Hult Center Seating Electrical and Mechanical Improvements Addendum 01.pdf
PDF 3 MB Posted
- Solicitation number
- S-KE0010-00016903
- Issued by
- Lane County, Oregon
About this file
This is an Addendum document for a State of Oregon capital improvement project at the Hult Center involving seating, electrical, and mechanical upgrades under Contract Opportunity COE 20262045. The base bid scope requires removal of existing seating platforms and lighting system upgrades throughout the facility. Alternate 1 expands the work to include installation of a cooling system in the existing spot booth, necessitating placement of a cooling unit within the booth and a corresponding rooftop unit, along with electrical infrastructure extension through Silva Hall above the ceiling, gypsum plenum opening between roof structures, patching work, core drilling, and membrane roof modifications as detailed in the project drawings. The bid submission deadline is June 4, 2026, with the contract opportunity having been posted on May 8, 2026. Qualified contractors must demonstrate the ability to perform mechanical, electrical, and structural work in accordance with the technical specifications outlined in the project documentation and construction drawings.
The specific award value or budget range for this project has not been disclosed in the available contract information. The contract opportunity documents do not explicitly specify set-aside designations, disadvantaged enterprise restrictions, or incumbent vendor information. Interested bidders should consult the complete project manual and request for proposal for additional details regarding minority-owned business enterprise participation requirements, bonding and insurance specifications, and evaluation criteria. Prospective bidders are advised to obtain the full scope documents and reach out to the contracting entity directly for clarification on timeline specifics and any pre-bid meeting or site visit opportunities that may be scheduled prior to the June 4, 2026 submission deadline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1 May 20, 2026
Project No. 51400
Addendum No. 1 page1
HULT CENTER SEATING, ELECTRICAL &
MECHANICAL IMPROVEMENTS
1 Eugene Center Eugene, Oregon
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated May 7,2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
GENERAL
1. The mandatory Pre-Bid Walkthrough occurred on May 13th at 9am. Attached is the sign-in sheet.
2. An additional site walkthrough will be provided for bidders on May 27th at 10am. Interested bidders are to meet on the south side of the Hult Center. This walk is optional and only bidders represented on the mandatory Pre-Bid Walkthrough sign-in sheet, dated May 13th, are permitted to bid.
3. Bids will be opened virtually on Microsoft Teams. The meeting ID is 237 752 194 650 954 with
Passcode: TZ7X5jh7
4. Base Bid with Alternate construction cost projection: $85,000.
5. Questions:
A. Where is the ADA aisle lighting fed from? Panel ELE1 located in the main electrical room.
B. Will the seats be given back to the owner? Yes. The seats will be salvaged to the owner C. Will replacement lamps be frosted? Lighting integrated into seats are a small “A” lamp with candelabra base.
D. What is color temperature for the LED tape light? Assume 3000K. Owner will confirm in the submittal.
PROJECT MANUAL
6. SECTION 001100 – SUMMARY OF WORK
A. Replace Section with new Section attached. Change summary: Alternate 1 Spot Booth Cooling added Plenum Work including
a) Work Scheduling Requirements.
b) Demolition inspection and patch/repair work added to scope.
SHEETS
7. SHEET A-002 – CODE AND GENERAL
A. DRAWING 2 - Clarification: There is a hoist area from the Upper Orchestra Level to an access hatch on the west side of the Spot Booth. Path could be utilized for material loading/unloading.
AD_01 May 20, 2026 Page 1 of 13
Addendum No. 1 May 20, 2026
Project No. 51400
Addendum No. 1 page 2
8. SHEET A-003 – SITE PLAN
A. Clarification: Use of “Storage Area” noted at north end of Silva Hall only permitted August 5, 2026 – August 23, 2026. For other dates, alternative storage area(s) will be made available.
9. SHEET A-101 – PLATFORM PLAN
A. Replace sheet with attached revised sheet. Change summary: electrical work added to Demo Plan and Area of Work Photo.
10. SHEETS E-301 – ELECTRICAL PLAN – CATWALK LEVEL & E-302 ELECTRICAL ROOF PLAN
A. Replace sheets with revised sheets attached. Change summary: deleted work associated with pulling new electrical conductors from MER-3 to Spot Booth. Added work interlocking existing exhaust fan conductor with new AC Unit.
11. SHEETS E-303 – CONDUIT ROUTING & E-304 – CONDUIT ROUTING
A. Replace sheets with revised sheets attached. Change summary: delete work shown on sheets.
12. SHEET E-401 – ELECTRICAL ONE LINE DIAGRAM
A. Replace sheets with revised sheets attached. Change summary: deleted One Line Diagram and Panel Schedule LE-1.
END OF ADDENDUM NO. 1
AD_01 May 20, 2026 Page 2 of 13
AD_01 May 20, 2026 Page 3 of 13
Hult Center Seating, Mechanical & Electrical Improvements 01 11 00 - 1 SUMMARY OF WORK
SECTION 01 11 00
SUMMARY OF WORK
PART 1 - GENERAL
1.01 WORK COVERED BY CONTRACT DOCUMENTS
A. Remove seating platform.
B. Lighting upgrades.
C. Alternate 1: Add cooling to Spot Booth, extending new circuit, core drill, and roof modificaitons.
1.02 RELATED SECTIONS
A. Base Bid & Alternate Bids: Section 01 23 00.
1.03 CONTRACT
A. If Work described herein is awarded, successful Bidder and Owner shall execute AIA
Document A101 “Owner-Contractor Agreement, Stipulated Sum” B. See Section 00 52 13 for Contract example.
1.04 WORK BY OTHERS UNDER SEPARATE CONTRACT
A. Potential Work: concurrently with Work of this Contract:
1.05 WORK PERFORMED BY OWNER
A. Products furnished and installed by Contractor:
1. Carpet
1.06 WORK SCHEDULING REQUIREMENTS / TIME OF COMPLETION
A. Removal of Seating Platforms: Work to occur between August 5, 2026 -August 23, 2026.
1. Achieve Final Completion by August 23, 2026
B. Handrail Lighting Upgrades: Achieve Substantial Completion by August 31, 2026
1. Work not permited on:
a. July 1, 2026 - July 12, 2026
b. July 20, 2026 - July 21, 2026
c. July 24, 2026
d. August 1, 2026
e. August 4, 2026
f. August 17, 2026 - August 22, 2026
C. Alternate 1 Spot Booth Cooling: Achive Substantial Completion by August 31, 2026
1. Work no permited on:
a. July 1, 2026 - July 2, 2026
b. July 4, 2026
c. July 6, 2026 - July 12, 2026
d. July 24, 2026
e. August 4, 2026
2. Plenum Work
a. Minimize shutdown of HVAC System: Coordinate work so that shutdowns do not impact events.
b. Shut down to occur between August 5, 2026 - August 23, 2026, unless otherwised approved by Owner.
c. Prior to scheduling work, conduct limited demolition inspection to verify scope and roof penetration location. Temporarily patch and repair as required.
1.07 WORK SEQUENCE
A. Execute Certificate of Substantial Completion for each specific portion of Work prior to Owner’s occupancy of those portions.
AD_01 May 20, 2026 Page 4 of 13
AD_01
Electrical Improvements 01 11 00 - 2 SUMMARY OF WORK
B. After Owner’s occupancy, Contractor shall allow:
1. Access for Owner and Personnel.
2. Access for Public.
3. Utility Systems operation.
1.08 OWNER’S USE OF PREMISES
A. Owner will occupy Premises during construction period for the conduct of normal operations.
1. Events include, but are not limited to:
a. Ticket Sales: Tuesday - Friday between the hours of 12pm and 5pm.
b. Day Camp utilizing entire facility with exception of Silva Hall will occur August 17 -
August 22.
B. Cooperate with Owner during construction operations to minimize conflicts and to facilitate
Owner’s use of facilities.
C. Schedule Work to maintain Owner’s continuous operations. Include in Contract Sum sufficient funds as may be required for any “overtime” work caused by this requirement. No additional payment to Contractor will be authorized because of Contractor’s failure to anticipate required “overtime” work.
1.09 CONTRACTOR’S USE OF PREMISES
A. Contractor shall limit use of the Premises for work and storage to allow for:
1. Work by other Contractors
2. Owner’s occupancy
3. Public use
4. Coordinate use of Premises as directed by Owner.
B. If and when necessary and if and when directed, move any stored Products, which are under Contractor’s control, and which interfere with operations of Owner.
C. Obtain and pay for any necessary additional Storage or Work Areas.
1. Contractor shall conduct operations as to insure the least reasonable inconvenience to the
General Public.
1.10 EXCESSIVE NOISE
A. Contractor to coordinate with Owner 24 hours prior to making excessive noise such as that caused by Jack Hammers, Air Compressors, Electricity Generators, Rivet Guns, and other similar Devices.
B. Core drilling of concrete slab to occur on Monday's unless otherwise approved by Owner.
1.11 OVERTIME WORK
A. To permit arrangements for inspections, the Contractor shall notify the Owner at least 48 hours in advance of any overtime work, including nights, weekends, and holidays. Do no overtime without notifying Owner.
B. The Contractor shall reimburse the Architect, Engineer, and Owner for any expense incurred by them because of Contractor’s overtime work.
1.12 WORK IN PUBLIC RIGHT-OF-WAY
1.13 PRODUCTS FURNISHED BY OWNER & INSTALLED BY CONTRACTOR
A. Owner’s Responsibilities:
1. Arrange for and deliver necessary Shop Drawings, Product Data, and Samples to
Contractor.
2. Inspect Product deliveries jointly with Contractor.
3. Submit claims for transportation damage.
4. Arrange for replacement of damaged, defective, missing, or otherwise unacceptable
Items.
5. Arrange for required Manufacturer’s inspections, service, bonds, and warranties.
AD_01 May 20, 2026 Page 5 of 13
Electrical Improvements 01 11 00 - 3 SUMMARY OF WORK
B. Contractor’s responsibilities:
1. Designate in Construction Schedule delivery date for each Product.
2. Review Shop Drawings, Product Data, and Samples. Notify Owner about any discrepancies or problems anticipated in Product installation or use.
3. Receive Product and unload at Project Site.
4. Promptly inspect Product jointly with Owner. Record any damage, shortage, or defect.
5. Protect Products against damage and discoloration.
6. Assemble, install, connect, adjust, and finish Products as stipulated in respective
Specification Sections.
7. Clean, repair and touch-up, or replace when directed, Products which have been soiled, discolored, or damaged by Contractor.
1.14 SURVEYING EXISTING CONDITIONS (REMODELING PROJECTS)
A. Prior to commencement of Work, Contractor, and Owner, shall jointly survey existing conditions, noting and recording any existing damage. Before Work begins, Owner and Contractor shall both sign Record.
B. Record will serve as a basis for determining any subsequent damage to existing facilities caused by Contract Work.
1.15 EXISTING CONDITIONS UNACCEPTABLE TO CONTRACTOR, IF ANY
A. Exposed to View:
1. Repair or, where necessary, replace at no additional cost to Owner.
B. Concealed:
1. Repair or, where necessary, replace.
C. Upon notification from Contractor, and if Owner concurs, Owner will issue a Change Order authorizing Contractor to perform this Work, and Contract Sum will be adjusted accordingly.
1.16 PROTECTING EXISTING UTILITIES
A. Drawings indicate approximate location of any known, concealed Utility Lines. Before starting work, Contractor shall determine exact location of any of these Lines that could be damaged by Contract Work.
B. Contractor shall assume that other unknown Utility Lines do exist, and Contractor shall proceed with caution when working in areas that could conceal unknown Utilities. If such Utility Lines are encountered, immediately request disposition instructions from Architect.
C. If Utility Lines are damaged, remove, repair, or replace Lines as directed. Additional compensation and/or extensions of time, if any, caused by removing, repairing, or replacing Lines will be determined in accordance with General Conditions.
1.17 USE OF OWNER’S PROPERTY & EQUIPMENT
A. Do not use Owner’s Property, Facilities, or Equipment such as Tools, Ladders, Furniture, Janitorial Equipment, Supplies, etc.
1.18 CORRECTION PERIOD FOR NON-COMPLYING WORK
A. Contractor’s response to notice of Work to be Corrected shall be accomplished during the following time periods:
1. Emergency Work:
a. Failures or deficiencies constituting immediate danger or health hazard to People or likely damage to Property.
b. Response Time: 24 hours per day 7 days per week
2. Urgent Work:
a. Failures or deficiencies which do not immediately endanger Persons or Property, but would soon do so if not corrected.
b. Response Time: Between 7 AM & 4 PM on Mondays thru Fridays and within 3 calendar days following receipt of Notice.
AD_01 May 20, 2026 Page 6 of 13
Electrical Improvements 01 11 00 - 4 SUMMARY OF WORK
3. Routine Work:
a. Failures or deficiencies of less importance that do not meet criteria of Emergency or
Urgent Work.
b. Response Time: Between 7 AM & 4 PM on Mondays thru Fridays and within 5 calendar days following receipt of Notice.
1.19 PERMITS AND INSPECTIONS
A. Owner will submit plans for permit application and pay cost of City required building permit, plan review and systems development charges.
B. Contractor shall pick up City permits, arrange for and attend required inspections and tests per 01 45 23 and as required by regulatory agencies.
1.20 TESTING AND INSPECTION
A. Comply with testing requirements as specified and required by authority having jurisdiction.
B. Notify Owner’s Testing Agency at least 24 hours prior to commencement of work requiring testing or special inspection.
C. Cost of sampling and testing to be paid by Owner to extend noted in each Specification Section and required by IBC. Results of tests will be binding on the Contractor. Retesting for unsatisfactory work to be paid by the Contractor.
1.21 USE OF RESTROOMS AND PARKING FACILITIES
A. Contractor allowed the use of the existing restroom facilities. Contractor required to keep restroom facilities neat and orderly.
B. Two on-site parking spots will be designated for use by the Contractor during execution of the
Work. Parking is allowed within the limits of the indicated layout area, only, unless specifically approved otherwise by the Owner’s Representative in writing. No personal vehicles or construction vehicles not in use at this project are allowed overnight in the parking lot/staging area. Other parking is to be coordinated at the expense of the Contractor, off-site.
PART 2 - NOT USED
PART 3 - NOT USED
END OF SECTION
AD_01 May 20, 2026 Page 7 of 13
DEMO
(E) SEATS
DEMO (E)
PLATFORM
REMOVE ALL (E) PARTIAL
CARPET TILES, REPLACE
WITH FULL SIZED TILES (BOTH SIDES)
NEW FLOOR PLAN
DEMO
(E) SEATS
NO FIXED SEATING IN THIS AREA
PATCH CARPET WITH
(E) MATCHING STOCK FROM
HULT STORAGE (BOTH SIDES)
1/16"=1'-0"
DEMO PLAN
1/16"=1'-0"
NEW PLATFORM DETAIL
1/2"=1'-0"
(E) WOOD FRAME
STEPPED PLATFORM
REMOVE (E) SEATS -
DISMANTLE AND RELOCATE
PARTS TO ON SITE STORAGE
REMOVE UPPER PLATFORM,
PATCH CONCRETE AND PLYWOOD
AS NEEDED PER SPECIFICATION
PATCH IN OFCI
CARPET TILE
PLATFORM DEMO DETAIL
1/2"=1'-0"
(E) SLOPED STRUCTURAL
CONCRETE
B
A
A
B
ADD BLACK VINYL RUBBER
STAIR NOSING AT EDGE
TO LOBBY
DEMO
(E) PLATFORM
STAGING AREA
AREA OF WORK
DR
W
N:
DA
TE
GJ
N:
CH
KD
RE
V:
BL
DG
N O.
CI
TY
O F
EU
G
EN
E
FA
CI
LI
TY
M
AN
AG
EM
EN
T
CH
ES
HI
RE
A
VE
NU
E
EU
GE
NE
, O
RE
GO
N
PL
AT
FO
RM
P
LA
N
HU
LT
C
EN
TE
R
SE
AT
IN
G, E
LE
CT
RI
CA
L
EU
GE
NE
C
EN
TE
R, E
UG
EN
E, O
RE
GO
N
A-101
M
EC
HA
NI
CA
L
IM
PR
OV
EM
EN
TS
5/ 7/
KC
L
JR
ADDENDUM 1:
REMOVE (E) STEP LIGHTING.
PULL WIRES TO NEAREST
JUNCTION BOX OR ADD
INFLOOR BOX WITH FLUSH
COVER AS NEEDED. TYPICAL AT
EACH END OF PLATFORM BOTH
SIDES OF THEATER.
1 1
STEP
LIGHTING
5/
/2
AD_01 May 20, 2026 Page 8 of 13
D R W
N
D A T E
G
JN
C H
K D
R E V
B L D
G N
O
C I T
Y O
F E
U G
E N
E
F A
C I L I T
Y M
A N
A G
E M
E N
T
C
H E S H
IR
E A
V E N
U E
E U
G E N
E O
R E G
O N
/7
/2
C h e ck e r
E
U G
E N
E C
E N
T E R E U
G E N
E O
R
H U
L T C
E N
T E R S
E A T
IN
G E L E C T R
IC
A L
M E C H
A N
IC
A L I
M P R
O V E M
E N
T S
E
LE
C T
R
IC
A L
P
LA
N
C A
T W
A
LK
L E
V E
L
PARADIGM ENGINEERING
85193 APPLETREE DRIVE
EUGENE, OR 97405
541-285 1680
Jkrumsick@outlook.com
EXP: 6-30-2027
E-301
ALTERNATE 1
JJ
J
J
(E)
PLAN NOTES
1, INSTALL NEW 25/2 CIRCUIT BREAKER IN EXISTNG PANEL
L-E1. USE TO FEED NEW ROOF TOP AIR CONDITIONING UNIT
2. RUN 1'C, 2# , #10 G EXPOSED THROUGH MECHANICAL ROOM
MER-3.
3. CORE DRILL WALL TO STAIRWAY AND CONNECT BRANCH
CIRCUIT CONDUIT TO PULL BOX HIGH ON WALL.
4, RUN CONDUIT EXPOSED IN STAIRWELL. TRANSITION TO
CAT WALK ACCESS AND CORE DRILL TO TRANSITION CONDUIT
TO CATWALK LEVEL.
5. CONNECT BRANCH CIRCUIT CONDUIT TO EXISTING EMPTY
JUNCTION BOX.
6, PULL BRANCH CIRCUIT WIRING THROUGH EXISTING EMPTY
CONDUIT MOUNTED ABOVE CATWALK RAILING.
7. INTERCEPT CONDUIT AND INSTALL NEW PULL BOX. RUN
NEW BRANCH CIRCUIT CONDUIT FROM THIS PULL BOX
THROUGH STAIRWELL WALL AND THROUGH STAIRWELL
TO NEW PULL BOX AT CATWALK ENTRY DOOR. FOLLOW
ROUTE OF EXISTING FIRE ALARM SYSTEM CONDUIT.
8. CORE DRILL STAIRWELL WALL AT CATWALK ACCESS
DOOR LOCATION AND RUN CONDUIT ABOVE EXISTING
CATWALK LIGHTING CONDUIT TO FOLLOW SPOT BOOTH.
9. PROVIDE ADDITIONAL BRANCH CIRCUIT PULL BOXES AS
REQUIRED.
10. PROVIDE JUNCTION BOX ADJACENT TO 4" SLEEVE PENETRATION
TO ROOF. SEE MECHANICAL DRAWINGS FOR DETAIL. RUN 1"
CONDUIT FROM THIS JUNCTION BOX THROUGH SLEEVE TO
ROOFTOP MECHANICAL UNIT AND SERVICE RECEPTACLE.
11. PROVIDE DISCONNECT SWITCH FOR NEW ROOFTOP MECHANICAL
UNIT AND CONNECT AS REQUIRED. INSTALL SERVICE RECEPTACLE
WITH WEATHERPROOF COVER ADJACENT TO DISCONNECT SWITCH
FEED SERVICE RECEPTACLE FROM EXISTING PANEL LST4 LOCATED
IN FOLLOW SPOT BOOTH. SEE DETAILS DRAWING E201.
12. USE SPARE 20/1 CIRCUIT BREAKER IN PANEL LST4 TO FEED NEW
SERVICE RECEPTACLE AT MECHANICAL UNIT. RUN 1/2" CONDUIT,
2#12, #12 GROUND FROM PANEL TO JUNCTION BOX REFERENCED
BY NOTE 10. CONTINUE CIRCUIT TO SERVICE RECEPTACLE IN
1" CONDUIT WITH MECHANICAL UNIT BRANCH CIRCUIT CONDUCTQORS
FOLLOW
SPOT BOOTH
ELECTRICAL SYSTEM PLAN VIEW
J
J
E304
E304
E304
5 4
3 2 E303E303
E303
E303
ABOVE DUCTWORK
James Krumsick
ADDENDUM 1:
DELETE NOTES 1-9.
MODIFY NOTES 10-12
AS INDICATED. DELETE
WORK REFERENCED BY
NOTES 1-9.
A
D D
E N
D U
M
/2
0/
AC UNIT / EF-6 SCHEMATIC
NOTE: NEW AC UNIT WILL BE INTERLOCKED
WITH EXISTING SPOT BOOTH EXHAUST FAN`
EXISTING
EXHAUST
FAN
NEW A/C
UNIT
NEW FUSED
SWITCH WITH
25A FUSES
GROUND
TRANSFORMER
TO BUILDING
STEEL
7,5 KVA
TRANSFOMRER
480:120/240V
TAP EXISTING MOTOR
CIRCUIT AND EXTEND
TAP TO NEW
TRANSFORMER
REROUTE MOTOR
LEADS THROUGH
NEW STARTER.
EXISTING MOTOR
STARTER AND CIRCUIT
BREAKER AT MCC-MER3
BYPASS STARTER FOR
PHASE CONDUCTORS
SERVING AC UNIT
NEMA SIZE 00
480 VOLT STARTER
IN FOLLOW SPOT
BOOTH
REUSE SWITCHED
CONDUCTOR FOR
CONTROL OF NEW
MOTOR STARTER
MATERIAL USED AS BASIS
FOR DESIGN:
TRANSFORMER:
SIEMENS 1F1R007
STARTER:
SIEMENS 14BUC82B
FUSIBLE SWITCH
SIEMENS GHN321NW
AD_01 May 20, 2026 Page 9 of 13
SCALE: 1/2" = 1'-0"
PIPING ROOF PENETRATION / OUTDOOR UNIT MOUNTING
ELECTRICAL CONDUIT, INSULATED
REFRIGERANT LINES, AND
POWER/CONTROL CABLE. ROUTE
TO OUTDOOR UNIT POINT OF
CONNECTION..
STAINLESS STEEL RAIN SHROUD,
BEAM PENETRATION
ZONE
3-1/2" NOMINAL ALUMINUM CARRIER PIPE ROUTED THROUGH 4"
BEAM AND ROOF PENETRATION.
ROOF MEMBRANE OVER INSULATION, DECK, AND
CONCRETE TEE BEAMS.
STAINLESS STEEL CURB CAP OVER
INSULATED EQUIPMENT MOUNTING
CURB, WELDED CORNERS.
18" MIN. 10" MIN.
14" MAX
CROSS SECTION OF PIPING/CONDUIT BUNDLE TO BE ROUTED
INSIDE OF CARRIER PIPE.
MINI-SPLIT OUTDOOR UNIT.
EXISTING EXH. FAN
AC-1
CD, REFG. AND
ELECTRICAL THROUGH 4"
DIA. PENETRATION
SCALE: 1/8" = 1'-0"
ROOF PARTIAL PLAN
N
WC-1
FOLLOW SPOT
BOOTH
18/18
A B
O V
E
A
B O
V E
1-1/4" ELECTRICAL
CONDUIT. SEE ELECTRICAL
PLANS FOR ROUTING.
APPROX. LOCATION OF
EXHAUST DUCT ABOVE AND
RUNNING IN BEAM CAVITY.
RL, RG, ELEC, CD, AND
POWER/CONTROL CABLE TO BE
BUNDLED AND ROUTED ON TOP
OF THE BOOTH THROUGH THE
ROOF IN 4" O.D. CARRIER DUCT
SCALE: 1/8" = 1'-0"
FOLLOW SPOT BOOTH LEVEL PARTIAL PLAN
ELECTRICAL JUNCTION
BOX WITH SERVICE RECEPTACLE
WITH WEATHERPROOF COVER
MOUNT ON TOP OF
CURB.
E-302
E
LE
C T
R
IC
A L
R O
O F
P
LA
W
N
D A T E
G
JN
C H
K D
R E V
B L D
G N
O
C I T
Y O
F E
U G
E N
E
F A
C I L I T
Y M
A N
A G
E M
E N
T
C
H E S H
IR
E A
V E N
U E
E U
G E N
E O
R E G
/7
E
U G
E N
E C
E N
T E R E U
G E N
E O
R
H U
L T C
E N
T E R S
E A T
IN
G E L E C T R
IC
A L
M E C H
A N
IC
A L I
M P R
O V E M
E N
T S
ALTERNATE 1
208 VOLTS, 1 PHASE
23 MCA, 25 MOCP.
PARADIGM ENGINEERING
85193 APPLETREE DRIVE
EUGENE, OR 97405
541-285 1680
Jkrumsick@outlook.com
EXP: 6-30-2027
James Krumsick
EXISTING 460 V 3 PHASE EXHAUST FAN.
TAP TWO PHASE CONDUCTORS AND FEED
NEW 7.5 kVA NEMA 3R TRANSFORMER.
REROUTE MOTOR CONDUCTORS THROUGH
NEW STARTER IN FOLLOW SPOT BOOTH
3/4" C, 2#10, #10G
RUN ON ROOF
ELECTRICAL JUNCTION
BOX WITH SERVICE RECEPTACLE
WITH WEATHERPROOF COVER
FED FROM FOLLOW SPOT BOOTH
PANEL LST4.
460:230 VOLT SINGLE
PHASE TRANSFORMER
WITH 30/2 FUSIBLE
SWITCH AT SECONDARY
A
D D
E N
D U
M
/2
0/
3/4" C, 6#10, #10G
RUN ON ROOF
J
PROVIDE NEW SIZE 0, 480 VOLT STARTER FOR
EXISTING 460 V 3 PHASE EXHAUST FAN.
MOUNT NEW STARTER IN FOLLOW SPOT BOOTH
AND REROUTE FAN MOTOR LEADS THROUGH
STARTER USING 4" CARRIER DUCT
AD_01 May 20, 2026 Page 10 of 13
W
N
D A T E
G
JN
C H
K D
R E V
B L D
G N
O
C I T
Y O
F E
U G
E N
E
F A
C I L I T
Y M
A N
A G
E M
E N
T
C
H E S H
IR
E A
V E N
U E
E U
G E N
E O
R E G
E-303
C O
N D
U
IT
R O
U T
IN
G
A L T
/7
/2
C h e ck e r
E
U G
E N
E C
E N
T E R
E U
G E N
E O
R
H U
L T C
E N
T E R S
E A T
IN
G E L E C T R
IC
A L
M E C H
A N
IC
A L I
M P R
O V E M
E N
T S
2 - FROM MER 3 UP ONE FLIGHT OF STAIRS
3 - FROM STAIRS TO STAGE CROSSING 4 - FROM STAIRS TO STAGE CROSSING CONTINUED
*PHOTOS ARE
SHOWN IN
SEQUENTIAL
ORDER FROM
MER3 TO
CATWALK TO
SPOT BOOTH*
UTILIZE THIS
CONDUIT TO
CROSS THE STAGE
CORE FOR 1" CONDUIT
THRU WALL AND
FIRESTOP, EXTACT
LOCATION TO BE
DETERMINED IN FIELD,
SEE PHOTO 7
CORE FOR 1"
CONDUIT THRU WALL
AND FIRESTOP
ALTERNATE 1
14" THICK CONCRETE WALL
12" THICK CONCRETE WALL
STAIR FROM MER 3
ON OPPOSITE SIDE
OF THIS WALL
CUT OUT SECTION OF MESH
FOR CONDUIT PENETRATION
TIE INTO EXISTING CONDUIT
CROSSING STAGE
EXISTING CONDUIT CROSSING
STAGE
MER 3 ON OPPOSITE SIDE
OF THIS WALL
1 - MER 3 TO STAIRS
CONDUIT PENETRATION FROM
STAIRWELL INTO MER 3 NEXT TO
DUCT OR ABOVE DUCT,
COORDIANTE IN FIELD
PARADIGM ENGINEERING
85193 APPLETREE DRIVE
EUGENE, OR 97405
541-285 1680
Jkrumsick@outlook.com
EXP: 6-30-2027
James Krumsick
ADDENDUM 1:
DELETE WORK SHOWN
ON THIS DRAWING
A
D D
E N
D U
M
/2
0/
AD_01 May 20, 2026 Page 11 of 13
W
N
D A T E
G
JN
C H
K D
R E V
B L D
G N
O
C I T
Y O
F E
U G
E N
E
F A
C I L I T
Y M
A N
A G
E M
E N
T
C
H E S H
IR
E A
V E N
U E
E U
G E N
E O
R E G
E-304
C O
N D
U
IT
R O
U T
IN
G
A L T
/7
/2
C h e ck e r
E
U G
E N
E C
E N
T E R
E U
G E N
E O
R
H U
L T C
E N
T E R S
E A T
IN
G E L E C T R
IC
A L
M E C H
A N
IC
A L I
M P R
O V E M
E N
T S
6 - STAIRS TO SPOT BOOTH
7 - STAIRS TO SPOT BOOTH
STAGE CROSSOVER ON
OPPOSITE SIDE OF THIS
WALL
ALTERNATE 1
CORE AS NOTED IN
PHOTO 4
FOLLOW EXISTING
CONDUIT PATH
CORE FOR 1" CONDUIT THRU
WALL AND FIRESTOP (12" THICK
CONCRETE WALL)
CATWALK TO SPOT
BOOTH ON
OPPOSITE SIDE OF
THIS WALL
5 - OPPOSITE SIDE OF STAGE TO STAIRS TO SPOT BOOTH
MODIFY EXISTING CONDUIT AND
CONTINUE NEW PATHWAY
CORE FOR 1" CONDUIT THRU
WALL AND FIRESTOP (12" THICK
CONCRETE WALL)
STAIR TO
SPOT BOOTH
*PHOTOS ARE
SHOWN IN
SEQUENTIAL
ORDER FROM
MER3 TO
CATWALK TO
SPOT BOOTH*
PARADIGM ENGINEERING
85193 APPLETREE DRIVE
EUGENE, OR 97405
541-285 1680
Jkrumsick@outlook.com
EXP: 6-30-2027
James Krumsick
ADDENDUM 1:
DELETE WORK SHOWN ON
THIS
DRAWING
A
D D
E N
D U
M
/2
0/
AD_01 May 20, 2026 Page 12 of 13
1000A
EXISTING
DISTRIBUTION
PANEL "DL3"
1000 AMP BUS
120 / 208V, 3Ø, 4W
(11) EXISTING FUSED SWITCHES
ONE LINE DIAGRAM SWITCHBOARD DL3 - TRANSFORMER T3 208 VOLT SYSTEM
TRANSFORMER
T3 -300 KVA
208Y/120 VOLT
SECONDARY
200A 200A 200A 40A 100A 70A 60A 100A 125A 50A 150A
200/3 200/3 200/3 60/3 100/3 100/3 100/3 100/3 200/3 100/3 200/3
SORENG
COMPANY
SWITCH
SILVA
COMPANY
SWITCH
SILVA
COMPANY
SWITCH
SILVA
ASSISTED
LISTENING
SORENG
WORK LIGHT
SYSTEM
SORENG
CONTROL ROOM
NON-DIM
SILVA FOLLOW
SPOT BOOTH
PANEL LST4
SILVA
WORK LIGHT
SYSTEM
SILVA
STAGE
NON-DIM
SORENG
PANEL LST12
MER 3
PANEL L-E1
E
LE
C T
R
IC
A L
O N
E L
IN
E
D
IA
G R
A M
1 2
PLAN NOTES
1. INSTALL 25/2 CIRCUIT BREAKER IN EXISTING PLANEL SPACE. USE TO FEED NEW AC/UNIT.
2. USE SPARE 20/1 BREKAER TO FEED NEW SERVICE RECEPTACLE
D R W
N
D A T E
G
JN
C H
K D
R E V
B L D
G N
O
C I T
Y O
F E
U G
E N
E
F A
C I L I T
Y M
A N
A G
E M
E N
T
C
H E S H
IR
E A
V E N
U E
E U
G E N
E O
R E G
/7
/2
C h e ck e r
E
U G
E N
E C
E N
T E R E U
G E N
E O
R
H U
L T C
E N
T E R S
E A T
IN
G E L E C T R
IC
A L
M E C H
A N
IC
A L I
M P R
O V E M
E N
T S
PARADIGM ENGINEERING
85193 APPLETREE DRIVE
EUGENE, OR 97405
541-285 1680
Jkrumsick@outlook.com
EXP: 6-30-2027
E-101
E
LE
C
T R
IC
A
L P
LA
N
V
IE
W
O R
C H
E S
T R
A
LO
B
B Y
L E
V E
L
E-401
E
LE
C T
R
IC
A L
O N
E L
IN
E
D
IA
G R
A M
James Krumsick
ADDENDUM 1:
DELETE WORK SHOWN ON
ONE LINE DIAGRAM AND
PANEL LE-1.
A
D D
E N
D U
M
/2
0/
AD_01 May 20, 2026 Page 13 of 13
| Hult Pre-Bid Sign-in Sheet |
| 01 11 00-USER-SUMMARY OF WORK-05-20-2026 |
| 011100 USER - SUMMARY OF WORK |
| A-101-PLATFORM_PLAN_AD 01 |
| Permit Drawings - Electrical_Addendum 1 |
| 01 11 00-USER-SUMMARY OF WORK-05-20-2026 |
| 011100 USER - SUMMARY OF WORK |
File details come from the government source that posted it. Updated .