Huttig Tower Requirement.pdf

PDF 247 KB Posted

Attached to
Huttig Tower Antenna and Cabinet Relocation
Solicitation number
RFQ15F06725Q0000121
Issued by

About this file

The document is a detailed requirements table for a tower site antenna and equipment relocation project for the Federal Bureau of Investigation (FBI). The table outlines 12 specific vendor requirements, including the ability to mobilize to the tower site, ascend and descend to approximately 1,250 feet, remove and relocate repeaters, cabinets, and antennas, hoist and install coaxial cables and new antenna equipment, weatherproof connections, run cables to the transmitter building, and perform industry-approved testing. Vendors must also clean up all debris and have their work verified by the government point of contact.

The project is located at the Huttig Tower site in Huttig, Arkansas, with coordinates 33:04:41.00N 92:13:31.00W, and is scheduled for completion between June and July 2025. The government will provide materials including Andrew AVA7-50 coax cables and Butterfly type connectors. Vendor requirements include providing current insurance and equipment operator licenses, being located within 150 miles of the work site, submitting detailed personnel and project completion information, and offering a proposal valid for 90 calendar days. The solicitation (RFQ15F06725Q0000121) is issued by the Department of Justice Federal Bureau of Investigation Headquarters Division.

View the file

Other files

File Type Posted
AMENDMENT 1 RFQ 15F06725Q0000121 Questions from PCI GlobalCom (002).docx DOCX document
20201014_115204.jpg JPG image
PXL_20240712_155736091.jpg JPG image
Hutting Tower Requirements.docx DOCX document
RFQ 15F06725Q0000121 Huttig Antenna and Line Replacement.pdf PDF
SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Number Description Questions

All vendors must be able to mobilize and de-mobilize to and from the tower site loca on.

All vendors must be able to ascend and descend as well as rig and un-rig the tower to approximately 1,250’feet with vendor provided supplied equipment.

All vendors must be able to remove and relocate and transport all repeaters, cabinets, and antenna, feedline, and fiber from approximately 1,200’feet and lower all to the ground.

All vendors must be able to lower the appropriate rigging to approximately 650’feet or as needed.

All vendors must be able to furnish all equipment to Assemble, hoist, and install of the 7/8” inch coaxial hangers and secure all the coax to the tower as well.

All vendors must be able to furnish all equipment needed to Assemble, hoist, and install all new antenna equipment to a height of 600’ feet and make all connections to the antenna as needed.

All vendors must be able to provide all equipment to hoist the 7/8” inch coaxial cable to the antenna with the use of a static line if needed.

All vendors must be able to use all appropriate equipment to set and install the hoisting rips needed. “e.g.” turnbuckles and other hardware as needed.

All vendors must be able to weatherproof all the connections, cable and install all the grounding straps as needed.

All vendors must be able to run the coax underneath any obstacles or obstructions into the transmitter building and make any needed connections to the transmitter.

All vendors must have the industry approved testing equipment needed to test the antenna system prior to all completion of work.

Testing must have the approval and verification of the government point of contact for the project and site point of contract.

All vendors must be able to clean up all debris created by the repairs and replacement of parts on the work site. All discarded materials from the work site shall be approved and verified by the government site point of contact as needed.

File details come from the government source that posted it. Updated .