IDNR Statement of Interest_5.pdf
PDF 211 KB Posted
- Attached to
- DNR -QBS Sinnissippi Dam Rehabilitation Plans
- Solicitation number
- 22-422DNR-WTRRE-B-35195
- Issued by
- Vermilion County, Illinois
About this file
The document is a Statement of Interest (SOI) Form for a professional services contract opportunity with the Illinois Department of Natural Resources (IDNR) for the Sinnissippi Dam Rehabilitation Plans project. The services requested include providing engineering services to develop construction and design plans, specifications, Programmable Logic Controller (PLC) code, and operations and maintenance manuals for the rehabilitation of the Sinnissippi Dam in Rock Falls, Whiteside County, Illinois. Interested firms must be prequalified with the Illinois Department of Transportation (IDOT) to submit a statement. The project location has not been determined, and the work will be performed by the prime firm and subcontractors, with percentages of work specified.
The SOI Form requires details on the firm, contact person, BidBuy number, project number, and distance to the project location. It also requests information on the percentage of work to be completed by the prime/joint venture and the percentage to be performed by subcontractors that are certified Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Veteran-Owned Small Business (VOSB), and Service-Disabled Veteran-Owned Small Business (SDVOSB) firms. Relevant project experience, team personnel, and a method for accomplishing the project's objectives must also be provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Submission Conference Sign-in Sheet v.20.1~4.pdf | ||
| Firms Ranking~6.docx | DOCX document | |
| BEP Vendor Directory~3.xlsx | XLSX spreadsheet | |
| VSB Vendor Directory~1.xlsx | XLSX spreadsheet | |
| ipg-active-registered-vendor-disclosure-formerly-forms-b-v.23.1~1.docx | DOCX document | |
| Pre-Bid meeting Web-Ex instructions.docx | DOCX document | |
| QBS-Sinnissippi Dam Solicitation document.docx | DOCX document | |
| BEP UtilizationPlan.pdf | ||
| vendor-disclosure-formerly-forms-a-v.23.3~1.docx | DOCX document | |
| VSB UtilizationPlan~1.pdf | ||
| Notice of Electronic Submission Only v.22.1~27.pdf | ||
| Question and Answer doc~2.docx | DOCX document | |
| Additional Questions and Answers doc.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IL 532 3046
ADM 236 Rev.12/2022 Statement of Interest (SOI) Form Page 1 of 8
Professional Services Qualifications - Statement of Interest (SOI) Form
1. Please Attach Prequalification Letter to SOI Form
2. Firm Name, address, phone & fax numbers
For Joint Venture (JV), include information for all members, design discipline of each member, and percentage (of total design team) of services of each member.
Firm Name:
Address:
Phone:
Fax:
3. Contact Person: Email:
4. BidBuy Number:
Project Number: Description:
5. Approximate distance to project location:
6. Percentage of work to be completed by Prime / JV:
Miles (Enter n/ a if location has not been determined.)
Certified by CMS?: MBE WBE VOSB SDVOSB NA
7. Percentage of work to be performed by Subcontractors that are CMS Certified MBE / WBE firms:
Percentage of work to be performed by Subcontractors that are CMS Certified VOSB / SDVOSB (VBE) firms:
*Percentages shall reflect the total of all Subcontractors that are MBE / WBE and VOSB / SDVOSB (VBE) in item 11.
8. Certifications & Disclosures. Submit Forms A or B.
Form A Form B (only if vendor is registered in the Illinois Procurement Gateway (IPG)) Approved IPG Registration Number:
9. IDNR Standard Business Terms and Conditions Enclosed:
ADM 236 Rev.12/2022 Statement of Interest (SOI) Form Page 2 of 8
10. Team personnel, by discipline, to be designated for this project including all Subcontractors.
Indicate personnel licensed in Illinois. Submit a résumé for each individual listed below in Item 14. Do not include clerical and support staff.
Personal by Discipline
# Assigned to this project
# Licensed in Illinois
Personnel by Discipline to this project
# Licensed in Illinois
Personnel by Discipline to this project
# Licensed in Illinois
Architects Env. Scientist/Technician Surveyors
Asbestos Project Designers Geologists Other:
Civil Engineers Mechanical Engineers Other:
Construction Observers Risk Assessors Other:
Electrical Engineers Structural Engineers Totals
ADM 236 Rev.12/2022 Statement of Interest (SOI) Form Page 3 of 8
11. Subcontractors Please list the Subcontractors that will be performing any portion of basic design services for this project. Any firm providing architectural, engineering, or land surveying must be prequalified with CDB or IDOT. The firms listed below are considered first tier Subcontractors and shall hold a contract directly with the firm submitting this SOI Form. Failure of the Subcontractors providing regulated design services to be prequalified will result in rejection of the Prime A/E’s submittal(s).
Add additional pages if needed.
Firm Name & Address Detailed Scope of Services
Percentage*: Worked with Prime? Prequalification or Registration Number: Certified by CMS?
ADM 236 Rev.12/2022 Statement of Interest (SOI) Form Page 4 of 8
12. Relevant Project Experience On completed projects within the past 10 years, limit to 8 projects for the submitting firm and 4 for each subcontractor.
For prime vendors, only 4 projects can be government and 4 can be from private entities. Of the 4 government projects, only 1 can be for IDNR.
For subcontractors, only 2 projects can be government and 2 can be private entities. Of the 2 government projects, only 1 can be for IDNR. One project per page, add additional pages as needed.
Firm Name:
Project Description & Location
Level of Responsibility & Detailed Description of Services
Project Contact Prime Contact Phone and Fax Number (Subcontractors, identify the Prime A / E.)
Project Start Date:
Project End Date:
Total Project Cost:
Project came in as budgeted?
ADM 236 Rev.12/2022 Statement of Interest (SOI) Form Page 5 of 8
13. Team Personnel Any contract awarded in response to this submittal is conditioned on the qualifications of the firm and the project team individuals as stated below. Therefore, the team listed below shall be assigned to this project if a contract is awarded to the submitting firm. Add additional rows as needed.
Name Project Assignment Associated Firm Individual Professional License(s) or Certification(s)
Licensed or Certified in Illinois?
Yes or No
ADM 236 Rev.12/2022 Statement of Interest (SOI) Form Page 6 of 8
14. Team Personnel Résumés (Add copies of this page as needed for each team member)
(a) Name and Title (b) Project Assignment
(c) Complete Office Address for this Individual (d) Years of Experience with this Firm (with other firms)
(e) Education: Institution / Field of Study / Degree / Year Obtained (f) Active Licenses / Certifications / Type / Year
(g) Specific Relevant Project Experience Including Individual's Level of Responsibility
ADM 236 Rev.12/2022 Statement of Interest (SOI) Form Page 7 of 8
15. Proposed Method of Accomplishing the Project's Objectives
ADM 236 Rev.12/2022 Statement of Interest (SOI) Form Page 8 of 8
16. Commitment to Completing the Work Please list and provide an explanation of all existing projects. Explain the commitment and availability of key personnel and your ability to complete the work in the time required.
17. Form must be signed by the Firm’s President, Vice President, Partner or Sole Owner, Joint Venture Designee or any other person authorized to execute business for the firm/JV.
Printed Name:
Signature: Date:
| 11. Subcontractors |
| 12. Relevant Project Experience |
| 13. Team Personnel |
| 16. Commitment to Completing the Work |
File details come from the government source that posted it. Updated .