEN OFFICE

461B

OPEN OFFICE

462A

STORAGE

463B

OFFICE

463C

OFFICE

463D

OFFICE

463E

OFFICE

410C

OFF

603C

OFFICE

603D

OFFICE

RECEPTION

CLASSROOM

603B

OFFICE

603A

OFFICE

CONFERENCE ROOM

PTA LAB

604A

SIM ROOM

604B

WORKROOM

604C

WORKROOM

UPPER COURT

(OPEN TO BELOW)

JANITOR

UPPER COURT

(OPEN TO BELOW)

UPPER COURT

(OPEN TO BELOW)

ART LAB

309A

ELEC

42 SF

155A

ORCH PIT

270 SF

CORRIDOR

654 SF

HALL

OFF

201 SF

STU GOV

CAREER SVC OFF

ADVISE OFF

138A

OFF

138B

OFF

136E

RECORDS

138F

OFF

138D

OFF

138C

OFF

137B

CONF

137A

DEAN OFF

OFFICE

VEST

BOOKSTORE

VEST

176 SF

VEST

170 SF

CLASSROOM

695 SF

OFF

400B

FREEZER

400A

REFIG

400C

STO

KITCHEN PREP

VEST

118D

OFF

118E

CONFERENCE

118G

IT OFFICE

118F

SERVER ROOM

112C

OFF

112E

HUMAN RESOURCES SERVICE

112A

OFF

OFF

109C

OFF

314A

WEIGHT RM

922 SF

314B

OBSERVATION

1,226 SF

RAQUETBALL - COURT F

810 SF

RAQUETBALL - COURT E

810 SF321

RAQUETBALL - COURT D

840 SF

MEN

259 SF

CORRIDOR

483 SF

JAN

128 SF

320C

STO

24 SF

320B

EQUIP

87 SF

320A

SHOWERS

367 SF

MEN'S LOCKER

666 SF

305C

STO

23 SF

305B

EQUIP

87 SF

305A

SHOWERS

369 SF

WOMEN'S LOCKER

672 SF

WOMEN

263 SF

COURT A

803 SF

803 SF

813 SF

WEIGHT RM

1,265 SF

OFF

211 SF

CLASSROOM

598 SF

OFF

159 SF

MECH

342 SF

STORAGE

228 SF

OFF

111 SF

OFF

111 SF

VEST

229 SF

322B

STAIR

132 SFCORRIDOR

2,315 SF

CHECK IN

570 SF

GYMNASIUM / HEALTH AND FITNESS CENTER

7,981 SF

AEROBIC STUDIO

1,675 SF

VEST

102 SF

CLASSROOM

757 SF

CLASSROOM

776 SF

CORRIDOR

2,163 SF

STO

226 SF

460B

STORAGE

461A

OPEN OFFICE

462B

OFFICE

463A

RECEPTION

CLASSROOM

772 SF

OFFICE

244 SF

LAB

856 SFCORR

180 SF

CORRIDOR

755 SF

CORR

197 SF

ITV LAB

722 SF

INTER ACTIVE LAB

999 SF

CONTROL

410 SF

MULTI-MEDIA LAB

899 SF

MAINT

207 SF

AEROBIC LAB

682 SF

CORRIDOR

CLASSROOM

VEST

166 SF

CORRIDOR

647 SF

FLIGHT TRAINING

CHECK-IN

244 SF

CORRIDOR

540 SF

364C

STAIR

171 SF

STO

128 SF

JAN

98 SF

CORRIDOR

498 SF

OFFICE

499 SF

367D

SHOWER

101 SF

367C

DRYING

103 SF

367B

LOCKERS

210 SF

MEN

63 SF367

MEN'S LOCKER

337 SF

VEST

94 SF

VEST

94 SF

VEST

89 SF

VEST

87 SF

368A

WOMEN

59 SF

WOMEN'S LOCKER

323 SF

368C

SHOWERS

211 SF368B

LOCKERS

220 SF

WOMEN

471 SF

VEST

25 SF

VEST

28 SF

MEN

327 SF

POOL EQ

325 SF

369A

MECH

14 SF

369B

MECH

15 SF

POOL

5,023 SF

VEST

STO

PRES OFF

MAINT

128A

MECH

128B

BOILER

127B

STO

127A

CONFERENCE

MARKETING OFF

LAVLAV

WOMENMEN HALL

SEC / RECEP

134D

STO

134B

OFF

134A

OFF

134C

OFF

136C

OFF

136D

OFF

136B

OFF

136A

OFF

CORRIDOR

STAIR

SEC / RECP

138E

FILE

DR. H. A. MILLER STUDENT SERVICES CENTER

138G

STORAGE/ELEC

138I

STO

STO STAIR

MEN WOMEN

142A

STO

TRIO

STAIR

COMMONS

138L

INFO

138J

ADMISSIONS

138K

RECORDS

CORRIDOR

HALL HALL

141I

OFF

141H

OFF

141G

OFF

141F

OFF

141E

WK RM

141D

OFF

141C

OFF

141B

OFF

141A

OFF

FACULTY OFFICE

VEST

CORRIDOR

CLASSROOM

101A

STO

102A

STO

CLASSROOM

104A

STO

103A

STO

103B

STO

UPWARD BOUND

VEST

JAN

LAV

WOMEN

LAVMEN

TESTING LAB

108B

OFF

108A

STO

116B

STO

109B

OFF

109A

OFF 112F

STO

TESTING LAB

110A

MACHINE RM

SECURITY

DR. JAMES H. TURNER BUSINESS SERVICE CENTER

MAINT.

112B

OFF

112D

STO

116A

OFF

WOMENMEN

LAVLAV

HALL

CORRIDOR

STAIR

SNACK BAR

125A

STO

TOILET

HALL

STO

BANNER ROOM

OFFICE

HALL

118A

OFF

118B

OFF

118C

OFF

INFORMATION TECHNOLOGY

CLASSROOM

1,019 SF

CLASSROOM

1,056 SF

ELEC

65 SF

410B

STO

410A

OFF

INDUSTRIAL TECHNOLOGY

1,750 SF

CORRIDOR

1,959 SF

CORRIDOR

325 SF

STO

CORRIDOR

SHIPPING & RECEIVING

403H

WK RM

141 SF

403G

OFF

100 SF

403F

OFF

101 SF403E

OFF

113 SF

403D

OFF

100 SF

403C

OFF

112 SF

403B

OFF

100 SF

403A

OFF

99 SF

FACULTY OFFICE

244 SF

CORRIDOR

435 SF

VEST

76 SF

MAINT.

289 SF

CONF

375 SF

406A

LAV

62 SF

407A

LAV

62 SF

MEN'S TOILETS

140 SF

WOMEN'S TOILETS

100 SF

409B

GRAPHICS / PRINTING

409A

STO

178 SF

411A

STO

126 SF

DRAFTING

1,145 SF

CLASSROOM

1,019 SF

VEST

105 SF

CORRIDOR

902 SF

415B

OFF

100 SF

EQUIP

59 SF

415A

OFF

100 SF

415C

STO

205 SF

415D

EQUIP

89 SF

415E

STO

100 SF

415A

TUTORING CENTER

4,464 SF

CORRIDOR

1,251 SF

CORR

327 SF

FACULTY OFFICE

546 SF

509E

OFF

127 SF

509D

OFF

146 SF

509C

OFF

131 SF

509B

OFF

135 SF

509A

OFF

134 SF

509H

OFF

136 SF

509G

OFF

132 SF

509F

OFF

147 SF

512A

PROJECTION

64 SF

BOARD RM

1,215 SF

VEST

86 SF

TV PROD

391 SF

CLASSROOM

965 SF

CLASSROOM

968 SF

JAN

STO

181 SF

PHOTO LAB

875 SF

WKRM

368 SF

540D

LIGHT LOCK

148 SF

540C

STO

28 SF

540B

FILMLOAD

28 SF

531A

STO

119 SF

CLASSROOM

969 SF

CLASSROOM

873 SF

CORR

1,029 SF

LOBBY

1,156 SF

146A

OFF

EULA MAE EDWARDS MUSEUM

146B

STO

SEMINAR

SEMINAR

CLASSROOM

CLASSROOM

VEST

340 SF

VEST

201 SF

151A

EDUCATIONAL SERVICES

151E

OFFICE

151C

CONF

152A

OPEN OFFICE

CORR

1,437 SF

VEST

363 SF

155B

DRESS

171 SF

155A

DRESS

221 SF

STAGE

2,264 SF

DR. JAY GURLEY TOWN HALL

2,759 SF

VEST

308 SF

CLASSROOM

552 SF

164C

TOOLS

98 SF

TOOLS

98 SF

157A

OFF

98 SF

157B

STO

132 SF

157C

MAINT. OFFICE

166 SF

PLANT MAINT

2,533 SF

COATS

135 SF

JAN

71 SF

GREEN RM

250 SF

CLASSROOM

552 SF

164A

OFF

98 SF

164B

STO

392 SF

CORR

550 SF

CORR

784 SF

CORR

451 SF

MEN

168 SF

WOMEN

188 SF

LAV

LAV

MEN

WOMEN

BLDG CONSTRUCTION

3,071 SF

WOMEN

72 SF

MEN

100 SF

STO

172 SF

HALL

164 SF

CLASSROOM

554 SF

167A

OFF

99 SF

167B

STO

444 SF

AUTOMOTIVE TECHNOLOGY

6,498 SF

DRAWING LAB

1,231 SF

STO

73 SF

STO

73 SF

WORK ROOM

542 SF

PAINTING LAB

1,249 SF

CORRIDOR

590 SF

WINDOWS GALLERY

1,493 SF

VEST

98 SF

STO

180 SF

517A

STO

149 SF

LAV

167 SF

MEN

134 SF

WOMEN

134 SF

CERAMIC LAB

1,652 SF

517B

KILN

419 SF

LOCKERS

LOCKERS

OFF

409A

GRAPHICS / PRINTING

"MILLENNIUM" COURTYARD

COURT B

COURT C

415B

MATH EMPORIUM

PATIO

STORAGE

460A

OPEN OFFICE

461B

OPEN OFFICE

462A

STORAGE

463B

OFFICE

463C

OFFICE

463D

OFFICE

463E

OFFICE

410C

OFF

152B

OFFICE

152C

OFFICE

151B

OFFICE

151C

OFFICE

151D

OFFICE

603C

OFFICE

603D

OFFICE

RECEPTION

CLASSROOM

603B

OFFICE

603A

OFFICE

CONFERENCE ROOM

PTA LAB

604A

SIM ROOM

604B

WORKROOM

604C

WORKROOM

E QP T P LA TFORM

ME ZZ P LA TFORM

OP E N TO B E LOW

UP P ER B OOK S TORE

(OP E N TO B E LOW )

ME ZZ P LA TFORM

ME ZZ P LA TFORM

UP P ER LRC

(OP E N TO B E LOW )

UP P E R COMMONS

(OP E N TO B E LOW )

UP P ER COURT

(OP E N TO B E LOW )

JA NITOR

UP P ER COURT

(OP E N TO B E LOW )

UP P ER COURT

(OP E N TO B E LOW )

CUT LINE

CUT LINE

CUT LINE

LAB

2227 SF

LAB

3200 SF

LAB

1600 SF

LAB

1000 SF

LAB

721 SF

LAB

856 SF

LAB

1330 SF

LAB

2703 SF

LAB

1543 SF

LAB

683 SF

FITNESS

3600 SF

FITNESS

13,320 SF

BUSINESS, B

2940 SF

CLASSROOM

600 SF

CLASSROOM

4203 SF

CLASSROOM

2091 SF

CLASSROOM

3818 SF

CLASSROOM

755 SF

LAB

2155 SF

CLASSROOM

717 SF

CLASSROOM

777 SF

MECHANICAL

386 SF

CLASSROOM

2022 SF

CLASSROOM

1215 SF

POOL, A-3

5023 SF

OBSERVATION, B

816 SF

LAB

1682 SF

GYM, A-3

8064 SF

STORAGE, S-1

1397 SF

MECHANICAL

300 SF

BUSINESS, B

5758 SF

BUSINESS, B

8603 SF

BUSINESS, B

10420 SF

BUSINESS, B

9203 SF

BUSINESS, B

435 SF

159'-5"

50 Occupants

165 Capacity

235 Occupants

330 Capacity

214'-7"164'-8"

141'-7"155'-0"

234 Occupants

330 Capacity

160 Occupants

330 Capacity

160 Occupants

330 Capacity

141'-1"

194'-7"330 Occupants

330 Capacity

202'-7"

202 Occupants

330 Capacity 196'-5"

161'-1"

155 Occupants

330 Capacity

IF THE GYM IS USED FOR EVENTS

SUCH AS GRADUATIONS, ETC. WHERE

SEATING IS PROVIDED IT MUST BE

LIMITED TO 299 OCCUPANTS OR THIS

BUILDING WILL BE REQUIRED TO BE

FIRE SPRINKLERED.

118'-3"

221 Occupants

330 Capacity

176'-2" 165 Occupants

165 Capacity

178'-9"

221 Occupan

330 Capacity

101 Occupants

330 Capacity

PHASE 4

PHASE 5

PHASE 6

PHASE 3

PHASE 1

PHASE 2

SKILLS

DVLP. CNTR.

CUT LINE

CUT LINE

CUT LINE

RAQUETBALL ADDITION

PHASE 4

SUMMARY OF TOTAL AREAS ON FIRST FLOOR

BUSINESS, B = 37,362 SF

CLASSROOM, B = 16,198 SF

LAB, B = 19,700 SF

FITNESS, B = 17,210 SF

OBSERVATION, B = 816 SF

GYM, A-3 = 8,064 SF

STORAGE, S-1 = 1,397 SF

MECHANICAL, B = 417 SF

TOTALS: 106,187 SF

PHASE 6 EAST SUMMARY OF TOTAL AREAS ON FIRST FLOOR

BUSINESS, B = 9,203 SF

CLASSROOM, B = 1,494 SF

LAB, B = 8,836 SF

FITNESS, B = 3,600 SF

POOL, A-3 = 5,023 SF

MECHANICAL, B = 300 SF

TOTALS: 28,456 SF

PHASE 5 SUMMARY OF TOTAL AREAS ON FIRST FLOOR

BUSINESS, B = 8,603 SF

CLASSROOM, B = 5,033 SF

LAB, B = 7,027 SF

TOTALS: 20,663 SF

PHASE 3 & 6 WEST SUMMARY OF TOTAL AREAS ON FIRST FLOOR

BUSINESS, B = 8,698 SF

CLASSROOM, B = 1,355 SF

LAB, B = 1,682 SF

FITNESS, B = 13,320 SF

GYM, A-3 = 8,064 SF

OBSERVATION, B = 816 SF

MECHANICAL, B = 386 SF

TOTALS: 34,321 SF

PHASE 4 SUMMARY OF TOTAL AREAS ON FIRST FLOOR

BUSINESS, B = 10,855 SF

CLASSROOM, B = 8,316 SF

LAB, B = 2,155 SF

STORAGE, S-1 = 1,397 SF

TOTALS: 22,723 SF

EXISTING AUTOMATIC SPRINKLER SYSTEM

PROVIDED IN THIS AREA

INTENDED TO BE 2-HR FIRE SEPARATION WALL, PER

PHASE 6 DRAWINGS, SHEET G-5

EXTENT OF 1-HOUR CORRIDOR SYSTEM REQUIRED

IN NON-FIRE SPRINKLED BUILDING. VERIFY WALL

ASSEMBLY, COMPLETENESS OF WALL AND CEILING

RATED CONSTRUCTION, OPENING PROTECTION,

DOORS AND SEALS, FIRE DAMPERS THROUGH

WALLS AND FIRE PENETRATIONS

TRAVEL DISTANCE MEASUREMENT

CLASSROOMS > 950 SF HAVE AN OCCUPANT LOAD

OF 50+ WHICH REQUIRES TWO SEPARATED EXIT

ACCESS DOORS WITH PANIC HARDWARE.

LEGEND

29'-3"

Current Issue:

S B

G P

R O

J E

C T

S \9

.2

C

L O

V

IS

C O

M M

U N

IT

Y

C O

L L E

G E

D E

S

IG

N O

F F

IR

E

A L A

R M

A N

D S

P R

IN

K

L E

R U

P G

R A

D E

S \C

A D

\B G

C E

C A

D \9

.2

C

.0

.D W

G

A L B

U Q

U E

R Q

U E

A

V O

N |D

E N

V E

R F

O R

T C

O L L

IN

S

.2

.3 w w w ˛b g b u ild in g w o rk s ˛c o m

F

IR

E A

L A

R M

A N

D S

P R

IN

K

L E

R S

Y S

T E

M U

P G

R A

D E

S S

C H

E P

P S

B L V

D

C L O

V

IS

N

E W

M E

X

IC

O

C L

O V

IS

C

O M

M U

N

IT

Y C

O L

L E

G E

Designed:

Reviewed:

Project No:

SEAL

Issued:

Scale: As Shown

Sheet Title:

Sheet No:

Date:

© 2020 BG BUILDINGWORKS INC.

P R O G

R E S S

P R

IN

T N O T F

O R

C O N S

TR

U C

TIO

N

KEY PLAN

GJN

JPH/AJL/ELR

PROGRESS SET

A0.2

CODE

PLAN-MAIN

BUILDING EAST

02/02/22

JPH21146

02/02/22

1/16" = 1'-0"1

CODE PLAN LEVEL ONE EAST

SEE A0.0 FOR

UP PE R SNACKB AR

(OP EN TO B E LOW )

UP PE R B OOKS TORE

(OP EN TO B E LOW )

UP PE R S TU S V C CE NTE R

(OP EN TO B E LOW )

UP PE R COMMONS

(OP EN TO B E LOW )

UPPER COURT

(OPEN TO BELOW)

UPPER COURT

(OPEN TO BELOW)

UPPER COURT

(OPEN TO BELOW)

A /H P LA TFORM NO. 2 A /H P LA TFORM NO. 1

A /H P LA TFORM NO. 4

2X X

543A

MECH MEZZ

1,043 SF

543B

ELEC RM

81 SF

224225

MAINT. CLOSET

769 SF

201A

S TO

S CIENCE LA B

FA CULTY OFFICE

202D

202C

OFF

202A

OFF

202B

OFF

S CIENCE LA B

CORR

203A

S TO

206A

S TO

CLA S SROOM

W OME N

ME N

CLA S SROOM

COMMONS

S CIENCE LA B

211D

S TO

211C

S TO

211B

OFFICE

211A

OFFICE

P REP

S CIENCE LA B

P HOTO LA B

213B

213A

P REP

CORRIDOR

ME N

W OME N

MUS IC

CLA S SROOM

CLA S SROOM

CORR

CORRIDOR

CLA S SROOM

CLA S SROOM

CLA S SROOM

MAINT. CLOSET

372A

MECH MEZZ

AEROBICS/DANCE LAB

301A

MAINT. CLOSET

372C

S TORA GE

S TORA GE

UPPER SNACKBAR

(OPEN TO BELOW)

UPPER BOOKSTORE

(OPEN TO BELOW)

UPPER STU SVC CENTER

(OPEN TO BELOW)

UPPER COMMONS

(OPEN TO BELOW)

A/H PLATFORM NO. 2 A/H PLATFORM NO. 1

A/H PLATFORM NO. 4

2XX

224225

201A

STO

SCIENCE LAB

FACULTY OFFICE

202D

202C

OFF

202A

OFF

202B

OFF

SCIENCE LAB

CORR

203A

STO

206A

STO

CLASSROOM

WOMEN

MEN

CLASSROOM

COMMONS

SCIENCE LAB

211D

STO

211C

STO

211B

OFFICE

211A

OFFICE

PREP

SCIENCE LAB

PHOTO LAB

213B

213A

PREP

CORRIDOR

MEN

WOMEN

MUSIC

CLASSROOM

CLASSROOM

CORR

CORRIDOR

CLASSROOM

CLASSROOM

CLASSROOM

STORAGE

STORAGE

UPPER COURT

(OPEN TO BELOW)

UPPER COURT

(OPEN TO BELOW)

UPPER COURT

(OPEN TO BELOW)

MAINT. CLOSET

769 SF

MAINT. CLOSET

372A

MECH MEZZ

AEROBICS/DANCE LAB

301A

MAINT. CLOSET

372C

543A

MECH MEZZ

1,043 SF

543B

ELEC RM

81 SF

PHASE 3

PHASE 1

PHASE 2

SKILLS

DVLP. CNTR.

PHASE 1

PHASE 2

SKILLS

DVLP. CNTR.

PHASE 4

PHASE 5

PHASE 6

PHASE 4

RAQUETBALL ADDITION

OPEN TO BELOW OPEN TO BELOW

OPEN

OPEN OPEN

OPEN

LAB, L

2166 SF

BUSINESS, B

7580 SFCLASSROOM, C

1567 SF

CLASSROOM, C

2270 SF

CLASSROOM, C

1981 SF

MECH, M

6318 SF

MECH, M

1910 SF

LAB, L

834 SF

LAB, L

2462 SF

BUSINESS, B

263 SF

ABOVE @ ROOF

269'-11"

214'-6"

244'-0"

178'-6"

165'-9"

201'-11"

127 Occupants

270 Capacity

127 Occupants

270 Capacity

127 Occupants

270 Capacity

209'-1"

MECHANICAL, M

634 SF

MECHANICAL, M

723 SF

MECHANICAL, M

833 SF

LAB, L

2294 SF

BUSINESS, B

1297 SF

33 Occupants

270 Capacity

34 Occupants

270 Capacity

166'-9"

186'-8"

MECHANICAL, M

1130 SF

4 Occupants

Ships Ladder

PHASES 1 & 2: SUMMARY OF TOTAL AREAS ON UPPER FLOOR

BUSINESS, B = 7,843 SF

CLASSROOM, B = 5,818 SF

LAB, B = 5,462 SF

MECHANICAL, B = 8,228 SF

TOTALS: 27,351 SF

EXISTING AUTOMATIC SPRINKLER SYSTEM

PROVIDED IN THIS AREA

INTENDED TO BE 2-HR FIRE SEPARATION WALL, PER

PHASE 6 DRAWINGS, SHEET G-5

EXTENT OF 1-HOUR CORRIDOR SYSTEM REQUIRED

IN NON-FIRE SPRINKLED BUILDING. VERIFY WALL

ASSEMBLY, COMPLETENESS OF WALL AND CEILING

RATED CONSTRUCTION, OPENING PROTECTION,

DOORS AND SEALS, FIRE DAMPERS THROUGH

WALLS AND FIRE PENETRATIONS

TRAVEL DISTANCE MEASUREMENT

CLASSROOMS > 950 SF HAVE AN OCCUPANT LOAD

OF 50+ WHICH REQUIRES TWO SEPARATED EXIT

ACCESS DOORS WITH PANIC HARDWARE.

LEGEND

29'-3"

Current Issue:

S B

G P

R O

J E

C T

S \9

.2

C

L O

V

IS

C O

M M

U N

IT

Y

C O

L L E

G E

D E

S

IG

N O

F F

IR

E

A L A

R M

A N

D S

P R

IN

K

L E

R U

P G

R A

D E

S \C

A D

\B G

C E

C A

D \9

.2

C

.0

.D W

G

A L B

U Q

U E

R Q

U E

A

V O

N |D

E N

V E

R F

O R

T C

O L L

IN

S

.2

.3 w w w ˛b g b u ild in g w o rk s ˛c o m

F

IR

E A

L A

R M

A N

D S

P R

IN

K

L E

R S

Y S

T E

M U

P G

R A

D E

S S

C H

E P

P S

B L V

D

C L O

V

IS

N

E W

M E

X

IC

O

C L

O V

IS

C

O M

M U

N

IT

Y C

O L

L E

G E

Designed:

Reviewed:

Project No:

SEAL

Issued:

Scale: As Shown

Sheet Title:

Sheet No:

Date:

© 2020 BG BUILDINGWORKS INC.

P R O G

R E S S

P R

IN

T N O T F

O R

C O N S

TR

U C

TIO

N

KEY PLAN

GJN

JPH/AJL/ELR

PROGRESS SET

A0.3

CODE

PLAN-MAIN

BUILDING L2

02/02/22

JPH21146

02/02/22

1/16" = 1'-0"1

CODE PLAN LEVEL TWO, PHASE 1

1/16" = 1'-0"2

CODE PLAN LEVEL TWO, PHASE 3

1/16" = 1'-0"3

CODE PLAN LEVEL TWO, PHASE 5

SUMMARY OF TOTAL AREAS PHASE 3

LAB, B = 2,294 SF

MECHANICAL, B = 2,190 SF

BUSINESS, B = 1,297 SF

TOTALS = 5,781 SF

SUMMARY OF TOTAL AREAS PHASE 5

MECHANICAL, B = 1,130 SF

TOTALS: 1,130 SF

SEE A0.0 FOR

604F

HALL

65 SF

189H

CHEMICAL ROOM

326 SF

189G

WASHERS

164 SF

189F

NAIL ROOM

296 SF

COSMETOLOGY CLINIC

2,067 SF

189E

FACIALS

133 SF

189D

OFF

180 SF

189B

SEC / RECP

91 SF

189C

WAITING

203 SF

HALL

226 SF

189A

OFF

279 SF

VEST

179 SF

WOMEN

301 SF

MAINT.

235 SF

MEN

170 SF

PHASE 2 LAB

794 SF

188A

STO

121 SF

187A

STO

120 SF

PHASE 1 LAB

797 SF

CLASSROOM

1,624 SF

CORR

1,289 SF

VEST

184 SF

WOMEN

133 SF

MEN

122 SF

DANCE LAB

1,876 SF

183A

STO

144 SF

JAN

56 SF

LAV

62 SF

LAV

57 SF

MAINT

50 SF

SEMINAR

197 SF

HALL

139 SF

CORR

548 SF

VEST

88 SF

CLASSROOM

900 SF

CLASSROOM

849 SF

CLASSROOM

888 SF

UPDN

CLASSROOM

2656 SF

-- OCCUPANTS

LAB

1904 SF

-- OCCUPANTS

CLASSROOM

1644 SF

-- OCCUPANTS

LAB

1890 SF

-- OCCUPANTS

LAB

3535 SF

-- OCCUPANTS

MECHANICAL

235 SF

-- OCCUPANTS

BUSINESS, B

4531 SF

-- OCCUPANTS

OPEN MECHANICAL

AREA w/ ROOF

COVERNING & FENCING

25' - 6"

92 Occupants

330 Capacity

118'-0" 100'-10"

113 Occupants

330 Capacity

70'-6"

36 Occupants

165 Capacity

91'-3"

135 Occupants

330 Capacity

96'-3"

Applicable Codes:

2015 International Building Code (IBC) 2015 International Existing Building Code (IEBC) 2015 International Mechanical Code (IMC) 2015 International Fuel Gas Code (IFGC) 2015 International Plumbing Code (IPC) 2015 International Fire Code (IFC) ICC A117.1-2009 Accessibility Standards (I/A)

A) Occupancy Classification: B (Classrooms/Educational Labs)

B) Type of Construction: II-B Non Fire-Sprinkled (NFPA 13) **

C) Location on Property:

North - > 30’ South- >30’ East - > 30’ West- > 30’

A 75% increase in Allowable Area is permitted based on the yards indicated above.

D) Allowable Floor Area: B in II-B Frontage Increase = .75 increase per IBC 506.3 Allowable Area = 23,000(basic) > 16,395 sf OK (Frontage increase not required)

E) Height & No. of Stories:

Height = 15’ < 55’ OK No. of Stories = 1 < 3 OK

F) Occupant Load Count:

Room Name Area(sf) Occupant Load Factor Occupant Load Count

Classroom 182 900 20 45 Classroom 184 849 20 43 Classroom 185 888 20 45 Classroom 186 1624 20 82 Labs 187/188 1890 50 38 Lab 189 3535 50 71 Dance Lab 183 1904 50 39 Seminar 181 197 20 10 Storage 183A 144 300 1 Office 189A 279 150 2

Total 376

G) Toilet Fixture Count:

376 occupants >> 188 male, 188 female

Male Female

Fixture Required Provided Required Provided Water Closets 1/50 = 4 4 1/50 = 4 11 Urinals 6 Lavatories 1/50 = 4 5 1/50 = 4 7 Drinking Fountain 1* 4 Service Sink 1 1

*Sufficient drinking fountains are not provided as required by IBC 2902. Also note that none of the toilet facilities appear to be Accessible as required by IBC 1109.2.

H) Travel Distance Occupancy Max Allowable Travel Distance(NS) Max Noted

B 200’ 113’

Cosmetology Building Code Analysis

EXISTING AUTOMATIC SPRINKLER SYSTEM

PROVIDED IN THIS AREA

INTENDED TO BE 2-HR FIRE SEPARATION WALL, PER

PHASE 6 DRAWINGS, SHEET G-5

EXTENT OF 1-HOUR CORRIDOR SYSTEM REQUIRED

IN NON-FIRE SPRINKLED BUILDING. VERIFY WALL

ASSEMBLY, COMPLETENESS OF WALL AND CEILING

RATED CONSTRUCTION, OPENING PROTECTION,

DOORS AND SEALS, FIRE DAMPERS THROUGH

WALLS AND FIRE PENETRATIONS

TRAVEL DISTANCE MEASUREMENT

CLASSROOMS > 950 SF HAVE AN OCCUPANT LOAD

OF 50+ WHICH REQUIRES TWO SEPARATED EXIT

ACCESS DOORS WITH PANIC HARDWARE.

LEGEND

29'-3"

GJN

JPH/AJL/ELR

Current Issue:

S B

G P

R O

J E

C T

S \9

.2

C

L O

V

IS

C O

M M

U N

IT

Y

C O

L L E

G E

D E

S

IG

N O

F F

IR

E

A L A

R M

A N

D S

P R

IN

K

L E

R U

P G

R A

D E

S \C

A D

\B G

C E

C A

D \9

.2

C

.0

.D W

G

A L B

U Q

U E

R Q

U E

A

V O

N |D

E N

V E

R F

O R

T C

O L L

IN

S

.2

.3 w w w ˛b g b u ild in g w o rk s ˛c o m

F

IR

E A

L A

R M

A N

D S

P R

IN

K

L E

R S

Y S

T E

M U

P G

R A

D E

S S

C H

E P

P S

B L V

D

C L O

V

IS

N

E W

M E

X

IC

O

C L

O V

IS

C

O M

M U

N

IT

Y C

O L

L E

G E

Designed:

Reviewed:

Project No:

SEAL

Issued:

Scale: As Shown

Sheet Title:

Sheet No:

Date:

© 2020 BG BUILDINGWORKS INC.

P R O G

R E S S

P R

IN

T N O T F

O R

C O N S

TR

U C

TIO

N

PROGRESS SET

A0.4

JPH21146

CODE PLAN -

COSMETOLOGY

CLASSROOM

02/02/22

02/02/22

1/8" = 1'-0"1

CODE PLAN COSMETOLOGY CLASSROOM

SUMMARY OF TOTAL AREAS

BUSINESS = 4,531 SF

CLASSROOM = 4,300 SF

LAB = 7,329 SF

MECHANICAL = 235 SF

TOTALS: 16,395 SF

CLASSROOM

725 SF

HVAC

LOCKERS

157 SF

JAN

25 SF

TOILET

27 SF

HALL

34 SF

PUMP ROOM

101 SF

ENTRY

162 SF

OFF

100 SF

TOOLS

119 SF

STO

87 SF

MECH

62 SF

WELD

4,914 SF

110A

TOOLS

110B

STORAGE

EXTERIOR COMPRESSOR SHED

HAZARDOUS, H

8107 SF

CLASSROOM

828 SF

MECHANICAL

62 SF

STORAGE, S-1

1680 SF

52'-2"

40 Occupants

330 Capacity

74'-9" 41 Occupants

330 Capacity

65'-8" 41 Occupants

330 Capacity

83'-0"

5 Occupants

165 Capacity

57'-0" 42 Occupants

165 Capacity

79'-7" 40 Occupants

330 Capacity

Applicable Codes:

2015 International Building Code (IBC) 2015 International Existing Building Code (IEBC) 2015 International Mechanical Code (IMC) 2015 International Fuel Gas Code (IFGC) 2015 International Plumbing Code (IPC) 2015 International Fire Code (IFC) ICC A117.1-2009 Accessibility Standards (I/A)

A) Occupancy Classification: H-2 (Welding Shop)* S-1 (Storage)

Non-Separated Use B (Classroom) *The H-2 designation is provided based on the apparent presence of flammable gas containers estimated to be in excess of the 1,000 cf limit per IBC Table 307.1(1). If the building is fire sprinklered this can be increased to 2,000 cf and the building would be considered as an F-1 occupancy. Alternately the quantities of flammable gasses can be restricted to 1,000 cf to allow the F-1 occupancy. College could provide exact quantities of all flammable gas and other hazardous contents within the building for further study if desired, to verify H-1 occupancy. We recommend further investigation to pursue this approach.

B) Type of Construction: III-B Non Fire-Sprinkled* (NFPA 13)

*A fire sprinkler system is required per IBC 903.2.5 for a building containing a Group H occupancy. It is only required in an F-1 occupancy with a fire area in excess of 12,000

sf. As such a fire sprinkler system would not be required in this building if the flammable gas containers were limited to 1,000 cf. We recommend further investigation to pursue this approach.

C) Location on Property:

North - > 30’ South- >30’ East - > 30’ West- > 30’

A 75% increase in Allowable Area is permitted based on the yards indicated above.

D) Allowable Floor Area: H-2 in III-B Frontage Increase = .75 increase per IBC 506.3 Allowable Area = 7,000(basic) + 7,000 x .75(f) = 12,250 sf/flr > 10,677 sf OK

E) Height & No. of Stories:

Height = 18’ < 55’ OK No. of Stories = 1 = 1 OK

F) Occupant Load Count:

Room Name Area(sf) Occupant Load Factor Occupant Load Count

Storage 1,680 300 6 Classroom 828 20 42 Welding Shop 8107 50 162

Total 210

G) Toilet Fixture Count:

210 occupants >> 105 male, 105 female

Male Female

Fixture Required Provided Required Provided Water Closets 1/50 = 2 2 1/50 = 2 1* Urinals 2 Lavatories 1/50 = 2 2 1/50 = 2 1* Drinking Fountain 0* 1 Service Sink 1 1

*Sufficient women’s toilet facilities and drinking fountains are not provided as required by IBC 2902. Also note that none of the toilet facilities appear to be Accessible as required by IBC 1109.2. See also attached Narrative under separate cover.

H) Travel Distance Occupancy Max Allowable Travel Distance(NS) Max Noted

S-1 200’ 83’ B 200’ 57’ H-2 100’ 83’ F-1 200’ 83’

Welding Building Code Analysis

EXISTING AUTOMATIC SPRINKLER SYSTEM

PROVIDED IN THIS AREA

INTENDED TO BE 2-HR FIRE SEPARATION WALL, PER

PHASE 6 DRAWINGS, SHEET G-5

EXTENT OF 1-HOUR CORRIDOR SYSTEM REQUIRED

IN NON-FIRE SPRINKLED BUILDING. VERIFY WALL

ASSEMBLY, COMPLETENESS OF WALL AND CEILING

RATED CONSTRUCTION, OPENING PROTECTION,

DOORS AND SEALS, FIRE DAMPERS THROUGH

WALLS AND FIRE PENETRATIONS

TRAVEL DISTANCE MEASUREMENT

CLASSROOMS > 950 SF HAVE AN OCCUPANT LOAD

OF 50+ WHICH REQUIRES TWO SEPARATED EXIT

ACCESS DOORS WITH PANIC HARDWARE.

LEGEND

29'-3"

GJN

JPH/AJL/ELR

Current Issue:

S B

G P

R O

J E

C T

S \9

.2

C

L O

V

IS

C O

M M

U N

IT

Y

C O

L L E

G E

D E

S

IG

N O

F F

IR

E

A L A

R M

A N

D S

P R

IN

K

L E

R U

P G

R A

D E

S \C

A D

\B G

C E

C A

D \9

.2

C

.0

.D W

G

A L B

U Q

U E

R Q

U E

A

V O

N |D

E N

V E

R F

O R

T C

O L L

IN

S

.2

.3 w w w ˛b g b u ild in g w o rk s ˛c o m

F

IR

E A

L A

R M

A N

D S

P R

IN

K

L E

R S

Y S

T E

M U

P G

R A

D E

S S

C H

E P

P S

B L V

D

C L O

V

IS

N

E W

M E

X

IC

O

C L

O V

IS

C

O M

M U

N

IT

Y C

O L

L E

G E

Designed:

Reviewed:

Project No:

SEAL

Issued:

Scale: As Shown

Sheet Title:

Sheet No:

Date:

© 2020 BG BUILDINGWORKS INC.

P R O G

R E S S

P R

IN

T N O T F

O R

C O N S

TR

U C

TIO

N

PROGRESS SET

A0.5

JPH21146

CODE

PLAN-WELDING

BUILDING

02/02/22

02/02/22

1/8" = 1'-0"1

CODE PLAN WELDING BUILDING

SUMMARY OF TOTAL AREAS

CLASSROOM = 828 SF

STORAGE = 1,680 SF

HAZARDOUS = 8,107 SF

MECH = 62 SF

TOTALS: 10,677 SF

100' - 2"

IN

S

ID

E

F A

C E

O F

S T

E E

L

25' - 0" 25' - 0" 25' - 0" 25' - 2"

8' - 10" 8' - 6" 7' - 8"

4' - 9"

12' - 6" 7' - 9" 25' - 0" 6' - 4" 3' - 4" 11' - 6"

4' - 0"

ELEVATED(E)

DIESEL TANK

ELEVATED(E

) GAS TANK

MEZZANINE ABOVE

4070 DOOR

2' - 0"

UP

3' - 0"

CLG. @ EAVE

16' - 4" AFF

CLG. @ RIDGE

17' - 5" AFF

8060 DOOR12' - 6" x 12' OVERHEAD DOOR8' - 6" x 8' OVERHEAD DOOR

(E) COL.

10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 2"

CROSS BRACING, EACH SIDE

STORAGE, S-1

6027 SF

-- OCCUPANTS

100'-10"

7 Occupants

165 Capacity

93'-4" 162'-2"

7 Occupants

165 Capacity

ALTERNATE TO

RELOCATE STAIR

111'-9"

100' - 2"

42' - 1" 7' - 0" 51' - 1"

2' - 0"

DN

OPEN TO BELOW

25' - 0" 25' - 0" 25' - 0" 25' - 2"

(E) COL. BELOW

GATE OPENING

MEZZANINE FLOOR

7' - 9 1/2" AFF

(E) 42" GUARD

(E) MASONITE DECKING

(E

C F

S P

U R

L

IN

S

(E

L x

B E

A M

S T

Y P

STORAGE, S-1

1000 SF

-- OCCUPANTS

Applicable Codes:

2015 International Building Code (IBC) 2015 International Existing Building Code (IEBC) 2015 International Mechanical Code (IMC) 2015 International Fuel Gas Code (IFGC) 2015 International Plumbing Code (IPC) 2015 International Fire Code (IFC) ICC A117.1-2009 Accessibility Standards (I/A)

A) Occupancy Classification: S-1 (Moderate Hazard Storage)

B) Type of Construction: II-B Non Fire-Sprinkled (NFPA 13)

C) Location on Property:

North – Approx 13’-6” to Maintenance Building* South- >30’ East - > 30’ West- > 30’

D) Allowable Floor Area: S-1 in II-B Allowable Area = 17,500(basic) > 6,027 sf OK (Frontage increase not required)

Note that the mezzanine does not contribute to the building area or number of stories per IBC 505.2.

*Note that the Maintenance Building and the Storage Building are limited in size such that they may be considered as a single building per IBC 707.3 exception 1.

Aggregate Area for both buildings, 17,500(basic) > 8,232 sf OK (Frontage increase not required) As such there are no wall and opening protection requirements between the two buildings.

E) Height & No. of Stories:

Height = 17’ < 55’ OK No. of Stories = 1 (plus mezzanine) < 2 OK

F) Occupant Load Count:

Room Name Area(sf) Occupant Load Factor Occupant Load Count

Warehouse 6027 500 12 Mezzanine 1000 500 2

Total 14

G) Toilet Fixture Count:

1 WATER CLOSET and 1 LAVATORY required per IBC 2902.

Facilities are provided in adjacent campus facilities within 500’

H) Travel Distance Occupancy Max Allowable Travel Distance(NS) Max Noted

S-1 200’ 162’

Max Allowable Common Path of Travel(NS) Max Noted 100’ 162’ *

*The maximum Common Path of Travel originating on the Mezzanine exceeds the 100’ Limit of IBC 1006.2.1. Considering the 100’ length of the Mezzanine a second stair would need to be added as well as a second exit door from the Warehouse.

Storage Building Code Analysis

EXISTING AUTOMATIC SPRINKLER SYSTEM

PROVIDED IN THIS AREA

INTENDED TO BE 2-HR FIRE SEPARATION WALL, PER

PHASE 6 DRAWINGS, SHEET G-5

EXTENT OF 1-HOUR CORRIDOR SYSTEM REQUIRED

IN NON-FIRE SPRINKLED BUILDING. VERIFY WALL

ASSEMBLY, COMPLETENESS OF WALL AND CEILING

RATED CONSTRUCTION, OPENING PROTECTION,

DOORS AND SEALS, FIRE DAMPERS THROUGH

WALLS AND FIRE PENETRATIONS

TRAVEL DISTANCE MEASUREMENT

CLASSROOMS > 950 SF HAVE AN OCCUPANT LOAD

OF 50+ WHICH REQUIRES TWO SEPARATED EXIT

ACCESS DOORS WITH PANIC HARDWARE.

LEGEND

29'-3"

GJN

JPH/AJL/ELR

Current Issue:

S B

G P

R O

J E

C T

S \9

.2

C

L O

V

IS

C O

M M

U N

IT

Y

C O

L L E

G E

D E

S

IG

N O

F F

IR

E

A L A

R M

A N

D S

P R

IN

K

L E

R U

P G

R A

D E

S \C

A D

\B G

C E

C A

D \9

.2

C

.0

.D W

G

A L B

U Q

U E

R Q

U E

A

V O

N |D

E N

V E

R F

O R

T C

O L L

IN

S

.2

.3 w w w ˛b g b u ild in g w o rk s ˛c o m

F

IR

E A

L A

R M

A N

D S

P R

IN

K

L E

R S

Y S

T E

M U

P G

R A

D E

S S

C H

E P

P S

B L V

D

C L O

V

IS

N

E W

M E

X

IC

O

C L

O V

IS

C

O M

M U

N

IT

Y C

O L

L E

G E

Designed:

Reviewed:

Project No:

SEAL

Issued:

Scale: As Shown

Sheet Title:

Sheet No:

Date:

© 2020 BG BUILDINGWORKS INC.

P R O G

R E S S

P R

IN

T N O T F

O R

C O N S

TR

U C

TIO

N

PROGRESS SET

A0.6

JPH21146

CODE

PLAN-STORAGE

BUILDING

02/02/22

02/02/22

3/16" = 1'-0"1

CODE PLAN STORAGE BUILDING RENOVATION

3/16" = 1'-0"2

CODE PLAN STORAGE BUILDING MEZZANINE

SUMMARY OF TOTAL AREAS

STORAGE = 7,027 SF

TOTALS: 7,027 SF

8' - 6" 9' - 2"

2' - 0" 10' - 5"2' - 2" 1' - 8"

3070 DOOR

3070 DOOR

D

O O

R

D

O O

R

(E) INTERIOR

CORRUGATED METAL

SIDING

13' - 10" 10' - 4"

108' - 0"

8"

8"

CLG. @ RIDGE

12' - 0" AFF

CLG. @ EAVE

9' - 10" AFF

10' - 4" x 8' - 0" DOOR 10' - 5" x 8' - 0" DOOR

27' - 0" 27' - 0" 27' - 0" 27' - 0"

3070 DOOR

(E) STORAGE

BUILDING TO THE

NORTH

STORAGE, S-1

1948 SF

-- OCCUPANTS

BUSINESS, B

257 SF

-- OCCUPANTS

47'-7" 57'-10"

11 Occupants

165 Capacity

48'-5"

11 Occupants

165 Capacity

Applicable Codes:

2015 International Building Code (IBC) 2015 International Existing Building Code (IEBC) 2015 International Mechanical Code (IMC) 2015 International Fuel Gas Code (IFGC) 2015 International Plumbing Code (IPC) 2015 International Fire Code (IFC) ICC A117.1-2009 Accessibility Standards (I/A)

A) Occupancy Classification: B (Offices) S-1 (Storage)

B) Type of Construction: II-B Non Fire-Sprinkled (NFPA 13)

C) Location on Property:

North - > 30’ South- Approx 13’-6” to Storage Building* East - > 30’ West- > 30’

D) Allowable Floor Area: S-1 in II-B Allowable Area = 17,500(basic) > 2,205 sf OK (Frontage increase not required)

*Note that the Maintenance Building and the Storage Building are limited in size such that they may be considered as a single building per IBC 707.3 exception 1.

Aggregate Area for both buildings, 17,500(basic) > 8,232 sf OK (Frontage increase not required) As such there are no wall and opening protection requirements between the two buildings.

E) Height & No. of Stories:

Height = 15’ < 55’ OK No. of Stories = 1 < 2 OK

F) Occupant Load Count:

Room Name Area(sf) Occupant Load Factor Occupant Load Count

Maint Shop 1948 100 20 Offices 189 100 2

Total 22

G) Toilet Fixture Count:

22 occupants Note that this is considered as a business occupancy so separate sex facilities are not required with an occupant load less than 25 per IBC 2902.2 exception 4. (Note: 2018

IBC)

Fixture Required Provided Water Closets 1/50 = 1 1 Urinals Lavatories 1/50 = 1 1 Drinking Fountain 1* Service Sink 1

*Sufficient drinking fountains are not provided as required by IBC 2902.

H) Travel Distance Occupancy Max Allowable Travel Distance(NS) Max Noted

B/S-1 200’ 55’

Grounds Maintenance Building Code Analysis

EXISTING AUTOMATIC SPRINKLER SYSTEM

PROVIDED IN THIS AREA

INTENDED TO BE 2-HR FIRE SEPARATION WALL, PER

PHASE 6 DRAWINGS, SHEET G-5

EXTENT OF 1-HOUR CORRIDOR SYSTEM REQUIRED

IN NON-FIRE SPRINKLED BUILDING. VERIFY WALL

ASSEMBLY, COMPLETENESS OF WALL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .