Text version

International Boundary and Water Commission United States and Mexico

United States Section

Technical Specifications

INFRASTRUCTURE IMPROVEMENTS FOR THE

SOUTH BAY INTERNATIONAL WASTEWATER

TREATMENT PLANT

San Diego County, California

Solicitation IBM15B0002

July 31, 2015

United States and Mexico United States Section Engineering Services Division El Paso, Texas

These specifications may be reprinted after Contract award using the awarded Contract number instead of the Solicitation number currently shown. The reprint shall have all changes indicated incorporated.

Reissuance of the awarded Technical Specifications with the Contract number will proceed without an amendment or modification.

Reissuance with the Contract number will NOT result in a new date being displayed on the Technical Specifications.

PLEASE NOTE

Specifications should be printed double sided.

Printing this document single sided will take 548 additional pages, and some of those pages will be blank to facilitate double sided printing.

USIBWC INFRASTRUCTURE IMPROVEMENTS FOR THE

SOUTH BAY INTERNATIONAL WASTEWATER TREATMENT PLANT

July 31, 2015 Division 00 USIBWC Solicitation IBM15B0002 Page Procurement and Contracting Requirements-1

TECHNICAL SPECIFICATIONS

DIVISION 00

PROCUREMENT AND CONTRACTING

REQUIREMENTS

Procurement and Contracting Requirements

Division 00

Division 00-Procurement and Contracting Requirements

Division 00 July 31, 2015 Page Procurement and Contracting Requirements-2 USIBWC Solicitation IBM15B0002

This page intentionally left blank for double sided printing.

July 31, 2015 Project Title USIBWC Solicitation IBM15B0002 Page 00.01.01-1

SPECIFICATION 00.01.01

PROJECT TITLE

00.01.01 Project Title 00.01.01-Project Title

The title of this project is as follows:

--End of Specification--

Project Title July 31, 2015 Page 00.01.01-2 USIBWC Solicitation IBM15B0002

July 31, 2015 Table of Contents Governing USIBWC Solicitation IBM15B0002 Page 00.01.10-1

SPECIFICATION 00.01.10

TABLE OF CONTENTS GOVERNING

00.01.10 Table of Contents Governing 00.01.10-Table of Contents Governing

DIVISIONS AND SPECIFICATIONS

Division 00 Procurement and Contracting Requirements

00 01 01 Project Title 00 01 10 Table of Contents Governing 00 01 15 List of Contract Drawings 00 31 19 Existing Condition Information 00 31 21 Survey Information 00 31 24 Environmental Information 00 31 26 Existing Hazardous Material Information 00 31 32 Geotechnical Data 00 31 43 Permit Application 00 31 50 Other Project Information 00 73 63 Security Requirements

Division 01 General Requirements

01 11 00 Summary of Work 01 22 00 Measurement and Payment 01 29 00 Payment Procedures 01 29 15 Certified Payroll 01 31 00 Project Coordination 01 31 75 Code of Business Ethics (Contracts >$5mil) 01 32 16 Construction Progress Schedule 01 32 33 Photographic Documentation 01 33 00 Submittal Procedures 01 33 23 Samples 01 35 00 Safety 01 42 00 References 01 45 00 Quality Control 01 45 10 Sequence of Construction 01 51 00 Temporary Utilities 01 52 13 Field Offices and Sheds 01 55 00 Vehicular Access and Parking 01 57 00 Temporary Controls for Work Areas 01 57 13 Temporary Environmental Controls 01 58 00 Project Identification 01 61 00 Common Product Requirements 01 69 00 Control of Materials and Products 01 74 19 Construction Waste Management and Disposal 01 75 01 Starting and Placing Equipment In Operation

Table of Contents Governing July 31, 2015 Page 00.01.10-2 USIBWC Solicitation IBM15B0002

01 75 02 Field Tests of Equipment 01 77 19 Closeout Requirements 01 78 23 Operation and Maintenance Data 01 78 36 Warranty 01 78 39 Project Record Documents 01 78 43 Spare Parts and Maintenance Materials 01 78 99 Project Data 01 79 00 Demonstration and Training

Division 02 Existing Conditions / Civil Site Work

02 01 00 Maintenance of Existing Conditions 02 11 00 Clearing 02 12 00 Cutting and Patching 02 21 00 Surveys 02 22 00 Existing Conditions Assessment 02 41 00 Demolition

Division 03 Concrete

03 11 00 Concrete Forming 03 15 00 Concrete Accessories 03 15 13 Waterstops 03 15 16 Concrete Joints 03 21 00 Reinforcement Bars 03 31 00 Cast-In-Place Concrete 03 39 00 Concrete Curing 03 40 00 Precast Concrete Launders 03 60 00 Grout

Division 05 Metals

05 05 12 Galvanizing 05 05 23 Welding 05 50 00 Structural Stainless Steel 05 61 00 Aluminum Handrails and Railings 05 62 00 Aluminum Covers 05 63 00 Aluminum Grating and Checkered Plate 05 64 00 Aluminum Access Hatches 05 65 00 Aluminum Stop Plate 05 91 00 Anchor Bolts, Expansion Anchors and Concrete Inserts

Division 09 Finishes

09 91 00 Painting 09 97 02 Protective Coating of Concrete

USIBWC Solicitation IBM15B0002 Page 00.01.10-3

Division 10 Specialties 10 14 00 Identification Devices

Division 11 Equipment

11 80 00 General Equipment Provisions 11 82 02 Submersible Non-Clog Centrifugal Pumps 11 82 05 Sump Pumps 11 82 06 Fiberglass Weir Plates 11 82 12 Stainless Steel Slide Gates 11 82 22 Floating Mixers 11 82 23 Secondary Sedimentation Tank (SST) Sludge Collector Equipment 11 82 24 Secondary Sedimentation Tank (SST) Rotary Skimmers 11 82 29 Channel Aeration Diffuser Equipment

Division 25 Integrated Automation

25 20 10 Instrumentation and Control System General Requirements 25 20 11 Instrumentation and Control System Factory Acceptance Testing (FAT) and Site Acceptance Teting (SAT) 25 20 12 Instrumentation and Control System Start-Up, Commissioning and Field

Testing 25 20 13 Instrumentation and Control System Training 25 20 14 System Functional Requirements 25 20 15 Programmable Controller System Components 25 20 16 Primary Sensors and Field Instruments 25 20 17 Control Panels and Enclosures

Division 26 Electrical

26 05 00 General Electrical Provisions 26 05 74 Overcurrent Protective Device Arc-Flash Study 26 24 19 Motor Control Centers 26 26 00 Disconnect Switches 26 29 23 Low Voltage Variable Frequency Drives 26 50 01 Lighting Fixtures 26 50 02 Lighting Controls 26 51 00 Lighting and Distribution Panelboards 26 61 01 Rigid Conduit 26 61 02 Flexibile Conduit 26 61 05 Sealing Fittings 26 61 06 Expansion Fittings 26 62 02 600 Volt Cable 26 62 06 Instrumentation Cable 26 63 01 Pull and Junction Boxes 26 63 04 Outlet Boxes 26 63 06 Receptacles

Page 00.01.10-4 USIBWC Solicitation IBM15B0002

26 64 02 Underground Duct Banks 26 64 12 Systems Harmonic and Load Flow Study 26 64 50 Grounding Systems

Division 31 Earthwork

31 05 16 Crushed Stone and Gravel 31 23 00 Excavation and Backfill 31 37 00 Riprap

Division 32 Exterior Improvements

32 12 00 Pavement 32 16 00 Concrete Curbs, Gutters and Sidewalks 32 31 13 Chain Link Fences and Gates

Division 40 Process Integration

40 00 50 General Piping Provisions 40 00 51 Buried Piping Installation 40 00 52 Exposed Piping Installation 40 00 63 Stainless Steel Pipe 40 00 64 Ductile-Iron Pipe 40 00 66 Glass-Lined Ductile-Iron Pipe 40 00 81 Polyvinyl Chloride, Chlorinated Polyvinyl Chloride, and Polyvinylidene

Difluoride Pipe 40 00 91 Valves and Appurtenances 40 00 92 Wall Pipes, Floor Pipes, and Pipe Sleeves 40 00 93 Piping Specialties 40 00 94 Pipe Markers

USIBWC Solicitation IBM15B0002 Page 00.01.10-5

Technical Specification Tables Table 1 - Index of Drawings Table 2 - Quality Control Testing Table 3 - Elastic Adhesive Chemical Composition Table 4 - Minimum Inside Diameter of Bar Bends Table 5 - Minimum Rebar Lap Requirements for Bar sizes through No. 11 Table 6 - Minimum Concrete Strength Table 7 - Maximum Water-Cement Ratio Table 8 - Chemical Limits for Mix Water Table 9 - Epoxy / Adhesive Requirements Table 10 - Overdesign to Meet Compressive Strength Requirements (1) Table 11 - Overdesign to Meet Compressive Strength Requirements Table 12 - Duration of Curing Table 13 - Galvanizing Standards Table 14 - SMAW Electrode Exposure Limits Table 15 - Minimum Preheat and Interpass Temperature for Reinforcing Steel

Technical Specification Figures Figure 1 - Sample Project Sign Figure 2 - Fabrication Tolerances for Bars Figure 3 - Miscellaneous Qualification: Fillet Weld Break Specimen Figure 4 - Miscellaneous Qualification-Method of Rupturing Specimen

Page 00.01.10-6 USIBWC Solicitation IBM15B0002

July 31, 2015 List of Contract Drawings USIBWC Solicitation IBM15B0002 Page 00.01.15-1

SPECIFICATION 00.01.15

LIST OF CONTRACT DRAWINGS

00.01.15 List of Contract Drawings 00.01.15-List of Contract Drawings

PART 1 - GENERAL

1.1 SECTION INCLUDES

Part 1 - General

1.1 Section Includes

1.2 Related Requirements

1.3 Measurement and Payment

1.4 Drawing Titles

1.5 Drawing Index

1.6 Additional Or Revised Drawings

Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Specification--

1.2 RELATED REQUIREMENTS

A. Specification 01.42.00-References

1.3 MEASUREMENT AND PAYMENT

The work performed by the Contractor under this specification shall not be paid for directly, but shall be included in the various Bid Items under this Contract.

1.4 DRAWING TITLES

The Contract drawings applicable to this Contract are titled:

1.5 DRAWING INDEX

An index of drawings is identified on GI-0002, Index of Sheets, and includes the following:

Table 1 - Index of Drawings Sheet

Number Sheet Title

GENERAL SHEETS

GI-0001 COVER SHEET

GI-0002 INDEX OF SHEETS

GI-0003 ABBREVIATIONS KEYS AND UNIT CONVERSIONS

List of Contract Drawings July 31, 2015 Page 00.01.15-2 USIBWC Solicitation IBM15B0002

Sheet Number Sheet Title

GI-0004 LEGEND

GC-0001 PLANT FLOW SCHEMATIC

GC-0002 HYDRAULIC PROFILE 1

GC-0003 HYDRAULIC PROFILE 2

GC-0004 HYDRAULIC PROFILE 3

GC-0005 EQUALIZATION TANK PROCESS SCHEMATIC

GC-0006 SECONDARY SEDIMENTATION TANK AND SLUDGE COLLECTION PROCESS SCHEMATIC

GC-0007 RAS PUMPING SYSTEM PROCESS SCHEMATIC

GC-0008 FLOW DIVERSION TO EQUALIZATION TANKS THRU BYPASS METERING STRUCTURE

CIVIL

C100 SITE PLAN

C500 EQUALIZATION TANKS SITE PLAN

C501 EQUALIZATION TANKS SECTIONS

C1100 EXISTING SITE PLAN AND DEMOLITION PLAN

C1101 SECONDARY SEDIMENTATION TANKS SITE PLAN

C1102 SECONDARY SEDIMENTATION TANKS ROAD PROFILE

C1 CIVIL DETAILS 1

C2 CIVIL DETAILS 2

C3 CIVIL DETAILS 3

MECHANICAL

M-500 EQUALIZATION TANKS 1 & 2 PLAN AND SECTION

M-501 EQUALIZATION TANKS SECTIONS

M-502 EQUALIZATION TANK PUMP STATION PLAN AND SECTIONS

M-503 PLANT YARD PIPING RECORD DRAWING

M-504 PLANT TANK DRAIN JUNC. STRUCTURES RECORD DRAWING

M-1100 EXISTING SST REFERENCE DRAWING

M-1101 SST ENLARGED TOP PLAN

M-1102 SST ENLARGED TOP PLAN

M-1103 SST ENLARGED TOP PLAN

M-1104 EFFLUENT GALLERY PARTIAL INTERIOR PLAN

M-1105 SST GENERAL SECTION

M-1106 SST INFLUENT AND EFFLUENT GALLERY GENERAL SECTIONS ENLARGED

M-1107 EFFLUENT GALLERY PARTIAL INTERIOR PLAN

M-1108 EFFLUENT GALLERY SECTION

M-1109 RAS PUMP STATION - RECORD DRAWING

M-1110 RAS PUMP STATION - DEMOLITION PLAN

M-1111 RAS PUMP STATION - MODIFICATIONS AND SECTIONS

M-1112 PRIMARY EFFLUENT BYPASS JUNCTION STRUCTURE PLANS AND SECTION RECORD DRAWING

M-1113 SST ENLARGED TOP PLAN

M-1114 SECONDARY SEDIMENTATION AREA SECTIONS AND DETAILS RECORD DRAWING

M-1115 TEMPORARY RAS PUMPING RECORD DRAWING

USIBWC Solicitation IBM15B0002 Page 00.01.15-3

Sheet Number Sheet Title

M-1 MECHANICAL DETAILS 1

M-2 MECHANICAL DETAILS 2

M-3 MECHANICAL DETAILS 3

M-4 MECHANICAL DETAILS 4

M-5 MECHANICAL DETAILS 5

M-6 MECHANICAL DETAILS 6

STRUCTURAL

S1 GENERAL NOTES

S2 STRUCTURAL TYPICAL DETAILS 1

S3 STRUCTURAL TYPICAL DETAILS 2

S4 STRUCTURAL TYPICAL DETAILS 3

S5 STRUCTURAL TYPICAL DETAILS 4

S6 STRUCTURAL TYPICAL DETAILS 5

S500 EQUALIZATION TANKS PARTIAL SITE PLAN

S501 EQUALIZATION TANKS BOTTOM SLAB PLAN

S502 EQUALIZATION TANKS SECTIONS 1

S503 EQUALIZATION TANKS SECTIONS 2

S504 EQUALIZATION TANKS SECTIONS 3

S505 EQUALIZATION TANKS WET WELL TOP SLAB AND FOUNDATION PLANS

S506 EQUALIZATION TANKS WET WELL SECTIONS

S507 EFFLUENT BYPASS JUNCTION STRUCTURE RETROFIT

S1100 SST SITE PLAN

S1101 SST DEMOLITION PLAN AND SECTIONS

S1102 SST FOUNDATION PLAN

S1103 SST OVERALL TOP PLAN

S1104 SST SECTIONS AND DETAILS 1

S1105 SST SECTIONS AND DETAILS 2

S1106 SST SECTIONS AND DETAILS 3

S1107 SST SECTIONS AND DETAILS 4

S1108 SST SECTIONS AND DETAILS 5

S1109 SST SECTIONS AND DETAILS 6

S1110 SST SECTIONS AND DETAILS 7

S1111 SST SECTIONS AND DETAILS 8

S1112 SST SECTIONS AND DETAILS 9

ELECTRICAL

E1 GENERAL NOTES, LEGEND AND ABBREVIATIONS SHEET 1

E2 GENERAL NOTES, LEGEND AND ABBREVIATIONS SHEET 2

E3 LIGHTING FIXTURE SCHEDULE

E4 PARTIAL SITE PLAN - ELECTRICAL EQUIPMENT

E5 PARTIAL SITE LIGHTING & GROUNDING PLANS

E6 ELECTRICAL DETAILS

Page 00.01.15-4 USIBWC Solicitation IBM15B0002

Sheet Number Sheet Title

E501 MCC-DAF ONE LINE DIAGRAM

E502 MCC-DAF ELEVATION

E503 DAF CONTROL STRUCTURE CONDUIT PLAN

E504 EQ TANKS - CONDUIT PLAN

E505 EQ TANKS - LIGHTING, POWER & GROUNDING PLAN

E506 PANEL SCHEDULES

E507 EQ BASIN - SCHEMATIC DIAGRAMS SHEET 1

E508 EQ BASIN - SCHEMATIC DIAGRAMS SHEET 2

E1101 MCC - SST - ONE LINE DIAGRAM

E1102 MCC - SST - ELEVATION

E1103 SST - LCP AREA - CONDUIT PLAN

E1104 SST - CONDUIT PLAN

E1105 TOP OF TANKS NORTH & SOUTH END CONDUIT PLANS

E1106 RAS PUMPS - POWER PLAN

E1107 TOP OF TANKS 11 THRU 13 LIGHTING, POWER & GROUNDING PLAN

E1108 SECONDARY EFFLUENT GALLERY LIGHTING, POWER & GROUNDING PLAN

E1109 PANEL SCHEDULES

E1110 RAS PUMPS SCHEMATIC DIAGRAM

E1111 SSC11 AND SGEF1A & SUMP PUMP - SCHEMATIC DIAGRAMS

E1112 SKIMMER ACTUATOR AND SPRAY VALVE ACTUATOR - SCHEMATIC DIAGRAMS

ECC1 EQ BASIN CONDUIT SCHEDULES

ECC2 SST AREA CONDUIT SCHEDULES

INSTRUMENTATION

I1 INSTRUMENTATION NOTES, LEGEND AND ABBREVIATION SHEET 1

I2 INSTRUMENTATION NOTES, LEGEND AND ABBREVIATION SHEET 2

I3 INSTRUMENTATION DETAILS

I4 INSTRUMENT AND CONTROLS SITE PLAN

I5A EXISTING PLC MODIFICATION SHEET 1

I5B EXISTING PLC MODIFICATION SHEET 2

I501 P & ID EQUALIZATION TANK 1

I502 P & ID EQUALIZATION TANK 2

I503 P & ID EQ WET WELL

I1101 SST P & ID TANK 11 AND 12

I1102 SST P & ID TANK 13

I1103 RAS PUMPS P & ID

1.6 ADDITIONAL OR REVISED DRAWINGS

A. Except as provided in these specifications for drawings to be furnished by Contractor, drawings will be supplemented by additional or revised general and detail drawings as necessary or desirable as work progresses.

USIBWC Solicitation IBM15B0002 Page 00.01.15-5

B. Additional or revised general and detail drawings will show dimensions and details necessary for construction purposes more completely than are shown on these drawings for features of work.

C. Perform work in accordance with additional general and detail drawings or revisions at applicable prices bid in schedule for such work.

PART 2 - PRODUCTS

(Not Used)

PART 3 - EXECUTION

Page 00.01.15-6 USIBWC Solicitation IBM15B0002

July 31, 2015 Existing Condition Information USIBWC Solicitation IBM15B0002 Page 00.31.19-1

SPECIFICATION 00.31.19

EXISTING CONDITION INFORMATION

00.31.19 Existing Condition Information 00.31.19-Existing Condition Information

PART 1 - GENERAL

1.1 SECTION INCLUDES

Part 1 - General

1.1 Section Includes

1.2 Related Requirements

1.3 Measurement and Payment

1.4 General

1.5 Existing Structures

1.6 Existing Utilities

Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Specification--

A. Specification 00.31.32-Geotechnical Data

1.4 GENERAL

A. Field assessment of existing conditions of the project shall be performed by the Contractor before groundbreaking.

B. Geotechnical investigations were performed as noted in Specification 00.31.32.

1.5 EXISTING STRUCTURES

A. As shown on the Drawings. Limited record drawings are also available for previous construction at this plant.

1.6 EXISTING UTILITIES

A. As shown on the Drawings.

Existing Condition Information July 31, 2015 Page 00.31.19-2 USIBWC Solicitation IBM15B0002

July 31, 2015 Survey Information USIBWC Solicitation IBM15B0002 Page 00.31.21-1

SPECIFICATION 00.31.21

SURVEY INFORMATION

00.31.21 Survey Information 00.31.21-Survey Information

PART 1 - GENERAL

1.1 SECTION INCLUDES

Part 1 - General

1.1 Section Includes

1.2 Related Requirements

1.3 Measurement and Payment

1.4 Existing Information

1.5 Field Survey

1.6 Survey Control

1.7 Existing Survey Markers

1.8 Right of Way (ROW)

1.9 Existing Utility Survey

Part 2 - Products (Not Used) Part 3 - Execution (Not Used)

A. Specification 02.01.00-Maintenance of Existing Conditions

1.4 EXISTING INFORMATION

The following documents were provided by the USIBWC and used as the basis of design.

South Bay International Wastewater Treatment Plant Construction of Contract for 25 MGD Secondary Treatment, S&B Infrastructure, June 2008.

Operation And Maintenance Manual For The South Bay International Wastewater Treatment Plant, Malcolm Pirnie, Inc., April 2011.

1.5 FIELD SURVEY

Limited field survey was performed in the proposed construction areas for the design of this project and is shown on the Drawings. As-built information from previous projects by S&B Infrastructure and Malcolm Pirnie were also used as the basis of design for tying into the existing structures.

Survey Information July 31, 2015 Page 00.31.21-2 USIBWC Solicitation IBM15B0002

1.6 SURVEY CONTROL

A. Horizontal and vertical controls are based on California State Plane Coordinate Grid System (CASPCGS) CA-Central Zone North American Datum of 1983 (NAD 83) in U.S.

survey feet, using GEOID12A, and North American Vertical Datum of 1988 (NAVD 88) in U.S. survey feet, respectively.

B. The survey was based on existing monumentation, and survey data are provided on the civil plans.

1.7 EXISTING SURVEY MARKERS

1.8 RIGHT OF WAY (ROW)

1.9 EXISTING UTILITY SURVEY

A. The Contractor shall conduct a utility survey for utility tie-in points as shown on the Drawings.

1. NOTE: It is the Contractor’s responsibility to verify locations of all existing utilities (shown and not shown) prior to construction.

2. Additionally, attention is called to Specifications 02.01.00, Maintenance of Operation of Existing Facilities for additional requirements and guidelines for existing utility survey.

July 31, 2015 Environmental Information USIBWC Solicitation IBM15B0002 Page 00.31.24-1

SPECIFICATION 00.31.24

ENVIRONMENTAL INFORMATION

00.31.24 Environmental Information 00.31.24-Environmental Information

PART 1 - GENERAL

1.1 SECTION INCLUDES

Part 1 - General

1.1 Section Includes

1.2 Reference Standards

1.3 Measurement and Payment

1.4 General

1.5 Preservation of Cultural and Natural Resources and the Environment

1.6 Other Considerations

1.7 Environmental Consideration

1.8 Use of Geologic Materials on a Federally Funded Project

Part 2 - Products (Not Used) Part 3 - Execution (Not Used)

1.2 REFERENCE STANDARDS

A. United States Code (USC)

1. Clean Air Act, 42 USC §7401 et seq.

2. Clean Water Act (CWA), 33 USC §1251 et seq.

3. Fish and Wildlife Act of 1956, 16 USC §742a 742j

4. Migratory Bird Treaty Act (MBTA), 16 USC §§703 - 712

5. National Environmental Policy Act (NEPA), 42 USC §§4321-4347

6. National Historic Preservation Act (NHPA), 16 USC §470 et seq.

7. National Wildlife Refuge System Improvement Act of 1997, 16 USC §668dd

8. Native American Graves Protection and Repatriation Act (NAGPRA), 25 USC §3001

et. seq.

9. Refuge Recreation Act, 16 USC §§460k - 460k-4

Environmental Information July 31, 2015 Page 00.31.24-2 USIBWC Solicitation IBM15B0002

1.4 GENERAL

A. The Project’s environmental assessment, titled "Supplemental Environmental Impact Statement Clean Water Act Compliance at the Southbay International Wastewater Plant," dated July 2005, was prepared for USIBWC by Parsons, Inc.

B. This document lists environmentally and culturally sensitive areas that need to be protected from any disturbances of construction activities. The environmentally and culturally sensitive areas that were identified in the document are identified below.

1. Environmentally Sensitive Areas:

a. Final Supplemental Environmental Impact Statement, Clean Water Act

Compliance at the South Bay International Wastewater Treatment Plant, Parsons, July 2005.

2. Culturally Sensitive Areas:

a. Final Supplemental Environmental Impact Statement, Clean Water Act

Compliance at the South Bay International Wastewater Treatment Plant, Parsons, July 2005.

3. Biological Resources:

a. Work should be scheduled to occur outside of the bird breeding season whenever possible. The breeding and nesting season is from March 1 through August 31. If work continues into the bird breeding season, the areas proposed for disturbance will be surveyed to avoid the inadvertent destruction of nests and eggs.

4. Natural Resources:

a. Equipment cannot be parked, staged, or used under large, mature trees. Keeping equipment away from the large, mature trees will prevent incidental damage to the trees and prevent compression of root balls.

C. The Contractor shall review and comply with the requirements provided in the environmental documents. The documents are available for Contractor review at:

http://www.ibwc.gov/Organization/Environmental/reports_studies.html .

1.5 PRESERVATION OF CULTURAL AND NATURAL RESOURCES AND THE

ENVIRONMENT

A. If the Contractor initiates changes to the Contract and USIBWC approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agencies.

B. Culturally Sensitive Areas

1. Cease all work immediately if a site, building, or location of historical, archeological, educational, or scientific interest is discovered within the right of way. The site, building, or location will be investigated and evaluated by USIBWC.

July 31, 2015 Environmental Information USIBWC Solicitation IBM15B0002 Page 00.31.24-3

1.6 OTHER CONSIDERATIONS

A. The Contractor is required to ensure that all Environmental Permits, Issues, and Comments (EPIC), which are included within the Contract Documents are followed and implemented to ensure potential impacts are avoided.

1.7 ENVIRONMENTAL CONSIDERATION

The USIBWC's Environmental Management Division (EMD) will be responsible for submitting the request for project clearance to comply with NEPA. EMD will determine the appropriate NEPA documentation for the project, which will be completed prior to the construction of the project.

1.8 USE OF GEOLOGIC MATERIALS ON A FEDERALLY FUNDED PROJECT

A. To ensure preservation of historical and archaeological data, when the Construction Contractor or any subcontractor proposes to use a borrow pit/source/quarry for soil, rock, or gravel, if necessary, the source must first be approved by the COR to ensure compliance with Section 106 of NEPA (36 CFR 800).

B. Submit a map showing the location of proposed sites to the COR at least forty five (45) days in advance of use.

C. Take no action to use or alter the proposed location until written approval for site use is received from the COR.

D. If the quarry or borrow site already provides materials for USACE or other governmental agency, a copy of the environmental approvals from said agencies may be provided to the

COR.

E. Include permission for Government access to any geological source locations.

Environmental Information July 31, 2015 Page 00.31.24-4 USIBWC Solicitation IBM15B0002

July 31, 2015 Existing Hazardous Material Information USIBWC Solicitation IBM15B0002 Page 00.31.26-1

SPECIFICATION 00.31.26

EXISTING HAZARDOUS MATERIAL INFORMATION

00.31.26 Existing Hazardous Material Information 00.31.26-Existing Hazardous Material Information

PART 1 - GENERAL

1.1 SECTION INCLUDES

Part 1 - General

1.1 Section Includes

1.2 Measurement and Payment

1.3 General

Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Specification--

1.2 MEASUREMENT AND PAYMENT

1.3 GENERAL

Based on the environmental report(s), identified in Specification 00.31.24-Environmental Information, there are no hazardous material or waste storage, disposal sites, or spill sites, identified within the immediate Project area.

Existing Hazardous Material Information July 31, 2015 Page 00.31.26-2 USIBWC Solicitation IBM15B0002

July 31, 2015 Geotechnical Data USIBWC Solicitation IBM15B0002 Page 00.31.32-1

SPECIFICATION 00.31.32

GEOTECHNICAL DATA

00.31.32 Geotechnical Data 00.31.32-Geotechnical Data

PART 1 - GENERAL

1.1 SECTION INCLUDES

Part 1 - General

1.1 Section Includes

1.2 Measurement and Payment

1.3 Geotechnical Reports

Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Specification--

1.3 GEOTECHNICAL REPORTS

A. A geotechnical investigation for this project was performed by URS Group, Inc. and summarized in their report entitled:

"Geotechnical Investigation, South Bay International Wastewater Treatment Plant Improvements, San Ysidro, California ,” dated February 13, 2015, and Addendum No. 1, dated April 30, 2015.

This investigation included four (4) exploratory borings within the project limits.

The Contractor may request a copy of these geotechnical reports from the USIBWC.

B. List any assumptions made of the geotechnical information in regards to this project.

Only a very small portion of the pertinent subsurface conditions were observed. The recommendations made herein are based on the assumption that soil conditions do not deviate appreciably from those found during our field investigation.

C. The data and report are not intended as a representation or warranty of continuity of conditions between soil borings nor of groundwater levels at the locations, dates, and times other than date and time when measured. The USIBWC neither warrants or guarantees the results of any geotechnical or subsurface investigations as being representative of the site, beyond the actual location of the test specimen(s) nor assumes any responsibility for the manner in which this information may be used or the

Geotechnical Data July 31, 2015 Page 00.31.32-2 USIBWC Solicitation IBM15B0002 conclusions reached in utilizing the information contained in the Contract documents.

Additional test borings and other exploratory operations may be made by Contractor subsequent to award of the Contract.

D. The Contractor shall consider all geotechnical information including geotechnical reports, bore logs, and site visits as a whole. The Contractor shall consider the limitations of any geotechnical tests performed including the auger size, bore hole spacing and location, consistency of bore hole data, as well as the frequency and results of testing. The USIBWC will not be responsible for interpretations or conclusions drawn there by the Contractor.

July 31, 2015 Permit Application USIBWC Solicitation IBM15B0002 Page 00.31.43-1

SPECIFICATION 00.31.43

PERMIT APPLICATION

00.31.43 Permit Application 00.31.43-Permit Application

PART 1 - GENERAL

1.1 SECTION INCLUDES

Part 1 - General

1.1 Section Includes

1.2 Reference Standards

1.3 Measurement and Payment

1.4 General

1.5 Work in Waters of the United States (Where Applicable)

1.6 Responsibilities

Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Specification--

1.2 REFERENCE STANDARDS

A. California Environmental Protection Agency (CEPA)

1. 2009-0009-DWQ Construction General Permit

B. Environmental Protection Agency (EPA)

1. General Construction Permit 2012

2. National Pollutant Discharge Elimination System (NPDES) Permit Program

C. U.S. Army Corps of Engineers (USACE)

1. Section 404 of Clean Water Act, 33 USC §1251 et seq.

1.4 GENERAL

Prior to the beginning of construction, the Contractor shall be responsible for researching, coordinating, obtaining, and paying all applicable fees for all permits required by Federal, state and local entities, including, but not limited to, a specific or general stormwater permit prepared in accordance with the requirements of the Stormwater Pollution Prevention Plan (SWPPP) and California 2009-0009-DWQ Construction General Permit.

Permit Application July 31, 2015 Page 00.31.43-2 USIBWC Solicitation IBM15B0002

1.5 WORK IN WATERS OF THE UNITED STATES (WHERE APPLICABLE)

A. USACE has determined that a Section 404 permit will not be required for work within the currently defined Temporary Construction Limits (TCL).

B. For work in the right of way, USIBWC will obtain any required Section 404 permits from USACE before work begins. Adhere to all agreements, mitigation plans, and standard best management practices required by the permit.

C. The Contractor must adhere to all agreements, mitigation plans, and standard best management practices required by the permit.

D. If Contractor-initiated changes in the construction method result in impacts to waters of the U.S., the Contractor shall have sole responsibility to obtain all required new or revised Section 404 permits and shall adhere to all agreements, mitigation plans, and standard best management practices required by these permits.

1.6 RESPONSIBILITIES

A. The Contractor shall be responsible for providing the proposed location of the project staging areas for compliance confirmation of the COR prior to installation of stormwater pollution prevention (SWPP) measures.

B. The Federal Government is not subject to local jurisdictions' building codes, nor is it required to obtain building permits from local jurisdictions for construction on real estate owned or controlled by the USIBWC. However, borrow pits and other offsite locations are subject to local regulations. The Contractor is responsible for researching and obtaining all necessary permits for offsite work.

C. The Contractor shall be responsible for obtaining all necessary permits and rights of entry for all work required under this Contract.

D. The Contractor will also be required to research the need for any other required permits, based on the information available from the Contract drawings and technical specifications prior to the beginning of construction. For the work under this Contract, the Contractor shall be responsible for coordinating and obtaining all permits required by Federal, state and local entities, unless otherwise specified within the Contract Provisions and these technical specifications.

E. The Contractor shall apply and pay for all required permits. The Government is not responsible for any existing or newly introduced permits required before, during and/or after construction.

F. The Contractor shall be responsible for and shall give and maintain any and all notices required by applicable regulations, laws, or permitting authorities pertaining to construction of this project.

July 31, 2015 Permit Application USIBWC Solicitation IBM15B0002 Page 00.31.43-3

Permit Application July 31, 2015 Page 00.31.43-4 USIBWC Solicitation IBM15B0002

July 31, 2015 Other Project Information USIBWC Solicitation IBM15B0002 Page 00.31.50-1

SPECIFICATION 00.31.50

OTHER PROJECT INFORMATION

00.31.50 Other Project Information 00.31.50-Other Project Information

PART 1 - GENERAL

1.1 SECTION INCLUDES

Part 1 - General

1.1 Section Includes

1.2 Measurement and Payment

1.3 General

--End of Specification--

1.3 GENERAL

There are no known locally impacted organizations within the work zone of this project. The plant is operated by Veolia. Border Patrol does regular surveillance around the plant complex.

USIBWC may have other ongoing work at the plant, which the Contractor will need to coordinate with.

Other Project Information July 31, 2015 Page 00.31.50-2 USIBWC Solicitation IBM15B0002

July 31, 2015 Security Requirements USIBWC Solicitation IBM15B0002 Page 00.73.63-1

SPECIFICATION 00.73.63

SECURITY REQUIREMENTS

00.73.63 Security Requirements 00.73.63-Security Requirements

PART 1 - GENERAL

1.1 SECTION INCLUDES

Part 1 - General

1.1 Section Includes

1.2 Related Requirements

1.3 Submittals

1.4 Measurement and Payment

1.5 General

1.6 Security

1.7 Insurance

1.8 Department of Homeland Security

Part 2 - Products (Not Used) Part 3 - Execution (Not Used) --End of Specification--

A. Specification 01.33.00-Submittal Procedures

1.3 SUBMITTALS

A. Submittals shall be transmitted by the Contractor in accordance with the requirements of Specification 01.33.00-Submittal Procedures. The Contractor Quality System Manager (QSM) shall be responsible for certifying that all submittals are in compliance with the Contract requirements.

B. Required submittals in this Section include:

1. Worker's name, social security number, and Government identification card for vetting.

1.4 MEASUREMENT AND PAYMENT

1.5 GENERAL

The project area is near the United States and Mexico international border. The project site may be exposed to vandalism and theft. The Contractor shall be responsible for providing adequate security of the project site in order to prevent vandalism and theft.

Security Requirements July 31, 2015 Page 00.73.63-2 USIBWC Solicitation IBM15B0002

1.6 SECURITY

A. Security is a major concern adjacent to the international boundary. The Contractor is responsible for securing the work site, equipment, and materials from vandalism and theft.

B. The Contractor shall repair all damage to property of the Government and others arising from failure to provide adequate security.

C. If fencing or barriers are breached or removed for purposes of construction, the Contractor shall provide and maintain temporary security fencing equal to the existing.

D. The Contractor shall maintain security throughout construction until Final Acceptance.

1.7 INSURANCE

A. When not required by the Contract clauses, the Contractor has the right to purchase coverage for property insurance, builder's risk insurance (including perils of wind, collapse, vandalism/malicious mischief, and theft, including theft of materials whether or not attached to any structure), and/or flood insurance or to be self-insured for these exposures.

B. The Contractor shall be held liable for all costs associated with losses, deductibles, and self-insurance for coverages not required by the Contract clauses.

1. Losses shall include architects' and engineers' fees that may be necessary to provide plans and specifications for the repair and/or replacement of damaged property.

2. Losses shall include appropriate supervision and quality control of all work for the repair and/or replacement of damaged property.

C. Any insurance policies purchased for work or property related to this Contract for coverages not required by the Contract clauses shall list the International Boundary and Water Commission, United States Section, as an additional insured.

1.8 DEPARTMENT OF HOMELAND SECURITY

A. In any event when the staff of the U.S. Department of Homeland Security (also known as U.S. Customs and Border Protection) alerts and directs any field crews to stop work for any security reasons in the area, the Contractor shall consider this as top priority and fully cooperate with the directions of DHS at all times until the security alert is cleared by the DHS. In addition, the Contractor shall contact and coordinate with the COR for any additional steps to be taken during and after the security alert from the DHS is cleared.

July 31, 2015 Security Requirements USIBWC Solicitation IBM15B0002 Page 00.73.63-3

B. Access to the site is controlled along with regular Border Patrol patrols. All site work is anticipated to take place on the north side of the DHS border fence. Gates through the border fence are located at various locations adjacent to the project site. Access through the border fence must be coordinated with Border Patrol.

C. The Contractor shall provide a list of all workers' names, their social security number, and a copy of a Government-issued identification card to the COR. This list shall be provided at least three (3) working days prior to the workers arriving on site. Border Patrol and/or USIBWC reserve the right to run background checks on all employees working on site.

D. The Contractor will ensure that all workers approved on site will remain in the immediate work area. Services such as latrines, water, and other resources to support the work force will be provided by the Contractor within the work area. If access is required outside the immediate work area, that should be coordinated with the COR three (3) working days prior so that an escort can be arranged.

1. The Contractor shall provide updates whenever employees are added or deleted from the work crews.

2. Employees must pass the Contractor's background checks/vetting to be allowed to work onsite. Employees with felony criminal histories will not be allowed to work on this project.

a. Workers with felony convictions, issues with their immigration paperwork, or outstanding warrants are precluded from working on site.

E. The Contractor shall ensure that all employees working on site are identifiable with a project identification card, a special hard hat color, a significantly colored piece of clothing, or another method agreeable to Border Patrol.

F. All on-road vehicles shall have the name of the construction company/Contractor clearly displayed on the side of the vehicle.

Security Requirements July 31, 2015 Page 00.73.63-4 USIBWC Solicitation IBM15B0002

July 31, 2015 Division 01 USIBWC Solicitation IBM15B0002 Page General Requirements-1

TECHNICAL SPECIFICATIONS

DIVISION 01

GENERAL REQUIREMENTS

General Requirements Division 01

Division 01-General Requirements

Division 01 July 31, 2015 Page General Requirements-2 USIBWC Solicitation IBM15B0002

July 31, 2015 Summary of Work USIBWC Solicitation IBM15B0002 Page 01.11.00-1

SPECIFICATION 01.11.00

SUMMARY OF WORK

01.11.00 Summary of Work 01.11.00-Summary of Work

PART 1 - GENERAL

1.1 SECTION INCLUDES

Part 1 - General

1.1 Section Includes

1.2 Related Requirements

1.3 Reference Standards

1.4 Measurement and Payment

1.5 Work Covered by the Contract Documents

1.6 Sequence of Work/Time for Completion of Work

1.7 Work Under Other Contracts

1.8 Labor and Staffing

1.9 Project Location

1.10 Investigation of Site Conditions

1.11 Other Contractual Requirements

Part 2 - Products

2.1 Government Furnished Materials

2.2 Products to be Furnished by the Contractor

Part 3 - Execution

3.1 Submittals Required Prior to Mobilization

3.2 Use of Right-of-Way

3.3 Occupancy of Right-of-Way

3.4 Work Restrictions/Special Construction Conditions

3.5 Delivery of Files to USIBWC

--End of Specification--

A. Specification 00.31.43-Permit Application

B. Specification 01.31.75-Code of Business Ethics (Contracts > $5mil)

C. Specification 01.32.16-Construction Progress Schedule

D. Specification 01.33.00-Submittal Procedures

E. Specification 01.35.00-Safety

F. Specification 01.45.00-Quality Control

G. Specification 01.45.10-Sequence of Construction

Summary of Work July 31, 2015 Page 01.11.00-2 USIBWC Solicitation IBM15B0002

H. Specification 01.51.00-Temporary Utilities

I. Specification 01.52.13-Field Offices and Sheds

J. Specification 01.55.00-Vehicular Access and Parking

K. Specification 01.57.00-Temporary Controls for Work Areas

L. Specification 01.57.13-Temporary Environmental Controls

M. Specification 01.74.19-Construction Waste Management and Disposal

N. Specification 02.01.00-Maintenance of Existing Conditions

O. Specification 02.22.00-Existing Conditions Assessment

P. Contract: Section I “Specifications and Drawings for Construction”.

Q. Technical Specifications: All.

R. Cross references to portions of the specifications are made for clarification only, and lack of such references shall not limit the enforcement of all applicable specifications.

S. The Contract Documents are complementary, and what is required by any one shall be as binding as if required by all, as applicable in accordance with the order of precedence set forth in the General Contract Provisions, Section J, Supplementary Conditions. The Contractor shall provide all labor, materials, equipment, services, and other items necessary for the proper execution and completion of the Work. Unless otherwise specifically noted, the Contractor shall provide and pay for all taxes, insurance, labor, materials, equipment, services, testing, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services including temporary piping, pumping, power generating, and dewatering equipment necessary for the proper execution and completion of the Work.

T. The organization of the Technical Specifications into divisions, parts, and paragraphs, and the arrangement of Contract Drawings shall not control the Contractor in dividing the Work among subcontractors or in establishing the extent of work to be performed by any trade.

U. The Contract Drawings are diagrammatic and indicate the general arrangement of systems and work included in the Contract. The Contractor shall field verify all dimensions and existing conditions affected by or affecting the Work, and shall include his verified dimensions and conditions with his submittals where appropriate. Do not scale the drawings for verification. The structural, civil, electrical and instrumentation drawings, specifications, and details shall be consulted in connection with the mechanical installations. Where the exact locations of fixtures and equipment are not definitely

USIBWC Solicitation IBM15B0002 Page 01.11.00-3 established, the Contractor shall field verify and shall confirm his information with the COR. The Contractor shall follow the Contract Drawings in laying out the Work and shall continually check the various trades to verify that sufficient space is available for the installation of all elements of the Work. Maximum headroom and space conditions shall be maintained at all points. Where headroom or space conditions appear inadequate, the COR shall be notified before proceeding with installations.

V. The Contract Drawings and Specifications may not indicate all offsets, fittings, and accessories which may be required to perform the Work, but this does not relieve the Contractor of the responsibility of making accommodations for non-identified offsets, as well as providing such fittings and accessories necessary to complete the Work at no additional cost to the Government. The Contractor shall carefully investigate the conditions affecting his work including existing materials and dimensions and shall arrange his work accordingly, furnishing such fittings, valves, transitions, pull or junction boxes, and accessories as may be required to meet such conditions.

W. The Contractor shall be solely responsible for ensuring that all of the Contractor’s suppliers; manufacturers of furnished equipment, structures and specialty items; and sub-contractors have reviewed all applicable Contract Documents relative to their work to avoid potential claims that are based on failure to review relevant Contract Documents, including the Contract Drawings. The Contractor shall provide all equipment, labor, material and services not provided by the Contractor’s suppliers, manufacturers, fabricators, and/or subcontractors but required for complete and operable facilities as described in the Contract Documents.

X. All schedules shown on the Contract Drawings and in the Specifications are partial schedules that are shown for the Contractor’s convenience and information only. The Contractor shall be responsible for complete take-offs and shall furnish and install all equipment, labor, materials, appurtenances and specialty items required for complete and operable facilities per the Contract Documents.

1.3 REFERENCE STANDARDS

A. United States Code (USC)

1. Davis Bacon Act (DBA), 40 USC 3141-3148

1.4 MEASUREMENT AND PAYMENT

1.5 WORK COVERED BY THE CONTRACT DOCUMENTS

A. Project Identification. The Project to be constructed under this Contract is identified as follows:

Page 01.11.00-4 USIBWC Solicitation IBM15B0002

1. Name of Project - “INFRASTRUCTURE IMPROVEMENTS FOR THE SOUTH BAY INTERNATIONALWASTEWATER TREATMENT PLANT”, and

2. Location of Project – in San Diego County, California.

B. General Description of Work. The Work required by these Contract Documents consists of construction of the equalization tanks (3.75 MG) with a duplex effluent submersible pump station, three (3) new secondary sedimentation tanks (SSTs) and replacement of the six existing return activated sludge (RAS) pumps with new submersible pumps for the South Bay International Wastewater Treatment Plant, including work consisting of civil/site , landscaping, structural, mechanical, electrical, and instrumentation, as well as all other miscellaneous work as described in the Contract Documents. The Contractor shall be responsible for ensuring that all the Contractor’s suppliers, subcontractors, and fabricators have reviewed all applicable Contract Documents relative to their work.

C. Detailed Description of the Work. A detailed description of the major features of the Work to be performed by the Contractor includes, but is not limited to the following:

1. Protection of Facilities and Personnel. The Contractor shall provide all labor, equipment, and materials required to protect personnel, existing facilities, and construction of new facilities including, but not limited to sheet piling, shoring, bracing and underpinning, and trench excavation protection as required for construction of new facilities and protection of personnel, as well as new and existing facilities. The Contractor shall submit, prior to construction, to the COR all details and calculations prepared by a Professional Engineer registered or licensed in the State of California in accordance with the Rules of the California Board for Professional Engineers and Land Surveyors for, but not limited to sheet piling, shoring, bracing and underpinning, and trench excavation protection activities required to protect existing facilities, install new facilities and provide for safe working conditions.

2. The Contractor shall meet all permit requirements and provide all equipment, labor, materials and power for groundwater control and dewatering and surface water control as required for construction and protection of new and existing facilities.

3. The Contractor shall provide all equipment, labor and materials and power required for temporary and permanent equipment, piping, and yard piping (process, fire water, potable and non-potable water, gas, conduit, and other), and electrical and instrumentation systems for construction of new facilities.

The Contractor shall provide all equipment, labor, materials and services required for jobsite safety, and required to prevent unauthorized access to the job site. The responsibility for site safety and security lies solely with the Contractor for all work performed in connection with these Contract Documents. At least one full-time person, designated by and representing the Contractor, and fully trained in site and construction safety, shall be provided by the Contractor and shall be present on the site whenever work is in progress to implement, monitor, and direct the Contractor's

USIBWC Solicitation IBM15B0002 Page 01.11.00-5 safety program. This person(s) shall be experienced in site and construction safety, and the Contractor shall submit qualifications and experience of this person with the Contractor’s safety program required under the Contract General Provisions, Part III, Section H, and Paragraph H.16 of the Contract Documents.

4. The Contractor shall provide all equipment, labor and materials required to repair and/or replace any facilities including site improvements damaged during the course of construction.

5. The Contractor shall provide all equipment, labor and materials required to verify existing conditions as required for construction including but not limited to potholing, hand digging, field measurements and surveying.

6. The Contractor shall provide all equipment, labor, and materials required to verify all points of interface in connection with the existing operations of the Plant and provide all equipment, labor and materials to complete all electrical, mechanical, structural, instrumentation and appurtenant connection between the work required by the Contractor at all tie-in interfaces required under these Contract Documents and the existing operations of the Plant.

7. The Contractor shall provide all equipment, labor, and materials required to maintain suitable personnel and vehicle access.

8. The Contractor shall be responsible for all work and costs for coordination with utilities, and for securing and providing all temporary utilities (power, water, sanitary, telephone) required for completion of his work.

9. The Contractor shall be responsible for ensuring that all of the Contractor's suppliers, fabricators, manufacturers and subcontractors have reviewed all applicable Contract Documents relative to their work, and shall include with the bid all equipment, labor, materials, testing, and services not provided by the Contractor's suppliers, fabricators, manufacturers, and/or subcontractors but required for complete and operable facilities as required by these Contract Documents.

10. Major Facilities. The major facilities to be constructed for the Infrastructure Improvements of the South Bay International Wastewater Treatment Plant under the provisions of these Contract Documents include, but are not limited to, the following:

a. Equalization Tanks: The contractor shall furnish and install all equipment, labor, appurtenances, specialty items and services for constructing the equalization tanks and effluent pump station with electrical and instrumentation and control.

b. Secondary Sedimentation Tanks (SSTs): The contractor shall furnish and install all equipment, labor, appurtenances, specialty items and services for constructing three (3) secondary sedimentation basins including electrical, instrumentation and control.

c. RAS Pump Replacement: The contractor shall furnish equipment and labor, appurtenances, specialty items and services for replacing the existing RAS pumps

Page 01.11.00-6 USIBWC Solicitation IBM15B0002 with six new submersible pumps including electrical and instrumentation and control.

d. Site Civil Work: The contractor shall furnish materials, equipment, labor and appurtenances, specialty items and services for site civil works including roadways, parking areas, grading, landscaping, yard piping, drainage structure and miscellaneous items.

The requirements listed above are a summary of the project requirements and are provided to assist the Contractor in an understanding of the Work and in preparing his bid; however, the complete project and the total project requirements are as defined in the Contract Documents.

1.6 SEQUENCE OF WORK/TIME FOR COMPLETION OF WORK

A. The work is to be performed as shown on the Contract Drawings.

B. After receipt of the Contract Notice to Proceed (NTP) the Contractor shall comply with all submittal requirements as covered under these specifications and obtain Government review of each submission.

1. No construction shall be started, with the exception of preparing the construction laydown and staging areas, until the Government reviews the required submittals and determines it satisfactory for purposes of beginning construction.

2. The…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .