Firms Ranking~6.docx
DOCX document 43 KB Posted
- Attached to
- DNR -QBS Sinnissippi Dam Rehabilitation Plans
- Solicitation number
- 22-422DNR-WTRRE-B-35195
- Issued by
- Vermilion County, Illinois
About this file
The document is a notice from the Illinois Department of Natural Resources (IDNR) regarding the ranking of consultants for the Sinnissippi Dam Rehabilitation Plans project. IDNR evaluated one firm, WSP USA, Inc., and its subconsultants, and will begin negotiations for the professional services required to provide engineering services, including the development of construction and design plans, specifications, programmable logic controller (PLC) code, and operations and maintenance manuals for the rehabilitation of the Sinnissippi Dam in Rock Falls, Whiteside County, Illinois. Interested firms must be prequalified with the Illinois Department of Transportation (IDOT) to submit a statement of interest.
The project is funded by the state of Illinois, and the contract will be awarded to the selected consultant firm. No further details are provided regarding pricing terms, set-asides, incumbents, funding requirements or sources, or contract term and renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Submission Conference Sign-in Sheet v.20.1~4.pdf | ||
| BEP Vendor Directory~3.xlsx | XLSX spreadsheet | |
| VSB Vendor Directory~1.xlsx | XLSX spreadsheet | |
| ipg-active-registered-vendor-disclosure-formerly-forms-b-v.23.1~1.docx | DOCX document | |
| Pre-Bid meeting Web-Ex instructions.docx | DOCX document | |
| QBS-Sinnissippi Dam Solicitation document.docx | DOCX document | |
| BEP UtilizationPlan.pdf | ||
| IDNR Statement of Interest_5.pdf | ||
| vendor-disclosure-formerly-forms-a-v.23.3~1.docx | DOCX document | |
| VSB UtilizationPlan~1.pdf | ||
| Notice of Electronic Submission Only v.22.1~27.pdf | ||
| Question and Answer doc~2.docx | DOCX document | |
| Additional Questions and Answers doc.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: June 6, 2023
SUBJECT: Ranking of Consultants – 22-422DNR-WTRRE-B-35195
The Illinois Department of Natural Resources (IDNR) would like to express their gratitude to all firms who submitted a Statement of Interest(SOI) via Bidbuy for IDNR Project Sinnissippi Dam Rehabilitation Plans
After careful consideration of all firms who have submitted their Statement of Interest, IDNR evaluated one (1) firm for consideration.
IDNR will begin negotiations with WSP USA, Inc., and all subconsultants.
Any requests for a debriefing should be submitted to Lisa Bulinski at lisa.bulinski@illinois.gov no later than June 14, 2023 at 4:00 pm (CST).
image1.png
File details come from the government source that posted it. Updated .