05_-_Geotechnical_Report_Addendum_No.1_04302015.pdf
PDF 347 KB Posted
- Solicitation number
- IBM15B0002
About this file
Attachment 5
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J:\41011854 USIBWC - South Bay\017 PROJECT DELIVERABLES\Geotechnical Final Report\2015-04-30 SBIWTP Addendum 1 GeoRept (URS).doc\1-May-15\SDG
URS Group, Inc.
4225 Executive Square, Suite 1600 La Jolla, CA 92037 Tel: 858.812.9292 Fax: 858.812.9293
April 30, 2015
Ms. Lisa Ramirez U.S. International Boundary and Water Commission (USIBWC) 4171 North Mesa, Suite C100 El Paso, Texas 79902-1441
Subject: Addendum No. 1 Geotechnical Investigation Report South Bay International Wastewater Treatment Plant Improvements San Ysidro, California URS Project No. 41011854.01 USIBWC Task Order – IBM14T0013
Dear Ms. Ramirez:
URS Group, Inc. (URS) has prepared this addendum to provide an updated site plan and revise the dimensions of the proposed project features.
URS completed the geotechnical investigation for the project and prepared a report titled “Geotechnical Investigation, South Bay International Wastewater Treatment Plant Improvements, San Ysidro, California,” and dated February 13, 2015.
This addendum presents an updated Site Plan (Figure 2) based on the 90 percent project design submittal. Further, we understand the capacity of the Equalization (EQ) Tanks is 3.75 million gallons. A capacity of 3.5 million gallons was stated in Section 1.1 of our report dated February 13, 2015.
CLOSURE
This letter should be bound with our February 13, 2015 report on all future submittals.
13'
13'
26'
TP-10
TP-9
B-3
B-4
PROPOSED
SSTs
SST EFFLUENT
CHANNEL
PROPERTY LINE
DIRT ROADWAY
RELOCATED
AC ROAD
RELOCATED DIRT
ROADWAY
RELOCATED DIRT
ACCESS ROAD
SLOPE,
2:1 MAX
S S
T N
O . 1
S S
T N
O . 1
S S
T N
O . 1
AC SPILLWAY
RIP RAP
AR-25
29'
31'
51'
55'
E Q
U A
LI
ZA
TI
O
N
TA
N K
N O
. 2
E Q
U
IL
IZ
A
TI
O
N
TA
N K
N O
. 1
HSA-14
HSA-16
HSA-17
B-1
HSA-20
B-2
PROPOSED
EQ BASIN
AC
ACCESS
ROAD
WET WELL
EQ EFFLUENT PIPE
AC
ACCESS
ROAD
AR-10
EQ INFLUENT PIPE
LEGEND
| 90% SBIWTP PDR 5-13-15.pdf |
| Appendix A-SOW.pdf |
| DOC005 |
| SOW FINAL |
File details come from the government source that posted it. Updated .